Nederland Fuel Tank Replacement
Solicitation number
BID-316-26
Issued by
Boulder County, Colorado

About this file

This is a Bid Tabulation Form for the Nederland Fuel Tank Replacement project administered by Boulder County Building Services, a Division of Public Works in Colorado. The project involves replacing one 10,000-gallon above-ground fuel storage tank located at 286 Ridge Road, Nederland, CO 80466, with a new UL-2085 AST storage tank split 60/40 for unleaded and diesel fuel. Work is to be completed by Q3 2027. Contractors may bid on all items or selected items, which include: Item #1 covering all demolition and site concrete paving work (saw cutting and removal of asphalt, excavation, gravel fill, backfill, compaction, layout, reinforcing steel installation, concrete forming and finishing, bollard installation, and required submittals); Item #2 covering storage tank removal and replacement including tank drainage, decommissioning, installation of the new 10,000-gallon tank, fuel dispenser installation, piping, pumps, sensors, hoses, hangers, and all appurtenances with compliance testing per State of Colorado requirements; and Item #3 covering electrical work including trenching, backfill, paving, and field verifications. Contractors must complete a total bid line regardless of which items they select.

The bid tabulation form requires contractors to provide individual cost estimates for each of the three items and a combined bid total. No specific response date, due date, award date, or contract term information is provided in this tabulation document. Contractors are directed to Boulder County's submittal instructions for additional procurement process requirements and contact procurement@bouldercounty.gov for questions regarding the Boulder County procurement process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TABULATION

Contractors may choose to bid on all items or only on selected items (items 1–3) as indicated on the Bid Tabulation Form. Regardless of which items you bid on, please be sure to complete the total bid line.

Description:

Cost:

ITEM #1: All demo and site concrete paving work described in the Drawings.

ITEM #2: Storage Tank Remove and Replace

ITEM #3: Electrical

BID Total:

ITEM #1: All demo and site concrete paving work described in the Drawings.

a. Saw cut, removal and haul-off of asphalt paving in preparation of concrete pad and apron.

b. Excavation, gravel fill, backfill, and compaction.

c. Layout from provided control points.

d. Provide and install all reinforcing steel.

e. Form, place, and finish all concrete including saw cutting of control joints.

f. Supply and install all concrete-filled bollards.

g. Submittals include rebar shop drawings and mix designs.

h. All accessories and materials necessary for complete installation per the project documents.

ITEM #2: Storage Tank Remove and Replace

a. Remove one 10,000-gallon storage tank. Include drain down and decommissioning of tank.

b. Provide and install one 10,000-gallon UL-2085 AST storage tank, split 60/40 for unleaded and diesel fuel.

c. Provide and install fuel dispenser per specification.

d. Include all piping, pumps, sensors, hoses, hangers, and appurtenances for a complete installation.

e. All testing to comply with State of Colorado requirements.

ITEM #3: Electrical

a. Provide alternate pricing for electrical power including trenching, backfill, and paving.

b. Responsible for field verifications.

ITEM #2: Storage Tank Remove and Replace
ITEM #3: Electrical
CostITEM 1 All demo and site concrete paving work described in the Drawings:
CostITEM 2 Storage Tank Remove and Replace:
CostITEM 3 Electrical:
CostBID Total: