4-4 - Appendix D - CMAR Cost Breakdown.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Construction Manager-at-Risk Austin MS
Solicitation number
RFP 26-260511
Issued by
Laurens County, Georgia

About this file

This document is a CMAR Cost Breakdown Appendix for RFP 25-250611 related to the South Paulding High School construction project in Paulding County School District, Georgia. The appendix outlines the detailed cost structure and line items that a Construction Manager-at-Risk contractor must include in their proposal. The cost breakdown is organized into major categories including preconstruction services, general conditions, construction fees, cost of work, work by others, and owner allowances. Preconstruction services encompass preliminary cost estimations, project meetings, drawing reviews, and site visits, supported by a comprehensive project management team including project executives, senior project managers, project superintendents, estimators, and safety directors. The document establishes that all listed items must be included in the contractor's pricing, with corresponding checkmarks indicating required cost line items.

The cost breakdown structure requires the CMAR contractor to provide lump-sum pricing for preconstruction services and general conditions, establish a construction fee percentage, and identify the cost of work. General conditions encompass site supervision, project coordination, jobsite office expenses, site safety and security, equipment, bonds and insurance, and miscellaneous project management items. Specific cost categories include temporary facilities setup, traffic control and security measures, cleaning and dust control, equipment rentals, performance and payment bonds, workers compensation and liability insurance, permit and inspection fees, and project closeout activities. This comprehensive breakdown ensures transparent cost allocation and allows the school district to evaluate the contractor's understanding of project scope, risk management, and overhead requirements for the school facility renovation and construction initiative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix D RFP 25-250611, CMAR South Paulding HS Appendix D - CMAR Cost Breakdown

ItemPreconstruction Services (LS)General Conditions (LS)Construction Fee (%)Cost of WorkWork by OthersOwner Allowances
Preconstruction Services
Preliminary Cost Estimations and Pricing ExercisesX
Project Meetings Prior to GMPX
Drawing Review and Architect Coordination for DesignX
Preliminary Site VisitsX
Site Supervision and Management
Project ExecutiveX
Corporate ExecutiveX
Legal ServicesX
Senior Project ManagerX
Project ManagerX
Project SuperintendentX
Assistant SuperintendentX
ForemanX
Project CoordinatorX
SecretaryX
Pre-construction ManagerX
EstimatorX
Safety DirectorX
Miscellaneous LaborX
SchedulerX
PurchasingX
AccountantX
Project Coordination and MeetingsX
Site Expenses
Job Office TrailerX
Jobsite Office SetupX
Temporary StorageX
Jobsite Office Furniture/FixturesX
Jobsite Office SuppliesX
Janitorial SuppliesX
First AidX
TelephonesX
InternetX
Temporary Utilities SetupX
Jobsite Monthly UtilitiesX
Staking & LayoutX
PostageX
ComputersX
SoftwareX
Existing Bldg. Furnishings Move-out/Move-inX
Existing Bldg. Packing SuppliesX
Existing Building Furnishings StorageX
Temporary Protection of Existing FacilitiesX
Job Toilets / Handwashing StationsX
Site Safety & Security
Safety IncentivesX
Traffic ControlX
Safety EquipmentX
RaingearX
Safety Gear (Hardhats, harnesses, etc.)X
Safety TrainingX
Drug TestingX
Temporary Fences and GatesX
Security GuardsX
Fire Protection (incl Extinguishers)X
Safety BarricadesX
Safety RailingsX
Weather ProtectionsX
ScaffoldingX
Temporary Ladders/StairsX
Temporary Access for Existing Bldg. EgressX
Cleaning
Dust ControlX
Daily CleaningX
Final CleanX
Window CleaningX
Jobsite DumpstersX
Equipment
Small Tools / ExpendablesX
Materials Handling EquipmentX
Equipment MaintenanceX
Dewatering EquipmentX
Generators / Air CompressorsX
Rental EquipmentX
Crane RentalsX
Bonds and Insurance
Performance and Payment BondsX
Workers Compensation InsuranceX
Liability InsuranceX
Unemployment InsuranceX
FICAX
Builder's Risk InsuranceX
Miscellaneous Items
CM General OverheadX
CM ProfitX
Costs over GMPX
Value EngineeringX
Project Staff Living ExpensesX
Per Diems and MealsX
Warranty WorkX
Ceremony ExpensesX
Staff VehiclesX
FuelX
Water / Ice / CupsX
Job SignageX
Project Drawings ReproductionX
Cold Weather ProtectionX
Temporary Heat for BuildingX
Progress Photos / DocumentationX
Temporary RoadsX
Corrective WorkX
Project Close-outX
As-builtsX
Owner TrainingX
PunchlistX
Advertising for BidsX
Plan Review FeesX
Impact FeesX
Permit FeesX
Soils TestingX
Construction Materials TestingX
Special InspectionsX
NPDES Third Party InspectionsX
Utilities Connection FeesX