3rd party testing report format_PDF.pdf

PDF 63 KB Posted

Attached to
H345--Boiler Safety Device Testing Federal contract opportunity
Solicitation number
36C26021Q0921
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

View the file

Other files for this federal contract opportunity

Other files attached to H345--Boiler Safety Device Testing, newest first.
File Type Posted
36C26021Q0921 0001.docx DOCX document
Boiler Safety Device Testing Manual - 5th Edition_December 2018_Final.pdf PDF
36C26021Q0921.docx DOCX document
36C26021Q0921.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Name device Type normal level or Regulated Pressure

Activation Point

Description / Comments / Device Fully Compliant installation, Location, Test Ports, Ect

Setpoint Compliant

Logic, Wiring, Annunciation Compliant

HWACT Warrick Probe Device OOC at start of visit Staff took Corrective action to repair ILSM * 1 No * 2 Yes Yes Yes LWACT M&M Mercoid

HWADT

LWADT

DAODS

DASV - 1

DASV - 2

SVFPRV -DA

LRVOPS

CAPI

LPG SSOV Maxon Main Gas SSOV Maxon Seismic Actuator Haz - Gas - Methane Haz - Gas - Propane Haz - Gas - CO ESPB- West Shuts down all Boilers Closes Natural Gas And Propane Back-up to Plant Stops FOSP ESPB- East ESPB-South ESPB- Office ESPB- Mastr panel

Item Name device Type normal level or Regulated Pressure

Activation Point description / Comments Device Fully Compliant installation, Location, Test Ports, Ect

Setpoint Compliant

Logic, Wiring, Annunciation Compliant

LWA Warrick Probe Middle of Glass Functions Correctly

PLWCO M&M 157 Float -2" on Scale 1" from Bottom Functions Correctly No No * 3

PWLCO - Shunt SLWCO Warrick Probe SLWCO - Shunt HWA Warrick Probe RBSPLS Ashcroft Switch NPBSPLS Honeywell Switch Front SVB Kunkle 15 PSIG 4640 lb/HR Lifts at 15.6 PSIG ; Reseat at 11.3 PSIG Yes * 5 Yes * 4 Rear SVB Kunkle 15 PSIG 4640 lb/HR Lifts at PSIG ; Reseat at PSIG

LFGPCS

HFGPCS

AFGSOV-1 LEAK

AFGSOV-2 LEAK

AFGSVV LEAK

AFGSVV OPEN

APFGSOV-1 LEAK

APFGSOV-2 LEAK

APFGSVV LEAK

APFGSVV OPEN

POC - AFGSOV-1 Maxon Switch break before Flow

POC - AFGSOV-2 Maxon Switch break before Flow

FSMFO Fireye 45UV5

FSNSIS

IT

MFIT

PPT Fireye YB110

LFPS - GAS

Seimens Positioner Intrnal Switch

LFPS - OIL

Seimens Positioner Intrnal Switch

LFPS - AIR

Seimens Positioner Intrnal Switch

Item Name device Type normal level or Regulated Pressure

Activation Point description / Comments Device Fully Compliant installation, Location, Test Ports, Ect

Setpoint Compliant

Logic, Wiring, Annunciation Compliant

FDDWOPS

Seimens Positioner Intrnal Switch

CAPS Cleavland Switch

PAPS

FDMIS-1 NK Current Relay FDMIS-2 NK Current Relay FDMIS-3 NK Current Relay

OSDPI

FPI Stack Damper Welded Open

LPFGPCS

FGRDI

Seimens Positioner Intrnal Switch

LFGOLI Rosemount 6888

LFOPCS

HFOPCS

LAMPS Ashcroft Switch LAMPDS Not Required - Decated Atomizing Air Compressor with Current Relays in Use LAMFS Not Required - no Crossover AACMIS - 1 NK Current Relay AACMIS - 2 NK Current Relay AACMIS -3 NK Current Relay AFOSV-1 - Leak AFOSV-2 - Leak

POC-AFOSV-1

POC-AFOSV-2

OBPS Not Required on this system

Item Name device Type normal level or Regulated Pressure

Activation Point description / Comments Device Fully Compliant installation, Location, Test Ports, Ect

Setpoint Compliant

Logic, Wiring, Annunciation Compliant

LWA Warrick Probe Middle of Glass Functions Correctly

PLWCO M&M 157 Float -2" on Scale 1" from Bottom Functions Correctly

PWLCO - Shunt SLWCO Warrick Probe SLWCO - Shunt HWA Warrick Probe RBSPLS Ashcroft Switch NPBSPLS Honeywell Switch Front SVB Kunkle 15 PSIG 4640 lb/HR Lifts at 15.6 PSIG ; Reseat at 11.3 PSIG Yes * 4 Yes * 5 Rear SVB Kunkle 15 PSIG 4640 lb/HR Lifts at PSIG ; Reseat at PSIG Yes * 4 Yes * 5

LFGPCS

HFGPCS

AFGSOV-1 LEAK

AFGSOV-2 LEAK

AFGSVV LEAK

AFGSVV OPEN

APFGSOV-1 LEAK

APFGSOV-2 LEAK

APFGSVV LEAK

APFGSVV OPEN

POC - AFGSOV-1 Maxon Switch break before Flow

POC - AFGSOV-2 Maxon Switch break before Flow

FSMFO Fireye 45UV5

FSNSIS

IT

MFIT

PPT Fireye YB110

LFPS - GAS

Seimens Positioner Intrnal Switch

LFPS - OIL

Seimens Positioner Intrnal Switch

LFPS - AIR

Seimens Positioner Intrnal Switch

Item Name device Type normal level or Regulated Pressure

Activation Point description / Comments Device Fully Compliant installation, Location, Test Ports, Ect

Setpoint Compliant

Logic, Wiring, Annunciation Compliant

FDDWOPS

Seimens Positioner Intrnal Switch

CAPS Cleavland Switch

PAPS

FDMIS-1 NK Current Relay FDMIS-2 NK Current Relay FDMIS-3 NK Current Relay

OSDPI

FPI Stack Damper Welded Open

LPFGPCS

FGRDI

Seimens Positioner Intrnal Switch

LFGOLI Rosemount 6888

LFOPCS

HFOPCS

LAMPS Ashcroft Switch LAMPDS Not Required - Decated Atomizing Air Compressor with Current Relays in Use LAMFS Not Required - no Crossover AACMIS - 1 NK Current Relay AACMIS - 2 NK Current Relay AACMIS -3 NK Current Relay AFOSV-1 - Leak AFOSV-2 - Leak

POC-AFOSV-1

POC-AFOSV-2

OBPS Not Required on this system

Item Name device Type normal level or Regulated Pressure

Activation Point description / Comments Device Fully Compliant installation, Location, Test Ports, Ect

Setpoint Compliant

Logic, Wiring, Annunciation Compliant

LWA Warrick Probe Middle of Glass Functions Correctly

PLWCO M&M 157 Float -2" on Scale 1" from Bottom Functions Correctly No No * 3

PWLCO - Shunt SLWCO Warrick Probe SLWCO - Shunt HWA Warrick Probe RBSPLS Ashcroft Switch NPBSPLS Honeywell Switch Front SVB Kunkle 15 PSIG 4640 lb/HR Lifts at 15.6 PSIG ; Reseat at 11.3 PSIG Yes * 4 Yes * 5 Rear SVB Kunkle 15 PSIG 4640 lb/HR Lifts at PSIG ; Reseat at PSIG Yes * 4 Yes * 5

LFGPCS

HFGPCS

AFGSOV-1 LEAK

AFGSOV-2 LEAK

AFGSVV LEAK

AFGSVV OPEN

APFGSOV-1 LEAK Functions Correctly - Plumbing issue - LOOP Issue No No * 6

APFGSOV-2 LEAK

APFGSVV LEAK

APFGSVV OPEN

POC - AFGSOV-1 Maxon Switch break before Flow

POC - AFGSOV-2 Maxon Switch break before Flow

FSMFO Fireye 45UV5

FSNSIS

IT

MFIT

PPT Fireye YB110

LFPS - GAS

Seimens Positioner Intrnal Switch

LFPS - OIL

Seimens Positioner Intrnal Switch

LFPS - AIR

Seimens Positioner Intrnal Switch

Page 6 0f 7

Item Name device Type normal level or Regulated Pressure

Activation Point description / Comments Device Fully Compliant installation, Location, Test Ports, Ect

Setpoint Compliant

Logic, Wiring, Annunciation Compliant

FDDWOPS

Seimens Positioner Intrnal Switch

CAPS Cleavland Switch

PAPS

FDMIS-1 NK Current Relay FDMIS-2 NK Current Relay FDMIS-3 NK Current Relay

OSDPI

FPI Stack Damper Welded Open

LPFGPCS

FGRDI

Seimens Positioner Intrnal Switch

LFGOLI Rosemount 6888

LFOPCS

HFOPCS

LAMPS Ashcroft Switch LAMPDS Not Required - Decated Atomizing Air Compressor with Current Relays in Use LAMFS Not Required - no Crossover AACMIS - 1 NK Current Relay AACMIS - 2 NK Current Relay AACMIS -3 NK Current Relay AFOSV-1 - Leak AFOSV-2 - Leak

POC-AFOSV-1

POC-AFOSV-2

OBPS Not Required on this system

*6 Pilot line requires LOOP Valve to be installed Device in place but does not keep valve srom being closed *1

*1. HWACT Warrick Probe was out of commission when we arrived VA Staff had ILSM in Place and Parts on order for repair. Parts arrived and were installed during visit. Device functioned correctly at that time *2 Device was OOC but Repairs were made and then testing took plact Device fully compliant at end of Visit *3 PLWCO, SLWCO, have the same annunciation message VIA BMS *4 Setpoints constrained by low pressure (15) psig limit and therefore closer than ths Standard VA Specification *5 Requires Boiler Water TDS to be below 3500 or too much liquid is carried through SSV's Causing excessive Slpash, steam in the room and pressure rise in the boiler

2 of 2 Boiler # 3 S/N

1 of 2 for Boiler # 1 S/N

Boiler Plant Safety Devices

2 of 2 for Boiler # 1 S/N

1 of 2 for Boiler # 2 S/N

2 of 2 Boiler # 2 S/N

1 of 2 Boiler # 3 S/N