About this file

This document is a set of mechanical and HVAC construction drawings for an Expanded Rehab Medicine and SPS project at NAVAHCS Prescott, Arizona (Building 148), prepared by GLHN Architects & Engineers as 100% Construction Documents dated October 5, 2016, with Project Number 0855.08.

The drawings encompass comprehensive mechanical systems design including HVAC layouts, piping schematics, control diagrams, and equipment schedules for a fully sprinkled facility. Key systems depicted include chilled water (CHWS/CHWR), hot water (HWS/HWR), steam (HPS/HPR), and domestic cold water (DCW) distribution throughout basement, first floor, second floor, and roof levels. The design incorporates multiple air handling units (MAU), fan coil units (FCU), reheat coils (RHC), exhaust fans, and energy recovery equipment. Mechanical schedules detail equipment selections for operation at 5,400 and 5,500 feet elevation, including AHU systems, four-pipe fan coil units, heat pump water heater schedules, steam condensate pump specifications, and steam pressure reducing valve schedules. Control systems include comprehensive diagrams for MAU control, unit ventilator control, rooftop exhaust fan control, steam/heating water control, and split system monitoring. The piping plans show detailed hydronic connections with expansion joints, pipe anchors, and flexible connectors for multiple floor levels. Airflow zoning plans identify supply air (SA), return air (RA), exhaust air (EA), and transfer air (XFR) quantities by room and zone for both first and second floor areas. Additional details address pipe support systems, roof-mounted equipment installations, and mechanical demolition plans for existing equipment removal during the renovation project.

View the file

Other files

File Type Posted
10-B162 Controls3.pdf PDF
7- Chiller Plant System Drawing.pdf PDF
6-B162 Controls1.pdf PDF
8-B158 Mechanical Schedules.pdf PDF
2- 70-M-601.pdf PDF
5-B158 HVAC Layout.pdf PDF
1- 9 Mechanical A 15shts.pdf PDF
3- 70-M-602.pdf PDF
9-B162 Controls2.pdf PDF
CS RFQ- Delta BAS Enteliweb- 36C26226Q1025- Unrestricted.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Level 1 100' - 0"

Level 2 115' - 0"

ROOF

140' - 0"

Basement 90' - 6"

GIH

MAU

EF

E5

148-M301

BB.3CDD.3E

ROOF LEVEL

B.O.D.

130' - 0"

FIRST LEVEL

100' - 0"

(N) PIPE BASEMENT

LEVEL

92' - 0"

SECOND LEVEL

115' - 0"

STAIR ROOF ACCESS

LEVEL

132' - 3"

P

P

ET

Level 1 100' - 0"

Level 2 115' - 0"

ROOF

140' - 0"

Basement 90' - 6"

C4

148-M301

FCU

EF

EF

UV

5 4.5 4 3.5 3 2 1

ROOF LEVEL

B.O.D.

130' - 0"

FIRST LEVEL

100' - 0"

(N) PIPE BASEMENT

LEVEL

92' - 0"

SECOND LEVEL

115' - 0"

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig h th in c o n e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e rs e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-M301

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

MECHANICAL SECTIONS

15 24

SCALE: 1/8" = 1'-0"C4

MECHANICAL SECTION 1

SCALE: 1/8" = 1'-0"E5

MECHANICAL SECTION 2

Level 1 100' - 0"

Level 2 115' - 0"

E

5"ø CHWS

(E)5"ø CHWS

(E)5"ø CHWR

FIRST LEVEL

100' - 0"

SECOND LEVEL

115' - 0"

BB.3

6"ø

SRV

HX

HX

ST

ST

ST

ST

CP

ST

ST

PRV

4"ø HPS 6"ø HPS

4"ø HPS

6"ø HPS 4"ø HPS

4"ø HPS

3/4"ø PC

1 1/2"ø PC

F6

148-M302

HX

4"ø HPS

ST

3"ø HPS

3"ø HWS

3"ø HWR

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-M302

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

MECHANICAL SECTIONS

16 24

SCALE: 1/4" = 1'-0"B6

FIRST FLOOR CHILLED WATER

EXPANSION JOINT

B6 KEYNOTES:

1. PROVIDE HORIZONTAL PIPE ANCHOR PER DETAIL B3 ON SHEET 148-M502

F3 KEYNOTES:

1. PROVIDE 12"x12"x12" CONCRETE BASE FOR PIPE SUPPORT STANCHION.

CONCRETE BLOCK TO REST ON TOP OF STRUCTURAL FOOTING.

2. PIPE STANCHION TO BE ANVIL INT FIG.63-TYPE C OR APPROVED EQUAL

3. PROVIDE HORIZONTAL PIPE ANCHOR PER DETAIL B3 ON SHEET 148-M502

F4 KEYNOTES:

1. STEAM CONTROL VALVE ASSEMBLY

2. PROVIDE STEAM TRAP ASSEMBLY PER DETAIL C4 ON SHEET 148-M503

F6 KEYNOTES:

1. INSTALL 4" BYPASS GATE VALVE AT 45 DEG FROM VERTICAL

2. DHX-1 AND DHX-2, REFER TO PLUMBING SHEETS FOR SCHEDULES

SCALE: 3/8" = 1'-0"F6

PIPE BASEMENT SECTION 1

SCALE: 3/8" = 1'-0"F4

PIPE BASEMENT SECTION 2

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2 3 4 5 6 7 8 9

Date

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

VA FORM 08-6231

o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t

NAVAHCS Prescott, AZ

Office of Construction and Facilities Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

05 OCT, 2016

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

148-M503

MECHANICAL DETAILS

RDS SY 19

1 2

METAL DECK

2 ADDENDUM-004 2017-03-24

T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2 3 4 5 6 7 8 9

Date

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

VA FORM 08-6231

o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t

NAVAHCS Prescott, AZ

Office of Construction and Facilities Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

05 OCT, 2016

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

148-M701

MECHANICAL SCHEDULES

RDS SY 23

NOTE: PERFORM ALL SELECTIONS

AT 5400 FT ELEVATION

1 ADDENDUM-003 2017-03-17

2 ADDENDUM-004 2017-03-24

T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2 3 4 5 6 7 8 9

Date

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

VA FORM 08-6231

o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t

NAVAHCS Prescott, AZ

Office of Construction and Facilities Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

05 OCT, 2016

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

148-M702

MECHANICAL SCHEDULES

RDS JMZ 24

NOTE: PERFORM ALL SELECTIONS

AT 5500 FT ELEVATION

1 ADDENDUM-003 2017-03-17

NORTH

NORTH

ACRCU

ACRCU

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-MD101

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

MECHANICAL DEMOLTION PLANS

2 24

SCALE:D6

(E) SHAFT DEMOLITION FOR

TEMP UTILITY CONNECTIONS

SCALE:F6

(E) SHAFT DEMOLITION FOR

FINAL UTILITY CONNECTIONS

SCALE:B5

CHILLER YARD DEMOLITION PLAN

B5 KEYNOTES:

1. AIR COOLED CHILLER TO BE DEMOLISHED, REMOVE ALL ASSOCIATED

CONTROLS, ELECTRICAL, AND PIPING ACCESSORIES

2. REMOVE EXISTING 5" CHWS AND 5" CHWR TO THIS POINT IN FIRST PHASE OF

CONSTRUCTION. THIS WILL BE THE CONNECTION POINT FOR TEMPORARY

CHILLER UNTIL NEW PLANT CHILLED WATER IS CONNECTED TO THE

BUILDING. AT TIME OF PLANT CHILLED WATER CONNECTION REMAINING

EXISTING CHILLED WATER LINES TO BE REMOVED.

3. EXISTING ELECTRICAL EQUIPMENT

D6 KEYNOTES:

1. REMOVE STEAM DRIP TRAP PIPING AND TRAP ASSEMBLY

2. POINT OF DEMOLITION FOR EXISTING FIRE DEPARTMENT CONNECTION

PIPING

3. REMOVE SECTION OF EXISTING 2-1/2" PC MAIN FOR TEMPORARY PC

CONNECTION. EXISTING 2-1/2" PC DOWN TO BELOW GRADE TO REMAIN,

REFER TO DETAIL F6 THIS SHEET FOR FINAL DEMOLITION.

4. REMOVE SECTION OF EXISTING 6" HPS MAIN FOR TEMPORARY HPS

CONNECTION. EXISTING 6" HPS DOWN TO BELOW GRADE TO REMAIN, REFER

TO DETAIL F6 THIS SHEET FOR FINAL DEMOLITION.

5. REMOVE SECTION OF EXISTING 4" DCW MAIN FOR TEMPORARY DCW

CONNECTION. EXISTING 4" DCW DOWN TO BELOW GRADE TO REMAIN, REFER

TO DETAIL F6 THIS SHEET FOR FINAL DEMOLITION.

6. POINT OF DEMOLITION FOR EXISTING 6" FP PIPING

7. EXISTING 6" ROOF DRAIN LEADER TO REMAIN

8. REMOVE EXISTING 1" STEAM CONDENSATE RETURN.

9. REMOVE EXISTING 1" STEAM CONDENSATE RETURN TO BRANCH MAIN

INSIDE EXISTING CLC BUILDING 148. PROVIDE CAP AT POINT OF CONNECTION

TO CONDENSATE RETURN MAIN ABOVE CEILING.

10. EXISTING 4" FP MAIN ABANDONED IN PLACE TO BE REMOVED

F6 KEYNOTES:

1. 6" HPS AND 2-1/2" PC DOWN TO BELOW GRADE TO BE REMOVED

2. POINT OF DEMOLITION FOR TEMPORARY 2-1/2" PC MAIN

3. POINT OF DEMOLITION FOR TEMPORARY 6" HPS MAIN

4. POINT OF DEMOLITION FOR TEMPORARY 4" DCW MAIN. REMOVE EXISTING 4"

GATE ISOLATION VALVE.

5. POINT OF DEMOLITION FOR TEMPORARY 6" HP MAIN. EXISTING 6" CHECK

VALVE TO BE STORED AND REINSTALLED DURING FINAL UTILITY

CONNECTION PHASE.

6. TEMPORARY UTILITIES AND PIPE SUPPORTS TO BE REMOVED. REFER TO

CIVIL DRAWINGS FOR MORE DETAILS.

F3 KEYNOTES:

1. REFER TO DETAILS THIS SHEET FOR DEMOLITION WORK IN THIS AREA

SCALE: 1/64" = 1'-0"F3

EXISTING 148 KEYPLAN

T S

C C C

J

J J

J

J

M

M

M

M M

M

M

M

M

M

M

M

M

J

T

T

T

T

R T S

C

R

J J

J

M

M

M M

M

M

M

M

M

M

M

M

M

M

M

M

M

JJ

J J

J J

J J

J

J

5 4.5 4 3.5 3 2 1

A

B

B.3

C

D

D.3

E

A.7

/F1 148-MH111

/F1 148-MH112

FIRST FLOOR AREA A

FIRST FLOOR AREA B

5 4.5 4 3.5 3 2 1

A

B

B.3

C

D

D.3

E

A.7

/F1 148-MH121

/F1 148-MH122

/F6 148-MH122

SECOND FLOOR AREA A

SECOND FLOOR AREA B

SECOND

FLOOR

AREA C

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-MH001

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

OVERALL HVAC KEY PLANS

3 24

SCALE: 1/8" = 1'-0"F1

1ST FLOOR OVERALL HVAC KEY PLAN

SCALE: 1/8" = 1'-0"F6

2ND FLOOR OVERALL HVAC KEY PLAN

NORTH NORTH

M

M

M

M

M

EF

UV

UV

UV

UV

36"x36"

C4

148-M301

E5

148-M301

5 4.5 4 3.5 3 2 1

A

B

B.3

C

D

D.3

E

35"x35"

28"x24"

HX

HX

ET

AS

P

P

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-MH101

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

PIPE BASEMENT HVAC PLAN

4 24

SCALE: 1/8" = 1'-0"E5

PIPE BASEMENT HVAC PLAN

E5 KEYNOTES:

1. PROVIDE 28"x24" EA DUCT TO EA SHAFT. SEAL PENETRATION TO BE AIR TIGHT.

2. PROVIDE 1/4" MESH SCREEN AT DUCT INLET

3. PROVIDE 36"x36" LOW PRESSURE COUNTER BALANCE BACKDRAFT DAMPER AT

DUCT OUTLET

4. PROVIDE 36"X36" OSA DUCT CONNECTION TO 36"x36" OPENING IN CONCRETE WALL.

PROVIDE DUCT WITH 2" ANGLE IRON MOUNTING FLANGE WITH MOUNTING BOLTS

AND EPDM GASKET. MOUNTING BOLTS TO BE MINIMUM 1/4"x2" AND SECURED IN

PLACE WITH EPOXY. PROVIDE MOUNTING BOLTS AT 1" ON CENTER.

5. INTAKE AIR SHAFT SEALED TO BE AIR TIGHT, SEAL WITH MOISTURE BARRIER AND

AIR TIGHT TO MAINTAIN 1.0" WATER COLUMN STATIC PRESSURE

6. REFER TO SHEET 148-MP101 FOR PIPING DETAILS

7. DOMESTIC HOT WATER HEAT EXCHANGERS, REFER TO PLUMBING FOR DETAILS

C C C

J

J J

M

M

M

M

M

M

M

M

T

T

C4

148-M301

MSC

MSC

"x

S A

"ø

12"ø

6"ø OSA

FCU

FCU

34"x16"12"x12"

"ø

"x

16"x10"

12"x10" EA

SD-02

230 CFM

5 4.5 4 3.5 3 2 1

A

B

B.3

C

A.7

10"x10"

RG-01

350 CFM

RG-01

95 CFM

SD-03

350 CFM

EG-01

185 CFM

/F1 148-MH112

SD-01

90 CFM

RG-01

110 CFM

6"ø

FCU

MSE

10"ø

6"ø

8"ø

8"ø

8"ø 8"ø

SD-02

200 CFM

SD-02

130 CFM

SD-02

130 CFM

8"ø 8"ø

10"ø

6"x6"

SD-01

100 CFM

SD-01

120 CFM

MSE

SD-01

120 CFM

4"x4"

6"x6" 6"x6"

6"x6" "x

" 8"ø

SD-02

155 CFM

EG-01

120 CFM

SD-01

55 CFM

"ø

8"x6"

6"ø

SD-01

80 CFM

EG-36

90 CFM

RG-01

65 CFM

SD-01

110 CFM

EG-04

20 CFM

SG-01

95 CFM

RG-02

40 CFM

20"x10"

6"x4"

"x

6"ø

12"x10"

8"x6"

FCU

"ø

6"x6" 18"x6"

8"ø

14"x8"

FCU

18"x6"

"ø

6"x6"

8"ø

8"ø

8"ø

"x

FCU

16"x8"

EG-01

45 CFM

RG-01

75 CFM

24"x14" OSA

8"ø8"ø

TYP. OF 5

"ø

"x

FCU

SG-01

110 CFM

8"ø 14"x8"

EG-01

45 CFM

RG-01

75 CFM

18"x6"

EG-01

50 CFM

EG-01

50 CFM

EG-01

65 CFM

RG-01

75 CFM

8"ø

14"x8"

4"x4"

SD-01

100 CFM

6"ø

EG-01

190 CFM

RG-01

25 CFM

EG-01

20 CFM

FCU

6"x6"

"x

E A

6"x4"

16"x10" 10"ø

"x

O S

A

6"x6"

6"x6"

"x

6"ø

2 2

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-MH111

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

FIRST FLOOR AREA A HVAC PLAN

5 24

SCALE: 1/4" = 1'-0"F1

1ST FLOOR AREA A HVAC PLAN

F1 KEYNOTES:

1. TYPE RG-01 GRILLE AT 75 CFM AND TYPE EG-01 AT 45 CFM

2. PROVIDE 1.5 HR FIRE DAMPER WITH DUCT ACCESS PANEL

3. REHAB DUCT STATIC PRESSURE LOCATION, REFER TO CONTROL DIAGRAMS

J

M

M

M

M

M

M

J

T

T

C4

148-M301

E5

148-M301

20"x16"

"ø

8"ø

10"ø

"ø

"x

"x

O S

A

"x

20"x12"

20"x12"

"x

" 10"ø

FCU

RHC

FCU

RHC

6"ø

"ø

8"x8"

"x

6"ø

30"x10"30"x10"

6"ø

4"ø

6"ø

6"ø

14"x10" 40"x20"

20"x14"

16"x10"

"ø

6"x6"

FCU

"x

"x

10"x10"

14"x6"

6"x6"

30"x10"

12"x10"

5 4.5 4 3.5 3 2 1

C

D

D.3

E

SD-02

225 CFM

SD-02

225 CFM

RG-01

675 CFM

SD-02

225 CFM

8"ø

FCU

UP

18"x10"

EG-01

800 CFM

RG-01

675 CFM

DOWN

SD-02

225 CFM

SD-02

225 CFM

RG-01

140 CFM

34"x16"

FCU

"x

D N

SD-02

200 CFM

UP DN

DN

UP

6"ø

6"x6"

SD-01

60 CFM

SD-02

155 CFM

SD-02

200 CFM

"x

"x

8"ø

SD-02

155 CFM

"x

8"ø

RG-01

150 CFM

8"x8"

SD-01

90 CFM

SD-01

85 CFM

10"ø

8"ø

SD-02

200 CFM

6"x6"

RG-01

80 CFM

EG-01

30 CFM

RG-01

310 CFM

UP

U P

10"x10"

30"x10"

EG-01

235 CFM

SD-02

105 CFM

8"ø

10"ø

EG-01

150 CFM

8"x8"

8"ø

SD-02

175 CFM

RHC

10"ø 8"ø

8"ø

RHC

10"x8"

EG-01

320 CFM

8"x8"

SD-02

125 CFM

SD-02

125 CFM

D N

D N

10"x8"

10"x8"

RHC

10"x10"

8"x8"

U P

"ø

8"ø

R-113

130 CFM

8"x8"

UP

UP

6"ø

8"ø 6"ø

SD-01

100 CFM

EG-01

130 CFM

SD-01

100 CFM

EG-01

130 CFM

SD-01

100 CFM

SD-02

185 CFM

SD-01

110 CFM

SD-02

200 CFM

8"ø

6"x6"

/F1 148-MH111

RHC

14"x10"

"x

"ø

10"ø

8"ø

SD-02

155 CFM

SD-03

255 CFM

SD-03

255 CFM

6"x6" EG-04

65 CFM

SG-01

50 CFM

SG-01

50 CFM

EG-04

65 CFM

"x

6"x6"

"ø

"ø

"x

"ø

24"x20" EA

RHC

8"x8"8"ø

6"ø6"ø

SD-06

115 CFM

TYP. OF 2

TYP. OF 2

EG-01

770 CFM

"x

"x

8"x8"

RHC

FCU

6"x4" 16"x10"

SD-07

145 CFM

8"ø

10"ø

8"x8"6 "x

"x

"6

"ø "ø

14"x8"

EG-01

20 CFM

RG-01

25 CFM

8"ø

RG-01

45 CFM

EG-01

30 CFM

10"x8"

EG-01

230 CFM

EG-11

150 CFM

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-MH112

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

FIRST FLOOR AREA B HVAC PLAN

6 24

SCALE: 1/4" = 1'-0"F1

1ST FLOOR AREA B HVAC PLAN

F1 KEYNOTES:

1. 24"X20" EA RISE TO SECOND FLOOR. REFER TO SHEET 148-MH122 FOR

CONTINUATION.

2. 24"X20" OSA DROP FROM SECOND FLOOR. REFER TO SHEET 148-MH122 FOR

CONTINUATION.

3. 8" EA DROP TO RANGE HOOD

4. 12x3 EA FROM RANGE HOOD TO ROOF DISCHARGE

M

M M

M

M

M

J J

J

C4

148-M301

RHC

RHC

"x

E A

10"x10"

22"x14"

"x

10"ø 10"ø

10"ø

24"x14"

"x

"x

"x

E A

14"x14"

5 4.5 4 3.5 3 2 1

B

B.3

C

A.7

RG-1

270 CFM 3

MSE

28"x10"

EG-01

35 CFM

SD-02

210 CFM

SD-05

700 CFM

8"ø

DN

DN

DN

SD-01

100 CFM

SD-03

375 CFM

SD-05

700 CFM

SD-02

130 CFM

EG-01

375 CFM

8"x8"

10"x10"

EG-01

535 CFM

TYP. OF 2

10"x10"

RHC

24"x14"

SD-03

285 CFM

EG-01

270 CFM

10"x8"

10"ø

8"x6"

12"ø

EG-02

1400 CFM

/F1 148-MH122

4"x6" 4"x6"

SG-03

115 CFM

"ø

RG-02

55 CFM

EG-04

45 CFM

EG-04

45 CFM

RG-02

55 CFM

FCU

SG-01

115 CFM

8"x6"

6"ø6"x4"

22"x8"

SD-02

235 CFM

"ø

FCU

10"x10" 20"x10"

"x

10"x8"

"ø

"x

"ø

"x

18"x8"14"x10"

FCU

SD-02

250 CFM

RG-01

205 CFM

EG-01

45 CFM

10"ø

"x

SD-01

90 CFM

6"ø

FCU

18"x6"

RG-01

55 CFM

EG-01

35 CFM

FCU

30"x10"

6"ø

30"x10"

10"ø

"ø

RG-01

185 CFM

EG-01

45 CFM

8"x8"

RG-01

180 CFM

EG-01

45 CFM

SD-02

230 CFM

SD-02

220 CFM

"x

"x

6"x6"

"x

"ø

SG-02

210 CFM

EG-05

510 CFM

14"x12"

12"x12"

"x

8"x6"

8"x6"

EG-05

140 CFM

TYP. OF 2

SD-06

105 CFM

TYP. OF 2

8"ø

"x

SD-01

45 CFM

6"ø

FCU

6"ø6"ø

EG-01

55 CFM

4"x4"

"x

"x

SD-03

270 CFM

RG-01

105 CFM

SD-02

160 CFM

6"ø

4"x4"

8"x8"

RG-01

75 CFM

6"x6"

22"x8" 20"x10"

10"x8"

"ø

8"x8"

FCU

RG-01

30 CFM

10"ø

"x

SG-02

110 CFM

8"ø

6"ø

"x

"x

"x

O S

A

8"ø

SG-02

110 CFM

6"x6"

EG-01

35 CFM

RG-01

75 CFM

EG-01

35 CFM

EG-01

35 CFM

4"x4" 4"x4"

8"ø

6"x6"

SG-02

105 CFM

"ø

SD-08

380 CFM

"ø

1 1

"x

20"x12"

20"x12"

TYP. OF 4

10"ø

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-MH121

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

SECOND FLOOR AREA A HVAC PLAN

7 24

SCALE: 1/4" = 1'-0"F1

2ND FLOOR AREA A HVAC PLAN

F1 KEYNOTES:

1. PROVIDE 1.5 HR FIRE DAMPER WITH DUCT ACCESS PANEL

2. TRANSFER AIR GRILLE ASSEMBLY CONSISTING OF (2) TYPE RG-01 GRILLES WITH

22x10 DUCT BOOTS CONNECTED WITH 14x10 DUCT. ASSEMBLY TO BE LINED.

NORTH

1 ADDENDUM-003 2017-03-17

R

S

C

R

M

M

M

M

M

M

M M

M

J

J

P

P

M

C4

148-M301

E5

148-M301

"x

"x

E A

40"x16" OSA

"x

O S

A

30"x20" OSA

"x

"x

"ø

MAU

RHC

"x

E A

"x

12"ø

10"ø

10"ø

10"ø

10"ø

"x

6"ø

8"ø

"ø

8"x6"

10"x10"

8"x6" 10"x8"

"x

"x

E A

"x

8"x8"

8"x6"

6"x6"

8"x6" 10"x8"

5 4.5 4 3.5 3 2 1

C

D

D.3

E

SD-02

130 CFM

10"x8"

33"x6"

FCU

RG-01

290 CFM

EG-01

35 CFM

RG-01

80 CFM

SD-08

270 CFM

TYP. OF 3

14"x12"

10"x8"

10"ø

8"ø

SD-07

200 CFM

RHC

RHC

22"x12"

UP

U P

6"x6"

EG-03

40 CFM

SD-06

100 CFM

F

-M

H

/F1 148-MH121

10"x10"

SD-02

190 CFM

8"x8"

6"x6"

8"x8" 8"x6"

EG-03

230 CFM

SD-07

205 CFM

SD-07

205 CFM

6"ø

RHC

SD-03

300 CFM

"x

EG-01

200 CFM

EG-03

185 CFM

8"ø

8"ø

EG-03

125 CFM

SD-06

100 CFM

SD-02

130 CFM

EG-01

200 CFM

EG-03

205 CFM

RHC

10"ø

DOWN

"x

E A

SD-01

100 CFM

SD-02

135 CFM

8"x6"

8"ø

8"ø 6"ø

EG-01

130 CFMSD-06

55 CFM

8"x8"

DOWN

RHC

EG-03

900 CFM

12"x12"

30"x20"

SD-03

300 CFM

EG-03

185 CFM

8"x6"

SD-07

175 CFM

EG-03

75 CFM

EG-01

195 CFM

8"x8"

6"x6"

14"x12"

10"ø

6"ø

10"ø

SG-02

485 CFM

18"x8"

8"x8"

30"x10"

320RA

EG-03

165 CFM

8"x6"

2 3

SD-02

130 CFM

"ø

EG-01

450 CFM

14"x8"

"x

O S

A

RG-01

75 CFM

6"ø

6"x6"

EG-01

170 CFM

20"x12"6"x6"

"x

"ø

FCU

8"ø

"x

"x

FCU

6"ø

SD-01

100 CFM

"ø

"x

RHC

10"x8"

10"ø

SD-03

325 CFM

"x

FCU

"x

RG-04

135 CFM

6"x8"

6"x10"

RG-01

60 CFM

EG-01

35 CFM

4"x4"

EG-01

375 CFM

10"x8"

"x

SD-02

205 CFM

SD-02

205 CFM

20"x10" 20"x10"

FCU

8"ø

8"ø 6"ø

SD-02

190 CFM

RG-01

335 CFM

EG-01

75 CFM

"x

10"x10"

FCU

8"ø

14"x10"

"ø

16"x10"

EG-01

40 CFM

RG-01

150 CFM

8"x8"

4"x4"

SD-03

280 CFM

FCU

10"ø

14"x10"

16"x10"

"ø

8"x8"

RG-01

210 CFM

EG-01

70 CFM

SD-02

135 CFM

8"ø

20"x10"

FCU

"ø

RG-01

90 CFM

EG-01

45 CFM

8"x6"

8"ø

EG-04

100 CFM

6"x6"

18"x6"

6"x6"

SD-06

75 CFM

6"ø

"x

EG-01

95 CFM

14"x10"

SD-08

270 CFM

MECHANICAL EQUIPMENT

2E-240

CORRIDOR

C2-105

SCOPE WASH

2E-222A

CLEAN SCOPE STORAGE

2E-222B

"ø

"x

CORRIDOR

C2-105

CORRIDOR

C2-106

14"x8"

"x

"ø

"ø

"ø

"ø

8"ø

8"ø

FCU

EG-01

60 CFM

RG-01

490 CFM

E

F

-M

H

6"x6"

8"x8"

SD-02

215 CFM

SD-02

215 CFM

SD-02

215 CFM

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-MH122

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

SECOND FLOOR AREAS B & C HVAC

PLANS

8 24

SCALE: 1/4" = 1'-0"F1

2ND FLOOR AREA B HVAC PLAN

SCALE: 1/4" = 1'-0"F6

2ND FLOOR AREA C HVAC PLAN

F1 KEYNOTES:

1. 8" EA DOWN TO STERILIZER EQUIPMENT. PROVIDE DROP WITH BALANCING DAMPER

AND BALANCE TO 200 CFM

2. 24"X20" EA RISE FROM FIRST FLOOR. REFER TO SHEET 148-MH112 FOR

CONTINUATION. PROVIDE FLOOR PENETRATION WITH 1.5 HR FIRE DAMPER AND

ACCESS PANEL.

3. 24"X20" OSA DROP TO FIRST FLOOR. REFER TO SHEET 148-MH112 FOR

CONTINUATION. PROVIDE FLOOR PENETRATION WITH 1.5 HR FIRE DAMPER AND

ACCESS PANEL.

4. RISE 24"x24" EA TROUGH ROOF ASSEMBLY. REFER TO SHEET 148-MH131 FOR

CONTINUATION.

5. BALANCE RA TO 320 CFM

6. 72"x40" OSA DOWN FROM ROOF TRANSITION TO 58"x23" OSA CONNECTION TO MAU-1.

7. SPS DUCT STATIC PRESSURE LOCATION, REFER TO CONTROL DIAGRAMS

8. TRANSFER AIR GRILLE ASSEMBLY CONSISTING OF (2) TYPE RG-01 GRILLES WITH

22x10 DUCT BOOTS CONNECTED WITH 12x10 DUCT. ASSEMBLY TO BE LINED.

NORTH

NORTH

1 ADDENDUM-003 2017-03-17

EF

EF

MSC

"ø

"ø

GIH

C4

148-M301

E5

148-M301

5 4.5 4 3.5 3 2 1

A

B

B.3

C

D

D.3

E

A.7

LV

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2 3 4 5 6 7 8 9

Date

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-MH131

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

ROOF HVAC PLAN

9 24

SCALE: 1/8" = 1'-0"F4

ROOF HVAC PLAN

F4 KEYNOTES:

1. 24"x24" EA DUCT RISE FROM SECOND FLOOR. REFER TO SHEET 148-MH122

FOR CONTINUATION

2. PROVIDE 72"x40" OSA DOWN FROM GIH-1 DOWN TO SECOND FLOOR. REFER

TO SHEET 148-MH122 FOR CONTINUATION

3. MOUNT LOUVER IN OPENING OF STRUCTURE. REFER TO ARCHITECTURAL

SHEETS FOR OPENING AND LOUVER MOUNTING DETAILS.

4. 12x3 EA FROM KITCHEN RANGE HOOD. PROVIDE WITH WEATHER PROOF

CAP

5. 6" Ø SCHEDULE 40 STEEL STEAM RELIEF VENT FROM SRV-1 IN BASEMENT

UP TO 72" ABOVE ROOF DECK. PROVIDE PIPE ANCHOR AT ROOF CURB PER

DETAIL B2, DRAWING 148-A504. FLASH PIPE SIMILAR TO DETAIL B6,

DRAWING 148-M503. PROVIDE(2) 90 DEGREE OFFSET BRACES (USING 1 5/8"

GREEN UNISTRUT) FROM ROOF DECK TO TOP OF VENT PIPE. PROVIDE

"TEE" TERMINATION AT VENT PIPE DISCHARGE TO DEFLECT STEAM

DISCHARGE TWO DIFFERENT DIRECTIONS.

NORTH

2 ADDENDUM-004 2017-03-24

M

M

M

M

M

M

UV

UV

UV

UV

148-MP101

C5

C4

148-M301

E5

148-M301

5 4.5 4 3.5 3 2 1

A

B

B.3

C

D

D.3

E

1"ø HWR

1"ø HWS

3/4"ø HWR

3/4"ø HWS

3/4"ø HWS

3/4"ø HWR

EF

2 1/2"ø PC

6"ø HPS

2 1/2"ø PC

6"ø HPS

6"ø CHWS

6"ø CHWR

4"ø DCW

3/4"ø HWR

3/4"ø HWS

3/4"ø HWS 3/4"ø HWR

REFER TO CIVIL DRAWING

148-CU400 FOR CONTINUATION

ST

4 3.5 3

B

B.3

C

F6

148-M302

F4

148-M302

P

P

ET

HX

PRV

CP

4"ø HWR

4"ø HWS

AS

2 1/2"ø PC

6"ø HPS 2"ø PC

1 1/2"ø PC

1 1/2"ø PC

2"ø MPR

4"ø HWR

4"ø HWR

4"ø HWR

4"ø HPS

6"ø HPS

4"ø HPS

ST

ST

ST

ST

ST

ST

HX

ST

1 1/2"ø HPR

2"ø HPS

45-730 PSI

SRV

DHX

DHX

ST

NORTH

6"ø FP

4"ø FDC

2 1/2"ø PC

6"ø HPS

4"ø DCW

NORTH

6"ø FP

6"ø HPS

2 1/2"ø PCR

4"ø FDC

4" DCW

6" DW

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2 3 4 5 6 7 8 9

Date

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-MP101

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

PIPE BASEMENT HYDRONIC PIPING

PLAN

12 24

SCALE: 1/8" = 1'-0"E1

PIPE BASEMENT HYDRONIC PIPING PLAN

E1 KEYNOTES:

1. PROVIDE PIPE ANCHOR FOR 6" HPS AND 2-1/2" PUMPED STEAM CONDENSATE (PC)

PER DETAIL B3 ON SHEET 148-M502.

2. HYDRONIC PIPE RISERS TO FIRST FLOOR, PROVIDE EACH RISE WITH ANCHOR

SUPPORT PER DETAIL C1 ON SHEET 148-M502

3. TEMPORARY AND FINAL UTILITY CONNECTIONS TO EXISTING UTILITIES IN SHAFT

TO BE INSTALLED PER DETAILS E5 AND E7 ON THIS SHEET.

4. 6" CHWS AND 6" CHWR PIPING FROM PLANT LOOP. PROVIDE FLANGE FITTINGS

AND ISOLATION VALVES ON CHILLED WATER LINES.

5. DROP 6" HPS AND 2-1/2" PC TO STEAM UTILITY TRENCH. PROVIDE DROPS WITH (2)

6" BALL EXPANSION JOINTS AND (2) 2-1/2" BALL EXPANSION JOINTS. BALL

EXPANSION JOINT TO BE HYSPAN TYPE N STYLE I (BB-31020) OR APPROVED

EQUAL.

6. 2" HPS AND 1-1/2" CD (HPR) UP TO SECOND LEVEL STERILIZER EQUIPMENT,

PROVIDE WITH ANCHOR SUPPORT AT FLOOR PENETRATION PER DETAIL C1 ON

SHEET 148-M502

7. PROVIDE DRIP TRAP ASSEMBLY ON 1-1/2" HPS LINE PER DETAIL C4 ON SHEET 148-

M503. PIPE DISCHARGE TO 2-1/2" PC MAIN.

8. PROVIDE HIGH PERFORMANCE BUTTERFLY ISOLATION VALVES ON 6" HPS AND 2-

1/2" PC, PROVIDE STANDARD BUTTERFLY ISOLATION VALVE ON 4" DCW.

9. PROVIDE MIN 15FT OF STRAIGHT 6" HPS PIPING FOR STEAM METER STM-1

INSTALLATION.

10. LOCATE CHILLED WATER METER CHM-1 IN THIS LOCATION

11. 6" PRESSURE RELIEF VENT RISE TO ROOF DISCHARGE

12. REFER TO FIRE PROTECTION/PLUMBING PLANS FOR CONTINUATION OF 6" FP, 4"

FIRE DEPARTMENT CONNECTION, AND 4" DCW MAINS

13. PROVIDE DIFFERENTIAL PRESSURE ASSEMBLY ACROSS 4" HWS AND 4" HWR FOR

CONTROLS

14. PROVIDE PIPE SLIDE SUPPORT FOR 6" HPS AND 2-1/2" PUMPED CONDENSATE.

SLIDE TO BE ANVIL INT FIG. 436 TYPE 6 OR APPROVED EQUAL. PROVIDE WITH

BOLTED BASE PLATE AND EXTENDED TEE HEIGHTS. EXTEND TEE HEIGHTS TO

MATCH PIPE GUIDE PIPE SUPPORT HEIGHT PER DETAIL D8 ON SHEET 148-M502.

E5 KEYNOTES:

1. CONNECT 4" FIRE DEPARTMENT CONNECTION PIPE TO EXISTING 4" FIRE

DEPARTMENT CONNECTION PIPE FOR EXISTING FIRE RISER

2. CONNECT 2-1/2" PC TO EXISTING 2-1/2" PC RISER

3. CONNECT 6" HPS TO EXISTING 6" HPS RISER

4. CONNECT 6" FP PIPING TO EXISTING 6" FP RISER

5. CONNECT 4" DCW TO EXISTING 4" DCW RISER

6. TEMPORARY PIPE RACK SUPPORT FOR TEMPORARY UTILITIES, REFER TO CIVIL

DRAWING FOR PIPE MOUNTED AND ORIENTATION DETAILS.

7. REFER TO CIVIL DRAWINGS FOR TEMPORARY UTILITY PIPE ROUTING

CONTINUATION

8. EXISTING 4" DCW MAIN TO BE DEMOLISHED DURING FINAL UTILITY CONNECTION

DEMOLITION, REFER TO DETAIL F6 ON SHEET 148-MD101.

9. EXISTING 6" ROOF DRAIN LEADER TO REMAIN

10. EXISTING 6" HPS AND 2-1/2" PC MAINS TO BE DEMOLISHED DURING FINAL UTILITY

CONNECTION DEMOLITION, REFER TO DETAIL F6 ON SHEET 148-MD101

11. 6" DW SPLIT TO 6" FP AND 4" DCW TO EXISTING BUILDING

E7 KEYNOTES:

1. 4" FIRE DEPARTMENT CONNECTION TO EXISTING

2. 2-1/2" PC PIPE CONNECTION TO EXISTING

3. 6" HPS PIPE CONNECTION TO EXISTING

4. 4" DCW PIPE CONNECTION TO EXISTING

5. 6" FP PIPE CONNECTION TO EXISTING

6. RELOCATE EXISTING 6" CHECK VALVE ON FP MAIN TO THIS LOCATION

C5 KEYNOTES:

1. 2'x2' EXPANSION LOOP

2. SLOPE CD (HPR) MIN 1/16" PER FT BACK TOWARDS PUMPED CONDENSATE

RETURN MAIN.

3. BRANCH PIPING SHALL BE FROM TOP OF STEAM MAIN

NORTH

SCALE: 1/4" = 1'-0"C5

PIPE BASEMENT HYDRONIC PIPING ENLARGED PLANNORTH

SCALE: NONEE7

(E) SHAFT FINAL UTILITY

CONNECTIONS

SCALE:E5

(E) SHAFT TEMPORARY UTILITY

CONNECTIONS

1 ADDENDUM-003 2017-03-17

2 ADDENDUM-004 2017-03-24

C C C

J

J

J

M

M

M

M

M

M

M

M

M

M

M

M

M

J

M

T

T

T

T

T

T

T

T T

T

T

T

T T

T

T

T

T

T

T

T

J

M

T

MSC

MSC

FCU

FCU

FCU

FCU

RHC

FCU

RHC

RHC

RHC

RHC

1 1/2"ø HWS

1 1/2"ø HWR

2"ø CHWS 2"ø CHWR

1 1/2"ø CHWR 1 1/2"ø CHWS

1"ø HWR 1"ø HWS

3/4"ø HWS

3/4"ø HWR

1 1/4"ø CHWR 1 1/4"ø CHWS 1"ø HWR 1"ø HWS

C4

148-M301

E5

148-M301

5 4.5 4 3.5 3 2 1

A

B

B.3

C

D

D.3

E

A.7

FCU-101

FCU-102

FCU

-104

FCU-108

RHC-101

FCU

FCU-110

FCU-111

FCU-112

RHC-105

RHC-106

RHC-107

RHC-108

FCU-113

MSE

MSE-1

FCU-105

FCU

148-MP111

E1

1 1/2"ø CHWR 1 1/2"ø CHWS

FCU-106

FCU 2

MSE

FCU

1 1/4"ø CHWR

1 1/4"ø CHWS

1"ø HWR

1"ø HWS

FCU

FCU

FCU-103

RHC

FCU

FCU-107

RHC

RHC-102

RHC-103

3/4"ø CHWR

3/4"ø CHWS

3/4"ø HWR

3/4"ø HWS

1 1/4"ø CHWR

1 1/4"ø CHWS

1"ø HWR

1"ø HWS

1 1/4"ø CHWR

1 1/4"ø CHWS 1 1/4"ø HWR

1 1/4"ø HWS

2"ø CHWS

1 1/2"ø HWR 1 1/2"ø HWS

1 1/4"ø CHWR 1 1/4"ø CHWS 1"ø HWR 1"ø HWS

1 1/4"ø CHWR 1 1/4"ø CHWS 1"ø HWR 1"ø HWS

3/4"ø CHWR 3/4"ø CHWS 3/4"ø HWR 3/4"ø HWS

2"ø CHWR 1 1/4"ø HWR 1 1/4"ø HWS3

D.3

E

B6

148-M302

FCU

EXJ

EXJ

5"ø CHWR

5"ø CHWS

1"ø CHWR

1"ø CHWS

3/4"ø HWR

3/4"ø HWS

(E)5"ø CHWR

(E)5"ø CHWS

RHC

RHC-104

2 1/2"ø CHWR

2 1/2"ø CHWS

2"ø HWR

2"ø HWS

4"ø CHWS

4"ø CHWR

4"ø HWS

4"ø HWR

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2 3 4 5 6 7 8 9

Date

CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-MP111

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

FIRST FLOOR HYDRONIC PIPING PLAN

13 24

E3 KEYNOTES:

1. 6" STEAM RELIEF VENT RISER TO ROOF DISCHARGE

2. 2" HPS AND 1-1/2" CD (HPR) FROM BASEMENT UP TO SECOND FLOOR. INSTALL

TIGHT TO WALL. PROVIDE INSULATION WITH ALUMINUM JACKETING FOR

PROTECTION. REFER TO SHEET 148MP121 FOR CONTINUATION.

E1 KEYNOTES:

1. RISE HYDRONIC PIPING FROM PIPE BASEMENT, REFER TO SHEET 148-MP101

FOR CONTINUATION

2. RISE 4" CHWS, 4" CHWR, 4" HWS, AND 4" HWR TO SECOND FLOOR, REFER TO

SHEET 148-MP121 FOR CONTINUATION

3. CONNECT 5" CHWS AND 5" CHWR TO EXISTING 5" CHWS AND 5" CHWR.

4. REFER TO DETAILS E5 AND E7 ON SHEET 148-MP101 FOR SHAFT UTILITY

TEMPORARY AND FINAL CONNECTION DETAILS

SCALE: 1/8" = 1'-0"E3

1ST FLOOR HYDRONIC PIPING PLAN

GENERAL NOTES:

1. HYDRONIC RUN OUT SIZES TO FCU'S AND HWC'S TO BE 3/4" UNLESS OTHERWISE

NOTED

NORTH

SCALE: 1/4" = 1'-0"E1

SPEECH THERAPY HYDRONIC

PIPING PLAN

NORTH

1 ADDENDUM-003 2017-03-17

R

S

HD

C

R

HD

HD

HD

HD

HD

J

HD

M

M

M M

M

M

M

M

M

M

M

M

M

M

M

M

M

J J

J

J

J

P

P

T

T T

T

T

T

T

T

T

T

T

T T

T

T T

T

T

T

T

T

T

T

T

R T S

C

R

M

J

2"ø HPS

1 1/2"ø HWS

1 1/2"ø HWR

2"ø CHWS

2"ø CHWR

MAU

FCU

FCU 204

FCU

RHC

RHC

RHC

RHC

RHC

RHC

RHC

RHC

RHC

C4

148-M301

E5

148-M301

5 4.5 4 3.5 3 2 1

A

B

B.3

C

D

D.3

E

A.7

FCU-201

FCU-204

FCU-205

FCU-208

FCU-209

FCU-214

RHC-210

RHC-209

RHC-207

RHC-208

RHC-206

RHC-205

HWC-203

HWC-204

RHC-202

FCU

3/4"ø HWS

3/4"ø HWR

1 1/4"ø CHWS

1 1/4"ø CHWR

1 1/2"ø HWR

1 1/2"ø HWS

2 1/2"ø CHWR

2 1/2"ø CHWS

2"ø HWR

2"ø HWS

1 1/2"ø HWS

1 1/2"ø HWR

1 1/4"ø HWS

1 1/4"ø HWR

148-MP121

E1

FCU

FCU-202

FCU

FCU-203

FCU

FCU

FCU

FCU-206

FCU

FCU-207

RHC

RHC-201

FCU

FCU-211

FCU

FCU

FCU-212

FCU

FCU-

FCU

FCU-210

2"ø CHWR 2"ø CHWS

1 1/2"ø HWR 1 1/2"ø HWS

FCU

2"ø CHWR

2"ø CHWS

1 1/4"ø HWR

1 1/4"ø HWS

1 1/2"ø HWS

1 1/2"ø HWR

1 1/4"ø HWS

1 1/4"ø HWR

1 1/4"ø CHWS

1 1/4"ø CHWR

2"ø CHWR

2"ø CHWS 1 1/2"ø HWR

1 1/2"ø HWS

1 1/2"ø HPS 1 1/2"ø HPR

1"ø HPS

ST

1 1/2"ø HPR

D

D.3

E

MECHANICAL EQUIPMENT

2E-240 3/4"ø HWR

1"ø CHWR

1"ø CHWS

MAU

FCU

2 1/2"ø HWR

2 1/2"ø HWS

4"ø CHWR

4"ø CHWS

2"ø HWS 2"ø HWR 2 1/2"ø CHWS 2 1/2"ø CHWR

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

SYRDS05 OCT, 2016

148-MP121

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

SECOND FLOOR HYDRONIC PIPING

PLAN

14 24

F3 KEYNOTES:

1. 6" STEAM RELIEF VENT RISER TO ROOF DISCHARGE

2. 2" HPS AND 1-1/2" CD (HPR) RISER FROM BASEMENT LEVEL. INSTALL TIGHT TO

WALL. PROVIDE INSULATION WITH ALUMINUM JACKETING FOR PROTECTION.

SLOPE ALL PIPING BACK TO RISER AT A MINIMUM 1/16" PER FOOT.

3. 3'x3' EXPANSION LOOP

4. 1" HPS AND 1" CD (HPR) DOWN TO WASHER DISINFECTOR. PROVIDE WITH

ISOLATION VALVE AND ACCESSORIES RECOMMENDED BY EQUIPMENT

MANUFACTURER.

5. 1" HPS DOWN TO STEAM GUN. PROVIDE WITH ISOLATION VALVE AND

ACCESSORIES RECOMMENDED BY EQUIPMENT MANUFACTURER.

6. 2"x12" LENGTH DRIP LEG WITH STEAM TRAP (ST-9) AT APPROX. 60" AFF. ROUTE

DISCHARGE INTO TOP OF CD (HPR) LINE BACK TO BASEMENT. SEE DETAIL C4

ON SHEET 148-M503.

E1 KEYNOTES:

1. 3" CHWS, 3" CHWR, 2-1/2" HWS, AND 2-1/2" HWR DROP TO MAU-1 COIL

CONNECTIONS. REFER TO MECHANICAL DETAILS FOR PIPING CONNECTION AND

PIPE ACCESSORY DETAILS.

2. 4" CHWS, 4" CHWR, 4" HWS, AND 4" HWR DROP TO DROP TO FIRST FLOOR,

REFER TO SHEET 148-MP111 FOR CONTINUATION

SCALE: 1/8" = 1'-0"F3

2ND FLOOR HYDRONIC PIPING PLAN

NORTH

GENERAL NOTES:

1. HYDRONIC RUN OUT SIZES TO FCU'S AND HWC'S TO BE 3/4" UNLESS OTHERWISE

NOTED

SCALE: 1/4" = 1'-0"E1

MECH ROOM 240 HYDRONIC PIPING PLAN

NORTH

1 ADDENDUM-003 2017-03-17

PT SEMI-PRIVATE TABLE

CUBICLE

1E-106F

GAIT LANE

1E-106E

PT TREATMENT CLINIC

1E-106A

PT EXERCISE AREA

1E-106B

OT TREATMENT CLINIC

1E-106C

OT SPL TREATMENT

1E-106D

ADL: BATHRM

1E-115

HAC

1E-117

ELEVATOR EQUIPMENT

1E-105

LOBBY

C1-102

ELECTRICAL

1E-133

TELECOMM

1E-134

FIRE RISER

1E-135

EQUIP STORAGE AND TEST

1E-131A

CLEAN CART HOLDING

1E-131B

CLEAN STORAGE

1E-130

DISPATCH AREA

1E-129B

DISPATCH CLERK

1E-129A

RECEIVING BREAK-OUT

1E-127

GAS EMPTY

1E-126

CORRIDOR

C1-104

TECH CUBICLES

1E-128A

CHIEF OFFICE

1E-121A

CORRIDOR

C1-103

BULKSTORAGE

1E-136

STAFF LOUNGE / LOCKERS

1E-129

GAS FULL

1E-131

STAFF WORK

1E-137

LOADING DOCK /

RECIEVING

1E-132

STORAGE

1E-119

CIRCULATION

106-00002

CIRCULATION

1E-128B

2255 SA

1350 RA

800 EA

105 XFR

CFM

OT OFFICE

1E-120A

PT OFFICE

1E-111A

5 4.5 4 3.5 3 2 1

A

B

B.3

C

D

D.3

E

A.7

FEMALE PUBLIC TOILET

1E-103

MALE PUBLIC TOILET

1E-104

CIRCULATION

1E-106J

RECEPTION

1E-102

ESCORT

1E-101A

WAITING

1E-101

STAFF TLT

1E-123

STAFF TLT

1E-124

SERVICE ELEVATOR

C1-101

SPEC. TREAT

1E-110

EXAM

1E-109

OT OFFICE

1E-120

ADL: KITCHEN / TREATMENT

1E-114

PT OFFICE

1E-111

PT PRIVATE TABLE ROOM

1E-107

UTILITY

1E-106H

STORAGE

1E-112

AIRWAY 1

B-003

STAIR

S-7

110 SA

75 RA

50 EA

-15 XFR

110 SA

65 RA

45 EA

0 XFR

170 SA

110 RA

90 EA

-30 XFR

CFM

120 SA

75 RA

65 EA

-20 XFR

CFM

120 SA

75 RA

45 EA

0 XFR

120 SA

75 RA

45 EA

0 XFR

45 SA

25RA

20 EA

5 XFR

CFM

45 SA

25 RA

20 EA

0 XFR

75 SA

45 RA

30 EA

0 XFR

45 CFM

520 SA

140 RA

30 EA

350 XFR

MINI-SPLIT

SERVICE

0 XFR

350 SA

350 RA

0 EA

0 XFR

100 SA

95 RA

0 EA

0 XFR

FCU

SERVICE

0 XFR

100 SA

0 RA

120 EA

-20 XFR

130 SA

0 RA

115 EA

15 XFR

145 SA

0 RA

190 EA

-45 XFR

200 SA

0 RA

230 EA

-30 XFR

CFM

700 SA

0 RA

645 EA

55 XFR

CFM

CFM

175 SA

0 RA

150 EA

25 XFR

CFM

665 SA

0 RA

770 EA

-105 XFR

105 CFM115 SA

0 RA

150 EA

-35 XFR

CFM

CFM

115 SA

0 RA

150 EA

-35 XFR

205 SA

0 RA

80 EA

125 XFR

CFM

90 SA

0 RA

120 EA

-30 XFR

CFM

CFM

175 SA

150 RA

0 EA

25 XFR

CFM

190 SA

0 RA

220 EA

-30 XFR

CFM

110 SA

80 RA

30 EA

0 XFR

385 SA

310 RA

0 EA

75 XFR

40 SA

0 RA

55 EA

-15 XFR

45 SA

0 RA

60 EA

-15 XFR

15 CFM

15 CFM

95 SA

40 RA

20 EA

35 XFR

5 CFM

CFM

CFM

CFM

CFM

5 CFM

CFM

75 CFM

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

JMZRDS05 OCT, 2016

148-MZ111

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

FIRST FLOOR AIRFLOW ZONING PLAN

10 24

SCALE: 1/8" = 1'-0"F2

1ST FLOOR AIRFLOW ZONING PLAN

WAITING

2E-101

RECEPTION

2E-102

EXAM ROOM

2E-105

EXAM ROOM

2E-104

EXAM ROOM

2E-107

EXAM ROOM

2E-106

MECHANICAL EQUIPMENT

2E-240

FEMALE LOCKER, TOILET,

SHOWER

2E-224

MALE LOCKER, TOILET,

SHOWER

2E-225 SCOPE WASH

2E-222A

CLEAN SCOPE STORAGE

2E-222B

SERVICE ELEVATOR

C2-001

TELECOMM

2E-241

ELECTRICAL

2E-242

STERILIZATION EQUIPMENT

2E-230A

CLEAN VESTIBULE AND

LOCKERS

2E-229

TOILET

2E-229A

SOILED HAC

2E-227

DECONTAMINATION

2E-221

CENTRAL STERILE

2E-230

STERILIZATION WORK AREA

2E-230C

CORRIDOR

C2-105

CORRIDOR

C2-104

LOBBY

C2-100

HAC

2E-118

CHIEF

2E-111

ADMIN ASST

2E-109

CIRCULATION

106-00003

CORRIDOR

C2-106

CORRIDOR

C2-107

CFM

5 4.5 4 3.5 3 2 1

A

B

B.3

C

D

D.3

E

A.7

PHYSICIAN. OFF.

2E-113

CORRIDOR

C2-102

STAFF TLT

2E-110

PATIENT TLT

2E-108

LPN CUBICLE

2E-103

SPEECH THERAPY

2E-112

PROVIDER OFF.

2E-115

STAFF LOUNGE

2E-117

THERAPIST

2E-114

SPS CONFERENCE /

TRAINING

2E-116

CONFERENCE

2E-119

CHIEF SPS

2E-123

LEAD TECH

2E-121B

RECEPTION / WAITING

2E-121A

AIRWAY 1

B-003

CORRIDOR

C2-101

DETERGENT WATER TREAT

2E-228 HAC

2E-230B

MANUAL EQUIP WASH

2E-226

SOILED TRANSITION

2E-220

STAIR

S - 6

ASST. CHIEF OFFICE

2E-120

750 SA

165 RA

605 EA

-20 XFR

90 SA

55 RA

35 EA

0 XFR

250 SA

205 RA

45 EA

0 XFR

230 SA

185 RA

45 EA

0 XFR

220 SA

180 RA

45 EA

0 XFR

325 SA

0 RA

375 EA

-50 XFR

105 SA

0 RA

140 EA

-35 XFR

45 SA

20 RA

25 EA

0 XFR

160 SA

105 RA

55 EA

0 XFR

95 SA

60 RA

35 EA

0 XFR

110 SA

75 RA

35 EA

0 XFR

280 SA

210 RA

70 EA

0 XFR

110 SA

75 RA

35 EA

0 XFR

105 SA

70 RA

35 EA

0 XFR

135 SA

90 RA

45 EA

0 XFR

410 SA

335 RA

75 EA

0 XFR

190 SA

150 RA

40 EA

0 XFR

230 SA

80 RA

170 EA

-20 XFR

335 SA

270 RA

20 EA

45 XFR

MINI-

SPLIT

SERVICE

0 XFR

375 SA

375 RA

0 EA

0 XFR

580 SA

290 RA

450 EA

-255 XFR

75 SA

0 RA

100 EA

-25 XFR

110 SA

75 RA

35 EA

0 XFR

485 SA

320 RA

165 EA

0 XFR

115 SA

55 RA

45 EA

15 XFR

645 SA

490 RA

60 EA

95 XFR

100 SA

0 RA

40 EA

60 XFR

200 SA

0 RA

230 EA

-30 XFR

300 SA

0 RA

385 EA

-85 XFR

300 SA

0 RA

385 EA

-85 XFR

100 SA

0 RA

125 EA

-25 XFR

175 SA

0 RA

205 EA

-30 XFR

135 SA

0 RA

180 EA

-45 XFR

90 SA

0 RA

120 EA

-30 XFR

285 SA

0 RA

270 EA

15 XFR

55 SA

0 RA

75 EA

-20 XFR

1400 SA

0 RA

1400 EA

0 XFR

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

435 CFM

DUCTED

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

1520 SA

0 RA

1065 EA

455 XFR

1075 SA

0 RA

1400 EA

-325 XFR

NOTE: 500 CFM

OF EA IS DIRECT

EQUIPMENT

CONNECTIONS

410 SA

0 RA

0 EA

410 XFR

CFM

DUCTED

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:

ARCHITECTS & ENGINEERS, INC

2222 3333 4444 5555 6666 7777 8888 9999

Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

1111 2222 3333 4444 5555 6666 7777 8888 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

NAVAHCS Prescott, AZ

Office of

Construction and Facilities

Management

GLHN PROJECT# 0855.08

FULLY SPRINKLED

649-409

JMZRDS05 OCT, 2016

148-MZ121

100% CONSTRUCTION DOCUMENTS

EXPANDED REHAB

MEDICINE AND SPS

SECOND FLOOR AIRFLOW ZONING

PLAN

11 24

NORTH

SCALE: 1/8" = 1'-0"F3

2ND FLOOR AIRFLOW ZONING PLAN

1 ADDENDUM-003 2017-03-17

2016_649-409_M001_162_I_M
2016_649-409_M301_162_I_M
2016_649-409_M302_162_I_M
2016_649-409_M501_162_I_M
2016_649-409_M502_162_I_M
2016_649-409_M503_162_I_M
2016_649-409_M701_162_I_M
2016_649-409_M702_162_I_M
2016_649-409_MD101_162_I_M
2016_649-409_MH001_162_I_M
2016_649-409_MH101_162_B_M
2016_649-409_MH111_162_1_M
2016_649-409_MH112_162_1_M
2016_649-409_MH121_162_2_M
2016_649-409_MH122_162_2_M
2016_649-409_MH131_162_R_M
Sheets
148-MH131 - ROOF HVAC PLAN
148-MP101 - PIPE BASEMENT HYDRONIC PIPING PLAN
148-MP111 - FIRST FLOOR HYDRONIC PIPING PLAN
2016_649-409_MI601_162_I_M
2016_649-409_MI602_162_I_M
2016_649-409_MI603_162_I_M
2016_649-409_MP101_162_B_M
Sheets
148-MH131 - ROOF HVAC PLAN
148-MP101 - PIPE BASEMENT HYDRONIC PIPING PLAN
148-MP111 - FIRST FLOOR HYDRONIC PIPING PLAN
2016_649-409_MP111_162_1_M
Sheets
148-MH131 - ROOF HVAC PLAN
148-MP101 - PIPE BASEMENT HYDRONIC PIPING PLAN
148-MP111 - FIRST FLOOR HYDRONIC PIPING PLAN
2016_649-409_MP121_162_2_M
2016_649-409_MZ111_162_1_M
2016_649-409_MZ121_162_2_M

File details come from the government source that posted it. Updated .