4-25-20_Winn981024D_Appendix_Ik.pdf

PDF 1 MB Posted

Attached to
WINN981024d 25-20
Solicitation number
009-RFB-WRBWL-CY25-20
Issued by
Story County, Iowa

About this file

This file contains construction and administration forms for the Winn981024A Nutrient Reduction Wetland Project, a contract opportunity issued by the Iowa Department of Agriculture & Land Stewardship, Division of Soil Conservation and Water Quality in Winneshiek County, Iowa. The project involves the construction of a nutrient reduction constructed wetland comprising approximately 8 acres of work that includes selective clearing, excavation, grading, and installation of infrastructure components such as 15,200 cubic yards of earthwork, 6,608 square feet of Flexamat Plus or equivalent tied concrete block mat, 1,100 linear feet of tile installation, 108 linear feet of RCP drawdown pipe, 48 tons of riprap, 2 anti-seep collars, and 1 concrete apron with footing guard. The sealed bid submission deadline was December 17, 2025, at 3:00 PM through the Iowa Management of Procurement and Contracts System (IMPACS), with a pre-bid conference held on December 2, 2025. The successful bidder receives a Notice-of-Award within 14 calendar days and must complete all construction work except seeding by November 15, 2026, and complete seeding by December 15, 2026. A Preconstruction Conference must be held within seven days prior to the Construction Start Date.

The estimated construction cost range is between $200,000 and $300,000. Bidders are required to submit a bid bond equal to ten percent of their bid amount and must be registered with the Iowa Department of Inspections, Appeals & Licensing. The successful contractor must furnish a Performance and Payment Bond equal to 100% of the contract price and provide a Certificate of Insurance. Non-Iowa corporations must provide proof of authorization from the Secretary of State to conduct business in Iowa prior to contract execution. The project includes provisions for construction progress schedules, change order requests, and contract amendments as needed. The contractor is authorized to purchase materials tax-free under Iowa Code Sections 422.42 and 422.47, with an Iowa Construction Sales Tax Exemption Certificate provided for eligible materials used directly on the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF IOWA

DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP

DIVISION OF SOIL CONSERVATION AND WATER QUALITY

Winn981024A NUTRIENT REDUCTION

WETLAND PROJECT

CONSTRUCTION CONTRACT

BID NO. 25-20

SECTION 24, TOWNSHIP 98 NORTH, RANGE 10 WEST

WINNISHEIK COUNTY, IOWA

PREPARED FOR: IOWA DEPARTMENT OF AGRICULTURE & LAND STEWARDSHIP

HOOVER STATE OFFICE BUILDING

1305 EAST WALNUT STREET

DES MOINES, IOWA 50319

PREPARED BY: BOLTON & MENK

1519 BALTIMORE DR

AMES, IA 50010

515-509-9296

December 2025

APPENDIX I

CONSTRUCTION & ADMINISTRATION FORMS

Winn981024A Nutrient Reduction Wetland Project DOCUMENT LL Bid No. 25-20 NOTICE-OF-AWARD

LL-1

November 14, 2025

Contractor name and address

Delivery via email: Contractor Email

RE: NOTICE-OF-AWARD – Winn981024A Nutrient Reduction Wetland Project, Contract 25-20

Dear _______________________________, This is to notify you that the Division of Soil Conservation and Water Quality has determined __________________ is the successful bidder for the Winn981024A Nutrient Reduction Wetland Project.

Award is being made for the base bid of $____________.

In accordance with Item #9 of the Instructions to Bidders, Document BB, you have fourteen (14) calendar days from the date of receipt of this notice to obtain the Performance Bond (Document NN), submit your Construction Progress Schedule (Document JJ) for review, and execute the Contract (Document DD). In addition, the Division must be provided with a Certificate of Insurance pursuant to the General Conditions, Insurance and Related Provisions (Document FF, Part 6-01).

Please note that Iowa Code Section 91C.7, requires that all construction contractors awarded a contract to perform work for the state or an agency of the state must be registered with the Iowa Department of Inspections, Appeals & Licensing. The Division of Soil Conservation and Water Quality cannot execute a contract with your firm unless you provide proof of this registration. Be sure to fill in the Department of Inspections, Appeals & Licensing registration number blank on the Contract (Document DD).

Enclosed are the Contract (Document DD), Construction Progress Schedule form (Document JJ), and the Performance Bond (Document NN). Please complete, sign and return scanned electronic copies along with completed Performance Bond. In addition, we must have the Certificate of Insurance pursuant to the General Conditions and/or Special Conditions.

Congratulations on being the successful bidder. We look forward to working with your company on this project. If you have any questions, please contact Tracy Bruun, (515) 344-6279.

Sincerely, Jake Hansen, Chief Water Resources Bureau Division of Soil Conservation and Water Quality

JH/tab Enclosures

CC:

Winn981024A Nutrient Reduction Wetland Project DOCUMENT MM Bid No. 25-20 NOTICE- TO-PROCEED

MM-1

November 14, 2025

Contractor name and address

Delivery via email: Contractor Email

RE: NOTICE-TO-PROCEED – Winn981024A Nutrient Reduction Wetland Project, Contract 25-20

Dear____________________________, The Division of Soil Conservation and Water Quality received the signed construction Contract (Document DD), the completed Performance Bond (Document NN), and the Certificate of Insurance from your company. These documents were found to be in order and the Division executed this contract with __________ dated xx/xx/xxxx. A scanned copy of the executed Contract and Performance Bond are enclosed.

The Division has accepted the Construction Progress Schedule (Document JJ) included here, with a Construction Start Date of xx/xx/xxxx. A Preconstruction Conference, as required in Item 13 of the Instructions to Bidders (Document BB), must be held within seven (7) days prior to the Construction Start Date established in the Construction Progress Schedule, or earlier if mutually agreed. No work may commence on site prior to the Preconstruction Conference. If the Construction Start Date requires adjustment, that needs to be communicated to the Engineer and Division in a timely manner so as to facilitate scheduling of the Preconstruction Conference.

In accordance with the Contract _____________________ must commence work under this contract for the Winn981024A Nutrient Reduction Wetland Project on or before the Construction Start Date scheduled in the Construction Progress Schedule, but not before the Preconstruction Conference. You have until November 15, 2026 to complete all of the work except for seeding, and until December 15, 2026 to complete the seeding.

Also attached is a scanned copy of the Iowa Construction Sales Tax Exempt Certificate and Authorization Letter for this project. Pursuant to Iowa Code Section 423.2(80), this allows you to purchase materials tax free for use on this project. Please read the information provided in the authorization letter. You are authorized with this Notice-to-Proceed to purchase necessary materials for this project and request reimbursement for those items that are stored prior to the Construction Start Date.

If you have any questions, please contact Tracy Bruun, (515) 344-6279.

Sincerely, Jake Hansen, Chief Water Resources Bureau

JH/tab Attachments

CC:

Winn981024A Nutrient Reduction Wetland Project DOCUMENT JJ Bid No. 25-20 CONSTRUCTION PROGRESS SCHEDULE

JJ-1

CONSTRUCTION PROGRESS SCHEDULE

Project ID: Winn981024A Date:

Contractor: ___________________________________________________________________________________

Contract End Dates:

All Construction Work Except Seeding: November 15, 2026

Seeding: December 15, 2026

Scheduled Dates:

Anticipated Construction Start Date:

Preconstruction Conference Date Range*:

*Preconstruction Conference must be held prior to Construction Start Date, by no more than seven (7) days

Estimated Completion Date of All Work Except Seeding:

Final Walkthrough should be held prior to Contract End Date for all construction work except seeding

Major Construction Work Item(s) Order of Work Estimated Duration of Work

# of days / # of weeks

Site Preparation

Drain Tile Investigation

Earthwork

Topsoil Placement

Water Control Structure

Flexamat Plus or engineer approved equal

New Tile Installation

Riprap Placement

Seeding

Dates established in this schedule may be adjusted as described in Document FF, Paragraph 3-21.

Winn981024A Nutrient Reduction Wetland Project DOCUMENT JJ Bid No. 25-20 CONSTRUCTION PROGRESS SCHEDULE

JJ-2

FOR THE CONTRACTOR

(Company Representative)

(Date)

(Name of Company)

(Address of Company)

(City, State, Zip code

FOR THE DIVISION

Mike Bourland, Water Resources Bureau

Accepted

Adjustment Requested

If adjustment is requested, describe below:

END OF DOCUMENT JJ

Winn981024A Nutrient Reduction Wetland Project DOCUMENT SS

Bid No. 25-20 APPLICATION AND CERTIFICATE FOR PAYMENT

SS-1

Winn981024A Nutrient Reduction Wetland Project DOCUMENT SS

Bid No. 25-20 APPLICATION AND CERTIFICATE FOR PAYMENT

SS-2

Winn981024A Nutrient Reduction Wetland Project DOCUMENT HH Bid No. 25-20 CHANGE ORDER REQUEST

HH-1

CHANGE ORDER REQUEST

Change Order Request No.

Project ID: Winn981024A Date:

Name of Project: Winn981024A

Location of Project: Winnisheik County

Name of Contractor:

Architect/Engineer: Bolton & Menk, Brandon Short, P.E.

Contract Plan and

Detail Reference:

Change Order Request

Drawing No. and Date:

Contract Specification

Reference:

Description of Change:

BREAKDOWN OF CONTRACT COST:

Original Project Contract Amount: $

Approved Change Orders No. thru : $

Pending Recommended Change Order Requests Nos. : $

This Change Order Request: $

Resulting Total Recommended Amount: $

Winn981024A Nutrient Reduction Wetland Project DOCUMENT HH Bid No. 25-20 CHANGE ORDER REQUEST

HH-2

Reason for Contract Change:

Change Requested by:

(Signature) (Date)

CONTRACTOR APPROVAL

By:

(Company) (Signature)

(Address) (Date)

IDALS PROJECT REPRESENTATIVE RECOMMENDATIONS

Concur Recommend Rejection (Attach Explanation)

IDALS Project Representative:

(Signature) (Date)

DIVISION OF SOIL CONSERVATION AND WATER QUALITY AUTHORIZATION

Change Order required due to:

Immediate authorization to proceed granted: Yes No

APPROVED: DENIED:

Susan Kozak, Director Susan Kozak, Director

Division of Soil Conservation and Water Quality Division of Soil Conservation and Water Quality

Iowa Department of Agriculture Iowa Department of Agriculture and Land Stewardship and Land Stewardship

(Date) (Date)

END OF DOCUMENT HH

Winn981024A Nutrient Reduction Wetland Project DOCUMENT II Bid No. 25-20 CONSTRUCTION CONTRACT AMENDMENT

II-1

State of Iowa

Iowa Department of Agriculture and Land Stewardship

Winn981024A Nutrient Reduction Wetland Project Construction Contract Amendment

THIS AMENDMENT, made this ______ day of ___________________________, 20____, by and between the State of Iowa, acting through:

hereinafter called the DIVISION, and

(Name of Company)

(Address)

(City, State, Zip) hereinafter called the CONTRACTOR.

WITNESSETH: That the DIVISION and the CONTRACTOR mutually agree to amend the agreement made the

_____day of __________, 20_____, for the Winnisheik County Nutrient Reduction Wetland Project (Winn981024A

– Bid No. 25-20) in this Amendment Number _________ as described below:

Description of Amendment:

Contract Plan Sheet(s) and Detail Reference(s):

Amendment No. _____

Drawing No. and Date:

Contract Specification

Reference(s):

Reason for Revision of

Contract Completion Date(s):

Original Contract Completion Date for All Work Except Seeding: November 15, 2026

Original Contract Completion Date for Seeding: December 15, 2026

Current Completion Date for All Work Except Seeding:

Current Completion Date for Seeding:

Revised Completion Date for All Work Except Seeding, This Amendment:

Revised Completion Date for Seeding, This Amendment:

Winn981024A Nutrient Reduction Wetland Project DOCUMENT II Bid No. 25-20 CONSTRUCTION CONTRACT AMENDMENT

II-2

BREAKDOWN OF AMENDMENT CONTRACT COST BY BID ITEM:

Item # Description

Adjustment

Quantity Unit Cost

Total Cost

Adjustment

TOTAL $

Original Project Contract Amount: $ 0.00

Approved Contract Amendments No. ____ through ____: $ 0.00

Pending Recommended Change Order Requests No. ____ through ____: $ 0.00

Approved Change Order Requests No. ____ through ____: $ 0.00

This Amendment Request: $ 0.00

Resulting Total Recommended Amount: $ 0.00

IN WITNESS WHEREOF, the parties hereto have executed this Amendment, in the day and year first above mentioned.

FOR THE DIVISION FOR THE CONTRACTOR

Grant D. Menke, Deputy Secretary

(Company Representative)

(Date) (Date)

(Name of Company)

(Address of Company)

(City, State, Zip Code)

CONSENT FROM SURETY

Seal if by a corporation

(Surety Representative)

(Name of Surety)

END OF DOCUMENT II

Winn981024A Nutrient Reduction Wetland Project DOCUMENT QQ Bid No. 25-20 SALES TAX EXEMPTION CERTIFICATE

IOWA

Department of Revenue www.state.ia.us/tax

Designated Exempt Entity Iowa Construction Sales Tax Exemption Certificate

This document may be completed by a designated exempt entity and given to their contractor and/or subcontractor along with an authorization letter. Seller: Keep this certificate in your files. Contractor/Exempt Entity: Keep a copy of this certificate for your records. Do not send this to the Department of Revenue

Designated Exempt Entity Division of Soil Conservation and Water Quality Iowa Department of Agriculture and Land Stewardship

Address 1 1305 East Walnut Street

Address 2

City Des Moines

State

IA

Zip Code 50319

Construction Project Name Winn981024A Nutrient Reduction Wetland Project

Construction Project Number (if used) Job No. 25-20

General Contractor or Subcontractor Name Sample

Address 1 123 Construction Ave

Address 2

City Dig City

State

IA

Zip Code 55555

Description of contract/subcontract (please print/type clearly)

Construction of Nutrient Reduction Wetland.

The named contractor may purchase building materials used in the contract, exempt from sales tax. This exemption does NOT apply to materials, equipment and supplies consumed by the contractor or subcontractor.

Designated Exempt Entity Authorized Agent ._____________________________________ Date: _____________

Authorization Letter From Division of Soil Conservation and Water Quality - Agriculture and Land Stewardship

Pursuant to Iowa Code Sections: 422.42 (16) & (17), and 422.47 (5), you are authorized to purchase construction materials tax free for the contract specified above.

The exemption certificate (or a copy of the certificate) may be provided to the suppliers of your construction materials and will authorize them to sell you the materials exempt from Iowa sales tax and any applicable local option sales tax and school infrastructure local option sales tax. Complete information on qualifying materials can be found at www.state.ia.us/tax, the Department of Revenue (IDR) website.

It is your responsibility to have records identifying the materials purchased and verifying they were used on this contract. Any materials purchased tax-free and not used on the construction project are subject to sales and applicable local option taxes. Should this occur, the tax must be paid directly by you to IDR in the same calendar quarter the project is completed. E-mail the department at: idrf@idrf.state.ia.us if you have questions on this requirement.

Contractors should be aware that use of the certificate to claim exemption from tax for items not used on this project or that do not qualify for exemption could result in civil or criminal penalties.

31-013 (12/10/02)

END OF DOCUMENT QQ

Blank Page
Blank Page

File details come from the government source that posted it. Updated .