This is a Stormwater Pollution Prevention Plan (SWPPP) and Erosion Control Plan document prepared by the City of Goodyear Engineering Department for the Camelback Road Improvement Project (Project No. 42038), located in Maricopa County, Arizona. The project involves roadway improvements and widening of Camelback Road from State Route 303L to the eastern City Limits, including grading, drainage improvements, pavement, traffic signals, street lighting, landscaping, and irrigation work. The erosion and sediment control measures specified in this plan include stabilized construction entrances/exits (334 square yards), grate/curb inlet protection devices (16 each), and sediment wattles measuring 10,112 linear feet. All temporary and permanent erosion control measures must be installed and maintained in compliance with federal, state, and local stormwater regulations, with the site requiring visual inspections at minimum once every seven calendar days or within 24 hours of rainfall events exceeding one-half inch as recorded by the Maricopa County Flood Control District.
The plan identifies the site location as portions of Sections 12, 13, 17, 18, 19, 20, and 24 in Township 2 North, Range 1 and 2 West, with a benchmark elevation of 1,056.34 feet (NAVD88) at the intersection of Camelback Road and Alsup Avenue. Impervious surface coverage is projected to increase from 54 percent before construction to 62 percent after construction. Permanent stabilization measures include decomposed granite placement in medians, vertical curbs, and seeding of all unpaved disturbed areas to achieve 70 percent native vegetation density. The contractor bears full responsibility for SWPPP compliance, maintenance of all control measures, record-keeping documentation, amendments as necessary during construction, and obtaining City of Goodyear construction stormwater and grading/drainage permits prior to land disturbance activities. Final site stabilization and Notice of Termination submission to the Arizona Department of Environmental Quality (ADEQ) are required upon construction completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1-800-STAKE-IT
BEFORE YOU DIG
602-263-1100
(OUTSIDE MARICOPA COUNTY)
CALL TWO WORKING DAYS
SHEET NUMBER
OF
C A
M E
L B
A C
K
R
O A
D
I M
P R
O V
E M
E N
T S
PROJECT NO: 42038 - SWPPP
PROJECT NUMBER
LATEST REVISION DATE
ORIGINAL PLAN DATE
SEALED
P R
O J E
C T
Y P
E
P R
O J E
N
A M
E
C I P
P
R O
J E
U M
B E
R
C A
M E
L B
A C
K
R
O A
D
S
R
L
T
O
C
I T
Y
L
I M
I T
S
D R
A W
I N
G
S C
A L
E S
OWNER
CITY OF GOODYEAR
STEPHEN SCINTO, P.E. (CITY ENGINEER)
14455 W VAN BUREN ST
GOODYEAR, ARIZONA 85338
PHONE: (623) 932-3004
FAX: (623) 932-3003
MAYOR VICE MAYOR
COUNCIL MEMBERS
CITY MANAGER
CAMELBACK RD (SR 303L TO CITY LIMITS)
BENCHMARKSURVEYOR
CITY OF GOODYEAR
WALLY CAMPBELL
BRANNON HAMPTON
JOE PIZZILLO
WYNETTE REED
R E
V I S
E D
VICKI GILLIS
LAURA KAINO
CITY ENGINEER
STEPHEN SCINTO, P.E., CFM
NOT APPLICABLE
ZONING
BENITA BECKLES
PROJECT NARRATIVE
A PORTION OF THE SOUTH HALF OF SECTION 13, AND NORTH
HALF OF SECTION 24,TOWNSHIP 2 NORTH, RANGE 2 WEST AND
NORTH HALF OF SECTIONS 19,20 AND SOUTH HALF OF SECTIONS
17,18, TOWNSHIP 2 NORTH, RANGE 1 WEST OF THE GILA AND
SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY, ARIZONA.
BENCHMARK NO. G371
3-INCH BRASS CAP AT INTERSECTION OF
CAMELBACK ROAD AND ALSUP AVE
(NAVD88) ELEVATION = 1056.34
C O
N
CON-22-6297
CAMELBACK ROAD PROJECT INCLUDES
ROADWAY IMPROVEMENTS AND WIDENING FROM SR 303L TO THE CITY LIMIT
(EAST OF 146TH AVE).
THE SWPPP CONSISTS OF UTILIZING WATTLES, SEEDING, GRANITE, GRATE
INLET PROTECTION, AND STABILIZED CONSTRUCTION ENTRANCES/EXITS.THIS
PACKAGE CONTAINS ONLY THE EROSION CONTROL PLANS.
OFFSITE FLOWS ARE PREVENTED ON THE NORTH AND SOUTH SIDE (EAST OF
ALSUP) BY EXISTING EARTHEN DRAINAGE CHANNEL. OFFSITE FLOWS SOUTH OF
ALSUP ARE CONTAINED BY DRAINAGE BASINS WITHIN EXISTING DEVELOPMENT.
CAMELBACK WASH RUNS ALONG THE NORTH SIDE OF THE PROJECT ON THE
WEST END. DURING CONSTRUCTION IT WILL BE PROTECTED BY WATTLES AS
PERIMETER CONTROL. FINAL PROTECTIONS WILL INCLUDE A VERTICAL CURB
ALONG THE ROADWAY WITH SEED IN ALL UNPAVED DISTURBED AREAS.
PRE AND DURING CONSTRUCTION TEMPORARY EROSION AND SEDIMENT
CONTROL MEASURES WILL CONSIST OF WATTLE, GRATE INLET PROTECTION,
AND STABILIZED CONSTRUCTION ENTRANCES/EXITS.
POST CONSTRUCTION, PERMANENT STABILIZATION, WILL CONSIST OF GRANITE
MULCH IN THE MEDIANS AND SEEDING WITHIN ALL UNPAVED DISTURBANCE
AREAS ALONG EACH SHOULDER AS IDENTIFIED IN THE LANDSCAPE PLANS.
PERMANENT STABILIZATION WILL INCLUDE ROCK PROTECTION AT HEADWALLS.
CONSTRUCTION ENTRANCE/EXIT LOCATION WILL BE DETERMINED BY THE
CONTRACTOR WITHIN THEIR SUBMITTAL FOR NOI.
WOOD, PATEL & ASSOCIATES, INC
GABRIEL S. RIOS
2051 WEST NORTHERN AVE, SUITE 100
PHOENIX, AZ 85021
(602) 335-8500
SURVEYOR@WOODPATEL.COM
N
VICINITY MAP
C O
T T
O
L
N
E
PROJECT
LOCATION
S A
R I V
V E
BETHANY HOME RD
S
GLENDALE AVE
INDIAN SCHOOL RD
CAMELBACK RD
R E
E M
S
R
D
L I T
C H
F I E
D
D
R
W
R
W
ENGINEER
STANLEY CONSULTANTS
CONTACT: DIANA KELLY
3133 E CAMELBACK ROAD, STE 100
PHOENIX, ARIZONA 85016
PHONE: (602) 333-2362
FAX: (602) 333-2333
SHEET INDEX
SHEET DRAWING DESCRIPTION
4-5
6-11
CS
ED-1.01
ED-1.02
ED-1.03 - ED-1.04
E-1.01 - E-1.06
COVER SHEET
EROSION CONTROL CMIS
EROSION CONTROL SUMMARY SHEET
EROSION CONTROL DETAIL SHEETS
EROSION CONTROL PLAN SHEETS
O
U
H
H
R
E E
T P
H O
E N
I X
I Z
O
T e l.
. 9
F a x
. 2 w w w c o r r a l d e s i g n g r o u p . c o m co rr al d es ig n g ro u p, in c.
DATA CERTIFICATION
BY DATE (SEAL)
I HEREBY CERTIFY THAT THIS DESIGN IS BASED ON
ACCURATE FIELD DATA WHICH HAS BEEN
CHECKED IN THE FIELD PRIOR TO SUBMISSION OF
THESE PLANS TO THE CITY FOR APPROVAL.
TREY TERRY
03/09/2026
03/09/2026
March 09, 2026
March 9, 2026
OF
A. Owner Name and Address:
CITY OF GOODYEAR
STEPHEN SCINTO, P.E. (CITY ENGINEER)
14455 W VAN BUREN ST
GOODYEAR, ARIZONA 85338
II. HYDROLOGIC INFORMATION
III. SOIL STABILIZATION MEASURES
IV. MEASURES TO CONTROL STORMWATER AND AIR QUALITY
I. PROJECT DESCRIPTION
Ending Longitude (NAD 83): _________________________
To obtain the project latitude/longitude data, refer to the Flash Earth web link below (Bing Maps with labels):
D. Project Description:
All disturbed soil, which will not be paved, riprapped or otherwise covered to prevent erosion, will be revegetated and/or landscaped in accordance with the project plans and specifications.
A. Temporary Stormwater and Air Quality Control Measures (CMs) / Best Management Practices (BMPs)
A. Percentage of the site that is impervious before and after construction:
Percentage before Construction: ___________________
Percentage after Construction: ____________________
B. CIP Project Number: ___________________________
C. Project Name/Location ( be consistent with the plan set cover sheet):
City: _________________ County: _________________ Beginning Latitude (NAD 83): ________________________
Beginning Longitude (NAD 83): _______________________
Ending Latitude (NAD 83): ___________________________ https://usgs.maps.arcgis.com/apps/MapTools/index.html?appid=41a5c2ca49bd4a83b239450e61022d53
B. Receiving Water(s), refer to the plan set cover sheet and the NHD Plus HR Availability Map Web Link below:
http://www.flashearth.com/
Temporary Diversion Dikes Temporary Rock Check Dams Stabilized Construction Entrance/Exit Gravel Pad Soil Stabilizer for Wind Erosion and Dust Control Rock Inlet/Outlet Protection Sediment Control Berms Silt Fences Wattles (Excelsior/Straw/Compost) Excelsior Logs / Sediment Logs Erosion Control Mattings Seeding (Class II with final mulch cover) Gravelbag Catch Basin Temporary Fabric Filter Designated Washout Areas Protected Chemical and Material Storage Area Equipment Maintenance Procedures Others Describe: _______________________________________
(If unnamed, state as unnamed)
CON-22-6297
Goodyear Maricopa
33° 30' 29.03" N
33° 30' 29.46" N
112° 25'04.53" W
112° 22' 12.46" W
54%
62%
Camelback Wash
CAMELBACK ROAD PROJECT INCLUDES ROADWAY
IMPROVEMENTS AND WIDENING FOR SR303L TO THE CITY LIMIT
(EAST OF 146TH AVE). THE WORK CONSISTS OF WIDENING
CAMELBACK ROAD INCLUDING CONSTRUCTION OF PAVEMENT;
GRADING; DRAINAGE IMPROVEMENTS; SIGNING AND PAVEMENT
MARKING; TRAFFIC SIGNALS; STREET LIGHTING; ITS SYSTEM;
LANDSCAPING AND IRRIGATION; AND OTHER RELATED WORK.
B. Permanent and Post-construction Stormwater and Air Quality Control Measures (CMs) / Best ManagementPractices (BMPs):
Crown Ditch/Dike Rock Protection Rock Riprap Channel Lining Sediment Basin Embankment Curb Spillways Downdrains Minibenching Solid Waste Management Rock-filled Stormwater Infiltration CM/BMP as Infiltration Basin and/or Trench Filtration Structures Infiltration Basin and/or Trench Retention and/or Detention Basins Bioretention Manufactured Treatment Devices Seeding established as a perennial vegetative cover with a density of 70% of the native background vegetative cover.
Others Describe: _______________________________________
TO BE COMPLETED FOR PROJECTS WITH ONE (1) ACRE OR MORE OF SOIL/GROUND DISTURBANCE OUTSIDE OF JURISDICTIONAL WATERS OF THE U.S. ( 1 ACRE*)
CONTROL MEASURE INDEX SHEET (CMIS)
Decomposed Granite Placement In Medians
A PORTION OF THE SOUTH HALF OF SECTION 12, AND NORTH
HALF OF SECTION 24, TOWNSHIP 2 NORTH, RANGE 2 WEST
AND NORTH HALF OF SECTIONS 19, 20, 21 AND SOUTH HALF
OF SECTIONS 16, 17, 18, TOWNSHIP 2 NORTH, RANGE 1
WEST OF THE GILA AND SALT RIVER BASE AND MERIDIAN
1-800-STAKE-IT
BEFORE YOU DIG
602-263-1100
(OUTSIDE MARICOPA COUNTY)
CALL TWO WORKING DAYS
CAMELBACK ROAD
SR 303L TO CITY LIMIT
CITY OF GOODYEAR
ENGINEERING DEPARTMENT
195 N. 145TH AVE
P.O.BOX 5100
BUILDING D,
GOODYEAR AZ 85338
4 6 3 2 S O U T H 3 6 T H S T R E E T P H O E N I X , A R I Z O N A 8 5 0 4 0 T e l. 6 0 2 . 2 2 2 . 9 8 2 2 F a x. 6 0 2 . 2 2 2 . 9 0 7 9 w w w . c o r r a l d e s i g n g r o u p . c o m corral design group, inc.
03/09/2026
2 11
A. ALL GENERAL CONSTRUCTION NOTES SHALL APPLY.
B. APPROVAL OF THIS DOCUMENT INDICATES THE CITY OF
GOODYEAR ENGINEERING DEPARTMENT HAS REVIEWED AND
FOUND THIS TO BE IN GENERAL COMPLIANCE WITH THE CITY’S
STORM WATER MANAGEMENT PLAN AND THAT THE CITY OF
GOODYEAR IS AT NO TIME RESPONSIBLE FOR THE
APPLICANT'S/OPERATOR'S DUTIES TO COMPLY WITH ANY
FEDERAL, STATE, OR LOCAL LAW OR ORDINANCE.
C. IT IS THE OPERATOR’S RESPONSIBILITY TO ENSURE THE SWPPP IS
MAINTAINED IN COMPLIANCE WITH ALL FEDERAL, STATE, AND
LOCAL REQUIREMENTS. THIS INCLUDES IMPLEMENTATION,
CONSTRUCTION, INSPECTION, MAINTENANCE, REPLACEMENT,
UPGRADING OF FACILITIES AND RECORD MANAGEMENT. ANY
VIOLATIONS AND FINES ARE THE RESPONSIBILITY OF THE
OWNER/OPERATOR AND/OR SITE CONTRACTOR.
D. A CITY OF GOODYEAR CONSTRUCTION STORM WATER PERMIT
AND A GRADING AND DRAINAGE PERMIT ARE REQUIRED PRIOR TO
PERFORMING ANY LAND DISTURBANCE ACTIVITIES. A COPY OF
THE PERMITS AND APPROVED PLANS SHALL BE MAINTAINED
ON-SITE.
E. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND
CONFIRMING THE DEPTH OF EXISTING UTILITY LINES WITHIN
PROPOSED SEDIMENT AND RETENTION BASIN AREAS. IF A BASIN
CANNOT BE CONSTRUCTED PER PLAN AS A RESULT OF CONFLICT
WITH UNDERGROUND UTILITIES THE CONTRACTOR SHALL CALL
THE CITY AND DESIGNER AND REQUEST MODIFICATION OF THE
BASIN DESIGN.
F. BMPS SHALL BE INSTALLED IN SUCH A MANNER SO THAT STORM
WATER DISCHARGES DO NOT CAUSE ANY FLOODING OR DAMAGE
TO ADJACENT PROPERTIES OR FLOWS OF SEDIMENT ONTO
PUBLIC STREETS, SIDEWALKS, DRAINAGE CHANNELS, OR
RIGHTS-OF-WAYS.
G. A COPY OF THE APPROVED STORM WATER POLLUTION
PREVENTION PLAN (SWPPP), NOTICE OF INTENT (NOI) AND ALL
RELATED RECORDS SHALL BE MAINTAINED ON THE SITE AND
AVAILABLE FOR REVIEW UPON REQUEST TO THE ARIZONA
DEPARTMENT OF ENVIRONMENTAL QUALITY (ADEQ) AND THE CITY
OF GOODYEAR. THE CITY OF GOODYEAR MAY AT ANY TIME
PERFORM A COMPLIANCE INSPECTION OF THE SITE.
H. THE OPERATOR SHALL POST THE ADEQ AUTHORIZATION
NUMBER(S) IN A CONSPICUOUS LOCATION NEAR THE MAIN
ENTRANCE OF THE CONSTRUCTION SITE AND RETAIN A COPY OF
THE AUTHORIZATION CERTIFICATE WITH THE SWPPP.
I. THE FACILITIES SHOWN ON THIS PLAN SHALL BE CONSTRUCTED IN
CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES IN
SUCH A MANNER AS TO ENSURE THAT SEDIMENT-LADEN WATER
DOES NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE
APPLICABLE WATER STANDARDS. ADDITIONALLY, THEY SHALL BE
INSTALLED AND IN OPERATION PRIOR TO ANY GRADING OR LAND
CLEARING. WHEREVER POSSIBLE, NATURAL VEGETATION SHALL
BE MAINTAINED TO ASSIST IN SILT CONTROL.
J. THE OPERATOR SHALL PERFORM, AT A MINIMUM, A VISUAL
INSPECTION OF THE CONSTRUCTION SITE ONCE EVERY SEVEN
CALENDAR DAYS OR ONCE EVERY 14 CALENDAR DAYS AND
WITHIN 24 HOURS OF ANY RAIN EVENT GREATER THAN OR EQUAL
TO 1/2-INCH AS RECORDED BY THE CLOSEST FLOOD CONTROL
DISTRICT OF MARICOPA COUNTY RAIN GAGE. IF WITHIN 1/4 MILE
OF AN IMPAIRED WATER, INSPECTIONS SHALL BE PERFORMED AT
A MINIMUM OF ONCE EVERY SEVEN CALENDAR DAYS AND
SHOULD INCLUDE VISUAL OBSERVATIONS OF STORM WATER
DISCHARGES AT ALL DISCHARGE LOCATIONS WITHIN ONE
BUSINESS DAY AFTER EACH RAIN EVENT OF 1/2-INCH OR
GREATER, AS RECORDED BY THE CLOSEST FLOOD CONTROL
DISTRICT OF MARICOPA COUNTY RAIN GAGE. THE OPERATOR
SHALL PREPARE A REPORT DOCUMENTING HIS/HER FINDINGS ON
THE CONDITIONS OF THE SWPPP CONTROLS AND NOTE ANY
EROSION PROBLEM AREAS. THE OPERATOR’S REPORT IS TO BE
MAINTAINED ON SITE BY THE OPERATOR.
CITY OF GOODYEAR
GENERAL NOTES FOR STORM WATER POLLUTION PREVENTION, LARGE SITES
EROSION AND SEDIMENT CONTROL LEGEND
DTL
SYMBOL DESCRIPTION
QTY.
EC1 *Erosion Control (Construction Entrance)
334 SY
EROSION AND SEDIMENT CONTROL SUMMARY NOTES:
1. THE PLACEMENT OF ALL EROSION & SEDIMENT CONTROL MEASURES
LISTED ABOVE MAY BE SUBJECT TO CHANGE AND MAY BE ADJUSTED
BY THE ENGINEER.
2. THE ENGINEER IS RESPONSIBLE TO VERIFY THE CONTRACTOR HAS
SUFFICIENT EROSION & SEDIMENT CONTROL MEASURES IN PLACE
TO CONTAIN ALL STORM WATER RUNOFF SEDIMENT WITHIN THE
PROJECT LIMITS AND ALL DISTURBED GROUND FROM EROSION.
3. *THE LOCATION OF EROSION CONTROL (CONSTRUCTION ENTRANCE)
ARE NOT SHOWN ON PLANS. FINAL LOCATION(S) ARE DEPENDENT
ON CONTRACTOR USE SITES AND APPROVED BY THE ENGINEER. THE
QUANTITY SHOWN IS BASED ON THE NEED FOR UP TO 2
CONSTRUCTION ENTRANCES/EXITS.
4. THE EROSION AND SEDIMENT CONTROL ITEMS ON THESE PLANS
ARE MEASURED AND PAID UNDER A SINGLE BID ITEM. SEE BID
TABULATION NUMBER 107.01000.
5. SEE DRAINAGE PLANS FOR HEADWALL AND PIPE INLET/OUTLET
PROTECTION.
6. SEE LANDSCAPE PLANS FOR SEEDING AND GRANITE.
EC2 Erosion Control (Grate/Curb Inlet Protection)
16 EACH
EC3 Erosion Control (9" Wattle)
10,112 LF
J. THE OPERATOR SHALL PERFORM, AT A MINIMUM, A VISUAL
INSPECTION OF THE CONSTRUCTION SITE ONCE EVERY SEVEN
CALENDAR DAYS OR ONCE EVERY 14 CALENDAR DAYS AND
WITHIN 24 HOURS OF ANY RAIN EVENT GREATER THAN OR EQUAL
TO 1/2-INCH AS RECORDED BY THE CLOSEST FLOOD CONTROL
DISTRICT OF MARICOPA COUNTY RAIN GAGE. IF WITHIN 1/4 MILE
OF AN IMPAIRED WATER, INSPECTIONS SHALL BE PERFORMED AT
A MINIMUM OF ONCE EVERY SEVEN CALENDAR DAYS AND SHOULD
INCLUDE VISUAL OBSERVATIONS OF STORM WATER DISCHARGES
AT ALL DISCHARGE LOCATIONS WITHIN ONE BUSINESS DAY AFTER
EACH RAIN EVENT OF 1/2-INCH OR GREATER, AS RECORDED BY
THE CLOSEST FLOOD CONTROL DISTRICT OF MARICOPA COUNTY
RAIN GAGE. THE OPERATOR SHALL PREPARE A REPORT
DOCUMENTING HIS/HER FINDINGS ON THE CONDITIONS OF THE
SWPPP CONTROLS AND NOTE ANY EROSION PROBLEM AREAS.
THE OPERATOR’S REPORT IS TO BE MAINTAINED ON SITE BY THE
OPERATOR.
K. THE OPERATOR OF THE SITE SHALL ALSO MAINTAIN RECORDS
WITH THE FOLLOWING INFORMATION:
1. THE DATES WHEN MAJOR GRADING ACTIVITIES OCCUR IN A
PARTICULAR AREA; AND
2. THE DATES WHEN CONSTRUCTION ACTIVITIES CEASE IN AN
AREA, TEMPORARILY OR PERMANENTLY; AND
3. THE DATES WHEN AN AREA IS STABILIZED, TEMPORARILY OR
PERMANENTLY; AND
4. THE DATES OF MAINTENANCE/REPLACEMENT OR REMOVAL OF
BEST MANAGEMENT PRACTICES (BMPS).
L. FACILITIES SHALL BE MAINTAINED AS NECESSARY TO ENSURE
THEIR CONTINUED FUNCTIONING. IN ADDITION, ALL CONTROLS AS
OUTLINED IN THE SWPPP SHALL BE MAINTAINED IN A
SATISFACTORY CONDITION UNTIL SUCH TIME THAT
CONSTRUCTION IS COMPLETED, PERMANENT DRAINAGE
FACILITIES ARE OPERATIONAL, AND THE POTENTIAL FOR EROSION
HAS PASSED.
M. THE OPERATOR SHALL AMEND THE SWPPP AS NECESSARY
DURING THE COURSE OF CONSTRUCTION TO RESOLVE ANY
PROBLEM AREAS WHICH BECOME EVIDENT DURING
CONSTRUCTION, ROUTINE INSPECTIONS, AND/OR PERIODS OF
RAINFALL. IF IT IS DETERMINED THAT CURRENT CONTROLS ARE
NOT EFFECTIVE AT MINIMIZING POLLUTANT DISCHARGES FROM
THE SITE, THE OPERATOR SHALL TAKE IMMEDIATE EFFORTS TO
CORRECT THE PROBLEM WITHIN 72 HOURS AND/OR PRIOR TO THE
NEXT RAIN EVENT. THE AMENDED PLAN SHALL BE MAINTAINED
ON-SITE AND IF REQUIRED, SUBMITTED WITHIN 15 CALENDAR
DAYS TO ADEQ.
N. IF, AT ANY TIME, THIS SITE BECOMES IMPACTED BY OTHER
CONSTRUCTION, STORM WATER POLLUTION PREVENTION
ACTIVITIES SHALL BE COORDINATED BETWEEN THE SITES AND
DOCUMENTED IN THE PROJECT SWPPP.
O. ONCE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED AND
THE SITE HAS MET FINAL STABILIZATION REQUIREMENTS WITH
ALL TEMPORARY BMP'S REMOVED, THE AUTHORIZED SITE
REPRESENTATIVE MAY FILE A NOTICE OF TERMINATION (NOT)
WITH ADEQ, WITH A COPY SUBMITTED TO THE CITY OF GOODYEAR
ENGINEERING DEPARTMENT.
P. THE OPERATOR SHALL SUBMIT A COPY OF THE ADEQ NOT
ACKNOWLEDGEMENT LETTER TO THE CITY, WHICH WILL
EFFECTIVELY TERMINATE COVERAGE UNDER THE CONSTRUCTION
STORM WATER PERMIT ISSUED BY THE CITY.
NOT SHOWN
1-800-STAKE-IT
BEFORE YOU DIG
602-263-1100
(OUTSIDE MARICOPA COUNTY)
CALL TWO WORKING DAYS
CAMELBACK ROAD
SR 303L TO CITY LIMIT
CITY OF GOODYEAR
ENGINEERING DEPARTMENT
195 N. 145TH AVE
P.O.BOX 5100
BUILDING D,
GOODYEAR AZ 85338
4 6 3 2 S O U T H 3 6 T H S T R E E T P H O E N I X , A R I Z O N A 8 5 0 4 0 T e l. 6 0 2 . 2 2 2 . 9 8 2 2 F a x. 6 0 2 . 2 2 2 . 9 0 7 9 w w w . c o r r a l d e s i g n g r o u p . c o m corral design group, inc.
3 11
Construction Yard or R/W Fence (Typ)
M
I N
12" MIN.
EDGE TREATMENT TRENCHING
TYPICAL SECTION (NTS)
Width of Rock Mulch Shall be Equal to Roadway Entry or 30'-0" Minimum
M i n i m u m
NOTES:
1. Install Stabilized Construction Entrance/Exit Gravel Pad for traffic entering or exiting a construction site where sedimentation, clay, silt or other pollutants can be tracked onto public roads and/or adjacent water bodies, as approved by the Engineer. It may also be applied for construction entrance/exit wind erosion/dust control, as approved by the
Engineer.
2. Locate new Construction Entrance(s)/Exit(s) at appropriate project entrance/exit points as determined in field with the approval of the Engineer. Relocate Stabilized Construction
Entrance/Exit Gravel Pad as needed as project progresses. Replace Rock Mulch materials in drive paths when dirt or mud accumulates.
3. Rock Mulch materials shall be fractured/crushed rocks in angular shape. Natural river-run materials, especially rounded natural river rocks are not acceptable.
4. Make field adjustments and corrections of Construction Entrance/Exit Gravel Pad immediately if it is causing flooding and/or affecting roadway safety.
5. Install nonwoven fabric when water is applied for construction vehicle/equipment cleaning on
Gravel Pad.
6. Edge treatment trenching and nonwoven fabric shall not be required if NO wash water is used for vehicle/equipment cleaning.
7. The depth of Gravel Pad varies from 6" to 12" based on the necessities of construction vehicle/equipment as per the approval of the Engineer.
STABILIZED CONSTRUCTION ENTRANCE/EXIT GRAVEL PAD
Existing Roadway
Gradiation 1"-4" Angular
Rock Mulch Installed to a
Depth of 6" to 12"
Nonwoven Very High
Survivability Fabric Beneath
All Aggregate
Existing Roadway
Gradiation D50 = 3" Angular Rock Mulch Installed to a
Depth of 6" to 12", Per MAG Section 220 and 703
Install Gravel Pad to be Flush with
Existing and Adjacent Roadway
Nonwoven Very High Survivability
Fabric Beneath All Aggregate with
Turn-Down Edge - See Typical
Section Detail Above, Per MAG
Section 796.1.3 Table 796.3, Class A
EC1DETAIL
NTS
(as needed)
BIRD'S EYE VIEW (NTS)
*ASSUMED 167 SQ.YD. ROCK MULCH PER EACH
STABILIZED CONSTRUCTION ENTRANCE/EXIT
1-800-STAKE-IT
BEFORE YOU DIG
602-263-1100
(OUTSIDE MARICOPA COUNTY)
CALL TWO WORKING DAYS
CAMELBACK ROAD
SR 303L TO CITY LIMIT
CITY OF GOODYEAR
ENGINEERING DEPARTMENT
195 N. 145TH AVE
P.O.BOX 5100
BUILDING D,
GOODYEAR AZ 85338
4 6 3 2 S O U T H 3 6 T H S T R E E T P H O E N I X , A R I Z O N A 8 5 0 4 0 T e l. 6 0 2 . 2 2 2 . 9 8 2 2 F a x. 6 0 2 . 2 2 2 . 9 0 7 9 w w w . c o r r a l d e s i g n g r o u p . c o m corral design group, inc.
4 11
Combination Curb Inlet and Grate
Inlet Protection, ERTEC
Enviromental Systems Curb Inlet
Guard or Approved Equal
Inlet Protection Height - 6"
Under Seal Gasket
NOTES:
1. Placement and installation shall be accomplished per curb inlet protection manufacturer recommendations for traffic and non-traffic conditions with approval of Engineer.
2. Perform maintenance as required. Inspect following rainfall events and at least daily during prolonged rainfall. Maintain to provide an adequate sediment holding capacity. Debris shall be removed when sediment accumulation reached 50% of barrier height. Removed sediment shall be incorporated in the project at designated locations, as approved by Engineer.
3. For Grate/Curb Inlets over 5', add additional 6' segments to cover Grate/Curb Inlets.
4. Field adjust and correct inlet protection immediately if it is causing flooding and/or affecting roadway safety.
GRATE/CURB INLET PROTECTION
EC2DETAIL NTS
Filter Height - 2"
FILL SLOPE PERIMETER
PROTECTION SECTION (NTS)
** Note:
Applicable only in the areas of concentrated flow - to include but not be limited to roadway sag spots and drop-off repair locations as per the direction of the Engineer.
Sediment Loading
Zone Min. 2'-0"
Limits of Disturbance
Fill Slope Perimeter Protection
9" Dia. Straw Wattle
Excavated Material To Be Tamped Against
Upstream Side of Sediment Wattles To Prevent
Undermining. The Thickness Should Be No More
Than 2" to Avoid Dramatic Reduction of the
Sediment Loading Capacity.
DETAILEC3NTS
SEDIMENT WATTLE
NOTES:
1. Install Sediment Wattle in conformance with manufacturers' specifications to meet site conditions in accordance with good engineering practices.
2. Sediment Wattles shall be in continuous contact with trench bottom and sides. Do not overlap wattle ends on top of each other.
3. Butt adjoining wattles tightly against each other. Drive the first end stake of the second wattle at an angle toward the first wattle to help abut them tightly.
4. Repair any rills or gullies promptly. Make field adjustments and corrections of
Sediment Wattle immediately if it is causing flooding, erosion, and/or affecting roadway safety.
5. Installation and maintenance of Sediment Wattles shall not negatively impact traffic safety, nor the designed function of roadway or bridge drainage facilities.
6. Install and maintain Sediment Wattles to carry the storm water of at least
2-year, 24-hour events.
1-800-STAKE-IT
BEFORE YOU DIG
602-263-1100
(OUTSIDE MARICOPA COUNTY)
CALL TWO WORKING DAYS
CAMELBACK ROAD
SR 303L TO CITY LIMIT
CITY OF GOODYEAR
ENGINEERING DEPARTMENT
195 N. 145TH AVE
P.O.BOX 5100
BUILDING D,
GOODYEAR AZ 85338
4 6 3 2 S O U T H 3 6 T H S T R E E T P H O E N I X , A R I Z O N A 8 5 0 4 0 T e l. 6 0 2 . 2 2 2 . 9 8 2 2 F a x. 6 0 2 . 2 2 2 . 9 0 7 9 w w w . c o r r a l d e s i g n g r o u p . c o m corral design group, inc.
5 11
XXX
X X X X X X X
X
X X X X X X X X X X X X X X X X X X X X X
XXX
X
X X X
XXX
COMM
COMM
COMM
COMM
COMM COMM COMM
COMM
XXXXXXXXXXXXXX
X X
X X
XXXXXXXXXXX
X X
X X
X
X X
X X
X
X X
X
X X
X X
1-800-STAKE-IT
BEFORE YOU DIG
602-263-1100
(OUTSIDE MARICOPA COUNTY)
CALL TWO WORKING DAYS
CAMELBACK ROAD
SR 303L TO CITY LIMIT
CITY OF GOODYEAR
ENGINEERING DEPARTMENT
195 N. 145TH AVE
P.O.BOX 5100
BUILDING D,
GOODYEAR AZ 85338
4 6 3 2 S O U T H 3 6 T H S T R E E T P H O E N I X , A R I Z O N A 8 5 0 4 0 T e l. 6 0 2 . 2 2 2 . 9 8 2 2 F a x. 6 0 2 . 2 2 2 . 9 0 7 9 w w w . c o r r a l d e s i g n g r o u p . c o m corral design group, inc.
CAMELBACK RD
CAMELBACK RD
6 11
X
1-800-STAKE-IT
BEFORE YOU DIG
602-263-1100
(OUTSIDE MARICOPA COUNTY)
CALL TWO WORKING DAYS
CAMELBACK ROAD
SR 303L TO CITY LIMIT
CITY OF GOODYEAR
ENGINEERING DEPARTMENT
195 N. 145TH AVE
P.O.BOX 5100
BUILDING D,
GOODYEAR AZ 85338
4 6 3 2 S O U T H 3 6 T H S T R E E T P H O E N I X , A R I Z O N A 8 5 0 4 0 T e l. 6 0 2 . 2 2 2 . 9 8 2 2 F a x. 6 0 2 . 2 2 2 . 9 0 7 9 w w w . c o r r a l d e s i g n g r o u p . c o m corral design group, inc.
CAMELBACK RD
CAMELBACK RD
7 11
W
W M
X
X
1-800-STAKE-IT
BEFORE YOU DIG
602-263-1100
(OUTSIDE MARICOPA COUNTY)
CALL TWO WORKING DAYS
CAMELBACK ROAD
SR 303L TO CITY LIMIT
CITY OF GOODYEAR
ENGINEERING DEPARTMENT
195 N. 145TH AVE
P.O.BOX 5100
BUILDING D,
GOODYEAR AZ 85338
4 6 3 2 S O U T H 3 6 T H S T R E E T P H O E N I X , A R I Z O N A 8 5 0 4 0 T e l. 6 0 2 . 2 2 2 . 9 8 2 2 F a x. 6 0 2 . 2 2 2 . 9 0 7 9 w w w . c o r r a l d e s i g n g r o u p . c o m corral design group, inc.
CAMELBACK RD
CAMELBACK RD
8 11
X X X X X X X X X X X X X X X X X X X X X X X X
XXXXXXXXXXXXXXX
X
X
X X
X X
X
X X X X X X
X
X
X
X
X
X X
1-800-STAKE-IT
BEFORE YOU DIG
602-263-1100
(OUTSIDE MARICOPA COUNTY)
CALL TWO WORKING DAYS
CAMELBACK ROAD
SR 303L TO CITY LIMIT
CITY OF GOODYEAR
ENGINEERING DEPARTMENT
195 N. 145TH AVE
P.O.BOX 5100
BUILDING D,
GOODYEAR AZ 85338
4 6 3 2 S O U T H 3 6 T H S T R E E T P H O E N I X , A R I Z O N A 8 5 0 4 0 T e l. 6 0 2 . 2 2 2 . 9 8 2 2 F a x. 6 0 2 . 2 2 2 . 9 0 7 9 w w w . c o r r a l d e s i g n g r o u p . c o m corral design group, inc.
CAMELBACK RD
CAMELBACK RD
9 11
X X
X
X X X
X
X
X
X
X
X X
X
XX X X
X X
XX
X
X
X X
XX X X X
X
X
X X
X X
X
X X
X
XXXXX
X X X
X X
X
X X X X X X
X X
XXXX
X X X X X X
XXX
X
X X
X
X
X
WM
W W
W W
W W
1-800-STAKE-IT
BEFORE YOU DIG
602-263-1100
(OUTSIDE MARICOPA COUNTY)
CALL TWO WORKING DAYS
CAMELBACK ROAD
SR 303L TO CITY LIMIT
CITY OF GOODYEAR
ENGINEERING DEPARTMENT
195 N. 145TH AVE
P.O.BOX 5100
BUILDING D,
GOODYEAR AZ 85338
4 6 3 2 S O U T H 3 6 T H S T R E E T P H O E N I X , A R I Z O N A 8 5 0 4 0 T e l. 6 0 2 . 2 2 2 . 9 8 2 2 F a x. 6 0 2 . 2 2 2 . 9 0 7 9 w w w . c o r r a l d e s i g n g r o u p . c o m corral design group, inc.
CAMELBACK RD
CAMELBACK RD
NO TEMPORARY PROTECTIONS FOR THIS VIEW
10 11
X
X
X
X X
X
X X
X
X X
X
X X
X
X X
X
X
X X
X X
X X
X
X X
X
X X X X X X X X
X X
X
X X
X X
X X
X XX X XX X X
X X X
X
XX
XX
X
X X
X
X X
XXX
X X
X X
X
X
X
X
X X
X XX X
X X X X
X
X X
X X
X X X
X
X X
X X X X
X
X
XXXX
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X X
X X
X
X X
X X
X
X X X X X X X X X
X X
X X
X
1-800-STAKE-IT
BEFORE YOU DIG
602-263-1100
(OUTSIDE MARICOPA COUNTY)
CALL TWO WORKING DAYS
CAMELBACK ROAD
SR 303L TO CITY LIMIT
CITY OF GOODYEAR
ENGINEERING DEPARTMENT
195 N. 145TH AVE
P.O.BOX 5100
BUILDING D,
GOODYEAR AZ 85338
4 6 3 2 S O U T H 3 6 T H S T R E E T P H O E N I X , A R I Z O N A 8 5 0 4 0 T e l. 6 0 2 . 2 2 2 . 9 8 2 2 F a x. 6 0 2 . 2 2 2 . 9 0 7 9 w w w . c o r r a l d e s i g n g r o u p . c o m corral design group, inc.
CAMELBACK RD
CAMELBACK RD
NO TEMPORARY PROTECTIONS FOR THIS VIEW
NO TEMPORARY PROTECTIONS FOR THIS VIEW
11 11
| Sheets and Views |
| CBR_42030_SWPPP COVER SHEET-Model |
| CBR_42030_SWPPP COVER SHEET-Cover Sheet |
| CBR_42030_SWPPP COVER SHEET-Layout1 |
| CBR_42030_Erosion Detail Sheets_ED001-ED004-Model |
| CBR_42030_Erosion Detail Sheets_ED001-ED004-ED-01 INDEX |
| CBR_42030_Erosion Detail Sheets_ED001-ED004-ED-02 SUM |
| CBR_42030_Erosion Detail Sheets_ED001-ED004-ED-03 |
| CBR_42030_Erosion Detail Sheets_ED001-ED004-ED-04 |
| CBR_42030_ECSP_Sheets_E001-E006-Model |
| CBR_42030_ECSP_Sheets_E001-E006-E-01 |
| CBR_42030_ECSP_Sheets_E001-E006-E-02 |
| CBR_42030_ECSP_Sheets_E001-E006-E-03 |
| CBR_42030_ECSP_Sheets_E001-E006-E-04 |
| CBR_42030_ECSP_Sheets_E001-E006-E-05 |
| CBR_42030_ECSP_Sheets_E001-E006-E-06 |
File details come from the government source that posted it. Updated .