This is a Scope of Work document for a multiple award archaeology contract issued by the State of Utah Division of Purchasing on behalf of the Utah Division of Wildlife Resources, in coordination with the Bureau of Land Management, Trust Lands Administration, Utah Division of Forestry, Fire, & State Lands, and the Utah Watershed Restoration Initiative. The project requires a Class II archaeological survey and cultural resources inventory of approximately 1,443.1 acres within the Wild Goose Fire burn area in Millard County, Utah, as well as revisits and updates to previously recorded archaeological sites within a 606.4-acre "Past Adequate Survey Area." The total Area of Potential Effect encompasses 2,049.5 acres across private lands (1,694.9 acres), Trust Lands Administration property (231.3 acres), and Bureau of Land Management lands (123.2 acres). The survey will be conducted using 30-meter transects and must comply with Section 106 of the National Historic Preservation Act and the State Protocol Agreement between the Utah State Historic Preservation Office and the Bureau of Land Management. The contract requires rolling consultation reporting within seven days following each field session, with fieldwork expected to be completed by November 18, 2026, draft deliverables due April 1, 2027, and final deliverables due June 1, 2027. No mandatory site visit or bidders conference is required, though agency archaeologists will conduct periodic inspections during fieldwork.

The contract is structured as a lump sum project with no modifications or change orders permitted for unexpected findings, despite expectations of high site density based on comparable recent surveys. Payment is scheduled in four milestones: 10 percent upon completion of pre-field literature review, 50 percent upon fieldwork completion with preliminary results, 30 percent upon delivery of draft deliverables, and the final 10 percent upon acceptance of final deliverables by agency archaeologists. Bidders must be on the approved vendor list for archaeology and hold current Bureau of Land Management Cultural Resources Use Permits and Public Lands Policy Coordinating Office Principal Investigator Permits. The project is funded through multiple state sources including Trust Lands Administration, the Utah Division of Forestry, Fire, & State Lands, the Utah Division of Wildlife Resources, and the Utah Watershed Restoration Initiative, with work conducted under procurement authority AS24-114. Award will be determined through a cumulative assessment combining the previously established Best Value score (300 points) from the original RFP with a new SOW Cost Point Award (700 points) based on individual bid responses, with the highest cumulative score receiving the contract at the submitted bid rate.

View the file

Other files

File Type Posted
8048_WildGoose_SurveyArea.kmz KMZ file
8048_WildGoose_SurveyArea_Landowner.zip ZIP file
5-Att.-A-PO-Terms-and-Conditions (1).docx DOCX document
2-ESR Rolling Consultation WildGooseESR.xlsx XLSX spreadsheet
8048_WildGoose_APE_Landowner.kmz KMZ file
8048_WildGoose_APE.zip ZIP file
8048_WildGoose_SurveyArea_Landowner.kmz KMZ file
8048_WildGoose_APE_Landowner.zip ZIP file
8048_WildGoose_SurveyArea.zip ZIP file
1-Vendor Prerequisites - IFB Agency.pdf PDF
6-NC27-113 Bid Table Unofficial.xlsx XLSX spreadsheet
8048_WildGoose_APE.kmz KMZ file
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Multiple Award for Archaeology Scope of Work Procurement Authority: State of Utah AS24-114 Project Title: Wild Goose Fire ESR, Cultural Resources Inventory (WRI 8048)

Solicitation to be conducted by Utah State Purchasing

Cultural Resources Project Type: Class II archaeological survey (30 meter transects) and site revisits (outside the survey area).

Project Description: The naturally caused Wild Goose Fire started on June 26th in Millard County. It was contained in late July after burning over 12,000 acres in Millard County. From the WRI proposal, the overall project objectives are:

1. Prevent invasive annual grass and weed species establishment.

2. Stabilize soils and reduce erosion.

3. Establish a productive understory of diverse grass, forb and shrub communities.

More from the WRI proposal: “This project objectives will consist of aerially seeding over [5,000] acres of the burned areas within the Wild Goose Fire with suitable grasses, forbs, shrub and browse species. This will be done through the use of contracting through State Purchasing a seeding contractor to aerially seed identified areas of the project… The treatment of a single chaining will be used in suitable areas to cover the seed and reduce erosion areas within the burn.”

The Project is a federal undertaking; as such, the cultural resources inventory is being completed in compliance with Section 106 of the National Historic Preservation Act and in accordance with State Protocol Agreement between Utah SHPO and BLM. The Project will require ‘rolling consultation’ per Appendix G of the State Protocol to receive preliminary concurrence from Utah State Historic Preservation Office (UtSHPO) and streamline the undertaking implementation (see below).

The Project includes state funding from the Trust Lands Administration (TLA), Utah Division of Forestry, Fire, & State Lands (FFSL), Utah Division of Wildlife Resources (DWR), and/or the Utah Watershed Restoration Initiative (WRI). Such state funding also qualifies this project as an undertaking as defined by Utah Code 9-8a-402. Such an undertaking requires these state agencies to take into account the effect of the undertaking on any historic property (Utah Code 9-8a-404).

The Project includes a cultural resource literature review and site revisits for the full Area of Potential Effect (APE; 2,049.5 acres) where mechanical treatments (chaining, drill seeding, mastication, etc.) may occur. Within the APE, a cultural resources inventory (Class II - 30 meter transects) is required for approximately 1,443.1 acres. Areas of the APE that are not included in the cultural resources inventory (~606.4 acres) were exempted from the new survey through early consultation with the Utah State Historic Preservation Office (UtSHPO), BLM, and partner state agencies. These exempted areas (“Past Adequate Survey Area”) were archaeologically surveyed since the year 2000. Within this area, previously recorded archaeological sites that were recorded between 2000 and 2010 and are NRHP unevaluated or eligible need to be revisited. These various Project activities will be documented in standard BLM and UtSHPO records and data files.

Specifically, the Project includes cultural resources identification and assessment tasks:

a. Completion of a cultural resource literature search, background research, data review, etc. of the entire APE (2,049.5 acres;

file: 8048_WildGoose_APE.zip/kmz) plus a 1/2-mile buffer of the APE.

b. Pedestrian cultural resource inventory (archaeological survey) of a portion of the APE defined in consultation with the

UtSHPO (1,443.1 acres; file: 8048_WildGoose_SurveyArea.zip/kmz). Survey intensity will be Class II using 30-meter width (or less) transects.

Being in the valley bottom, survey “exclusion” areas are not expected, but if areas within the survey area are deemed unsafe or are significantly steep, they may be excluded or surveyed at a less intensive level in conversation with the Agency Archaeologists. Such exclusion areas must be documented in the final report and delineated in the associated final project shapefiles. Exclusion areas will be shared with the Agency Archaeologists through shapefile as part of the Project’s rolling consultation requirement. Transect data shown as tracks in GIS and delivered in a separate shapefile may be required at the discretion of Agency Archaeologists to ensure full coverage of survey areas. If transect data are not required, it will be noted in the kickoff meeting. If requested, survey areas will be field mapped using professional quality GPS units, either through GPS’ing survey lines or GPS’ing the beginning and ending of survey transects.

https://wri.utah.gov/wri/project/title.html?id=8048

c. Revisit and documentation update of previously recorded archaeological sites within the Past Adequate Survey Area, were recorded between 2000 and 2010, and have an NRHP status of eligible or unevaluated. These resources will be recorded in accordance with current UtSHPO and BLM guidance and requirements. See a preliminary list of resources below.

d. Documentation of all previously recorded or newly identified cultural resources within the pedestrian archaeological survey area according to current UtSHPO and BLM guidance and requirements.

e. Complete “rolling consultation” reporting. This task is described below.

WRI Number: 8048

Land Manager: The Project is located on land administered by the BLM-Salt Lake Field Office (SLFO), private lands, and TLA lands.

Cultural Lead: Savanna Agardy, BLM West Desert District/US Wildland Fire Service (USWFS) Great Basin Unit 11 Fuels Archaeologist, will represent BLM lands and will lead agency cultural resource consultation efforts. Lindsay Fenner, TLA Archaeologist will represent TLA lands. Allan Wolfum, FFSL Archaeologist, and Arie Leeflang, DWR Archaeologist, will represent state funding interests. Arie Leeflang will handle invoicing and contracting tasks. These individuals are collectively noted as “Agency Archaeologists” in this document.

Fieldwork Preferences: The Agency Archaeologists will provide direction regarding fieldwork area priorities. Specifically, site revisits within the Past Adequate Survey Areas will likely need to be completed first to allow those areas to be treated first.

Do not place physical datums. Site boundaries, artifacts, and features must be GPS’d with submeter accuracy following BLM Utah Fieldwork Guidelines. Follow the 2008 UPAC Linear Sites guidance for the recordation of linear sites. Clearly justify the recordation of the linear as a site, according to the UPAC guidance, as opposed to an isolated occurrence. Linear sites that are not justified as an archaeological site will be transitioned to an isolated occurrence at the Contractor’s expense.

Utah Archaeological Site Forms will be completed for each newly recorded cultural resource site and each revisited previously documented site. Previously documented sites that are unable to be relocated will be documented using a Utah Archaeological Site Form Part A or appropriate UtSHPO Archaeology Records forms. Previously recorded sites that are recently recorded (less than 10 years) do not need to be re-documented if they have adequate information and key aspects have not changed since the previous recording, including but not limited to eligibility, condition/impacts, artifact or feature lists, and site boundary, and the existing documentation meets UtSHPO and BLM standards.

Each cultural resource site within the Project area shall be evaluated for inclusion in the National Register of Historic Places (NRHP), as set forth in 36 CFR 60. The Contractor shall make recommendations concerning site eligibility and include a written justification, both on the Utah Archaeological Site Form and in the Project report. This justification shall specify the specific criteria under which eligible sites are found to qualify and a discussion of the seven aspects of integrity specified in 36 CFR 60. Justifications should reference Research Questions from the applicable Class I Report. Final determinations of NRHP eligibility will be made by BLM in partnership with TLA, FFSL, and DWR, in consultation with the UtSHPO.

If areas of dense vegetation or steep slopes present an unsafe work environment, document the locations with GPS points or polygons and photographs. Such changes in archaeological survey intensity will be documented and shared with the Agency Archaeologists as part of rolling consultation materials (please see below) unless otherwise directed. These areas must be documented in the final report and spatial data attributes and will be coded as reconnaissance surveys or exempted in the report.

Photos shall be submitted for Isolated Occurrences (IOs) that are features or consist of diagnostic Indigenous artifacts. IOs that consist of more than one artifact shall list the measurable extent in which the IF occurs to ensure they do not meet the site definition. Follow the BLM/UtSHPO Protocol for IO definitions.

Site avoidance flagging is not required.

Reporting Requirements: No paper reporting is required for this project. Rolling consultation reporting is required. A single report and standard BLM and UtSHPO site forms and data files are required to document all the tasks listed. A half mile literature review buffer will be used to identify previously conducted archaeological investigations and previously recorded archaeological sites in the area. A streamlined cultural context or cultural setting for the Project area will be included in the report.

Report format will follow current BLM requirements, including the BLM 8100 summary form. Cultural resource findings and results may be provided in the report in a table or simplified format. Such presentation will include the site type, a site description, and a simplified NRHP discussion.

https://wri.utah.gov/wri/project/title.html?id=8048 https://www.blm.gov/sites/default/files/docs/2024-04/BLM%20Utah%20Cultural%20Fieldwork%20Guidelines%20and%20Standards_2024.pdf https://www.blm.gov/sites/default/files/docs/2024-04/BLM%20Utah%20Cultural%20Fieldwork%20Guidelines%20and%20Standards_2024.pdf https://www.blm.gov/sites/default/files/docs/2024-04/BLM%20Utah%20Cultural%20Fieldwork%20Guidelines%20and%20Standards_2024.pdf https://82f96c66-8d2b-4bed-939b-344cbc2ba706.usrfiles.com/ugd/82f96c_c901a7a7da6d4242ad7083a2392dc393.pdf https://82f96c66-8d2b-4bed-939b-344cbc2ba706.usrfiles.com/ugd/82f96c_c901a7a7da6d4242ad7083a2392dc393.pdf

Deliverables (draft and final) will each include the report, site forms, GIS data, tabular data, and IF data, all according to UtSHPO and BLM guidance, standards, and templates (e.g., Isolated Finds template). If revisions are substantial, additional reviews may be necessary. UtSHPO may also have additional edits that will need to be incorporated.

Follow the 2008 UPAC Linear Sites guidance for the recordation of linear sites. Roads or other linear features that are recorded as linear sites and are not appropriately justified as a linear site in alignment with the UPAC guidance will be asked to transition the site to an isolated occurrence at the Contractor’s expense.

The Utah Archaeology Site Form will be used for recording new sites and updating previously recorded sites. All sites shall be assigned Smithsonian Trinomials prior to draft deliverables submission. Do not submit draft deliverables with temp numbers only.

Include photographs of all diagnostic artifacts and features and a representative sample of complete groundstone tools if found.

Also document onsite deposition depth estimates and your method to determine depth as part of your NRHP discussion and recommendation.

Upon completion of fieldwork, Agency Archaeologists may request the spatial data for transect lines, archaeological sites, as well as preliminary fieldwork results such as a list of sites, total Class II or exclusion acres (if applicable), and preliminary eligibility determinations before approving the fieldwork completion milestone invoice. If transect data may be required, it will be disclosed in the project kickoff meeting.

UtSHPO Rolling Consultation: Rolling consultation with the UtSHPO is planned and will require reporting to the Agency Archaeologists by the Contractor following each field session. This will include reporting the area of newly completed survey (via shapefile) and initial documentation and updating of newly recorded or updated archaeological sites (via spreadsheet, attached:

ESR_Rolling_Consultation_WildGooseESR.xlsx). This reporting is required within seven days of the closing of each archaeological field session. Archaeological site reporting will be via the BLM rolling consultation template spreadsheet (attached) and with the submission of all documented site boundaries and completed-survey areas in a shapefile. This is an extra effort above usual non- ESR project reporting and is time critical as treatments may begin immediately following rolling consultation completion with UtSHPO. Initial rolling consultation is expected within 17 days of fieldwork start (10-day session plus 7 days processing time).

Permitting Requirements: Principal Investigators, Field Directors, and Crew Chiefs must hold a current BLM Cultural Resources Use Permit for the Great Basin and a Public Lands Policy Coordinating Office (PLPCO) Principal Investigator Permit to Conduct Archaeological Surveys. Further, all work shall be performed in accordance with the Secretary of the Interior’s "Standards and Guidelines for Archaeology and Historical Preservation” (Federal Register, Volume 48, Number 190; Thursday, September 29, 1983, page 44716). The Principal Investigator shall be required to hold a valid state permit to conduct archaeological surveys on federal and state property. Field directors must be listed under the BLM permit. The Contractor shall provide qualified personnel who have knowledge and experience in identifying and evaluating cultural resources found in Utah. All Project staff and crew members must be directly supervised in the field by qualified and permit-listed field directors or the principal investigator. Staffing changes must be approved by the Agency Archaeologists.

Fieldwork authorizations from the BLM field office and TLA are required.

MA for Archaeology Region: Southern, greater than 300 acres.

WRI Contracting Model: Lump sum. As a lump sum project, cost modifications or change orders based upon unexpected or excessive findings will not be possible. The area is expected to have a high site density.

Acres:

APE: 2,049.5 acres*

● Private = 1,694.9 acres

● TLA = 231.3 acres

● BLM = 123.2 acres

Survey Area: 1,443.1 acres**

● Private: 1,319.6 acres

● TLA: less than 1 acre (likely GIS layers error or alignment issue)

● BLM: 123.2 acres

*There are approximately 606.4 acres of previous survey that is considered adequate (Past Adequate Survey Area), and eligible for exclusion from new survey in consultation with Agency Archaeologists and the UtSHPO. As such, the acres requiring Class II Inventory will be 1,443.1 acres. Revisiting certain sites in the excluded areas is required (see section below).

**As part of the GIS exercise building the survey area, certain areas of Past Adequate Survey Area were added back into the survey area to make a less disjointed survey polygon. Other extraneous ‘sliver’ areas that were not previously surveyed were manually removed from the required survey area due to their small size and likely origin as a GIS digitizing or generalization error.

Period of Performance:

Expected Fieldwork Completion Date: November 18, 2026 Rolling Consultation Due Date: Seven working days following each field session.

Draft Deliverables Due Date: April 1, 2027 Final Deliverables Due Date: June 1, 2027

Expectations: Based on recent nearby surveys (U09UM0550, U22LI0459, U25U10772) and good ground visibility, site density is expected to be high.

Revisit of Previously Recorded Sites Outside of the Survey Area, within Past Adequate Survey Area: In consultation with UtSHPO, certain previously recorded sites within the Past Adequate Survey Area require a revisit, re-recording, and NRHP update and assessment. These include sites recorded between 2000 and 2010 that are unevaluated, recommended eligible for, or determined eligible for, the NRHP. As all of the previously recorded sites within the Past Adequate Survey area were recorded between 2000 and 2010, all previously recorded sites which have an unevaluated or eligible status will be revisited and updated.

Below is a preliminary list of previously recorded sites within the larger project area and their revisit work requirement. If additional sites, or corrections to this list, are identified that qualify under the criteria listed above (e.g., recorded 2000-2010 and NRHP unevaluated or eligible), these newly identified sites will also require revisit and reassessment

List of preliminary of previously recorded sites within the Past Adequate Survey Area and their site revisit requirement:

Smith_Tri Class Site Type Year Recorded Eligibility Revisit?

42MD3305 Indigenous Lithic and tool scatter 2008 Eligible Yes

42MD3306 Indigenous Lithic and tool scatter 2008 Eligible Yes

42MD3417 Multicomponent Indigenous and historic artifact scatter 2009 Not eligible No

42MD3418 Historic Artifact scatter 2009 Not eligible No

42MD3421 Historic Artifact scatter 2009 Not eligible No

42MD3422 Historic Artifact scatter 2009 Not eligible No

42MD3423 Historic Artifact scatter 2009 Not eligible No

42MD3424 Historic Artifact scatter 2009 Not eligible No

42MD3425 Historic Artifact scatter 2009 Not eligible No

42MD3427 Indigenous Artifact scatter 2009 Not eligible No

42MD3429 Indigenous Artifact scatter 2009 Not eligible No

42MD3430 Indigenous Artifact scatter 2009 Eligible Yes

42MD3431 Historic Irrigation ditch 2009 Not eligible No

42MD3432 Historic Historic road 2009 Eligible Yes

42MD3433 Historic Dugout and irrigation ditch 2009 Eligible Yes

42MD3434 Indigenous Artifact scatter 2009 Not eligible No https://dha.lib.utah.edu/ark:/87278/s6bc6jt2 https://dha.lib.utah.edu/ark:/87278/s6cgfmgs https://dha.lib.utah.edu/ark:/87278/s6zh920t

Access: Access to the Project area will be through established BLM, county, and private roads. A high clearance four-wheel drive, field-going vehicle will be required. As the area is within burn scar, roads may be in poor condition or destroyed. Deadwalking to reach certain portions of private land may be required due to poor roads or lack of roads. Seasonal weather will make the roads slippery and difficult. Access to private land will be coordinated with Kendall Bagley, DWR Southern Region Assistant Habitat Manager.

Inspections: Agency Archaeologists will complete periodic site visits and inspections during fieldwork and as part of the review of draft and final deliverable records.

Payment Schedule: Invoicing for this project will follow the standard Multiple Award for Archaeology contract schedule: 10% invoiced upon completion of pre-field literature review; 50% upon completion of fieldwork, including a preliminary report of fieldwork results as described above; 30% upon delivery of draft deliverables; final 10% upon full acceptance of final deliverables by the Agency Archaeologists. Approval of milestone invoicing must be made by Agency Archaeologists. If more frequent invoicing is required, include your preferred invoice schedule in your bid response for consideration by the Project managers.

Please note – arrival and approval of each milestone require the submission of milestone-reaching documentation:

● Pre-field literature review: submission of a brief Class I document that summarizes the initial literature review and background research effort. While this does not need to be polished, the document should provide evidence of a thorough literature review effort and should include a survey findings expectations paragraph.

● Fieldwork: Cultural leads may request documentation of fieldwork and preliminary fieldwork results. This may include spatial data for fieldwork transect lines, preliminary archaeological site boundaries, and class II or other exclusion areas.

Preliminary site lists and preliminary eligibility determinations may also be requested. Such submissions may be waived by the cultural leads during the Project kickoff meeting.

● Draft deliverables: draft UtSHPO package following BLM and UtSHPO reporting and data standards requirements.

● Final deliverables: final UtSHPO package following BLM and UtSHPO reporting and data standards requirements.

Billing PO: 202644

Attached Files:

● 8048_WildGoose_GIS.zip – a zipped folder containing the following GIS files: (Note, the GIS shapefiles, not the map figures, will be used for all contractual project area identification tasks. SOW-included maps are generalized and provided to orient bidders to the general area of the Project.)

o 8048_WildGoose_APE.zip/kmz: – a GIS shapefile and KMZ file of the full APE, including the Past Adequate Survey Area.

o 8048_WildGoose_APE_Landowner.zip/kmz - the same GIS shapefile as above, but with landownership delineated.

o 8048_WildGoose_SurveyArea.zip/kmz: – a GIS shapefile and KMZ file of the class II archaeological survey area.

o 8048_WildGoose_SurveyArea_Landowner.zip/kmz - the same GIS shapefile as above, but with landownership delineated.

● ESR_Rolling_Consultation_WildGooseESR.xlsx – the required BLM template for reporting documented sites for “rolling consultation” with UtSHPO. The Contractor will provide session fieldwork results within seven days of session’s end. Results will include this spreadsheet (populated), site boundaries in a shapefile, and a shapefile of the completed survey area.

How Projects will be Awarded

The individual SOW project award will be made based upon a cumulative assessment which will take place at each project release.

That assessment will combine the previously outlined Best Value score and a new “SOW Cost Point Award.”

The Best Value score was awarded in RFP AS24-114 and is not changeable. It is a portion of 300 points as assessed in the first three categories (Technical Criteria) of the RFP.

The “SOW Cost Point Award” is figured each time bids are received based upon an individual SOW. The bid responses may be for a “lump sum” bid that would cover all the costs associated with the entire project. Or the bid responses may ask for a “base rate” bid that would cover the basic aspects of an archaeological survey and a “per site” bid that would also ask for the costs to record an archaeological site. 700 cost points are possible. The lowest cost bid will receive the full 700 points. Each higher bid will receive points based upon its percentage higher than the lowest bid.

Cumulative Assessment is calculated by:

(AS24-114 Best Value score out of 300) + (“SOW Cost Point Award” out of 700)

The highest point tally will receive the Project contract at their submitted bid rate.

This approach will assure the State of Utah and the WRI are able to include the point rankings associated with non-cost elements from the RFP, along with the cost ranking associated with each project SOW release (aka the “SOW Cost Point Award”).

All work is contracted and awarded through the State of Utah Division of State Purchasing & General Services Solicitation AS24-114 and Limited Purchasing Delegation #230

Any awarded work is at a fixed rate and is not open to modification except as allowed under State of Utah Division of State Purchasing & General Services rules.

*Your PDF bid response document is the legal document DWR will use to access and score bids. The bid table entries in U3P will not be used to score the bids and is simply a tool for State Purchasing to quickly gather preliminary bid information.

Copyright:© 2013 National Geographic Society, i-cubed

4335000

4330000

4335000

4330000

410000405000

410000405000

990 0 990 1,980 2,970 3,960495

Meters

Area of Potential Effect Survey Area µ Figure 1: Area of Potential Effect and Survey Area.

Wild Goose Fire ESR, Cultural Resources Inventory.

WRI 8048.

AGOL USA Topographic Map.

Map prepared by Arie W. Leeflang, September 14, 2026.