Summary
This is a Schedule of Bid Items (Bid Sheet Attachment C) for the Southwest Regional Park (SWRP) Field & Track Upgrades project in Texas. The project encompasses comprehensive improvements to multiple athletic fields and associated infrastructure across Fields 1, 5, 6, 7, 8, and 9. The scope of work is organized into three main schedules: Schedule 100 (General Site/Civil work), Schedule 200 (Athletic Fields/Flatwork/Fencing), and Schedule 300 (Miscellaneous items). Schedule 100 includes demolition of existing turf, trees, irrigation systems, and concrete structures; erosion control and tree protection measures; and extensive earthwork including excavation of up to 9,350 cubic yards and embankment/fill work totaling 14,150 cubic yards. Schedule 200 addresses fence replacement for Fields 1 and 5, track resurfacing for Field 6 (50,830 square feet), installation of three new synthetic flex fields (Fields 7, 8, and 9) totaling 262,320 square feet of artificial turf, construction of ribbon curbs, concrete walks, drainage systems, and vinyl-coated chain link fencing with various heights. Additional Schedule 200 work includes parking lot improvements, handicap space modifications, bleachers, shade cantilevered structures, and site revegetation across 6,460 square yards.
The bid sheet provides line-item quantities and unit descriptions for all work items but does not display completed pricing information, as the document shows placeholder values of "$-0" for all subtotals and indicates that bidders must enter unit prices and project duration in days for each schedule. The project involves substantial infrastructure improvements to a public recreational facility with work spread across multiple fields and common areas, requiring coordination of demolition, construction, and landscaping activities. Bidders are expected to provide comprehensive pricing for labor, materials, and equipment while identifying realistic project timelines for each major work schedule.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SWRP_SCH-BID_(2026-01)
Southwest Regional Park - Field & Track Upgrades Schedule of Bid Items
| ERROR:#VALUE! | |||||||
| 1.14.2026 | |||||||
| Item No. | Spec. | Description | Quantity | Unit | Unit Price | Total Price | Project Duration for Delivery & Installation (show in days) |
| No. | |||||||
| SCHEDULE NO. 100 - GENERAL SITE / CIVIL | |||||||
| Demolition | |||||||
| 100.01 | Existing Field 6: Clearing/Grubbing - remove existing natural turf and soil to 4 inch depth minimum, use onsite for embankment/backfill at sides of field. | 2.55 | AC | ||||
| 100.02 | Existing Fields 7,8 & 9: Clearing/Grubbing - remove existing natural turf and soil to 4 inch depth minimum, use onsite for embankment/backfill at sides of field. | 7 | AC | ||||
| 100.03 | Tree Removal | 17 | EA | ||||
| 100.04 | Irrigation Demolition Allowance (Fields 6 - 9) - removal and/or capping/abandon in place, adjusting mainline as needed - existing irrigation system within proposed synthetic field area. | 1 | LS | ||||
| 100.05 | Demolition Existing Misc. Drainage (culverts, inlets, pipes, headwalls, pipe railing etc) - all fields 6, 7, 8, 9 | 1 | LS | ||||
| 100.06 | Demolition Existing Decomposed Granite Trail | 500 | SF | ||||
| 100.07 | Demolition Existing Rock Wall | 80 | LF | ||||
| 100.08 | Demolition Existing Misc.Concrete | 6,410 | SF | ||||
| 100.09 | Demolition Misc. Site Chainlink Fencing (North Field 7, Northwest Field 8, South Field 9) | 487 | LF | ||||
| 100.10 | Demolition Misc. Site Chainlink Fencing (At Fence Replacement Fields: South Field 1, South Field 5) | 445 | LF | ||||
| 100.11 | Remove Existing wheelstops with Dowels (at mill/overlay area - 8 Spaces) | 8 | EA | ||||
| 100.12 | Field 6 Parking Lot - Remove/Dispose Existing Concrete Wheelstops | 11 | EA | ||||
| 100.13 | Field 6 Parking Lot - Remove/Dispose Existing Handicap Signs / Posts | 9 | EA | ||||
| 100.14 | Field 7 & 8 Parking Lot - Remove/Dispose Existing Concrete Wheelstops | 7 | EA | ||||
| 100.15 | Field 7 & 8 Parking Lot - Remove/Dispose Existing Handicap Signs / Posts | 8 | EA | ||||
| 100.16 | Field 9 Parking Lot - Remove/Dispose Concrete Wheelstop (at van accessible stripe-out) | 1 | EA | ||||
| Erosion Control & Tree Protection | |||||||
| 100.17 | G6 | Temporary Sediment Control Fence | 1,200 | LF | |||
| 100.18 | G6 | Inlet Protection | 720 | LF | |||
| 100.19 | G6 | Rock Berm | 137 | LF | |||
| 100.20 | G6 | Stabilized Rock Construction Entrance | 2 | EA | |||
| 100.21 | G6 | Construction Entrance - Trackout Control Mats (2 panels) | 2 | EA | |||
| 100.22 | G6 | Concrete Washout | 3 | EA | |||
| 100.23 | G6 | Tree Protection | 2,630 | LF | |||
| Earthwork / Quarry Block Retaining Walls / Storm Sewer | |||||||
| 100.24 | Excavation/Cut (Fields 7, 8, 9, site) | 6,250 | CY | ||||
| 100.25 | Excavation/Cut (Field 6) | 3,100 | CY | ||||
| 100.26 | Embankment/Fill (On-site Material from Field 7,.8, 9 - assume meets geotech specifications for embankment/fill) | 6,250 | CY | ||||
| 100.27 | Embankment/Fill (Import Material) | 7,900 | CY | ||||
| 100.28 | Field 7 - Quarry Block Retaining Wall - Type 1 (0 - 2 ft. Max.) | 470 | LF | ||||
| 100.29 | Field 7 - Quarry Block Retaining Wall - Type 1 (0 - 4 ft. Max.) | 625 | LF | ||||
| 100.30 | Field 8 - Quarry Block Retaining Wall - Type 1 (0 - 2 ft. Max.) | 250 | LF | ||||
| 100.31 | Field 8 - Quarry Block Retaining Wall - Type 1 (0 - 4 ft. Max.) | 620 | LF | ||||
| 100.32 | Field 8 - Quarry Block Retaining Wall - Type 2 (4 - 6 ft. Max.) | 310 | LF | ||||
| 100.33 | Field 9 - Quarry Block Retaining Wall - Type 1 (0 - 2 ft. Max.) | 250 | LF | ||||
| 100.34 | Field 9 - Quarry Block Retaining Wall - Type 1 (0 - 4 ft. Max.) | 665 | LF | ||||
| 100.35 | Field 9 - Quarry Block Retaining Wall - Type 2 (4 - 6 ft. Max.) | 22 | LF | ||||
| SUBTOTAL SCHEDULE NO. 100: | $ - 0 | Enter Total # of Days Here |
| SCHEDULE NO. 200 - ATHLETIC FIELDS / FLATWORK / FENCING | |||||||
| FIELDS 1 & 5 - Fence Replacement | |||||||
| 200.00 | Field 1: 8 ft. Vinyl Coated Chain Link (on 8 in. ribbon curb/turf anchor) | 230 | LF | ||||
| 200.01 | Field 5: 8 ft. Vinyl Coated Chain Link (on 8 in. ribbon curb/turf anchor) | 215 | LF | ||||
| FIELD 6 - Track Resurfacing | |||||||
| 200.02 | Track Re-surfacing (remove existing track surface, resurface with Paragon Sports PTS 2000 Spray Coat System or equal) | 50,830 | SF | ||||
| FIELD 6 - 1 New Synthetic Flex Fields (Soccer & Football) | |||||||
| 200.03 | Artificial Turf Fields (109,760 sf./field | subgrade compaction, turf, infill, pad, liner, drain stone & subsurface drainage system) | 109,760 | SF | ||||
| 200.04 | Nyloplast Drop Basin W/ Cast Iron Lid & Turf Cover (reconect 24" outfall pipe) | 1 | EA | ||||
| 200.05 | 20 ft. height Protective Net (collapsable net) | 130 | LF | ||||
| 200.06 | Field Equipment Allowance (combo football/soccer goals & corner flags-full size fields only) | 1 | LS | ||||
| FIELD 7 - 1 New Synthetic Flex Fields (Soccer) | |||||||
| 200.07 | Artificial Turf Fields (87,280 sf./field | subgrade compaction, turf, infill, pad, liner, drain stone & subsurface drainage system) | 87,280 | SF | ||||
| 200.08 | Nyloplast Drop Basin W/ Cast Iron Lid & Turf Cover | 1 | EA | ||||
| 200.09 | 18" HDPE | 90 | LF | ||||
| 200.10 | 12" HDPE | 21 | LF | ||||
| 200.11 | 18 x 18 x 12 in. Plain End Corrugated HDPE Wye | 1 | EA | ||||
| 200.12 | 18" Precast SET (with Concrete Mortared Riprap) | 1 | EA | ||||
| 200.13 | 3' x 3' Area Inlet with Heel Proof Grate | 1 | EA | ||||
| 200.14 | Ribbon Curb - 12 x 12 in. curb (1,205 LF/field | around synthetic turf, to face of wall, outside field) | 1,205 | LF | ||||
| 200.15 | Concrete Walk / Spectator Areas (5 IN Depth | to fields, spectator areas) | 2,600 | SF | ||||
| 200.16 | 3 ft. Vinyl Coated Chain Link (on 12 in. ribbon curb/turf anchor) | 215 | LF | ||||
| 200.17 | 4 ft. Vinyl Coated Chain Link (on 12 in. ribbon curb/turf anchor) | 515 | LF | ||||
| 200.18 | 8 ft. Vinyl Coated Chain Link (on 12 in. ribbon curb/turf anchor) | 570 | LF | ||||
| 200.19 | 4 ft. Vinyl Coated Chain Link w/ 16 ft. Net Above (on 12 in. ribbon curb/turf anchor) | 65 | LF | ||||
| 200.20 | 8 ft. Vinyl Coated Chain Link w/ 12 ft. Net Above (on 12 in. ribbon curb/turf anchor) | 65 | LF | ||||
| 200.21 | 3 ft. height, Vinyl Coated Chain Link Single Gates: 4 ft. leaves (Entry to Field) | 1 | EA | ||||
| 200.22 | 8 ft. height, Vinyl Coated Chain Link Single Gates: 4 ft. leaves | 3 | EA | ||||
| 200.23 | 4 ft. height, Vinyl Coated Chain Link Double Gates: 6 ft. leaves | 1 | EA | ||||
| 200.24 | Field Equipment Allowance (soccer goals & corner flags-full size fields only) | 1 | LS | ||||
| FIELD 8 - 1 New Synthetic Flex Fields (Soccer) | |||||||
| 200.25 | Artificial Turf Fields (87,280 sf./field | subgrade compaction, turf, infill, pad, liner, drain stone & subsurface drainage system) | 87,280 | SF | ||||
| 200.26 | Nyloplast Drop Basin | 1 | EA | ||||
| 200.27 | 18" HDPE | 10 | LF | ||||
| 200.28 | Concrete Drain Outfall at Wall (for 18" HDPE piep with pipe gate) | 1 | EA | ||||
| 200.29 | Rip-Rap - 5 to 8 Inch Rock (on slurry concrete) | 230 | SF | ||||
| 200.30 | Ribbon Curb - 12x12 in. curb (1,205 LF/field | around synthetic turf, to face of wall, outside field) | 1,205 | LF | ||||
| 200.31 | Concrete Walk / Spectator Areas (5 IN Depth | to fields, spectator areas) | 4,990 | SF | ||||
| 200.32 | 3 ft. Vinyl Coated Chain Link (on 12 in. ribbon curb/turf anchor) | 220 | LF | ||||
| 200.33 | 4 ft. Vinyl Coated Chain Link (on 12 in. ribbon curb/turf anchor) | 515 | LF | ||||
| 200.34 | 8 ft. Vinyl Coated Chain Link (on 12 in. ribbon curb/turf anchor) | 580 | LF | ||||
| 200.35 | Chainlink Fencing Transition at Maintenance Gate & Quarry Block Wall (Detail 1/L414) - | ||||||
| 14 ft. Vinyl Coated Chain Link Transition to 6 ft. Fence on Quarry Wall (on 12 in. ribbon curb/turf anchor) | 11 | LF | |||||
| 200.36 | 4 ft. Vinyl Coated Chain Link w/ 16 ft. Net Above (on 12 in. ribbon curb/turf anchor) | 65 | LF | ||||
| 200.37 | 8 ft. Vinyl Coated Chain Link w/ 12 ft. Net Above (on 12 in. ribbon curb/turf anchor) | 65 | LF | ||||
| 200.38 | 3 ft. height, Vinyl Coated Chain Link Single Gates: 4 ft. leaves (Entry to Field) | 1 | EA | ||||
| 200.39 | 8 ft. height, Vinyl Coated Chain Link Single Gates: 4 ft. leaves | 1 | EA | ||||
| 200.40 | 4 ft. height, Vinyl Coated Chain Link Double Gates: 6 ft. leaves | 1 | EA | ||||
| 200.41 | Field Equipment Allowance (soccer goals & corner flags-full size fields only) | 1 | LS | ||||
| FIELD 9 - 1 New Synthetic Flex Fields (Soccer) | |||||||
| 200.42 | Artificial Turf Fields (87,280 sf./field | subgrade compaction, turf, infill, pad, liner, drain stone & subsurface drainage system) | 87,280 | SF | ||||
| 200.43 | Nyloplast Drop Basin | 1 | EA | ||||
| 200.44 | 18" HDPE | 10 | LF | ||||
| 200.45 | Concrete Drain Outfall at Wall (for 18" HDPE piep with pipe gate) | 1 | EA | ||||
| 200.46 | Rip-Rap - 5 to 8 Inch Rock (on slurry concrete) | 135 | SF | ||||
| 200.47 | 18" RCP Culvert (3-28 ft. parallel pipes) | 84 | LF | ||||
| 200.48 | 18" Precast SET (with Concrete Mortared Riprap) | 2 | EA | ||||
| 200.49 | Ribbon Curb - 12 x 12 in. curb (1,205 LF/field | around synthetic turf, to face of wall, outside field) | 1,205 | LF | ||||
| 200.50 | Concrete Walk / Spectator Areas (5 IN Depth | to fields, spectator areas) | 2,690 | SF | ||||
| 200.51 | 3 ft. Vinyl Coated Chain Link (on 12 in. ribbon curb/turf anchor) | 220 | LF | ||||
| 200.52 | 4 ft. Vinyl Coated Chain Link (on 12 in. ribbon curb/turf anchor) | 255 | LF | ||||
| 200.53 | 8 ft. Vinyl Coated Chain Link (on 12 in. ribbon curb/turf anchor) | 670 | LF | ||||
| 200.54 | 4 ft. Vinyl Coated Chain Link w/ 16 ft. Net Above (on 12 in. ribbon curb/turf anchor) | 65 | LF | ||||
| 200.55 | 8 ft. Vinyl Coated Chain Link w/ 12 ft. Net Above (on 12 in. ribbon curb/turf anchor) | 215 | LF | ||||
| 200.56 | 3 ft. height, Vinyl Coated Chain Link Single Gates: 4 ft. leaves (Entry to Field) | 1 | EA | ||||
| 200.57 | 8 ft. height, Vinyl Coated Chain Link Single Gates: 4 ft. leaves | 1 | EA | ||||
| 200.58 | 4 ft. height, Vinyl Coated Chain Link Double Gates: 6 ft. leaves | 1 | EA | ||||
| 200.59 | Field Equipment Allowance (soccer goals & corner flags-full size fields only) | 1 | LS | ||||
| Common Area Site Improvements (Fields 6, 7, 8 & 9) | |||||||
| 200.60 | Concrete Flume & Curb (5 IN Depth | Adjacent to existing basketball & pickleball courts) | 211 | LF | ||||
| 200.61 | Decomposed Granite Trail - Replacement (8 ft wide | includes sub-grade prep) | 500 | SF | ||||
| 200.62 | Existing Parking Lot Field 8 - Mill / Overlay with 2 Inch Depth Max., Type D Hot Mix Asphalt (near parking field 8) | 144 | SY | ||||
| 200.63 | Re-Stripe Parking Lot spaces (at mill/overlay area - 8 Spaces) - Allowance | 1 | LS | ||||
| 200.64 | Add Concrete wheelstops with Dowels (at mill/overlay area - 8 Spaces) | 8 | EA | ||||
| 200.65 | Ribbon Curb - 6 x 18 in. curb (75 LF | remove and replace curb at parking lot near field 8) | 75 | LF | ||||
| 200.66 | Concrete Walk (5 IN Depth | at parking near fields 8 & 9) | 756 | SF | ||||
| 200.67 | Field 6 Parking Lot - Seal Coat (Re-striped limits of handicap / accessible parking) | 2,275 | SF | ||||
| 200.68 | Field 6 Parking Lot - Add New Concrete Wheelstops | 10 | EA | ||||
| 200.69 | Field 6 Parking Lot - Handicap Space Markings (stripe out and symbol | 9 total accessible spaces - 4 van / 5 standard) | 1 | LS | ||||
| 200.70 | Field 6 Parking Lot - Standard Handicap Space Signage (post/sign) | 5 | EA | ||||
| 200.71 | Field 6 Parking Lot - Van Accessible Handicap Space Signage (post/sign) | 4 | EA | ||||
| 200.72 | Field 7 & 8 Parking Lot - Seal Coat (Re-striped limits of handicap / accessible parking) | 2,025 | SF | ||||
| 200.73 | Field 7 & 8 Parking Lot - Add New Concrete Wheelstops | 8 | EA | ||||
| 200.74 | Field 7 & 8 Parking Lot - Handicap Space Markings (stripe out and symbol | 8 total accessible spaces - 4 van / 4 standard) | 1 | LS | ||||
| 200.75 | Field 7 & 8 Parking Lot - Standard Handicap Space Signage (post/sign) | 4 | EA | ||||
| 200.76 | Field 7 & 8 Parking Lot - Van Accessible Handicap Space Signage (post/sign) | 4 | EA | ||||
| 200.77 | Field 9 Parking Lot - Handicap Space Markings (stripe out and symbol | 2 total accessible spaces - 1 van / 1 standard) | 1 | LS | ||||
| 200.78 | Field 9 Parking Lot - Standard Handicap Space Signage (post/sign) | 1 | EA | ||||
| 200.79 | Field 9 Parking Lot - Van Accessible Handicap Space Signage (post/sign) | 1 | EA | ||||
| 200.80 | Field 7 & 8 Pipe Guard Rail at Walkway - 3 ft. ht. Steel Pipe (w/ aluminum sleeve & core-drilled into concrete turndown) | 215 | LF | ||||
| 200.81 | 8 ft. Vinyl Coated Chain Link (on 12 in. ribbon curb/turf anchor) | 135 | LF | ||||
| 200.82 | 8 ft. height, Vinyl Coated Chain Link Double Gates: 4 ft. leaves | 2 | EA | ||||
| 200.83 | 8 ft. height, Vinyl Coated Chain Link Double Gates: 6 ft. leaves | 2 | EA | ||||
| 200.84 | 3-Row Aluminum Bleachers - Allowance (15' Three-Row - 30 Seat / Ea) | 12 | EA | ||||
| 200.85 | Spectator Fabric Shade Cantilever - (2 -10' x 20' = 40' Total per structure | includes install/footings) | 1 | EA | ||||
| 200.86 | Spectator Fabric Shade Cantilever - (3 -10' x 20' = 60' Total per structure | includes install/footings) | 5 | EA | ||||
| 200.87 | Revegetation - Bermuda Hydromulch (includes watering/establishment) | 6,460 | SY | ||||
| 200.88 | 3" Hardwood Mulch (over weed fabric) | 14 | CY | ||||
| SUBTOTAL SCHEDULE NO. 200: | $ - 0 | Enter Total # of Days Here |
| SCHEDULE NO. 300 - MISCELLANEOUS | |||||
| 300.00 | Mobilization/De-Mob/General Requirements of Contract/SWPPP | 1 | LS | ||
| SUBTOTAL SCHEDULE NO. 300: | $ - 0 | Enter Total # of Days Here |
TOTAL BASE BID SCHEDULES NO. 100 THROUGH 300: $ - 0 Total Days for Project:
Southwest Regional Park Field and Track Upgrades Schedule of Bid Items Page &P of &N 1-2026 60316.001 image2.png image3.jpeg