4) AL-1745-1941 SR Flanged BPM Button ESD.pdf
PDF 1 MB Posted
- Attached to
- SR Flanged BPM Buttons
- Solicitation number
- MG-06112024
- Issued by
-
Department of Energy
About this file
This document is an engineering specification for SR (Storage Ring) flanged Beam Position Monitor (BPM) buttons for the Advanced Light Source Upgrade (ALS-U) project at Lawrence Berkeley National Laboratory (LBNL).
The specification outlines the technical requirements for the design and manufacturing of the flanged BPM buttons, including mechanical dimensions, connector type, electromagnetic properties, vacuum properties, and manufacturing processes. It also specifies the cleaning environment, fluids, and codes/standards that must be followed. Three different BPM button variants are covered, which will be integrated into various storage ring vacuum chambers. The document includes a revision history, approvals, abbreviations, and applicable documents. A related federal contract opportunity is provided, which is a Request for Proposal (RFP) from LBNL for the procurement of these SR flanged BPM buttons. The RFP includes a timeline with key dates for supplier questions and proposal submissions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 13) Response to Questions 2 - RFP MG 06112024.pdf | ||
| 12) Response to Questions 1 - RFP MG 06112024.pdf | ||
| Documents.zip | ZIP file | |
| 5) AL-1745-1944 Reference Document List.pdf | ||
| 1) RFP-MG-06112024 BVSS.pdf | ||
| 7) GP-Commercial Foreign.pdf | ||
| 9) Rep Cert Form RFP MG-06112024.docx | DOCX document | |
| Drawings.zip | ZIP file | |
| 3) AL-1745-1942 SR Flanged BPM SOW.pdf | ||
| 2) Sample SubK - RFP MG-06112024.pdf | ||
| 6) GP-Commercial Supplies and Services.pdf | ||
| 8) Price Proposal Schedule Attachment A - RFP MG-XXXX2024.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AL-1745-1941 Rev. A Doc. Status: Working Page 1 of 16
Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.
SR Flanged BPM Button Engineering Specification
Release Date: Jun 10 2024 2:10:14 PM PDT
Document Number: AL-1745-1941 Revision: B
Document Status: Released
Document Type: SPECIFICATION
Category Code: AL7530
ALS-U - STORAGE RING
VACUUM - GENERAL
O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
4O
Downloaded by: Mouda Tung at June 10, 2024 14:54:59
AL-1745-1941 Rev. A Doc. Status: Working Page 2 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
TABLE OF CONTENTS
1 Revision History
2 Approvals
3 Abbreviations and Acronyms
4 Introduction
4.1 Introduction to ALS-U
4.2 Subject of this Engineering Specification
5 DOCUMENT Definition
5.1 Specification Definition
5.2 Identification Number
5.3 Traceability
6 Description
7 Environment Requirements
7.1 Codes and Standards
7.2 Cleaning Environment
7.3 Cleaning Fluids
7.4 Cutting Fluids
8 Technical requirements
8.1 General Mechanical Dimensions
8.2 BPM connector type
8.3 Electromagnetic properties
8.4 Vacuum properties
8.5 Manufacturing process
8.5.1 Material
8.5.2 Fabrication
8.5.2.1 Part fabrication
8.5.2.2 Part joining
8.5.2.3 Cleaning after manufacturing
8.6 Final test
8.6.1 Inspection verification
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 3 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
8.6.2 Functional dimension verification
8.6.3 He Leak Test
8.7 Packing and shipping
9 Applicable Documents ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 4 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
1 REVISION HISTORY
Rev. CM Number Description of Change A Baseline B Adding additional requirement
2 APPROVALS
The following individual(s) must approve this document:
Approver Project Role Ken Chow Chief Engineer/ Accelerator Mechanical Systems lead
Jiani Niu Project QA manager Olusola Omolayo Vacuum CAM Changchun Sun Diagnostics CAM Windchill Approved / Concurred By
3 ABBREVIATIONS AND ACRONYMS
ALS Advanced Light Source ACL Acceptance Criteria List ALS-U Advanced Light Source Upgrade AR Accumulator Ring ARO After Receipt of Order BPM Beam Position Monitor CAD Computer Aid Design CMM Coordinate Measuring Machine CP Control Plan FAT Factory Acceptance Test
FDR
FE
Final Design Review Beamline Front End
HHL High Heat Load HP Hold Point
IR
KOM
InfraRed Kick Off Meeting
LBNL Lawrence Berkeley National Laboratory LCW Liquid Cooled Water NCR Nonconformance Report NP Notification Point NTP Notification To Proceed SR Storage Ring UHV Ultra High Vacuum VC Vacuum Chamber W Witness ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 5 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
4 INTRODUCTION
4.1 Introduction to ALS-U
ALS-U is an upgrade project to the LBNL Advanced Light Source (ALS). The ALS is a 1.9
GeV storage ring operating at 500 mA of beam current. It is optimized to produce intense beams of soft x-rays, which offer spectroscopic contrast, nanometer-scale resolution, and broad temporal sensitivity. The ALS facility includes an accelerator complex and photon delivery system that is capable of providing the foundations for an upgrade that will achieve world-leading soft x-ray coherent flux. The existing ALS provides a ready-made foundation, including conventional facilities and includes extensive beamlines (up to 40 simultaneously operating beamlines) and instrumentation, an experimental hall, computing resources, ancillary laboratories, offices, and related infrastructure that will be heavily utilized in an upgrade scenario.
The ALS will be upgraded with a multibend achromat (MBA) lattice design that will provide a soft x-ray source that is orders of magnitudes brighter — an up to 100-1000 times increase in brightness and will provide a significantly higher fraction of coherent light in the soft x-ray region than is currently available at ALS.
4.2 Subject of this Engineering Specification
The flanged BPM buttons for the ALS-U storage ring (SR) features a BPM feedthrough assembly welded to a stainless-steel vacuum flange as shown in Figure 4-1. This document outlines the technical specifications for the final design and manufacturing of the flanged BPM buttons.
Figure 4-1: SR BPM button Variants ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 6 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
5 DOCUMENT DEFINITION
5.1 Specification Definition
Must, will, may, and should are used to define every specification listed in this document.
The definitions of these terms are as follows
May – is used to indicate a desire or goal of a specification. This can also be interpreted
‘as nice to have’ and are not contractually binding.
Must –is a specification that is contractually binding and must be implemented.
Should – is used to indicate a desire or goal of a specification. This can also be interpreted ‘as nice to have’ and are not contractually binding.
Will – is used to inform intent or declaration of purpose. This is not a specification.
Example, the author will use the word ‘must’ to indicate that a specification is contractually binding and must be implemented.
5.2 Identification Number
Each specification stated in this document must have a unique identification (ID) number
(NUM). Once an ID NUM has been assigned to a specific specification, the ID
NUM cannot be changed or reassigned.
The ID NUM formant is as follows SYY-XX-QQQQQQ, where S indicates that this is a specification, YY identifies the Major Systems Level within the ALS-U project, XX is a unique identifier within the Major Systems Level, and QQQQQQ is a unique six digit number.
The ALS-U Lead System Engineer assigns the unique ID numbers.
5.3 Traceability
Each specification stated in this document must have a traceability to determine the relationship between different requirements and specifications not only within this document, but also for the entire project.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 7 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
6 DESCRIPTION
The SR BPM buttons are mounted to the BPM blocks which are in turn integrated to the storage ring vacuum chambers. Figure 6-1 shows the BPM buttons mounted to the BPM block. There are 3 designs of the BPM buttons covered by this technical specification. All
3 BPM variants share the following features: SMA female connector, Stainless steel flanges with helicoflex sealing grooves and vendor determine brazed feedthrough interface between button and SMA connector.
Differences between the 3 design variants are button diameter, flange geometry, overall length of button stem and geometry of the BPM stem.
Figure 6-1: Flanged BPM button mounted to vacuum chamber BPM block
Table 6-1 list the button types and the associated storage ring vacuum chambers ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 8 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
Table 6-1: Flange BPM Button Host Chambers
Sector RAFT Chamber Button Sector RAFT Chamber Button Sector RAFT Chamber Button
VC01 AL-1225-3370
1 VC03 AL-1225-3370
1 VC03 AL-1225-3370
VC02 AL-1225-3370
VC05 AL-1378-5599
VC05-1 AL-1378-5599
VC03 AL-1225-3370 VC06 AL-1379-1836 VC06 AL-1379-1836
VC05 AL-1378-5599 VC07 AL-1378-5599 VC07 AL-1378-5599
VC06 AL-1378-5599
VC08 AL-1378-5599
VC08-2 AL-1378-5599
VC07 AL-1378-5599 VC09 AL-1379-1836 VC06 AL-1379-1836
VC08 AL-1378-5599 VC10 Al-1379-1836
VC13 AL-1225-3370
VC09 AL-1378-5599
VC13 AL-1225-3370 VC15 AL-1225-3370
VC10 AL-1378-5599 VC15 AL-1225-3370 Straight Transition AL-1225-3370
VC13 AL-1225-3370
1 VC03 AL-1225-3370
1 VC03 AL-1225-3370
VC15 AL-1225-3370
VC05-1 AL-1378-5599
VC05-2 AL-1378-5599
Diagnostic Straight AL-1225-3370 VC06 AL-1379-1836 VC06-1 AL-1378-5599
1 VC03 AL-1225-3370 VC07 AL-1378-5599 VC07-1 AL-1378-5599
VC05-1 AL-1378-5599
VC08-2 AL-1378-5599
VC08 AL-1378-5599
VC06 AL-1379-1836 VC06 AL-1379-1836 VC06 AL-1379-1836
VC07 AL-1378-5599
VC13 AL-1225-3370 VC10 AL-1379-1836
VC08-1 AL-1378-5599 VC15 AL-1225-3370
VC13 AL-1225-3370
VC09-2 AL-1378-5599
1 VC03 AL-1225-3370 VC15 AL-1225-3370
VC10 AL-1379-1836
VC05-2 AL-1378-5599
1 VC03 AL-1225-3370
VC13 AL-1225-3370 VC06-1 AL-1378-5599
VC05-1 AL-1378-5599
VC15 AL-1225-3370 VC07-1 AL-1378-5599 VC06 AL-1379-1836
VC01 AL-1225-3370
VC08-2 AL-1378-5599 VC07 AL-1378-5599
VC02-1 AL-1225-3370 VC06 AL-1379-1836
VC08-2 AL-1378-5599
VC03-1 AL-1225-3370 VC10 AL-1379-1836 VC06 AL-1379-1836
VC05-1 AL-1378-5599
VC13 AL-1225-3370
VC13 AL-1225-3370
VC06 AL-1379-1836 VC15 AL-1225-3370 VC15 AL-1225-3370
VC07 AL-1378-5599
1 VC03 AL-1225-3370
1 VC03 AL-1225-3370
VC08-2 AL-1378-5599
VC05-2 AL-1378-5599
VC05-2 AL-1378-5599
VC06 AL-1379-1836 VC06-2 AL-1378-5599 VC06-2 AL-1378-5599
VC13 AL-1225-3370 VC07 AL-1378-5599 VC07 AL-1378-5599
VC15 AL-1225-3370
VC08 AL-1379-1836
VC08 AL-1379-1836
1 VC03 AL-1225-3370 VC09 AL-1378-5599 VC09 AL-1378-5599
VC05 AL-1378-5599 VC10 AL-1379-1836 VC10 AL-1379-1836
VC06 AL-1378-5599
VC13 AL-1225-3370
VC13 AL-1225-3370
VC07 AL-1378-5599 VC15 AL-1225-3370 VC15 AL-1225-3370
VC08 AL-1379-1836
VC09 AL-1378-5599
VC10 AL-1379-1836
VC13 AL-1225-3370
VC15 AL-1225-3370
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 9 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
7 ENVIRONMENT REQUIREMENTS
7.1 Codes and Standards
ID NUM
(SYY-XX-) Specification
S09-94-000151
The following standards must apply for the fabrication and test of the SR Single Flanged BPM buttons:
EN ISO 13919 or EN ISO 5817
EN ISO 17637
ASTM E498.
EN ISO 17640
ASTM E2734/E2734 M − 10.
7.2 Cleaning Environment
ID NUM
(SYY-XX-) Specification
S09-94-000152 The cleaning environment must comply with UHV Chamber and Component Production Requirements AL-1220-7841, §7.2
7.3 Cleaning Fluids
(SYY-XX-) Specification
S09-94-000153 The cleaning fluids must comply with UHV Chamber and Component Production Requirements AL-1220-7841, §7.3
7.4 Cutting Fluids
(SYY-XX-) Specification
S09-94-000154 The cutting fluids must comply with UHV Chamber and Component Production Requirements AL-1220-7841, §7.4 ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 10 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
8 TECHNICAL REQUIREMENTS
8.1 General Mechanical Dimensions
ID NUM
(SYY-XX-)
Specification
S09-05-000357 The mechanical dimension of the BPM button must be in accordance with the approved vendor drawings
8.2 BPM connector type
ID NUM
(SYY-XX-)
Specification
S09-94-000286 The connector of the BPM button must be compatible with a standard SMA male connector
(SYY-XX-)
RQMT
DEF
Specification Value Unit
S09-94-000287 Must
SMA connector impedance
50 Ω
8.3 Electromagnetic properties
The electrical properties of the buttons must not deviate from the electrical properties of prototype SR Single Flanged BPMs measured at LBNL. A summary of the measured properties is listed below. It is desirable that the vendor is able to check the following values for all button units, and LBNL will sampled the measurement as part of the acceptance criteria for each delivered batch.
ID NUM
(SYY-XX-)
RQMT
DEF
Specification Value Unit
S09-94-000291 Must Isolation to ground >5 MΩ
S09-05-000288 Must Capacitance
2< C <4.5 Variation under 0.4 pF pF
S09-94-000289 Must Spread in electrical length between buttons ≤30 ps
S09-94-000290 Must
Characteristic impedance along the structure, upstream of the button electrode
46-54.0 Ω ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 11 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
8.4 Vacuum properties
(SYY-XX-)
RQMT DEF Specification Value Unit
S09-94-000277 Must
UHV
compatibility <5.00e-10 Torr
S09-94-000275 Must
Maximum Allowable
Temperature for bakeout
300 Degree Celsius
8.5 Manufacturing process
8.5.1 Material
The procurement of the raw material by the vendor must comply with the following requirements
ID NUM
(SYY-XX-)
Specification
S09-94-000279 The flanges of the BPM Button must be stainless steel 316L
S09-05-000356 The magnetic permeability must be < 1.04 μ/ μ0
ID NUM
(SYY-XX-)
RQMT DEF Specification Value Unit
S09-94-000169 Must
The material must be compatible with synchrotron radiation >1 x 105 Gray
8.5.2 Fabrication
8.5.2.1 PART FABRICATION
The fabrication of the BPM must comply with the following requirements
Cutting fluids
ID NUM
(SYY-XX-)
Specification
S09-94-000170 A water-soluble and non-halogenated cutting fluids must be used for fabrication ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 12 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
8.5.2.2 PART JOINING
The joining process of the components must comply with the following requirements
General requirement
ID NUM
(SYY-XX-)
Specification
S09-94-000177 All parts must be cleaned prior to welding
S09-94-000178 A WPS is not required
S09-94-000182 All welds must be free from cracks and fissures or other defects that would make them incompatible with a high vacuum environment.
Inspection of welded joints
(SYY-XX-)
Specification
S09-94-000183 100% of the vacuum boundary welded joints must be visually inspected
Component leak check
ID NUM
(SYY-XX-) Specification
S09-94-000185 100% of the vacuum boundary welded joints must be leak tested.
S09-94-000186 The leak test of the welded joint must be performed.
8.5.2.3 CLEANING AFTER MANUFACTURING
An intermediate cleaning must be done after manufacturing and must comply with the following requirements
ID NUM
(SYY-XX-)
Specification
S09-94-000172 UHV surfaces must be protected as per best practices during handling operations.
S09-94-000173 Parts must be stored in a clean area from the workshop
S09-94-000174 Parts must be suspended in tanks by wire, hooks or in baskets S09-94-000280
Ultrasonic bath must be used to rinse part
S09-94-000281 Any spot cleaning must be done by using acetone followed by isopropyl alcohol.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 13 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
8.6 Final test
The final tests to ensure the performance of the SR Single Flanged BPM Buttons must be performed in the sequence shown in Figure 8-1.
Figure 8-1: Final test sequence ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 14 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
General requirement
(SYY-XX-)
Specification
S09-94- 000193 All tests must take place in a clean area
S09-94-000197 LBNL must have right to visit the contractor during these tests
8.6.1 Inspection verification
(SYY-XX-)
Specification
S09-94-000282 100 % of BPM buttons must be inspected
8.6.2 Functional dimension verification
ID NUM
(SYY-XX-)
Specification
S09-94-000283 A Functional dimension verification must be performed, on all BPM Buttons
8.6.3 He Leak Test
ID NUM
(SYY-XX-)
RQMT DEF Specification Value Unit
S09-94-000284 must Allowable leak rate <1x10-11 torr-liters/sec.
8.7 Packing and shipping
ID NUM
(SYY-XX-)
Specification
S09-94-000285 The BPM button must be properly bagged, secured, and packaged to maintain cleanliness and prevent damage and contamination during transit by commercial carriers.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 15 of 16
All officially released LBNL documents are watermarked and contain LBNL Document
9 APPLICABLE DOCUMENTS
This section identifies applicable documents that are considered to be a part of this document. All information contained in an applicable document shall be valid to the full extent unless specifically noted within this document. Applicable documents must be obtained from the LBNL Document Control Center (DCC).
Table 9-1: Applicable documents ID Document ID Title
1 AL-1745-1942B SR Flanged BPM Buttons Statement of Work 2 AL-1745-1943A SR Flanged BPM Buttons ACL 3 AL-1220-7841F UHV Chamber and Component Production Requirements 4 AL-1405-1295A Control plan template 5 AL-1265-6612B ALS-U Build to Specification CAD Model and Drawing Requirements
6 AL-1225-3370 BUTTON, BPM, FLANGED, 6MM, 28.4 L
8 AL-1378-5599 BUTTON, BPM, FLANGED, 4MM OD, 35.5 L
9 AL -1379-1836 BUTTON, BPM, 4MM OD, 20.5 L
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
AL-1745-1941 Rev. A Doc. Status: Working Page 16 of 16
All officially released LBNL documents are watermarked and contain LBNL Document ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: X
FU
LN
H
TW
File details come from the government source that posted it. Updated .