4-2016_649-409_162_Mechanical.pdf
PDF 17 MB Posted
- Solicitation number
- 36C26226Q1025
About this file
This document is a set of mechanical and HVAC construction drawings for an Expanded Rehab Medicine and SPS project at NAVAHCS Prescott, Arizona (Building 148), prepared by GLHN Architects & Engineers as 100% Construction Documents dated October 5, 2016, with Project Number 0855.08.
The drawings encompass comprehensive mechanical systems design including HVAC layouts, piping schematics, control diagrams, and equipment schedules for a fully sprinkled facility. Key systems depicted include chilled water (CHWS/CHWR), hot water (HWS/HWR), steam (HPS/HPR), and domestic cold water (DCW) distribution throughout basement, first floor, second floor, and roof levels. The design incorporates multiple air handling units (MAU), fan coil units (FCU), reheat coils (RHC), exhaust fans, and energy recovery equipment. Mechanical schedules detail equipment selections for operation at 5,400 and 5,500 feet elevation, including AHU systems, four-pipe fan coil units, heat pump water heater schedules, steam condensate pump specifications, and steam pressure reducing valve schedules. Control systems include comprehensive diagrams for MAU control, unit ventilator control, rooftop exhaust fan control, steam/heating water control, and split system monitoring. The piping plans show detailed hydronic connections with expansion joints, pipe anchors, and flexible connectors for multiple floor levels. Airflow zoning plans identify supply air (SA), return air (RA), exhaust air (EA), and transfer air (XFR) quantities by room and zone for both first and second floor areas. Additional details address pipe support systems, roof-mounted equipment installations, and mechanical demolition plans for existing equipment removal during the renovation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-B162 Controls3.pdf | ||
| 7- Chiller Plant System Drawing.pdf | ||
| 6-B162 Controls1.pdf | ||
| 8-B158 Mechanical Schedules.pdf | ||
| 2- 70-M-601.pdf | ||
| 5-B158 HVAC Layout.pdf | ||
| 1- 9 Mechanical A 15shts.pdf | ||
| 3- 70-M-602.pdf | ||
| 9-B162 Controls2.pdf | ||
| CS RFQ- Delta BAS Enteliweb- 36C26226Q1025- Unrestricted.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Level 1 100' - 0"
Level 2 115' - 0"
ROOF
140' - 0"
Basement 90' - 6"
GIH
MAU
EF
E5
148-M301
BB.3CDD.3E
ROOF LEVEL
B.O.D.
130' - 0"
FIRST LEVEL
100' - 0"
(N) PIPE BASEMENT
LEVEL
92' - 0"
SECOND LEVEL
115' - 0"
STAIR ROOF ACCESS
LEVEL
132' - 3"
P
P
ET
Level 1 100' - 0"
Level 2 115' - 0"
ROOF
140' - 0"
Basement 90' - 6"
C4
148-M301
FCU
EF
EF
UV
5 4.5 4 3.5 3 2 1
ROOF LEVEL
B.O.D.
130' - 0"
FIRST LEVEL
100' - 0"
(N) PIPE BASEMENT
LEVEL
92' - 0"
SECOND LEVEL
115' - 0"
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig h th in c o n e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e rs e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-M301
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
MECHANICAL SECTIONS
15 24
SCALE: 1/8" = 1'-0"C4
MECHANICAL SECTION 1
SCALE: 1/8" = 1'-0"E5
MECHANICAL SECTION 2
Level 1 100' - 0"
Level 2 115' - 0"
E
5"ø CHWS
(E)5"ø CHWS
(E)5"ø CHWR
FIRST LEVEL
100' - 0"
SECOND LEVEL
115' - 0"
BB.3
6"ø
SRV
HX
HX
ST
ST
ST
ST
CP
ST
ST
PRV
4"ø HPS 6"ø HPS
4"ø HPS
6"ø HPS 4"ø HPS
4"ø HPS
3/4"ø PC
1 1/2"ø PC
F6
148-M302
HX
4"ø HPS
ST
3"ø HPS
3"ø HWS
3"ø HWR
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-M302
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
MECHANICAL SECTIONS
16 24
SCALE: 1/4" = 1'-0"B6
FIRST FLOOR CHILLED WATER
EXPANSION JOINT
B6 KEYNOTES:
1. PROVIDE HORIZONTAL PIPE ANCHOR PER DETAIL B3 ON SHEET 148-M502
F3 KEYNOTES:
1. PROVIDE 12"x12"x12" CONCRETE BASE FOR PIPE SUPPORT STANCHION.
CONCRETE BLOCK TO REST ON TOP OF STRUCTURAL FOOTING.
2. PIPE STANCHION TO BE ANVIL INT FIG.63-TYPE C OR APPROVED EQUAL
3. PROVIDE HORIZONTAL PIPE ANCHOR PER DETAIL B3 ON SHEET 148-M502
F4 KEYNOTES:
1. STEAM CONTROL VALVE ASSEMBLY
2. PROVIDE STEAM TRAP ASSEMBLY PER DETAIL C4 ON SHEET 148-M503
F6 KEYNOTES:
1. INSTALL 4" BYPASS GATE VALVE AT 45 DEG FROM VERTICAL
2. DHX-1 AND DHX-2, REFER TO PLUMBING SHEETS FOR SCHEDULES
SCALE: 3/8" = 1'-0"F6
PIPE BASEMENT SECTION 1
SCALE: 3/8" = 1'-0"F4
PIPE BASEMENT SECTION 2
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2 3 4 5 6 7 8 9
Date
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
VA FORM 08-6231
o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t
NAVAHCS Prescott, AZ
Office of Construction and Facilities Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
05 OCT, 2016
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
148-M503
MECHANICAL DETAILS
RDS SY 19
1 2
METAL DECK
2 ADDENDUM-004 2017-03-24
T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2 3 4 5 6 7 8 9
Date
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
VA FORM 08-6231
o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t
NAVAHCS Prescott, AZ
Office of Construction and Facilities Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
05 OCT, 2016
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
148-M701
MECHANICAL SCHEDULES
RDS SY 23
NOTE: PERFORM ALL SELECTIONS
AT 5400 FT ELEVATION
1 ADDENDUM-003 2017-03-17
2 ADDENDUM-004 2017-03-24
T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2 3 4 5 6 7 8 9
Date
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
VA FORM 08-6231
o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t
NAVAHCS Prescott, AZ
Office of Construction and Facilities Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
05 OCT, 2016
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
148-M702
MECHANICAL SCHEDULES
RDS JMZ 24
NOTE: PERFORM ALL SELECTIONS
AT 5500 FT ELEVATION
1 ADDENDUM-003 2017-03-17
NORTH
NORTH
ACRCU
ACRCU
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-MD101
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
MECHANICAL DEMOLTION PLANS
2 24
SCALE:D6
(E) SHAFT DEMOLITION FOR
TEMP UTILITY CONNECTIONS
SCALE:F6
(E) SHAFT DEMOLITION FOR
FINAL UTILITY CONNECTIONS
SCALE:B5
CHILLER YARD DEMOLITION PLAN
B5 KEYNOTES:
1. AIR COOLED CHILLER TO BE DEMOLISHED, REMOVE ALL ASSOCIATED
CONTROLS, ELECTRICAL, AND PIPING ACCESSORIES
2. REMOVE EXISTING 5" CHWS AND 5" CHWR TO THIS POINT IN FIRST PHASE OF
CONSTRUCTION. THIS WILL BE THE CONNECTION POINT FOR TEMPORARY
CHILLER UNTIL NEW PLANT CHILLED WATER IS CONNECTED TO THE
BUILDING. AT TIME OF PLANT CHILLED WATER CONNECTION REMAINING
EXISTING CHILLED WATER LINES TO BE REMOVED.
3. EXISTING ELECTRICAL EQUIPMENT
D6 KEYNOTES:
1. REMOVE STEAM DRIP TRAP PIPING AND TRAP ASSEMBLY
2. POINT OF DEMOLITION FOR EXISTING FIRE DEPARTMENT CONNECTION
PIPING
3. REMOVE SECTION OF EXISTING 2-1/2" PC MAIN FOR TEMPORARY PC
CONNECTION. EXISTING 2-1/2" PC DOWN TO BELOW GRADE TO REMAIN,
REFER TO DETAIL F6 THIS SHEET FOR FINAL DEMOLITION.
4. REMOVE SECTION OF EXISTING 6" HPS MAIN FOR TEMPORARY HPS
CONNECTION. EXISTING 6" HPS DOWN TO BELOW GRADE TO REMAIN, REFER
TO DETAIL F6 THIS SHEET FOR FINAL DEMOLITION.
5. REMOVE SECTION OF EXISTING 4" DCW MAIN FOR TEMPORARY DCW
CONNECTION. EXISTING 4" DCW DOWN TO BELOW GRADE TO REMAIN, REFER
TO DETAIL F6 THIS SHEET FOR FINAL DEMOLITION.
6. POINT OF DEMOLITION FOR EXISTING 6" FP PIPING
7. EXISTING 6" ROOF DRAIN LEADER TO REMAIN
8. REMOVE EXISTING 1" STEAM CONDENSATE RETURN.
9. REMOVE EXISTING 1" STEAM CONDENSATE RETURN TO BRANCH MAIN
INSIDE EXISTING CLC BUILDING 148. PROVIDE CAP AT POINT OF CONNECTION
TO CONDENSATE RETURN MAIN ABOVE CEILING.
10. EXISTING 4" FP MAIN ABANDONED IN PLACE TO BE REMOVED
F6 KEYNOTES:
1. 6" HPS AND 2-1/2" PC DOWN TO BELOW GRADE TO BE REMOVED
2. POINT OF DEMOLITION FOR TEMPORARY 2-1/2" PC MAIN
3. POINT OF DEMOLITION FOR TEMPORARY 6" HPS MAIN
4. POINT OF DEMOLITION FOR TEMPORARY 4" DCW MAIN. REMOVE EXISTING 4"
GATE ISOLATION VALVE.
5. POINT OF DEMOLITION FOR TEMPORARY 6" HP MAIN. EXISTING 6" CHECK
VALVE TO BE STORED AND REINSTALLED DURING FINAL UTILITY
CONNECTION PHASE.
6. TEMPORARY UTILITIES AND PIPE SUPPORTS TO BE REMOVED. REFER TO
CIVIL DRAWINGS FOR MORE DETAILS.
F3 KEYNOTES:
1. REFER TO DETAILS THIS SHEET FOR DEMOLITION WORK IN THIS AREA
SCALE: 1/64" = 1'-0"F3
EXISTING 148 KEYPLAN
T S
C C C
J
J J
J
J
M
M
M
M M
M
M
M
M
M
M
M
M
J
T
T
T
T
R T S
C
R
J J
J
M
M
M M
M
M
M
M
M
M
M
M
M
M
M
M
M
JJ
J J
J J
J J
J
J
5 4.5 4 3.5 3 2 1
A
B
B.3
C
D
D.3
E
A.7
/F1 148-MH111
/F1 148-MH112
FIRST FLOOR AREA A
FIRST FLOOR AREA B
5 4.5 4 3.5 3 2 1
A
B
B.3
C
D
D.3
E
A.7
/F1 148-MH121
/F1 148-MH122
/F6 148-MH122
SECOND FLOOR AREA A
SECOND FLOOR AREA B
SECOND
FLOOR
AREA C
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-MH001
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
OVERALL HVAC KEY PLANS
3 24
SCALE: 1/8" = 1'-0"F1
1ST FLOOR OVERALL HVAC KEY PLAN
SCALE: 1/8" = 1'-0"F6
2ND FLOOR OVERALL HVAC KEY PLAN
NORTH NORTH
M
M
M
M
M
EF
UV
UV
UV
UV
36"x36"
C4
148-M301
E5
148-M301
5 4.5 4 3.5 3 2 1
A
B
B.3
C
D
D.3
E
35"x35"
28"x24"
HX
HX
ET
AS
P
P
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-MH101
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
PIPE BASEMENT HVAC PLAN
4 24
SCALE: 1/8" = 1'-0"E5
PIPE BASEMENT HVAC PLAN
E5 KEYNOTES:
1. PROVIDE 28"x24" EA DUCT TO EA SHAFT. SEAL PENETRATION TO BE AIR TIGHT.
2. PROVIDE 1/4" MESH SCREEN AT DUCT INLET
3. PROVIDE 36"x36" LOW PRESSURE COUNTER BALANCE BACKDRAFT DAMPER AT
DUCT OUTLET
4. PROVIDE 36"X36" OSA DUCT CONNECTION TO 36"x36" OPENING IN CONCRETE WALL.
PROVIDE DUCT WITH 2" ANGLE IRON MOUNTING FLANGE WITH MOUNTING BOLTS
AND EPDM GASKET. MOUNTING BOLTS TO BE MINIMUM 1/4"x2" AND SECURED IN
PLACE WITH EPOXY. PROVIDE MOUNTING BOLTS AT 1" ON CENTER.
5. INTAKE AIR SHAFT SEALED TO BE AIR TIGHT, SEAL WITH MOISTURE BARRIER AND
AIR TIGHT TO MAINTAIN 1.0" WATER COLUMN STATIC PRESSURE
6. REFER TO SHEET 148-MP101 FOR PIPING DETAILS
7. DOMESTIC HOT WATER HEAT EXCHANGERS, REFER TO PLUMBING FOR DETAILS
C C C
J
J J
M
M
M
M
M
M
M
M
T
T
C4
148-M301
MSC
MSC
"x
S A
"ø
12"ø
6"ø OSA
FCU
FCU
34"x16"12"x12"
"ø
"x
16"x10"
12"x10" EA
SD-02
230 CFM
5 4.5 4 3.5 3 2 1
A
B
B.3
C
A.7
10"x10"
RG-01
350 CFM
RG-01
95 CFM
SD-03
350 CFM
EG-01
185 CFM
/F1 148-MH112
SD-01
90 CFM
RG-01
110 CFM
6"ø
FCU
MSE
10"ø
6"ø
8"ø
8"ø
8"ø 8"ø
SD-02
200 CFM
SD-02
130 CFM
SD-02
130 CFM
8"ø 8"ø
10"ø
6"x6"
SD-01
100 CFM
SD-01
120 CFM
MSE
SD-01
120 CFM
4"x4"
6"x6" 6"x6"
6"x6" "x
" 8"ø
SD-02
155 CFM
EG-01
120 CFM
SD-01
55 CFM
"ø
8"x6"
6"ø
SD-01
80 CFM
EG-36
90 CFM
RG-01
65 CFM
SD-01
110 CFM
EG-04
20 CFM
SG-01
95 CFM
RG-02
40 CFM
20"x10"
6"x4"
"x
6"ø
12"x10"
8"x6"
FCU
"ø
6"x6" 18"x6"
8"ø
14"x8"
FCU
18"x6"
"ø
6"x6"
8"ø
8"ø
8"ø
"x
FCU
16"x8"
EG-01
45 CFM
RG-01
75 CFM
24"x14" OSA
8"ø8"ø
TYP. OF 5
"ø
"x
FCU
SG-01
110 CFM
8"ø 14"x8"
EG-01
45 CFM
RG-01
75 CFM
18"x6"
EG-01
50 CFM
EG-01
50 CFM
EG-01
65 CFM
RG-01
75 CFM
8"ø
14"x8"
4"x4"
SD-01
100 CFM
6"ø
EG-01
190 CFM
RG-01
25 CFM
EG-01
20 CFM
FCU
6"x6"
"x
E A
6"x4"
16"x10" 10"ø
"x
O S
A
6"x6"
6"x6"
"x
6"ø
2 2
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-MH111
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
FIRST FLOOR AREA A HVAC PLAN
5 24
SCALE: 1/4" = 1'-0"F1
1ST FLOOR AREA A HVAC PLAN
F1 KEYNOTES:
1. TYPE RG-01 GRILLE AT 75 CFM AND TYPE EG-01 AT 45 CFM
2. PROVIDE 1.5 HR FIRE DAMPER WITH DUCT ACCESS PANEL
3. REHAB DUCT STATIC PRESSURE LOCATION, REFER TO CONTROL DIAGRAMS
J
M
M
M
M
M
M
J
T
T
C4
148-M301
E5
148-M301
20"x16"
"ø
8"ø
10"ø
"ø
"x
"x
O S
A
"x
20"x12"
20"x12"
"x
" 10"ø
FCU
RHC
FCU
RHC
6"ø
"ø
8"x8"
"x
6"ø
30"x10"30"x10"
6"ø
4"ø
6"ø
6"ø
14"x10" 40"x20"
20"x14"
16"x10"
"ø
6"x6"
FCU
"x
"x
10"x10"
14"x6"
6"x6"
30"x10"
12"x10"
5 4.5 4 3.5 3 2 1
C
D
D.3
E
SD-02
225 CFM
SD-02
225 CFM
RG-01
675 CFM
SD-02
225 CFM
8"ø
FCU
UP
18"x10"
EG-01
800 CFM
RG-01
675 CFM
DOWN
SD-02
225 CFM
SD-02
225 CFM
RG-01
140 CFM
34"x16"
FCU
"x
D N
SD-02
200 CFM
UP DN
DN
UP
6"ø
6"x6"
SD-01
60 CFM
SD-02
155 CFM
SD-02
200 CFM
"x
"x
8"ø
SD-02
155 CFM
"x
8"ø
RG-01
150 CFM
8"x8"
SD-01
90 CFM
SD-01
85 CFM
10"ø
8"ø
SD-02
200 CFM
6"x6"
RG-01
80 CFM
EG-01
30 CFM
RG-01
310 CFM
UP
U P
10"x10"
30"x10"
EG-01
235 CFM
SD-02
105 CFM
8"ø
10"ø
EG-01
150 CFM
8"x8"
8"ø
SD-02
175 CFM
RHC
10"ø 8"ø
8"ø
RHC
10"x8"
EG-01
320 CFM
8"x8"
SD-02
125 CFM
SD-02
125 CFM
D N
D N
10"x8"
10"x8"
RHC
10"x10"
8"x8"
U P
"ø
8"ø
R-113
130 CFM
8"x8"
UP
UP
6"ø
8"ø 6"ø
SD-01
100 CFM
EG-01
130 CFM
SD-01
100 CFM
EG-01
130 CFM
SD-01
100 CFM
SD-02
185 CFM
SD-01
110 CFM
SD-02
200 CFM
8"ø
6"x6"
/F1 148-MH111
RHC
14"x10"
"x
"ø
10"ø
8"ø
SD-02
155 CFM
SD-03
255 CFM
SD-03
255 CFM
6"x6" EG-04
65 CFM
SG-01
50 CFM
SG-01
50 CFM
EG-04
65 CFM
"x
6"x6"
"ø
"ø
"x
"ø
24"x20" EA
RHC
8"x8"8"ø
6"ø6"ø
SD-06
115 CFM
TYP. OF 2
TYP. OF 2
EG-01
770 CFM
"x
"x
8"x8"
RHC
FCU
6"x4" 16"x10"
SD-07
145 CFM
8"ø
10"ø
8"x8"6 "x
"x
"6
"ø "ø
14"x8"
EG-01
20 CFM
RG-01
25 CFM
8"ø
RG-01
45 CFM
EG-01
30 CFM
10"x8"
EG-01
230 CFM
EG-11
150 CFM
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-MH112
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
FIRST FLOOR AREA B HVAC PLAN
6 24
SCALE: 1/4" = 1'-0"F1
1ST FLOOR AREA B HVAC PLAN
F1 KEYNOTES:
1. 24"X20" EA RISE TO SECOND FLOOR. REFER TO SHEET 148-MH122 FOR
CONTINUATION.
2. 24"X20" OSA DROP FROM SECOND FLOOR. REFER TO SHEET 148-MH122 FOR
CONTINUATION.
3. 8" EA DROP TO RANGE HOOD
4. 12x3 EA FROM RANGE HOOD TO ROOF DISCHARGE
M
M M
M
M
M
J J
J
C4
148-M301
RHC
RHC
"x
E A
10"x10"
22"x14"
"x
10"ø 10"ø
10"ø
24"x14"
"x
"x
"x
E A
14"x14"
5 4.5 4 3.5 3 2 1
B
B.3
C
A.7
RG-1
270 CFM 3
MSE
28"x10"
EG-01
35 CFM
SD-02
210 CFM
SD-05
700 CFM
8"ø
DN
DN
DN
SD-01
100 CFM
SD-03
375 CFM
SD-05
700 CFM
SD-02
130 CFM
EG-01
375 CFM
8"x8"
10"x10"
EG-01
535 CFM
TYP. OF 2
10"x10"
RHC
24"x14"
SD-03
285 CFM
EG-01
270 CFM
10"x8"
10"ø
8"x6"
12"ø
EG-02
1400 CFM
/F1 148-MH122
4"x6" 4"x6"
SG-03
115 CFM
"ø
RG-02
55 CFM
EG-04
45 CFM
EG-04
45 CFM
RG-02
55 CFM
FCU
SG-01
115 CFM
8"x6"
6"ø6"x4"
22"x8"
SD-02
235 CFM
"ø
FCU
10"x10" 20"x10"
"x
10"x8"
"ø
"x
"ø
"x
18"x8"14"x10"
FCU
SD-02
250 CFM
RG-01
205 CFM
EG-01
45 CFM
10"ø
"x
SD-01
90 CFM
6"ø
FCU
18"x6"
RG-01
55 CFM
EG-01
35 CFM
FCU
30"x10"
6"ø
30"x10"
10"ø
"ø
RG-01
185 CFM
EG-01
45 CFM
8"x8"
RG-01
180 CFM
EG-01
45 CFM
SD-02
230 CFM
SD-02
220 CFM
"x
"x
6"x6"
"x
"ø
SG-02
210 CFM
EG-05
510 CFM
14"x12"
12"x12"
"x
8"x6"
8"x6"
EG-05
140 CFM
TYP. OF 2
SD-06
105 CFM
TYP. OF 2
8"ø
"x
SD-01
45 CFM
6"ø
FCU
6"ø6"ø
EG-01
55 CFM
4"x4"
"x
"x
SD-03
270 CFM
RG-01
105 CFM
SD-02
160 CFM
6"ø
4"x4"
8"x8"
RG-01
75 CFM
6"x6"
22"x8" 20"x10"
10"x8"
"ø
8"x8"
FCU
RG-01
30 CFM
10"ø
"x
SG-02
110 CFM
8"ø
6"ø
"x
"x
"x
O S
A
8"ø
SG-02
110 CFM
6"x6"
EG-01
35 CFM
RG-01
75 CFM
EG-01
35 CFM
EG-01
35 CFM
4"x4" 4"x4"
8"ø
6"x6"
SG-02
105 CFM
"ø
SD-08
380 CFM
"ø
1 1
"x
20"x12"
20"x12"
TYP. OF 4
10"ø
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-MH121
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
SECOND FLOOR AREA A HVAC PLAN
7 24
SCALE: 1/4" = 1'-0"F1
2ND FLOOR AREA A HVAC PLAN
F1 KEYNOTES:
1. PROVIDE 1.5 HR FIRE DAMPER WITH DUCT ACCESS PANEL
2. TRANSFER AIR GRILLE ASSEMBLY CONSISTING OF (2) TYPE RG-01 GRILLES WITH
22x10 DUCT BOOTS CONNECTED WITH 14x10 DUCT. ASSEMBLY TO BE LINED.
NORTH
1 ADDENDUM-003 2017-03-17
R
S
C
R
M
M
M
M
M
M
M M
M
J
J
P
P
M
C4
148-M301
E5
148-M301
"x
"x
E A
40"x16" OSA
"x
O S
A
30"x20" OSA
"x
"x
"ø
MAU
RHC
"x
E A
"x
12"ø
10"ø
10"ø
10"ø
10"ø
"x
6"ø
8"ø
"ø
8"x6"
10"x10"
8"x6" 10"x8"
"x
"x
E A
"x
8"x8"
8"x6"
6"x6"
8"x6" 10"x8"
5 4.5 4 3.5 3 2 1
C
D
D.3
E
SD-02
130 CFM
10"x8"
33"x6"
FCU
RG-01
290 CFM
EG-01
35 CFM
RG-01
80 CFM
SD-08
270 CFM
TYP. OF 3
14"x12"
10"x8"
10"ø
8"ø
SD-07
200 CFM
RHC
RHC
22"x12"
UP
U P
6"x6"
EG-03
40 CFM
SD-06
100 CFM
F
-M
H
/F1 148-MH121
10"x10"
SD-02
190 CFM
8"x8"
6"x6"
8"x8" 8"x6"
EG-03
230 CFM
SD-07
205 CFM
SD-07
205 CFM
6"ø
RHC
SD-03
300 CFM
"x
EG-01
200 CFM
EG-03
185 CFM
8"ø
8"ø
EG-03
125 CFM
SD-06
100 CFM
SD-02
130 CFM
EG-01
200 CFM
EG-03
205 CFM
RHC
10"ø
DOWN
"x
E A
SD-01
100 CFM
SD-02
135 CFM
8"x6"
8"ø
8"ø 6"ø
EG-01
130 CFMSD-06
55 CFM
8"x8"
DOWN
RHC
EG-03
900 CFM
12"x12"
30"x20"
SD-03
300 CFM
EG-03
185 CFM
8"x6"
SD-07
175 CFM
EG-03
75 CFM
EG-01
195 CFM
8"x8"
6"x6"
14"x12"
10"ø
6"ø
10"ø
SG-02
485 CFM
18"x8"
8"x8"
30"x10"
320RA
EG-03
165 CFM
8"x6"
2 3
SD-02
130 CFM
"ø
EG-01
450 CFM
14"x8"
"x
O S
A
RG-01
75 CFM
6"ø
6"x6"
EG-01
170 CFM
20"x12"6"x6"
"x
"ø
FCU
8"ø
"x
"x
FCU
6"ø
SD-01
100 CFM
"ø
"x
RHC
10"x8"
10"ø
SD-03
325 CFM
"x
FCU
"x
RG-04
135 CFM
6"x8"
6"x10"
RG-01
60 CFM
EG-01
35 CFM
4"x4"
EG-01
375 CFM
10"x8"
"x
SD-02
205 CFM
SD-02
205 CFM
20"x10" 20"x10"
FCU
8"ø
8"ø 6"ø
SD-02
190 CFM
RG-01
335 CFM
EG-01
75 CFM
"x
10"x10"
FCU
8"ø
14"x10"
"ø
16"x10"
EG-01
40 CFM
RG-01
150 CFM
8"x8"
4"x4"
SD-03
280 CFM
FCU
10"ø
14"x10"
16"x10"
"ø
8"x8"
RG-01
210 CFM
EG-01
70 CFM
SD-02
135 CFM
8"ø
20"x10"
FCU
"ø
RG-01
90 CFM
EG-01
45 CFM
8"x6"
8"ø
EG-04
100 CFM
6"x6"
18"x6"
6"x6"
SD-06
75 CFM
6"ø
"x
EG-01
95 CFM
14"x10"
SD-08
270 CFM
MECHANICAL EQUIPMENT
2E-240
CORRIDOR
C2-105
SCOPE WASH
2E-222A
CLEAN SCOPE STORAGE
2E-222B
"ø
"x
CORRIDOR
C2-105
CORRIDOR
C2-106
14"x8"
"x
"ø
"ø
"ø
"ø
8"ø
8"ø
FCU
EG-01
60 CFM
RG-01
490 CFM
E
F
-M
H
6"x6"
8"x8"
SD-02
215 CFM
SD-02
215 CFM
SD-02
215 CFM
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-MH122
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
SECOND FLOOR AREAS B & C HVAC
PLANS
8 24
SCALE: 1/4" = 1'-0"F1
2ND FLOOR AREA B HVAC PLAN
SCALE: 1/4" = 1'-0"F6
2ND FLOOR AREA C HVAC PLAN
F1 KEYNOTES:
1. 8" EA DOWN TO STERILIZER EQUIPMENT. PROVIDE DROP WITH BALANCING DAMPER
AND BALANCE TO 200 CFM
2. 24"X20" EA RISE FROM FIRST FLOOR. REFER TO SHEET 148-MH112 FOR
CONTINUATION. PROVIDE FLOOR PENETRATION WITH 1.5 HR FIRE DAMPER AND
ACCESS PANEL.
3. 24"X20" OSA DROP TO FIRST FLOOR. REFER TO SHEET 148-MH112 FOR
CONTINUATION. PROVIDE FLOOR PENETRATION WITH 1.5 HR FIRE DAMPER AND
ACCESS PANEL.
4. RISE 24"x24" EA TROUGH ROOF ASSEMBLY. REFER TO SHEET 148-MH131 FOR
CONTINUATION.
5. BALANCE RA TO 320 CFM
6. 72"x40" OSA DOWN FROM ROOF TRANSITION TO 58"x23" OSA CONNECTION TO MAU-1.
7. SPS DUCT STATIC PRESSURE LOCATION, REFER TO CONTROL DIAGRAMS
8. TRANSFER AIR GRILLE ASSEMBLY CONSISTING OF (2) TYPE RG-01 GRILLES WITH
22x10 DUCT BOOTS CONNECTED WITH 12x10 DUCT. ASSEMBLY TO BE LINED.
NORTH
NORTH
1 ADDENDUM-003 2017-03-17
EF
EF
MSC
"ø
"ø
GIH
C4
148-M301
E5
148-M301
5 4.5 4 3.5 3 2 1
A
B
B.3
C
D
D.3
E
A.7
LV
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2 3 4 5 6 7 8 9
Date
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-MH131
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
ROOF HVAC PLAN
9 24
SCALE: 1/8" = 1'-0"F4
ROOF HVAC PLAN
F4 KEYNOTES:
1. 24"x24" EA DUCT RISE FROM SECOND FLOOR. REFER TO SHEET 148-MH122
FOR CONTINUATION
2. PROVIDE 72"x40" OSA DOWN FROM GIH-1 DOWN TO SECOND FLOOR. REFER
TO SHEET 148-MH122 FOR CONTINUATION
3. MOUNT LOUVER IN OPENING OF STRUCTURE. REFER TO ARCHITECTURAL
SHEETS FOR OPENING AND LOUVER MOUNTING DETAILS.
4. 12x3 EA FROM KITCHEN RANGE HOOD. PROVIDE WITH WEATHER PROOF
CAP
5. 6" Ø SCHEDULE 40 STEEL STEAM RELIEF VENT FROM SRV-1 IN BASEMENT
UP TO 72" ABOVE ROOF DECK. PROVIDE PIPE ANCHOR AT ROOF CURB PER
DETAIL B2, DRAWING 148-A504. FLASH PIPE SIMILAR TO DETAIL B6,
DRAWING 148-M503. PROVIDE(2) 90 DEGREE OFFSET BRACES (USING 1 5/8"
GREEN UNISTRUT) FROM ROOF DECK TO TOP OF VENT PIPE. PROVIDE
"TEE" TERMINATION AT VENT PIPE DISCHARGE TO DEFLECT STEAM
DISCHARGE TWO DIFFERENT DIRECTIONS.
NORTH
2 ADDENDUM-004 2017-03-24
M
M
M
M
M
M
UV
UV
UV
UV
148-MP101
C5
C4
148-M301
E5
148-M301
5 4.5 4 3.5 3 2 1
A
B
B.3
C
D
D.3
E
1"ø HWR
1"ø HWS
3/4"ø HWR
3/4"ø HWS
3/4"ø HWS
3/4"ø HWR
EF
2 1/2"ø PC
6"ø HPS
2 1/2"ø PC
6"ø HPS
6"ø CHWS
6"ø CHWR
4"ø DCW
3/4"ø HWR
3/4"ø HWS
3/4"ø HWS 3/4"ø HWR
REFER TO CIVIL DRAWING
148-CU400 FOR CONTINUATION
ST
4 3.5 3
B
B.3
C
F6
148-M302
F4
148-M302
P
P
ET
HX
PRV
CP
4"ø HWR
4"ø HWS
AS
2 1/2"ø PC
6"ø HPS 2"ø PC
1 1/2"ø PC
1 1/2"ø PC
2"ø MPR
4"ø HWR
4"ø HWR
4"ø HWR
4"ø HPS
6"ø HPS
4"ø HPS
ST
ST
ST
ST
ST
ST
HX
ST
1 1/2"ø HPR
2"ø HPS
45-730 PSI
SRV
DHX
DHX
ST
NORTH
6"ø FP
4"ø FDC
2 1/2"ø PC
6"ø HPS
4"ø DCW
NORTH
6"ø FP
6"ø HPS
2 1/2"ø PCR
4"ø FDC
4" DCW
6" DW
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2 3 4 5 6 7 8 9
Date
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-MP101
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
PIPE BASEMENT HYDRONIC PIPING
PLAN
12 24
SCALE: 1/8" = 1'-0"E1
PIPE BASEMENT HYDRONIC PIPING PLAN
E1 KEYNOTES:
1. PROVIDE PIPE ANCHOR FOR 6" HPS AND 2-1/2" PUMPED STEAM CONDENSATE (PC)
PER DETAIL B3 ON SHEET 148-M502.
2. HYDRONIC PIPE RISERS TO FIRST FLOOR, PROVIDE EACH RISE WITH ANCHOR
SUPPORT PER DETAIL C1 ON SHEET 148-M502
3. TEMPORARY AND FINAL UTILITY CONNECTIONS TO EXISTING UTILITIES IN SHAFT
TO BE INSTALLED PER DETAILS E5 AND E7 ON THIS SHEET.
4. 6" CHWS AND 6" CHWR PIPING FROM PLANT LOOP. PROVIDE FLANGE FITTINGS
AND ISOLATION VALVES ON CHILLED WATER LINES.
5. DROP 6" HPS AND 2-1/2" PC TO STEAM UTILITY TRENCH. PROVIDE DROPS WITH (2)
6" BALL EXPANSION JOINTS AND (2) 2-1/2" BALL EXPANSION JOINTS. BALL
EXPANSION JOINT TO BE HYSPAN TYPE N STYLE I (BB-31020) OR APPROVED
EQUAL.
6. 2" HPS AND 1-1/2" CD (HPR) UP TO SECOND LEVEL STERILIZER EQUIPMENT,
PROVIDE WITH ANCHOR SUPPORT AT FLOOR PENETRATION PER DETAIL C1 ON
SHEET 148-M502
7. PROVIDE DRIP TRAP ASSEMBLY ON 1-1/2" HPS LINE PER DETAIL C4 ON SHEET 148-
M503. PIPE DISCHARGE TO 2-1/2" PC MAIN.
8. PROVIDE HIGH PERFORMANCE BUTTERFLY ISOLATION VALVES ON 6" HPS AND 2-
1/2" PC, PROVIDE STANDARD BUTTERFLY ISOLATION VALVE ON 4" DCW.
9. PROVIDE MIN 15FT OF STRAIGHT 6" HPS PIPING FOR STEAM METER STM-1
INSTALLATION.
10. LOCATE CHILLED WATER METER CHM-1 IN THIS LOCATION
11. 6" PRESSURE RELIEF VENT RISE TO ROOF DISCHARGE
12. REFER TO FIRE PROTECTION/PLUMBING PLANS FOR CONTINUATION OF 6" FP, 4"
FIRE DEPARTMENT CONNECTION, AND 4" DCW MAINS
13. PROVIDE DIFFERENTIAL PRESSURE ASSEMBLY ACROSS 4" HWS AND 4" HWR FOR
CONTROLS
14. PROVIDE PIPE SLIDE SUPPORT FOR 6" HPS AND 2-1/2" PUMPED CONDENSATE.
SLIDE TO BE ANVIL INT FIG. 436 TYPE 6 OR APPROVED EQUAL. PROVIDE WITH
BOLTED BASE PLATE AND EXTENDED TEE HEIGHTS. EXTEND TEE HEIGHTS TO
MATCH PIPE GUIDE PIPE SUPPORT HEIGHT PER DETAIL D8 ON SHEET 148-M502.
E5 KEYNOTES:
1. CONNECT 4" FIRE DEPARTMENT CONNECTION PIPE TO EXISTING 4" FIRE
DEPARTMENT CONNECTION PIPE FOR EXISTING FIRE RISER
2. CONNECT 2-1/2" PC TO EXISTING 2-1/2" PC RISER
3. CONNECT 6" HPS TO EXISTING 6" HPS RISER
4. CONNECT 6" FP PIPING TO EXISTING 6" FP RISER
5. CONNECT 4" DCW TO EXISTING 4" DCW RISER
6. TEMPORARY PIPE RACK SUPPORT FOR TEMPORARY UTILITIES, REFER TO CIVIL
DRAWING FOR PIPE MOUNTED AND ORIENTATION DETAILS.
7. REFER TO CIVIL DRAWINGS FOR TEMPORARY UTILITY PIPE ROUTING
CONTINUATION
8. EXISTING 4" DCW MAIN TO BE DEMOLISHED DURING FINAL UTILITY CONNECTION
DEMOLITION, REFER TO DETAIL F6 ON SHEET 148-MD101.
9. EXISTING 6" ROOF DRAIN LEADER TO REMAIN
10. EXISTING 6" HPS AND 2-1/2" PC MAINS TO BE DEMOLISHED DURING FINAL UTILITY
CONNECTION DEMOLITION, REFER TO DETAIL F6 ON SHEET 148-MD101
11. 6" DW SPLIT TO 6" FP AND 4" DCW TO EXISTING BUILDING
E7 KEYNOTES:
1. 4" FIRE DEPARTMENT CONNECTION TO EXISTING
2. 2-1/2" PC PIPE CONNECTION TO EXISTING
3. 6" HPS PIPE CONNECTION TO EXISTING
4. 4" DCW PIPE CONNECTION TO EXISTING
5. 6" FP PIPE CONNECTION TO EXISTING
6. RELOCATE EXISTING 6" CHECK VALVE ON FP MAIN TO THIS LOCATION
C5 KEYNOTES:
1. 2'x2' EXPANSION LOOP
2. SLOPE CD (HPR) MIN 1/16" PER FT BACK TOWARDS PUMPED CONDENSATE
RETURN MAIN.
3. BRANCH PIPING SHALL BE FROM TOP OF STEAM MAIN
NORTH
SCALE: 1/4" = 1'-0"C5
PIPE BASEMENT HYDRONIC PIPING ENLARGED PLANNORTH
SCALE: NONEE7
(E) SHAFT FINAL UTILITY
CONNECTIONS
SCALE:E5
(E) SHAFT TEMPORARY UTILITY
CONNECTIONS
1 ADDENDUM-003 2017-03-17
2 ADDENDUM-004 2017-03-24
C C C
J
J
J
M
M
M
M
M
M
M
M
M
M
M
M
M
J
M
T
T
T
T
T
T
T
T T
T
T
T
T T
T
T
T
T
T
T
T
J
M
T
MSC
MSC
FCU
FCU
FCU
FCU
RHC
FCU
RHC
RHC
RHC
RHC
1 1/2"ø HWS
1 1/2"ø HWR
2"ø CHWS 2"ø CHWR
1 1/2"ø CHWR 1 1/2"ø CHWS
1"ø HWR 1"ø HWS
3/4"ø HWS
3/4"ø HWR
1 1/4"ø CHWR 1 1/4"ø CHWS 1"ø HWR 1"ø HWS
C4
148-M301
E5
148-M301
5 4.5 4 3.5 3 2 1
A
B
B.3
C
D
D.3
E
A.7
FCU-101
FCU-102
FCU
-104
FCU-108
RHC-101
FCU
FCU-110
FCU-111
FCU-112
RHC-105
RHC-106
RHC-107
RHC-108
FCU-113
MSE
MSE-1
FCU-105
FCU
148-MP111
E1
1 1/2"ø CHWR 1 1/2"ø CHWS
FCU-106
FCU 2
MSE
FCU
1 1/4"ø CHWR
1 1/4"ø CHWS
1"ø HWR
1"ø HWS
FCU
FCU
FCU-103
RHC
FCU
FCU-107
RHC
RHC-102
RHC-103
3/4"ø CHWR
3/4"ø CHWS
3/4"ø HWR
3/4"ø HWS
1 1/4"ø CHWR
1 1/4"ø CHWS
1"ø HWR
1"ø HWS
1 1/4"ø CHWR
1 1/4"ø CHWS 1 1/4"ø HWR
1 1/4"ø HWS
2"ø CHWS
1 1/2"ø HWR 1 1/2"ø HWS
1 1/4"ø CHWR 1 1/4"ø CHWS 1"ø HWR 1"ø HWS
1 1/4"ø CHWR 1 1/4"ø CHWS 1"ø HWR 1"ø HWS
3/4"ø CHWR 3/4"ø CHWS 3/4"ø HWR 3/4"ø HWS
2"ø CHWR 1 1/4"ø HWR 1 1/4"ø HWS3
D.3
E
B6
148-M302
FCU
EXJ
EXJ
5"ø CHWR
5"ø CHWS
1"ø CHWR
1"ø CHWS
3/4"ø HWR
3/4"ø HWS
(E)5"ø CHWR
(E)5"ø CHWS
RHC
RHC-104
2 1/2"ø CHWR
2 1/2"ø CHWS
2"ø HWR
2"ø HWS
4"ø CHWS
4"ø CHWR
4"ø HWS
4"ø HWR
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2 3 4 5 6 7 8 9
Date
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-MP111
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
FIRST FLOOR HYDRONIC PIPING PLAN
13 24
E3 KEYNOTES:
1. 6" STEAM RELIEF VENT RISER TO ROOF DISCHARGE
2. 2" HPS AND 1-1/2" CD (HPR) FROM BASEMENT UP TO SECOND FLOOR. INSTALL
TIGHT TO WALL. PROVIDE INSULATION WITH ALUMINUM JACKETING FOR
PROTECTION. REFER TO SHEET 148MP121 FOR CONTINUATION.
E1 KEYNOTES:
1. RISE HYDRONIC PIPING FROM PIPE BASEMENT, REFER TO SHEET 148-MP101
FOR CONTINUATION
2. RISE 4" CHWS, 4" CHWR, 4" HWS, AND 4" HWR TO SECOND FLOOR, REFER TO
SHEET 148-MP121 FOR CONTINUATION
3. CONNECT 5" CHWS AND 5" CHWR TO EXISTING 5" CHWS AND 5" CHWR.
4. REFER TO DETAILS E5 AND E7 ON SHEET 148-MP101 FOR SHAFT UTILITY
TEMPORARY AND FINAL CONNECTION DETAILS
SCALE: 1/8" = 1'-0"E3
1ST FLOOR HYDRONIC PIPING PLAN
GENERAL NOTES:
1. HYDRONIC RUN OUT SIZES TO FCU'S AND HWC'S TO BE 3/4" UNLESS OTHERWISE
NOTED
NORTH
SCALE: 1/4" = 1'-0"E1
SPEECH THERAPY HYDRONIC
PIPING PLAN
NORTH
1 ADDENDUM-003 2017-03-17
R
S
HD
C
R
HD
HD
HD
HD
HD
J
HD
M
M
M M
M
M
M
M
M
M
M
M
M
M
M
M
M
J J
J
J
J
P
P
T
T T
T
T
T
T
T
T
T
T
T T
T
T T
T
T
T
T
T
T
T
T
R T S
C
R
M
J
2"ø HPS
1 1/2"ø HWS
1 1/2"ø HWR
2"ø CHWS
2"ø CHWR
MAU
FCU
FCU 204
FCU
RHC
RHC
RHC
RHC
RHC
RHC
RHC
RHC
RHC
C4
148-M301
E5
148-M301
5 4.5 4 3.5 3 2 1
A
B
B.3
C
D
D.3
E
A.7
FCU-201
FCU-204
FCU-205
FCU-208
FCU-209
FCU-214
RHC-210
RHC-209
RHC-207
RHC-208
RHC-206
RHC-205
HWC-203
HWC-204
RHC-202
FCU
3/4"ø HWS
3/4"ø HWR
1 1/4"ø CHWS
1 1/4"ø CHWR
1 1/2"ø HWR
1 1/2"ø HWS
2 1/2"ø CHWR
2 1/2"ø CHWS
2"ø HWR
2"ø HWS
1 1/2"ø HWS
1 1/2"ø HWR
1 1/4"ø HWS
1 1/4"ø HWR
148-MP121
E1
FCU
FCU-202
FCU
FCU-203
FCU
FCU
FCU
FCU-206
FCU
FCU-207
RHC
RHC-201
FCU
FCU-211
FCU
FCU
FCU-212
FCU
FCU-
FCU
FCU-210
2"ø CHWR 2"ø CHWS
1 1/2"ø HWR 1 1/2"ø HWS
FCU
2"ø CHWR
2"ø CHWS
1 1/4"ø HWR
1 1/4"ø HWS
1 1/2"ø HWS
1 1/2"ø HWR
1 1/4"ø HWS
1 1/4"ø HWR
1 1/4"ø CHWS
1 1/4"ø CHWR
2"ø CHWR
2"ø CHWS 1 1/2"ø HWR
1 1/2"ø HWS
1 1/2"ø HPS 1 1/2"ø HPR
1"ø HPS
ST
1 1/2"ø HPR
D
D.3
E
MECHANICAL EQUIPMENT
2E-240 3/4"ø HWR
1"ø CHWR
1"ø CHWS
MAU
FCU
2 1/2"ø HWR
2 1/2"ø HWS
4"ø CHWR
4"ø CHWS
2"ø HWS 2"ø HWR 2 1/2"ø CHWS 2 1/2"ø CHWR
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
SYRDS05 OCT, 2016
148-MP121
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
SECOND FLOOR HYDRONIC PIPING
PLAN
14 24
F3 KEYNOTES:
1. 6" STEAM RELIEF VENT RISER TO ROOF DISCHARGE
2. 2" HPS AND 1-1/2" CD (HPR) RISER FROM BASEMENT LEVEL. INSTALL TIGHT TO
WALL. PROVIDE INSULATION WITH ALUMINUM JACKETING FOR PROTECTION.
SLOPE ALL PIPING BACK TO RISER AT A MINIMUM 1/16" PER FOOT.
3. 3'x3' EXPANSION LOOP
4. 1" HPS AND 1" CD (HPR) DOWN TO WASHER DISINFECTOR. PROVIDE WITH
ISOLATION VALVE AND ACCESSORIES RECOMMENDED BY EQUIPMENT
MANUFACTURER.
5. 1" HPS DOWN TO STEAM GUN. PROVIDE WITH ISOLATION VALVE AND
ACCESSORIES RECOMMENDED BY EQUIPMENT MANUFACTURER.
6. 2"x12" LENGTH DRIP LEG WITH STEAM TRAP (ST-9) AT APPROX. 60" AFF. ROUTE
DISCHARGE INTO TOP OF CD (HPR) LINE BACK TO BASEMENT. SEE DETAIL C4
ON SHEET 148-M503.
E1 KEYNOTES:
1. 3" CHWS, 3" CHWR, 2-1/2" HWS, AND 2-1/2" HWR DROP TO MAU-1 COIL
CONNECTIONS. REFER TO MECHANICAL DETAILS FOR PIPING CONNECTION AND
PIPE ACCESSORY DETAILS.
2. 4" CHWS, 4" CHWR, 4" HWS, AND 4" HWR DROP TO DROP TO FIRST FLOOR,
REFER TO SHEET 148-MP111 FOR CONTINUATION
SCALE: 1/8" = 1'-0"F3
2ND FLOOR HYDRONIC PIPING PLAN
NORTH
GENERAL NOTES:
1. HYDRONIC RUN OUT SIZES TO FCU'S AND HWC'S TO BE 3/4" UNLESS OTHERWISE
NOTED
SCALE: 1/4" = 1'-0"E1
MECH ROOM 240 HYDRONIC PIPING PLAN
NORTH
1 ADDENDUM-003 2017-03-17
PT SEMI-PRIVATE TABLE
CUBICLE
1E-106F
GAIT LANE
1E-106E
PT TREATMENT CLINIC
1E-106A
PT EXERCISE AREA
1E-106B
OT TREATMENT CLINIC
1E-106C
OT SPL TREATMENT
1E-106D
ADL: BATHRM
1E-115
HAC
1E-117
ELEVATOR EQUIPMENT
1E-105
LOBBY
C1-102
ELECTRICAL
1E-133
TELECOMM
1E-134
FIRE RISER
1E-135
EQUIP STORAGE AND TEST
1E-131A
CLEAN CART HOLDING
1E-131B
CLEAN STORAGE
1E-130
DISPATCH AREA
1E-129B
DISPATCH CLERK
1E-129A
RECEIVING BREAK-OUT
1E-127
GAS EMPTY
1E-126
CORRIDOR
C1-104
TECH CUBICLES
1E-128A
CHIEF OFFICE
1E-121A
CORRIDOR
C1-103
BULKSTORAGE
1E-136
STAFF LOUNGE / LOCKERS
1E-129
GAS FULL
1E-131
STAFF WORK
1E-137
LOADING DOCK /
RECIEVING
1E-132
STORAGE
1E-119
CIRCULATION
106-00002
CIRCULATION
1E-128B
2255 SA
1350 RA
800 EA
105 XFR
CFM
OT OFFICE
1E-120A
PT OFFICE
1E-111A
5 4.5 4 3.5 3 2 1
A
B
B.3
C
D
D.3
E
A.7
FEMALE PUBLIC TOILET
1E-103
MALE PUBLIC TOILET
1E-104
CIRCULATION
1E-106J
RECEPTION
1E-102
ESCORT
1E-101A
WAITING
1E-101
STAFF TLT
1E-123
STAFF TLT
1E-124
SERVICE ELEVATOR
C1-101
SPEC. TREAT
1E-110
EXAM
1E-109
OT OFFICE
1E-120
ADL: KITCHEN / TREATMENT
1E-114
PT OFFICE
1E-111
PT PRIVATE TABLE ROOM
1E-107
UTILITY
1E-106H
STORAGE
1E-112
AIRWAY 1
B-003
STAIR
S-7
110 SA
75 RA
50 EA
-15 XFR
110 SA
65 RA
45 EA
0 XFR
170 SA
110 RA
90 EA
-30 XFR
CFM
120 SA
75 RA
65 EA
-20 XFR
CFM
120 SA
75 RA
45 EA
0 XFR
120 SA
75 RA
45 EA
0 XFR
45 SA
25RA
20 EA
5 XFR
CFM
45 SA
25 RA
20 EA
0 XFR
75 SA
45 RA
30 EA
0 XFR
45 CFM
520 SA
140 RA
30 EA
350 XFR
MINI-SPLIT
SERVICE
0 XFR
350 SA
350 RA
0 EA
0 XFR
100 SA
95 RA
0 EA
0 XFR
FCU
SERVICE
0 XFR
100 SA
0 RA
120 EA
-20 XFR
130 SA
0 RA
115 EA
15 XFR
145 SA
0 RA
190 EA
-45 XFR
200 SA
0 RA
230 EA
-30 XFR
CFM
700 SA
0 RA
645 EA
55 XFR
CFM
CFM
175 SA
0 RA
150 EA
25 XFR
CFM
665 SA
0 RA
770 EA
-105 XFR
105 CFM115 SA
0 RA
150 EA
-35 XFR
CFM
CFM
115 SA
0 RA
150 EA
-35 XFR
205 SA
0 RA
80 EA
125 XFR
CFM
90 SA
0 RA
120 EA
-30 XFR
CFM
CFM
175 SA
150 RA
0 EA
25 XFR
CFM
190 SA
0 RA
220 EA
-30 XFR
CFM
110 SA
80 RA
30 EA
0 XFR
385 SA
310 RA
0 EA
75 XFR
40 SA
0 RA
55 EA
-15 XFR
45 SA
0 RA
60 EA
-15 XFR
15 CFM
15 CFM
95 SA
40 RA
20 EA
35 XFR
5 CFM
CFM
CFM
CFM
CFM
5 CFM
CFM
75 CFM
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
JMZRDS05 OCT, 2016
148-MZ111
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
FIRST FLOOR AIRFLOW ZONING PLAN
10 24
SCALE: 1/8" = 1'-0"F2
1ST FLOOR AIRFLOW ZONING PLAN
WAITING
2E-101
RECEPTION
2E-102
EXAM ROOM
2E-105
EXAM ROOM
2E-104
EXAM ROOM
2E-107
EXAM ROOM
2E-106
MECHANICAL EQUIPMENT
2E-240
FEMALE LOCKER, TOILET,
SHOWER
2E-224
MALE LOCKER, TOILET,
SHOWER
2E-225 SCOPE WASH
2E-222A
CLEAN SCOPE STORAGE
2E-222B
SERVICE ELEVATOR
C2-001
TELECOMM
2E-241
ELECTRICAL
2E-242
STERILIZATION EQUIPMENT
2E-230A
CLEAN VESTIBULE AND
LOCKERS
2E-229
TOILET
2E-229A
SOILED HAC
2E-227
DECONTAMINATION
2E-221
CENTRAL STERILE
2E-230
STERILIZATION WORK AREA
2E-230C
CORRIDOR
C2-105
CORRIDOR
C2-104
LOBBY
C2-100
HAC
2E-118
CHIEF
2E-111
ADMIN ASST
2E-109
CIRCULATION
106-00003
CORRIDOR
C2-106
CORRIDOR
C2-107
CFM
5 4.5 4 3.5 3 2 1
A
B
B.3
C
D
D.3
E
A.7
PHYSICIAN. OFF.
2E-113
CORRIDOR
C2-102
STAFF TLT
2E-110
PATIENT TLT
2E-108
LPN CUBICLE
2E-103
SPEECH THERAPY
2E-112
PROVIDER OFF.
2E-115
STAFF LOUNGE
2E-117
THERAPIST
2E-114
SPS CONFERENCE /
TRAINING
2E-116
CONFERENCE
2E-119
CHIEF SPS
2E-123
LEAD TECH
2E-121B
RECEPTION / WAITING
2E-121A
AIRWAY 1
B-003
CORRIDOR
C2-101
DETERGENT WATER TREAT
2E-228 HAC
2E-230B
MANUAL EQUIP WASH
2E-226
SOILED TRANSITION
2E-220
STAIR
S - 6
ASST. CHIEF OFFICE
2E-120
750 SA
165 RA
605 EA
-20 XFR
90 SA
55 RA
35 EA
0 XFR
250 SA
205 RA
45 EA
0 XFR
230 SA
185 RA
45 EA
0 XFR
220 SA
180 RA
45 EA
0 XFR
325 SA
0 RA
375 EA
-50 XFR
105 SA
0 RA
140 EA
-35 XFR
45 SA
20 RA
25 EA
0 XFR
160 SA
105 RA
55 EA
0 XFR
95 SA
60 RA
35 EA
0 XFR
110 SA
75 RA
35 EA
0 XFR
280 SA
210 RA
70 EA
0 XFR
110 SA
75 RA
35 EA
0 XFR
105 SA
70 RA
35 EA
0 XFR
135 SA
90 RA
45 EA
0 XFR
410 SA
335 RA
75 EA
0 XFR
190 SA
150 RA
40 EA
0 XFR
230 SA
80 RA
170 EA
-20 XFR
335 SA
270 RA
20 EA
45 XFR
MINI-
SPLIT
SERVICE
0 XFR
375 SA
375 RA
0 EA
0 XFR
580 SA
290 RA
450 EA
-255 XFR
75 SA
0 RA
100 EA
-25 XFR
110 SA
75 RA
35 EA
0 XFR
485 SA
320 RA
165 EA
0 XFR
115 SA
55 RA
45 EA
15 XFR
645 SA
490 RA
60 EA
95 XFR
100 SA
0 RA
40 EA
60 XFR
200 SA
0 RA
230 EA
-30 XFR
300 SA
0 RA
385 EA
-85 XFR
300 SA
0 RA
385 EA
-85 XFR
100 SA
0 RA
125 EA
-25 XFR
175 SA
0 RA
205 EA
-30 XFR
135 SA
0 RA
180 EA
-45 XFR
90 SA
0 RA
120 EA
-30 XFR
285 SA
0 RA
270 EA
15 XFR
55 SA
0 RA
75 EA
-20 XFR
1400 SA
0 RA
1400 EA
0 XFR
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
435 CFM
DUCTED
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
1520 SA
0 RA
1065 EA
455 XFR
1075 SA
0 RA
1400 EA
-325 XFR
NOTE: 500 CFM
OF EA IS DIRECT
EQUIPMENT
CONNECTIONS
410 SA
0 RA
0 EA
410 XFR
CFM
DUCTED
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2222 3333 4444 5555 6666 7777 8888 9999
Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
NAVAHCS Prescott, AZ
Office of
Construction and Facilities
Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
JMZRDS05 OCT, 2016
148-MZ121
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
SECOND FLOOR AIRFLOW ZONING
PLAN
11 24
NORTH
SCALE: 1/8" = 1'-0"F3
2ND FLOOR AIRFLOW ZONING PLAN
1 ADDENDUM-003 2017-03-17
| 2016_649-409_M001_162_I_M |
| 2016_649-409_M301_162_I_M |
| 2016_649-409_M302_162_I_M |
| 2016_649-409_M501_162_I_M |
| 2016_649-409_M502_162_I_M |
| 2016_649-409_M503_162_I_M |
| 2016_649-409_M701_162_I_M |
| 2016_649-409_M702_162_I_M |
| 2016_649-409_MD101_162_I_M |
| 2016_649-409_MH001_162_I_M |
| 2016_649-409_MH101_162_B_M |
| 2016_649-409_MH111_162_1_M |
| 2016_649-409_MH112_162_1_M |
| 2016_649-409_MH121_162_2_M |
| 2016_649-409_MH122_162_2_M |
| 2016_649-409_MH131_162_R_M |
| Sheets |
| 148-MH131 - ROOF HVAC PLAN |
| 148-MP101 - PIPE BASEMENT HYDRONIC PIPING PLAN |
| 148-MP111 - FIRST FLOOR HYDRONIC PIPING PLAN |
| 2016_649-409_MI601_162_I_M |
| 2016_649-409_MI602_162_I_M |
| 2016_649-409_MI603_162_I_M |
| 2016_649-409_MP101_162_B_M |
| Sheets |
| 148-MH131 - ROOF HVAC PLAN |
| 148-MP101 - PIPE BASEMENT HYDRONIC PIPING PLAN |
| 148-MP111 - FIRST FLOOR HYDRONIC PIPING PLAN |
| 2016_649-409_MP111_162_1_M |
| Sheets |
| 148-MH131 - ROOF HVAC PLAN |
| 148-MP101 - PIPE BASEMENT HYDRONIC PIPING PLAN |
| 148-MP111 - FIRST FLOOR HYDRONIC PIPING PLAN |
| 2016_649-409_MP121_162_2_M |
| 2016_649-409_MZ111_162_1_M |
| 2016_649-409_MZ121_162_2_M |