4-2026-0639 Jessup Township Municipal Building Alterations - Bid Manual and Specifications.pdf
PDF 8 MB Posted
- Attached to
- Jessup Township Building Alterations
- Solicitation number
- US.263394
- Issued by
- Somerset County, Pennsylvania
About this file
This is a Bid Manual and Project Specifications document for the Jessup Township Municipal Building Alterations project in Susquehanna County, Pennsylvania. The project involves repairs and alterations to the existing municipal building at 10175 SR 706, Montrose, PA, including structural repairs, wall reconstruction, a new overhead garage door, a new second-floor exit door with exterior steel stair, and associated site and building improvements. A mandatory pre-bid conference will be held on Tuesday, December 8, 2026, at 9:00 AM at the project site. Sealed bids are due via PennBid by 2:00 PM on Tuesday, December 28, 2026, with bids to be opened and read aloud at the regular scheduled Township Meeting on December 30, 2026. The project is expected to be awarded by Wednesday, February 10, 2027. The contract time for substantial completion is 120 calendar days from the date the Notice to Proceed is issued. Bidding documents are available on PennBid, and addenda will be issued only to those whose names and email addresses are recorded as having obtained the contract documents.
Each bid must be accompanied by bid security equal to ten percent of the total bid amount, submitted as a Bid Bond naming Jessup Township as obligee, or as a cashier's check or certified check payable to Jessup Township. The successful bidder must provide Performance and Payment Bonds in the amount of 100 percent of the contract amount within 15 days of notice of award. Prevailing wage rates apply to this project. Liquidated damages are assessed at $500 per calendar day for failure to achieve substantial completion within the contract time. Bids shall remain open for 60 days from the bid opening date, or 120 days if award is delayed by required governmental approvals, bond sales, or grant awards. The contract will be awarded on a lump sum basis to the lowest responsive and responsible bidder. Jessup Township reserves the right to reject any or all bids, waive defects or irregularities, and accept any bid deemed in its best interest.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID MANUAL &
PROJECT
SPECIFICATIONS
JESSUP TOWNSHIP
MUNICIPAL BUILDING
ALTERATIONS
10175 SR 706
JESSUP TOWNSHIP
SUSQUEHANNA COUNTY, PA
NOVEMBER 18, 2026
TABLE OF CONTENTS
Jessup Township Building Alterations
Jessup Township, Susquehanna County, PA TOC-i
DIVISION 0 - BIDDING AND CONTRACT INFORMATION
Section 000115: List of Drawing Sheets
Section 001113: Advertisement for Bids
Section 002113: Instructions to Bidders
Section 002513: Prebid Meetings
Section 003000: Bid Bond
Section 003126: Existing Hazardous Material Information
Section 004100: Bid Cover Sheet
Section 004113: Bid Form - Stipulated Sum (Single-Prime Contract)
Section 004113.01: Employment Verification Form
Section 004113.02: Experience, Equipment and Financial Statement
Section 004113.03: Hold Harmless Agreement
Section 004113.04: Noncollusion Affidavit
Section 004113.05: Nonsegregated Form
Section 004113.06: Nondiscrimination
Section 004373: Proposed Schedule of Values Form
Section 004393: Bid Submittal Checklist
Section 005000: Agreement Between Owner and Contractor
Section 005100: Notice of Award
Section 005101: Performance Bond
Section 005102: Payment Bond
Section 006005: Wage Rates
Section 006400: Notice to Proceed
Section 006500: Certificate of Substantial Completion
Section 006600: Change Order
Section 007000: General Conditions
Section 008000: Supplementary Conditions
DIVISION 1 - GENERAL REQUIREMENTS
Section 011000: Summary
Section 011813: Utility Service Connections
Section 012100: Allowances
Section 012500: Substitution Procedures
Section 012600: Contract Modification Procedures
Section 012900: Payment Procedures
Section 013300: Submittal Procedures
Section 015000: Temporary Facilities and Controls
Section 017419: Construction Waste Management and Disposal
Section 017700: Closeout Procedures
Section 017823: Operation and Maintenance Data
Section 017839: Project Record Documents
DIVISIONS 2-32 - DETAILED TECHNICAL SPECIFICATIONS
Division 2 – Existing Conditions
Section 024119: Selective Demolition
Jessup Township, Susquehanna County, PA TOC-ii
Division 3 – Concrete
Section 032000: Concrete Reinforcing
Section 033000: Cast-in-Place Concrete
Division 5 – Metals
Section 051200: Structural Steel Framing
Section 055000: Metal Fabrications
Section 055119: Metal Grating Stairs
Division 6 – Wood, Plastics, and Composites
Section 061000: Rough Carpentry
Section 061600: Sheathing
Division 7 – Thermal and Moisture Protection
Section 072100: Thermal Insulation
Section 072500: Weather Barriers
Section 073113: Asphalt Shingles
Section 074623: Wood Siding
Section 077100: Roof Specialties
Section 079200: Joint Sealants
Division 8 – Openings
Section 081113: Hollow Metal Doors and Frames
Section 083323: Overhead Coiling Doors
Section 087100: Door Hardware
Division 9 – Finishes
Section 092900: Gypsum Board
Section 099113: Exterior Painting
Section 099123: Interior Painting
Division 22 - Plumbing
Section 220500: Common Work Results for Plumbing
Division 23 - Heating, Ventilating And Air Conditioning
Section 230500: Common Work Results for Hvac
Division 26 - Electrical
Section 260500: Common Work Results for Electrical
Division 31 - Earthwork
Section 312000: Earth Moving
Jessup Township, Susquehanna County, PA TOC-iii
Section 315000: Excavation Support and Protection
Division 32 - Exterior Improvements
Section 329200: Turf and Grasses
END OF TABLE OF CONTENTS
JHA Companies 2026-0639
Jessup Township Municipal Building Alterations Jessup Township, Susquehanna County, Pennsylvania 18801
LIST OF DRAWING SHEETS
00 01 15 - 1
DOCUMENT 00 01 15 - LIST OF DRAWING SHEETS
PART 1 - GENERAL
1.1 LIST OF DRAWINGS
A. Drawings: Drawings that will be enumerated in the Owner/Contractor Agreement as part of the Contract Documents are listed on the Table of Contents page of the separately bound drawing set titled Jessup Township Municipal Building Alterations, dated November 17, 2026, as modified by subsequent Addenda and Modifications.
B. List of Drawings: Drawings that will be enumerated in the Owner/Contractor Agreement as part of the Contract Documents are the following Drawings and other drawings of type indicated, as modified by subsequent Addenda and Modifications:
1. G-1.0 COVER SHEET/ DRAWING INDEX
2. G-1.1 CODE COMPLIANCE REVIEW/ PROJECT INFORMATION
3. AE-1.1 DEMOLITION PLANS
4. AE-2.1 DEMOLITION ELEVATIONS
5. S-0.1 GENERAL STRUCTURAL NOTES
6. S-0.2 GENERAL STRUCTURAL NOTES
7. S-1.0 FOUNDATION PLANS, ELEVATIONS, & DETAILS
8. S-5.0 STRUCTURAL DETAILS
9. S-5.2 STRUCTURAL PLANS, ELEVATIONS, & DETAILS FOR STAIRS
10. S-5.3 STRUCTURAL PLANS, ELEVATIONS, & DETAILS FOR STAIRS
11. A-1.0 PROPOSED FLOOR PLAN
12. A-1.1 PROPOSED FLOOR PLAN
13. A-2.1 EXTERIOR ELEVATIONS
14. A-2.2 EXTERIOR ELEVATIONS
PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)
END OF DOCUMENT 00 01 15
ADVERTISEMENT FOR BIDS
00 11 13 - 1
DOCUMENT 00 11 13 - ADVERTISEMENT FOR BIDS
Jessup Township is soliciting bids for repairs and alterations to the existing Municipal Building, including structural repairs, wall reconstruction, a new overhead garage door, and a new second-floor exit door and exterior steel stair, with associated site and building improvements.
Sealed bids will be received by Jessup Township for the Jessup Township Municipal Building
Alterations Project until 2:00 PM, prevailing local time, on Tuesday, December 28, 2026, via
PennBid. Bids will be read aloud at the regular scheduled Township Meeting on December 30, 2026. It is expected that the project will be awarded, and bidder notified by Wednesday, February
10, 2027.
A pre-bid conference for prospective bidders only will be held at 9:00 AM on Tuesday, December 8, 2026, at the project site, 10175 SR 706, Montrose PA 18801. Attendance at pre-bid meeting is required.
Bidding Documents including plans and specifications are available on PennBid.
Addenda, if any, will be issued to only those persons whose names and email addresses are on record as having obtained the Contract Documents.
Each bid must be accompanied by bid security in an amount equal to ten percent (10%) of the total bid amount. Bid security shall be in the form of a Bid Bond naming Jessup Township as obligee, or a cashier's check or certified check payable to Jessup Township. Performance and Payment bonds in the amount of 100% of the contract amount shall be provided by the successful bidder within 15 days of the notice of award. Prevailing Wage Rates apply to this project.
No bids may be withdrawn, except when the Bidder(s) comply with the withdrawal requirements of Act No. 4 of the General Assembly of Pennsylvania, Senate Bill 793, Printers No. 1655 (as amended).
Jessup Township reserves the right to reject any or all bids or parts thereof or items therein, to waive any defects or irregularities in the Bids, and to accept any Bid which, in its judgment, is for its best interest.
Bids shall remain open for a period of sixty (60) days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of one-hundred twenty
(120) days from the date of Bid opening.
END OF DOCUMENT 001113
INSTRUCTIONS TO BIDDERS 00 21 13 - 1
DOCUMENT 00 21 13 - INSTRUCTIONS TO BIDDERS
PART 1 - GENERAL
1.1 DEFINED TERMS
A. Terms used in these Instructions to Bidders will have the meanings indicated in the General conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have meaning indicated below:
1. Bidder: One who submits a Bid directly to Owner as distinct from a sub-bidder, who submits a bid to a Bidder.
2. Issuing Office: The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.
a. Issuing Office is the office of the Engineer whose name, address and phone number are listed in the Advertisement for Bids.
3. Successful Bidder: The lowest, responsible and responsive Bidder to whom Owner (on the basis of Owner's evaluation as hereinafter provided) makes an award.
1.2 COPIES OF BIDDING DOCUMENTS
A. Bidding Documents including plans and specifications are available via PennBid.
B. Complete sets of the Bidding Documents must be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
C. Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not authorize or confer a license for any other use.
1.3 QUALIFICATIONS OF BIDDERS
A. Each Bid must contain evidence of Bidder's qualification to do business in the State where the Project is located or covenant to obtain such qualification prior to award of the Contract. Such qualifications may include an authorized business status or state contractor license or both. Employment Verification Form is included in this package (attached to bid form).
B. To demonstrate Bidders qualifications to perform the Work, each Bidder must be prepared to submit detailed written evidence, such as financial data, previous experience, present commitments, and other such data as may be pertinent.
Experience, Equipment, and Financial Statement is included in this bid package (attached to bid form).
C. Owner requires the bidder to agree to indemnify and save harmless the Owner and the Engineer from and against all claims, damages, losses and expenses arising out of or resulting from the performance of the work Bidder shall include a completed Hold
INSTRUCTIONS TO BIDDERS 00 21 13 - 2
Harmless Agreement in bid. Hold Harmless Agreement is included in this bid package (attached to bid form).
D. Owner requires the bidder to provide documentation that no collusion took place. Bidder shall provide a completed NONCOLLUSION AFFIDAVIT OF PRIME BIDDER as well as for any sub-contractors. Non-collusion Affidavit is included in this bid package (attached to bid form).
E. Owner requires the bidder to certify that he/she does not maintain or provide employees any segregated facilities. Bidder shall provide a completed CERTIFICATION OF NON-
SEGREGATED FACILTIES AND NON-EMPLOYMENT OF ILLEGAL ALIEN LABOR.
Non-Segregated Form is included in this bid package (attached to bid form).
F. A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
G. No requirement to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
H. Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
1.4 SITE & OTHER AREAS: EXISTING SITE CONDITIONS, EXAMINATION OF SITE;
OWNER’S SAFETY PROGRAM; OTHER WORK AT SITE
A. Site and Other Areas
1. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
B. Site Visit and Testing by Bidders
1. Bidder shall conduct the required Site visit during normal working hours and shall not disturb any ongoing operations at the Site. Prospective bidders are encouraged to schedule a site investigation by contacting the Township.
2. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
C. Other Work at the Site
1. Reference is made in the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed
INSTRUCTIONS TO BIDDERS 00 21 13 - 3
at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
1.5 BIDDER'S REPRESENTATIONS
A. It is the responsibility of each Bidder before submitting a Bid to:
1. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
2. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
3. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
4. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
5. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
6. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
7. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
8. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work; and
9. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
INSTRUCTIONS TO BIDDERS 00 21 13 - 4
1.6 PRE-BID CONFERENCE
A. A pre-Bid conference will be held at the time and location stated in the invitation or advertisement to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are required to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
1.7 INTERPRETATIONS AND ADDENDA
A. All questions about the meaning or intent of the Bidding Documents are to be submitted through PennBid. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven (7) days prior to the date Bids are due may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
B. Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
1.8 BID SECURITY
A. Each bid must be accompanied by bid security in an amount equal to ten percent (10%) of the total bid amount. Bid security shall be in the form of a Bid Bond naming Jessup Township as obligee, or a cashier's check or certified check payable to Jessup Township.
B. The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Intent to Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Intent to Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
C. The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 120 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
D. Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
1.9 CONTRACT TIMES
A. The number of days within which, or the dates by which, Milestones are to be achieved, and the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
INSTRUCTIONS TO BIDDERS 00 21 13 - 5
1.10 LIQUIDATED DAMAGES
A. Provisions for liquidated damages for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment. Contractor shall pay Owner $500 for each calendar day in excess of the stated date of Substantial Completion.
1.11 SUBSTITUTIONS AND "OR EQUAL" ITEMS
A. The Contract for the Work, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents and those "or-equal" or substitute materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an "or-equal" or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids in the case of a proposed substitute and 5 days prior in the case of a proposed "or-equal." Each such request shall comply with the requirements of SECTION 01 25 00 - SUBSTITUTION PROCEDURES. The burden of proof of the merit of the proposed item is upon Bidder. Engineer's decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner. Substitutes and "or-equal" materials and equipment may be proposed by Contractor in accordance with SECTION 01 25 00 - SUBSTITUTION PROCEDURES after the Effective Date of the Contract.
B. All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of "or-equal" or substitution requests are made at Bidder's sole risk.
C. If an award is made, Contractor shall be allowed to submit proposed substitutes and "or-equals" in accordance with the General Conditions.
1.12 SUBCONTRACTORS, SUPPLIERS, AND OTHERS
A. If the Supplementary Conditions requests the identity of certain Subcontractors, Suppliers individuals, or entities to be submitted by Owner in advance of the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after the request submit to Owner a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individuals or entities if requested by Owner. If Owner or Engineer after due investigation has reasonable objection to any proposed Subcontractor, Supplier, individuals, or entities, either may, before the Notice of Intent to Award is given, request the apparent Successful Bidder to submit an acceptable substitute without an increase in the Bid.
B. If apparent Successful Bidder declines to make any such substitution, Owner may award the contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Supplies and individuals, or entities. Declining to make requested substitutions will not
INSTRUCTIONS TO BIDDERS 00 21 13 - 6
constitute grounds for sacrificing the Bid security of any Bidder. Any Subcontractor, Supplier, individuals, or entities listed and to whom Owner or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in the General Conditions.
C. Contractor shall not be required to employ any Subcontractor, Supplier, individuals, or entities against whom Contractor has reasonable objection.
1.13 PREPARATION OF BID
A. The Bid Form is included with the Bidding Documents.
1. All blanks on the Bid Form must be completed. A Bid price shall be indicated for each section, Bid item, alternative, adjustment unit price item and unit price item, listed therein.
2. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional and Bidder elects to not furnish pricing for such optional alternate item, then the Bidder may enter the words "No Bid" or "Not Applicable."
3. A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature) accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown.
4. A Bid by partnership shall be executed in the partnership name and signed by a partner (whose title may appear under the signature) accompanied by evidence of authority to sign. The official address of the partnership shall be shown.
5. A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the business address of the firm shall be shown.
6. A Bid by an individual shall show the Bidder's name and official address.
7. A Bid by a joint venture shall be executed in the manner indicated on the Bid Form.
The official address of the joint venture shall be shown.
8. All names shall be printed in ink below the signature.
9. The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers and dates of which shall be filled in on the Bid Form.
10. Postal and e-mail addresses and telephone number for communication regarding the Bid shall be shown.
11. The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances named in the Contract Documents.
INSTRUCTIONS TO BIDDERS 00 21 13 - 7
12. If the Bidder is an individual or partnership trading under a fictitious or assumed name, the Bidder should state the firm's fictitious or assumed name and whether it has been registered under the Fictitious Name Act of Pennsylvania, the Act of May 25, 1955 P.L. 167.
13. The Bid shall contain evidence of Bidder's authority and qualification to do business in the state where the Project is located or covenant in writing to obtain such authority and qualification prior to award of the Contract. Bidder's state contractor license number, if any, shall also be shown on the Bid Form.
14. Bid prices shall include all taxes of whatever nature applicable to the Work or performance thereof.
15. Owner may be exempt from sales and use taxes for certain items to be incorporated into the Work. Each Bidder shall obtain legal advice to determine how and to what extent the Owner's tax exemption may be utilized by the Contractor. Owner will provide, at the Contractor's request, documentation required to obtain applicable tax exemptions.
16. Attached to each bid, bidder must provide:
a. 10% Bid Security
b. Public Works Employment Verification Form
c. Experience, Equipment, and Financial Statement
d. Hold Harmless Agreement
e. Non-collusion affidavit of prime bidder
f. Certification of non-segregated facilities and non-employment of illegal alien labor
g. Non-discrimination Agreement
h. Proposed Schedule of Values Form
i. Bid Cover Sheet for electronic bids.
17. The following items shall be required after award prior to commencement of the work or are included in the bid manual for reference only. They are not bid submission documents.
a. Executed Agreement between Owner and Contractor (Section 00 50 00).
b. Performance Bond – 100% of Contract Price (Section 00 51 01).
c. Payment Bond – 100% of Contract Price (Section 00 51 02).
d. Required insurance certificates and endorsements.
INSTRUCTIONS TO BIDDERS 00 21 13 - 8
e. Notice of Award (Section 00 51 00).
f. Notice to Proceed (Section 00 64 00).
g. Certificate of Substantial Completion (Section 00 65 00).
h. Change Order (Section 00 66 00).
i. Any additional post-award documentation required by the Agreement or Supplementary Conditions.
1.14 BASIS OF BID; COMPARISON OF BIDS
A. Lump Sum Bid Format
1. Bidders shall submit a Bid on a lump sum basis for the Bid and include a separate price for each alternate described in the Bidding Documents as provided for in the Bid Form. The price for each alternate will be the amount added to or deducted from the base Bid if Owner selects the alternate. In the comparison of Bids, alternates will be applied in any order of priority by the Owner and at its sole discretion and interest.
B. Allowances
1. For cash allowances the Bid price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02 of the General Conditions.
1.15 SUBMITTAL OF BID
A. The bidder shall submit via PennBid the completed Bid Form and Bid Security along with all applicable supporting documents as required under the terms of the applicable article of the Bid Form.
B. A Bid shall be submitted via PennBid no later than the date and time prescribed, and shall be accompanied by the Bid security and other required documents.
C. Bids received by any other means, or after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned unopened.
1.16 MODIFICATION AND WITHDRAWAL OF BID
A. If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
B. This provision is governed by and is subject to any modifications or amendments to Act No. 4 of the General Assembly of the Commonwealth of Pennsylvania, Senate Bill 793, Printer's No. 1655.
INSTRUCTIONS TO BIDDERS 00 21 13 - 9
1.17 OPENING OF BIDS
A. Bids will be opened at the time and place indicated in the Advertisement for Bids and, unless obviously non-responsive, read aloud publicly at the subsequent township meeting. An abstract of the amounts of the Bids and major alternates, if any, will be made available to Bidders after the reading of Bids.
B. Bids shall remain open for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. The Owner will either award the Contract within the applicable time period or reject all Bids, returning the Bid security to the Bidders. Thirty-day extensions of the date for the award may be made by the mutual written consent of the Owner and the apparent Successful Bidder.
1.18 BIDS TO REMAIN SUBJECT TO ACCEPTANCE
A. All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid Security prior to the end of this period.
1.19 EVALUATION OF BIDS AND AWARD OF CONTRACT
A. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive;
provided that Owner also reserves the right to waive all minor informalities not involving price, time or changes in the Work.
B. More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
C. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
D. In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
E. Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors or Suppliers.
F. If the Owner awards the Contract for the Work, to the responsible Bidder, such award
INSTRUCTIONS TO BIDDERS 00 21 13 - 10
shall be submitted to the lowest responsive Bid.
G. The owner has the unqualified right to award the contract to the lowest responsible bidder based on the sum of the base bid price and any combination of bid alternate additions or deduction prices set forth in the bid form. Such award shall be at the owner's sole discretion and for which it deems to be in its best interests.
1.20 CONTRACT SECURITY AND INSURANCE
A. The General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner's requirements as to performance and payment bonds and insurance.
When the Successful Bidder delivers the Agreement (executed by successful Bidder) to Owner, it must be accompanied by such required bonds and insurance documentation.
B. The party to whom the Notice of Award is given will be required to obtain the performance and payment bonds within fifteen (15) calendar days from the date of receipt of the Notice of Award.
C. In case the bonds, Agreement, or certificates of insurance submitted by the Bidder do not meet the requirements of the Contract Documents, and changes are to be made before these documents can be accepted by the Owner, the Bidder is obligated to accept an extension of the date of award of the Contract, or the date of issuance of Notice to Proceed, as the case may be, for that period of additional time required to furnish acceptable documents.
D. The General Conditions and the Supplementary Conditions, set forth Owner's requirements as to insurance to be provided by the Contractor. When the apparent Successful Bidder delivers the signed Agreement to the Owner, it must be accompanied by the required insurance certificate on the latest version of the Acord 25 Certificate of Insurance form. The Acord 25 form shall be modified to state: "All policies of insurance shown on this form shall not be canceled or materially changed or renewal refused until at least thirty days' prior written notice has been given to Owner and Engineer and to each additional insured and will contain waiver provisions in accordance with the General Conditions."
E. The General Conditions sets forth the indemnification provisions to which the Contractor is subject. When the apparent Successful Bidder delivers the signed Agreement to the Owner, it must be accompanied by the Hold Harmless Agreement on the form provided in the Bidding Documents.
1.21 SIGNING OF AGREEMENT
A. Within ten (10) days after the approval of the Bonds by the Owner, the Owner will issue the Notice of Award. When Owner gives a Notice of Intent to Award to the apparent Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement, along with the other Contract Documents which are identified in the Agreement. Within 15 days thereafter, Successful Bidder shall sign and deliver the executed counterparts of the Agreement and other contract documents to Owner.
B. Agreement for the Work will be written on EJCDC C-520 – Agreement between Owner and Contractor for Construction Contract (Stipulated Price)
INSTRUCTIONS TO BIDDERS 00 21 13 - 11
C. If the Owner finds the documents submitted by the apparent Successful Bidder acceptable, it will, within ten days thereafter, deliver one fully executed counterpart of the Agreement to Successful Bidder.
D. If the Owner elects to issue a Notice-to-Proceed, such notice will accompany the fully executed copies of the Agreement. If no Notice-to-Proceed is issued, the Contract Time will commence to run as specified in the General Conditions.
1.22 SALES AND USE TAXES, GROSS RECEIPTS TAXES
A. Owner may be exempt from certain state sales and use taxes on materials and equipment to be incorporated in the Work to the extent provided by law. It is entirely incumbent on the Bidder to ascertain what materials and equipment are subject to said sales and use taxes and include the necessary taxes in the Bid. Refer to paragraph 6.10.B. of the Supplementary Conditions for additional information.
B. Under no circumstances will the Owner be responsible for payment of any unpaid taxes or assessments incurred by the Contractor in connection with the Work including any claims or change orders requesting additional compensation.
1.23 WAGE RATES
A. The Work under this contract is subject to the provisions of the Pennsylvania Prevailing Wage Act of 1961, P.L. 987, No. 442. Refer to Section 00 60 05 - Wage Rates.
PART 2 - PRODUCTS (Not Used)
END OF DOCUMENT 00 21 13
PREBID MEETINGS 00 25 13 - 1
DOCUMENT 00 25 13 - PREBID MEETINGS
PART 1 - GENERAL
1.1 PREBID MEETING
A. Engineer will conduct a pre-bid meeting as indicated below:
1. Meeting Date: Tuesday, December 8, 2026
2. Meeting Time: 9:00 AM, local time.
3. Location, In-Person Meeting: at project site located at 10175 SR 706 Montrose
PA 18801
4. Information provided during Prebid Meeting does not constitute a modification to the Procurement and Contracting Documents. Modifications to the Procurement and Contracting Documents are issued by written Addendum only.
B. Attendance:
1. Prime Bidders: Attendance at Prebid Meeting is mandatory.
2. Subcontractors: Attendance at Prebid Meeting is recommended.
3. Notice: Bids will only be accepted from prime bidders represented on Prebid
Meeting sign-in sheet.
C. Bidder Questions: Submit written questions to be addressed at Prebid Meeting minimum of two business days prior to meeting.
1. Submit requests for clarification or interpretation via email via PennBid
2. Submit requests for substitution/prior approval using form via PennBid
D. Agenda: Prebid Meeting agenda will include review of topics that may affect proper preparation and submittal of bids, including the following:
1. Procurement and Contracting Requirements:
a. Advertisement for Bids.
b. Instructions to Bidders.
c. Bid Bond
d. Existing condition information
e. Bid Form
f. Employment Verification
g. Experience, Equipment, and Financials
h. Hold Harmless Agreement
i. Non-collusion Affidavit
j. Non-segregation Form
k. Non-discrimination Form
l. Schedule of Values Form
m. Performance Bond
n. Payment Bond
PREBID MEETINGS 00 25 13 - 2
o. Wage Rates
p. Bid submittal requirements.
q. Notice of Award.
2. Communication during Bidding Period:
a. Obtaining documents.
b. Bidder's Requests for Information.
c. Bidder's Substitution Request/Prior Approval Request.
d. Addenda.
3. Contracting Requirements:
a. Agreement.
b. The General Conditions.
c. The Supplementary Conditions.
d. Other Owner requirements.
e. Permits
4. Construction Documents:
a. Scope of Work.
b. Temporary facilities.
c. Use of site.
d. Work restrictions.
e. Substitutions following award.
5. Separate Contracts:
a. Work by Owner.
6. Schedule:
a. Project schedule.
b. Contract Time.
c. Liquidated damages.
d. Other Bidder questions.
7. Site/facility visit or walkthrough.
8. Post-meeting addendum.
E. Minutes: Engineer will record and distribute meeting minutes to attendees. Minutes of meeting are issued as Available Information and do not constitute a modification to the Procurement and Contracting Documents. Modifications to the Procurement and Contracting Documents are issued by written Addendum only.
1. Sign-in Sheet: Minutes will include list of meeting attendees.
1.2 SITE WALKTHROUGH
A. Site walkthrough will be conducted by members of Project team following the Prebid
PREBID MEETINGS 00 25 13 - 3
Meeting.
B. Prospective bidders are encouraged to schedule a site investigation visit by contacting Jessup Township staff:
1. Pam Lewis, Vice-Chair 570.767.5414, pamlewisjessuptwp@gmail.com
PART 2 - PRODUCTS (Not Used)
END OF DOCUMENT 00 25 13
PENAL SUM FORM
EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013. Prepared by the Engineers Joint Contract Documents Committee.
BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name, and Address of Principal Place of Business):
OWNER (Name and Address):
BID
Bid Due Date:
Description (Project Name— Include Location):
BOND
Bond Number:
Date:
Penal sum $
(Words) (Figures)
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title
Note: Addresses are to be used for giving any required notice.
Provide execution by any additional parties, such as joint venturers, if necessary.
PENAL SUM FORM
EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013. Prepared by the Engineers Joint Contract Documents Committee.
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding
Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of
Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States
Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such
Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
EXISTING HAZARDOUS MATERIAL INFORMATION 003126 - 1
DOCUMENT 00 31 26 - EXISTING HAZARDOUS MATERIAL INFORMATION
PART 1 - GENERAL
1.1 EXISTING HAZARDOUS MATERIAL INFORMATION
A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for the Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information. This Document and its attachments are not part of the Contract Documents.
B. An existing asbestos report for Project, prepared by Environmental Abatement Associates, Inc. dated October 22, 2026, is available for viewing on PennBid.
C. Related Requirements:
1. Document 002113 "Instructions to Bidders" for the Bidder's responsibilities for examination of Project site and existing conditions.
PART 2 - PRODUCTS (Not Used)
END OF DOCUMENT 00 31 26
BID COVER SHEET 00 41 00 - 1
DOCUMENT 00 41 00 - BID COVER SHEET
PART 1 - GENERAL
1.1 BID INFORMATION
A. Project Name: Jessup Township Municipal Building Alterations
B. Bidder:
C. Bidder Address:
D. Bid Submitter's Phone Number:
E. Bidder Contractor's License Number:
F. Bid Date:
G. Bid Time: , local time.
PART 2 - PRODUCTS (Not Used)
END OF DOCUMENT 00 41 00
BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT) 00 41 13 - 1
DOCUMENT 00 41 13 - BID FORM - STIPULATED SUM
(SINGLE-PRIME CONTRACT)
PART 1 - GENERAL
1.1 BID INFORMATION
A. Bidder: ____________________________________________________.
B. Project Name: Jessup Township Municipal Building Alterations
C. Project Location: 10175 SR 706 Montrose PA 18801
D. Owner: Jessup Township
E. Engineer: JHA Companies
F. Engineer Project Number: 2026-0639
1.2 CERTIFICATIONS AND BASE BID
A. Base Bid, Single-Prime (All Trades) Contract: The undersigned Bidder, having carefully examined the Procurement and Contracting Requirements, Conditions of the Contract, Drawings, Specifications, and all subsequent Addenda, as prepared by JHA Companies and Engineer's consultants, having visited the site, and being familiar with all conditions and requirements of the Work, hereby agrees to furnish all material, labor, equipment and services, including all scheduled allowances indicated in Section 012100 "Allowances, necessary to complete the construction of the above-named Project, in accordance with the requirements of the Procurement and Contracting Documents, for the stipulated sum of:
TOTAL AMOUNT: Dollars
1.3 ALLOWANCES
A. The undersigned Bidder acknowledges that the Base Bid includes the following allowance as specified in Section 01 21 00 – Allowances:
1. Allowance No. 1 – Building Permit and Municipal Fees: One Thousand Five Hundred Dollars ($1,500.00).
B. The allowance amount shall be included in the Base Bid and shall not be added to the Bid amount as a separate cost.
BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT) 00 41 13 - 2
C. Actual costs incurred for the allowance shall be documented and adjusted in accordance with Section 01 21 00 – Allowances.
1.4 BID SECURITY
A. The undersigned Bidder agrees to execute a contract for this Work in the above amount and to furnish surety as specified within 15 days after a written Notice of Award, if offered within 60 days after receipt of bids, and on failure to do so agrees to forfeit to Owner the attached Bid Security, as liquidated damages for such failure as follows:
1. In the following amount constituting 10 percent of the Base Bid amount above:
a. ___________________________________________ Dollars
B. Form of Bid Security: Bidder has attached the following:
1. ▢ AIA Document A310-2010, "Bid Bond."
2. ▢ EJCDC Document C-430 “Bid Bond: Penal Sum Form”
3. ▢ Cashier's check.
4. ▢ Certified check.
C. In the event Owner does not offer Notice of Award within the time limits stated above, Owner will return to the undersigned the cashier's check, certified check, or bid bond.
1.5 TIME OF COMPLETION
A. Time of Completion:
1. The undersigned Bidder proposes and agrees hereby to commence the Work of the Contract Documents on a date specified in a written Notice to Proceed to be issued by Engineer, and to substantially complete the Work within 120 calendar days.
1.6 ACKNOWLEDGMENT OF ADDENDA
A. The undersigned Bidder acknowledges receipt of and use of the following Addenda in the preparation of this Bid:
1. Addendum No. 1, dated ____________________.
2. Addendum No. 2, dated ____________________.
3. Addendum No. 3, dated ____________________.
4. Addendum No. 4, dated ____________________.
5. Addendum No. 5, dated ____________________.
BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT) 00 41 13 - 3
1.7 CONTRACTOR'S LICENSE
A. The undersigned further states that it is a duly licensed contractor, for the type of work proposed, in Jessup Township, Susquehanna County, Pennsylvania, and that all fees, permits, etc., pursuant to submitting this proposal have been paid in full.
1.8 SUBMISSION OF BID
A. Respectfully submitted this ____ day of ______________________ December 2026
B. Submitted by: ____________________________________________________
(Name of bidding firm or corporation).
C. Authorized Signature: _______________________________ (Handwritten signature).
D. Signed by: __________________________________________ (Type or print name).
E. Title: _______________________________(Owner/Partner/President/Vice President).
F. Witnessed by: _____________________________________ (Handwritten signature).
G. Witnessed by: ________________________________________(Type or print name).
H. Witness Title: ____________________________________________________
I. Street Address:
J. City, State, Zip:
K. Phone:
L. License No.:
M. Federal ID No.:
N. (Affix Corporate Seal Here)
Employment Verification Form 00 41 13 - 4
COMMONWEALTH OF PENNSYLVANIA
PUBLIC WORKS EMPLOYMENT VERIFICATION FORM
Date , 2026
Business or Organization Name (Employer)
Address
City State Zip Code
Contractor
Contracting Public Body Jessup Township, Susquehanna County, Pennsylvania
Contract Jessup Township Municipal Building Alterations
Project Description Repairs to existing building including steel framing and new stair
Project Location 10175 SR 706, Montrose PA 18801
As a contractor/subcontractor for the above referenced public works contract, I hereby aform that as of the above date, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E‐Verify Program (EVP) operated by the United States Department of Homeland Security.