4-4451-012 Attachment C - Bid Schedule.pdf
PDF 110 KB Posted
- Attached to
- UDOT Blanding Wash Pad
- Solicitation number
- UDOT260217CN -
- Issued by
- Tooele County, Utah
About this file
This is a Bid Schedule (Attachment C) for a construction project issued by the Utah Department of Transportation (UDOT) Region 4 for the Blanding Yard MS4 Improvements project located on US-191 at milepost 49.5 (Maintenance No. 4451-012). The project involves cast-in-place concrete work and utility installations at the Blanding Maintenance Station. The bid schedule contains nine line items with specified quantities: mobilization (1 lump sum), one cast-in-place catch basin, 2,000 square feet of concrete flatwork, 100 linear feet of stem wall with footer, one precast 660 SA installation, 150 linear feet of 2-inch SDR-11 waterline piping, 10 linear feet of 2-inch galvanized waterline piping, 50 linear feet of 8-inch SDR-35 sewer pipe, and one yard hydrant installation (1 lump sum). The mandatory virtual pre-bid meeting is scheduled for Thursday, April 16, 2026, at 2:00 PM, with attendance required for bid eligibility. Project completion is required by June 26, 2026.
All prices are to be entered by the bidder in the blank fields provided for unit price and total cost for each line item. The bid schedule indicates that all work includes labor, materials, and equipment as specified, with connections to drainage features and other infrastructure considered incidental to construction with no separate payment. Material responsibilities between the contractor and UDOT are detailed in the Material List on the final page of Attachment E. The solicitation requires award to the lowest responsive and responsible bidder, and this will be a contractor-assisted maintenance project completed in part by the UDOT Blanding maintenance crew in conjunction with the selected contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C
Bidding Schedule
Project Name: Blanding Yard MS4 Improvements Route: US-191
MP: 49.5
Maintenance No.: 4451-012
ITEM DESCRIPTION CONDITIONS & DEFINITIONS UNIT QTY PRICE TOTAL
1 Mobilization - San Juan County
Section 01501 - Mobilization A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
E. Includes time and travel for project related meetings.
Lump 1 ($ - ) ($ - )
2 Catch Basin - Cast-in-Place
Section 02633 - Concrete Drainage Structures A. Includes labor, material, and equipment.
B. Consists of all necessary materials required to make a complete drainage structure including but not limited to the following: Concrete, reinforcing steel, manhole steps, and any other items required in standard drawings. See DB series UDOT Standard Drawings. Includes in-field coring upon approval of State representative.
C. The connection to any pipe culvert or other drainage feature will be incidental to construction and no separate payment will be made for this work.
Each 1 ($ - ) ($ - )
3 Concrete Flatwork
Section 02776 - Concrete Flatwork A. Calculated using the in-place surface area.
B. Includes excavation and compaction.
C. Includes untreated base course and granular borrow.
D. Includes labor, material, and equipment.
E. Consists of all necessary materials required to make a complete work item including but not limited to the following: Concrete, reinforcing steel, and any other items required. in standard drawings. Includes in-field coring upon approval of State representative.
F. The connection to any pipe culvert or other drainage feature will be incidental to construction and no separate payment will be made for this work.
SF 2,000 ($ - ) ($ - )
4 Stem Wall with Footer - Cast-in-Place
Section 03055: Portland Cement Concrete A. Includes labor, material, and equipment.
B. Consists of all necessary materials required to make a complete work item including but not limited to the following: Concrete, reinforcing steel, manhole steps, and any other items required in standard drawings. See DB series UDOT Standard Drawings.
Includes in-field coring upon approval of State representative.
C. The connection to any pipe culvert or other drainage feature will be incidental to construction and no separate payment will be made for this work.
LF 100 ($ - ) ($ - )
Project Name: Blanding Yard MS4 Improvements Route: US-191
MP: 49.5
Maintenance No.: 4451-012
ITEM DESCRIPTION CONDITIONS & DEFINITIONS UNIT QTY PRICE TOTAL
5 Installation of 660 SA - Precast
A. Includes excavation and compaction.
C. Includes untreated base course and granular borrow.
D. Includes labor, material, and equipment.
E. Consists of all necessary materials required to make a complete work item.
F. The connection to any pipe will be incidental to construction and no separate payment will be made for this work.
Each 1 ($ - ) ($ - )
6 Installation of Utility Piping - 2 IN
SDR-11, waterline A. Includes excavation and compaction.
B. Includes labor, material, and equipment.
C. Consists of all necessary materials required to make a complete work item not specifically noted as provided by UDOT.
LF 150 ($ - ) ($ - )
7 Installation of Utility Piping - 2 IN
Galvanized pipe, waterline A. Includes excavation and compaction.
B. Includes labor, material, and equipment.
C. Consists of all necessary materials required to make a complete work item not specifically noted as provided by UDOT.
LF 10 ($ - ) ($ - )
8 Installation of Utility Piping - 8 IN
SDR-35, sewer pipe A. Includes excavation and compaction.
B. Includes labor, material, and equipment.
C. Consists of all necessary materials required to make a complete work item not specifically noted as provided by UDOT.
LF 50 ($ - ) ($ - )
9 Installation of Yard Hydrant - 2IN See detail drawing.
A. Includes labor, material, and equipment.
B. Consists of all necessary materials required to make a complete work item.
Lump 1 ($ - ) ($ - )
See the final page of Attachment E for the "Material List" which shows the division between the Contractor and UDOT.
Grand Total ($ - )