3f Drawings.pdf
PDF 5 MB Posted
- Attached to
- Sources Sought/RFI Industry Capabilities for Complex Mechanical - HVAC Repairs at TYS ATCT in Knoxville, TN
- Solicitation number
- ES-25-00809
About this file
This is a set of mechanical and electrical drawings for HVAC repairs at the Knoxville Air Traffic Control Tower (ATCT) cab at Tyson McGhee Metropolitan Airport in Alcoa, TN. The drawings detail plans for repairing/replacing two air handling units (AHU-1 and AHU-2) and their associated heat pump condensing units (HPCU-1 and HPCU-2) in an operational air traffic control facility.
The drawings include detailed specifications for demolition and new work, HVAC controls, refrigerant piping diagrams, electrical installations, and a phasing plan. Key technical requirements include providing temporary cooling during repairs (60,000 Btuh water-cooled portable unit), careful rigging and temporary support of AHU-1 while replacing AHU-2, replacement of condensate pans, fan motors, DX coils, and installation of new electrical disconnects and control wiring. The work requires extensive coordination due to the facility remaining operational, with most work to be performed during non-business hours (22:00-06:00). Special attention is given to maintaining air traffic control operations and safety, with multiple warnings about not interrupting critical services. The drawings also specify requirements for dealing with potential asbestos-containing materials and lead paint during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3f Statement of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
T OF TRANSPORTAT ION
MER IC
A
O F
S T AT E S
UN ITED
DE
PA
RT
MEN
AV IAT
IO
N
LAREDEF
TR AT IO
N
SINI
MD
A
KNOXVILLE ATCT (TYS) CAB
HVAC REPAIRS
TYSON McGHEE METROPOLITAN AIRPORT
ALCOA, TN
SITE LOCATION: 35.81604, -83.99688
MECHANICAL / ELECTRICAL
GENERAL
DRAWING LIST
ME001 HVAC DEMOLITION AND NEW WORK
G002 GENERAL INFORMATION
G001 TITLE SHEET AND DRAWING L IST
H
G
F
E
D
C
B
A
8 1234567
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
$F
IL
E$ $D
AT
E$
$T
IM
E$ $N
AM
E$
APPROVED
DATE
8 23467 5
H
G
F
E
D
C
B
A
ME002 HVAC CONTROLS
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
1/15/2025
SHANE HARVEY, PE
PLATFORM MANAGER, AJW-2E15B
APA
ALCOA
TYS-E-24016804-G001
DLS
DLS
KNOXVILLE ATCT CAB HVAC REPAIRS
HVAC DEMOLITION AND NEW WORK
fil e.
dw g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
Is su e R ea so n
TYSON McGHEE METROPOLITAN AIRPORT
THIS DRAWING PRODUCED ON THEASO REGION CAD SYSTEM
DONALD SPRINKLE, PE
PROJECT ENGINEER, AJW-2E15B
24016804
TN
POINT OF CONNECTION / DEMOLITION
DETAIL NUMBER DRAWING
NUMBER WHERE SHOWN
NEW DUCTWORK
EXISTING DUCTWORK TO REMAIN
EXISTING EQUIPMENT TO REMAIN
TEMPERATURE SENSOR
SMOKE 'DUCT' DETECTOR
MOTORIZED DAMPER
AIR FILTER
CHECK VALVE
THERMOSTATIC EXPANSION VALVE
SOLENOID VALVE
S
NEW EQUIPMENT
R
XXX
XXX
EXISTING TO BE REMOVED
OR RELOCATED
NEW EQUIPMENT
EXISTING EQUIPMENT TO REMAIN
M
END SWITCH
T
ES
EXISTING PIPE
NEW PIPE
AMP
AIR CONDITIONING
AIR CONDITIONING UNIT
AIR COOLED CONDENSING UNIT
AIR CONDITIONING AND REFRIGERANT
ACCESS DOOR / PANEL
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ADJUSTABLE FROM GRAPHICS
AIR FILTRATION UNIT
AIR HANDLING UNIT
ANALOG INPUT
ANALOG OUTPUT
ACCESS PANEL
ASPIRATING SMOKE DETECTOR
AMERICAN WIRE GAUGE
BACK DRAFT DAMPER
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CHILLED WATER SUPPLY AND RETURN
CONDENSATE LINE
COMPUTER ROOM AIR CONDITIONER
COMPUTER ROOM UNIT
COMPRESSION TANK
CONDENSER UNIT
COLD WATER
DIGITAL INPUT
DIGITAL OUTPUT
DISCONNECT 'SAFETY' SWITCH
DOMESTIC WATER
DIRECT EXPANSION
ENTERING AIR
ELECTRICALLY COMUTATED MOTOR
ELECTRIC DUCT HEATER
ELECTRICAL EFFICIENCY RATION
EXHAUST FAN
ELECTRIC
ELECTRICAL METALLIC TUBING
END SWITCH
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMPERATURE
EXHAUST AIR
FIRE ALARM CONTROL PANEL
FAN COIL UNIT
FILTER DRIER
FINISHED FLOOR
FEET
GALLONS PER MINUTE
HOT GAS LINE
HOT GAS REHEAT
HEAT PUMP
HEAT PUMP CONDENSING UNIT
HEATING WATER SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY & RETURN
INTERNAL STATIC PRESSURE
KILOWATT
LIQUID-TITE FLEXIBLE METAL CONDUIT
LIQUID LINE
LWT
A A/C
ACU
ACCU
ACR
AD / P
AFF
AFG
AFG
AFU
AHU
AI
AO
AP
ASD
AWG
BDD
CHWS
CHWR
CHWS&R
CL
CRAC
CRU
CT
CU
CW
DI
DO
DS
DW
DX
EA
ECM
EDH
EER
EF
ELEC
EMT
ES
ESP
EWT
EXA
FACP
FCU
FD
FF
FT
GPM
HGL
HGR
HP
HPCU
HWS
HWR
HWS&R
ISP
KW
LFMC
LL
LWT
FLEXIBLE DUCT CONNECTION
R E
DUCT SENSOR 'AUXILLARY'
ENCAPSULATED RELAY (PAM)
MIXED AIR
METAL FLEX
MAX ALLOWABLE WATER PRESSURE
NOT IN CONTRACT
NET POSITIVE SUCTION HEAD
OUTSIDE AIR
ON CENTER
ORIGINAL EQUIPMENT MANUFACTURER
PRIMARY AIR
PRESSURE DROP
POWERED INDUCTION UNIT (FAN VAV)
POINT OF CONTACT
PACKAGED TERMINAL AIR CONDITIONER
PRESSURE REDUCING VALVE
RETURN AIR
RIGID GALVANIZED STEEL
SUPPLY AIR
SUCTION 'GAS' LINE
SIGHT GLASS
STAINLESS STEEL
TEMPORARY AIR CONDITIONING UNIT
THERMOSTAT
TEMPERATURE AND PRESSURE RELIEF VALVE
THERMOSTATIC EXPASION VALVE
TYPICAL
UNIT HEATER
VARIABLE AIR VOLUME
VOLUME DAMPER
ELECTRICAL TRANSFORMER
EXPANSION TANK
VOLT
WATER GAUGE
WITH
ZONE AREA MODULE
MA
MF
MAWP
NIC
NPSH
OA
OC
OEM
PA
PD
PIU
POC
PTAC
PRV
RA
RGS
SA
SL
SG
SS
TACU
T-STAT
TXP
TXV
TYP
UH
VAV
VD
XFMR
XT
V
WG
W/
ZAM
DUCT SENSOR REMOTE ALARM INDICATOR
EM EMERGENCY SWITCH
S
REFRIGERANT BALL AND SCHRADER VALVE
FD REFRIGERANT FILTER DRIER
REFRIGERANT SITE GLASS
LEGEND AND ABBREVIATIONS:
DISCONNECT 'SAFETY' SWITCH
WIRING CONNECTION
H
G
F
E
D
C
B
A
8 1234567
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
$F
IL
E$ $D
AT
E$
$T
IM
E$ $N
AM
E$
APPROVED
DATE
8 23467 5
H
G
F
E
D
C
B
A
WARNING!
THIS IS AN OPERATIONAL
AIR TRAFFIC CONTROL FACILITY
DO NOT WORK IN ANY AREA IF YOU ARE NOT FULLY
AWARE OF THE CONSEQUENCES OF YOUR ACTIONS
THIS INCLUDES, BUT NOT LIMITED TO:
· OPENING OR CLOSING ANY CIRCUIT BREAKER.
· OPENING OR CLOSING ANY VALVE.
· CUTTING ANY WIRE OR CABLE.
· TURNING ON OR OFF ANY PIECE OF EQUIPMENT.
· PLUGGING ANYTHING INTO A POWER OUTLET.
· CUTTING, DRILLING OR CORING INTO ANY WALL, FLOOR,
ROOF, OR CEILING.
· PERFORMING ANY ACTIVITIES THAT PRODUCE FUMES,
ODORS, OR DUST.
· CAUSING LOUD NOISES OR BUILDING VIBRATIONS.
· EFFECTING A FIRE PROTECTION OR SECURITY SYSTEM
ALARM.
KNOW WHAT YOU ARE DOING BEFORE YOU DO IT!
DON'T TAKE THE CHANCE OF CAUSING AN ACCIDENT OR
INTERRUPTING AIR TRAFFIC!
Security ATM SSC Vacant Vacant David Beal (Acting)
(XXX) XXX-XXXX (XXX) XXX-XXXX (865) 201-8568
BUILDING CODE
SUMMARY
WARNING!
THIS FACILITY IS USED IN FAA AIR TRAFFIC CONTROL. LOSS OF
HUMAN LIFE MAY RESULT FROM SERVICE INTERRUPTION. ANY
PERSON WHO INTERFERES WITH AIR TRAFFIC CONTROL, OR
DAMAGES OR TRESPASSES ON THIS PROPERTY WILL BE
PROSECUTED UNDER FEDERAL LAW.
GENERAL NOTES:
1. WORK THAT MAY INTERFERE WITH BUILDING OPERATIONS SHALL BE PERFORMED DURING NON-BUSINESS HOURS (22:00 TO 06:00) - SEE PHASING PLAN. CONTRACTOR'S
WORKING HOURS SHALL BE COORDINATED NOT LESS THAN THREE (3) WORKING DAYS IN ADVANCE AND APPROVED BY COR. NO WORK WILL BE ALLOWED OVER FEDERAL HOLIDAYS AND CONSTRUCTION MORATORIUMS ISSUED BY FAA AIR TRAFFIC MANAGEMENT. LISTING OF HOLIDAYS AND MORATORIUMS WILL BE COVERED IN THE
PRE-CONSTRUCTION MEETING.
2. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. DO NOT SCALE FOR EXACT LOCATIONS.
3. HEATING, VENTILATION AND AIR CONDITIONING SYSTEM (HVAC) SYSTEMS SHALL BE PROVIDED WITH ALL ANCILLARY COMPONENTS NECESSARY FOR COMPLETE AND FUNCTIONAL
USE AND OPERATION.
4. FIELD VERIFY EXISTING CONDITIONS AND COORDINATE WORK PLACEMENT WITH COR PRIOR TO ORDERING MATERIALS AND EQUIPMENT, FABRICATION, OR MAKING PERMANENT
INSTALLATION. CONTACT THE SSC MANAGER FOR ALL SITE-VISIT REQUESTS.
5. PROVIDE AND INSTALL PROVISIONS TO MITIGATE THE AFFECT OF THERMAL EXPANSION AND TRANSFER OF VIBRATIONS ASSOCIATED WITH MECHANICAL EQUIPMENT OR SYSTEMS. .
6. REPAIR BUILDING FINISHES THAT ARE AFFECTED BY THE WORK, TO INCLUDE BUT NOT LIMITED TO: WALLS, CEILINGS, FLOORING, ROOF, FACADE, PARKING SURFACES, PARTITIONS, DOORS, GLAZING, AND EXTERIOR GROUNDS IF DAMAGED, RESTORE TO MATCH SURROUNDINGS.
7. COORDINATE WITH FACILITY MAINTENANCE PERSONNEL TO LOCK-OUT / TAG-OUT EXISTING ELECTRICAL CIRCUITS PRIOR TO DEMOLITION OF RESPECTIVE HVAC EQUIPMENT, TO INCLUDE ASSOCIATED ELECTRICAL POWER FEED. ELECTRICAL CIRCUITS NOT REQUIRING COMPLETE DEMOLITION BACK TO PANEL SHALL BE PROPERLY TERMINATED IN A JUNCTION BOX AND INCLUDE REMOVAL OF ASSOCIATED CONDUIT BACK TO THE SAME POINT, SO LONG AS IT FACILITATES A CONTINUOUS WORKING CONDITION FOR THE
REMAINING ELECTRICAL SYSTEM.
8. COVER ALL OPEN DUCTS DURING CONSTRUCTION, AND PROTECT OR CLOSE IF ALLOWED, ANY OUTDOOR AIR OPENINGS THAT HAVE THE POTENTIAL TO INTRODUCE OBJECTIONABLE CONTAMINANTS, FUMES OR ODORS PRODUCED BY CONSTRUCTION RELATED ACTIVITIES INTO OCCUPIED SPACES. FURNISH AND INSTALL DISPOSABLE 'CONSTRUCTION FILTERS' (MERV 8 BLANKET OR ROLL FILTER MEDIA) ACROSS RETURN AIR INTAKES, IN ADDITION TO PERMANENT FILTERS OF OPERATIONAL AIR HANDLING UNITS.
9. SAFEGUARD FIRE ALARM AND SECURITY SYSTEMS FROM DAMAGE OR FALSE ALARMS PRIOR TO DOING ANY WORK. RESTORE SYSTEMS TO NORMAL OPERATION BEFORE LEAVING.
10. FIELD COORDINATE LAYOUT OF NEW EQUIPMENT FOR EASE OF ACCESS, TO AVOID OBSTRUCTIONS AND COMPLY WITH REQUIRED SERVICE-CLEARANCES.
11. HANG AND/OR SUPPORT DUCTWORK AND EQUIPMENT ONLY FROM STEEL JOISTS, AND ONLY FROM TOP CHORDS IF LOAD IS GREATER THAN 30 LBs.
12. LABEL ALL NEW EQUIPMENT, CONTROL DEVICES, AND ELECTRICAL POWER AS SPECIFIED.
13. NO ASBESTOS IS FORESEEN BEING IMPACTED BY CONSTRUCTION. TEST HIDDEN BUILDING ELEMENTS UNLESS INSTRUCTED OTHERWISE. SEE ENVIRONMENTAL CONCERN BELOW.
14. NO LEAD IS FORESEEN BEING IMPACTED BY CONSTRUCTION.
15. RESTROOM FACILITIES ARE AVAILABLE ON SITE AND USE IS PERMITTED SO LONG AS CONTRACTOR PERSONNEL EXERCISE CARE IN USING.
16. WATER (POTABLE AND NON-POTABLE) IS AVAILABLE ON SITE FOR CONTRACTOR USE. USE IS LIMITED TO ORDINARY BUILDING CONSUMPTION.
17. NORMAL BUILDING ELECTRICAL POWER MAY BE MADE AVAILABLE FOR CONTRACTOR USE ON A DAY-BY-DAY BASIS. COORDINATE NEED AT THE PRE-CONSTRUCTION MEETING.
18. THERE ARE NO DUMPSTERS OR DEBRIS DISPOSAL FACILITIES FOR CONTRACTOR USE. ALL PROJECT-GENERATED WASTE AND DEBRIS SHALL BE REMOVED OFF-SITE BY
CONTRACTOR MEANS.
19. ACCESS TO THE SITE REQUIRES PASSING THROUGH A SECURITY GATE. A DESIGNATED FAA ESCORT WILL ATTEND CONTRACTOR PERSONNEL TO AND FROM THE SITE ON A DAILY BASIS. COORDINATE ARRANGEMENTS AT THE PRE-CONSTRUCTION MEETING., TO INCLUDE EMERGENCY CONTACT AND NOTIFICIATION ALERTS.
20. DUE TO SECURITY REGULATIONS, NO FOREIGN NATIONALS WILL BE ALLOWED ON SITE WITHOUT A 30-DAY (CALENDAR) NOTIFICATION AND PRIOR APPROVAL. CONTACT THE SSC
MANAGER FOR ADDITIONAL INFORMATION.
International Mechanical Code
ENVIRONMENTAL WARNING:
WORK REVIEW REQUEST (WRR) SECM REMARKS:
1. ALL BUILDING MATERIALS ARE ASSUMED TO CONTAIN
ASBESTOS (ACM).
2. IF CONCRETE WALL CORED AN ACCREDITED ASBESTOS
INSPECTOR NEED TO CONFIRM/REFUTE THE PRESENCE OF
ASBESTOS INSULATION IN THE VOIDS (OF THE CONCRETE
BLOCK WALLS).
3. ALL PAINTED SURFACES. ANY DRILLING INTO FLOOR TILE
MUST BE PERFORMED USING THE ATTACHED SOPS ASSUMED
TO BE COATED WITH LEAD CONTAINING PAINTS (LCP).
4. ONLY PROPERLY TRAINED / CERTIFIED / LICENSED
PERSONNEL MAY IMPACT ACM AND LCP MATERIALS
5. IF CHEMICALS ARE USED, PLEASE PROVIDE SDS
NOTES :
1. * FAA LETTER OF AUTHORIZATION (LOA)
2. TYS ATCT is a United States Government-owned property of the Department of Transportation, Federal Aviation Administration (FAA). FAA engineer of record is the AUTHORITY HAVING JURISDICTION
(AHJ).
Name of Project: Knoxville ATCT (TYS) Cab HVAC Repairs
Address: Tyson McGhee Metropolitan Airport; 2055 Alcoa Hwy; Alcoa, TN 37701
Facility Type: Combined Air Traffic Control Tower (ATCT)
Owner/Contact Person: Knoxville SSC Phone: (865) 980-3053
DESIGNER'S NAME LICENSE #
Architectural
Electrical
Structural
Mechanical Donald Sprinkle, PE
Robert Blanchette FAA LOA*
FAA LOA* (404) 984-3954
(404) 293-1856
TELEPONE #
Applicable Codes:
Type Name Edition
Building Life Safety Life Safety
Life Safety
Accessiblity Mechanical Code Plumbing Code Gas Code Electrical Code Fire Prevention Energy Code International Energy Conservation Code
International Fire Code NFPA 70 - National Electric Code International Fuel Gas Code International Plumbing Code
ANSI 117.1
FAA Order 6930.1, Fire Prevention and Maintenance of Fire Protection Equipment
Alternate Standard for Fire Safety in Airport Traffic Control Towers 29 CFR 1960.17
NFPA 101 - Life Safety Code International Buidling Code 2018
Occupancy Classification, IBC and NFPA 101: BUSINESS
Fire
Civil -- -
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
1/15/2025
SHANE HARVEY, PE
PLATFORM MANAGER, AJW-2E15B
APA
ALCOA
TYS-E-24016804-G002
DLS
DLS
KNOXVILLE ATCT CAB HVAC REPAIRS
HVAC DEMOLITION AND NEW WORK
fil e.
dw g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
Is su e R ea so n
TYSON McGHEE METROPOLITAN AIRPORT
THIS DRAWING PRODUCED ON THEASO REGION CAD SYSTEM
DONALD SPRINKLE, PE
PROJECT ENGINEER, AJW-2E15B
24016804
TN
PHASING PLAN:
THE FOLLOWING IS A SUGGESTED PLAN FOR BASIS OF BID ONLY. ACTUAL ACTIVITIES, THEIR PRECEDENCE AND RELATIONSHIPS, SHALL BE PERFORMED ACCORDING TO CONTRACTOR'S CONSTRUCTION SCHEDULE AND FAA DISCRETION, TAKING INTO ACCOUNT AIR TRAFFIC OPERATIONS, BUILDING USE, WEATHER, AND UNFORSEEN CONDITIONS.
PROVIDE EMERGENCY TEMPORARY COOLING
1. PROVIDE, SET-UP, AND OPERATE A TEMPORARY BACK-UP AIR CONDITIONER: MINIMUM 1 EACH, 60,000 BthH, WATER-COOLED PORTABLE STAND ALONE AIR CONDITIONING
UNITS (SPOT COOLER). INCLUDE RESPECTIVE HOSE ATTACHMENTS, DUCTING, AND TEMPORARY ELECTRICAL WIRING BETWEEN AVAILABLE AHU POWER SOURCE AND UNIT.
REPAIR HVAC CONTROLS
2. INVESTIGATE AND REPAIR HVAC CONTROLS FOR OPERATION OF BOTH AHU-1 AND 2 WITH RESPECTIVE HPCU-1, 2, AUXILIARY ELECTRIC HEATERS, OUTDOOR AIR
ECONOMIZER, LEAD/LAG, AND FAIL-OVER.
3. COMPLETE BOTH SYSTEMS AND ESTABLISH RELIABLE OPERATION BEFORE PROCEEDING WITH OTHER WORK.
PREPARE AND APPROVE RIGGING PLAN AND TEMPORARY SUPPORT OF AHU-1
4. IDENTIFY SUITABLE SUPPORT POINTS
5. CHECK SUPPORT CAPACITY
6. PLAN FOR REDUNDANT BRACING
7. PRESENT PLAN TO FAA FOR APPROVAL
8. IMPLEMENT TEMPORARY SUPPORT OF AHU-1 FOR CONTINUOUS OPERATION
SELECTIVELY DISASSEMBLE NON-WORKING AHU AND DEMOLISH RESPECTIVE HPCU
9. LO/TO EXISTING HPCU-2 AND AHU-2.
10. RECOVER REFRIGERANT.
11. SELECTIVELY DEMOLISH AND DISPOSE OF HPCU-2
PREP FOR REINSTALLATION OF NEW HPCUs
1. MODIFY AND PAINT HPCU SUPPORT FRAME
2. INSTALL NEW ELECTRICAL DISCONNECTS AND PARTIALLY ROUTE NEW POWER AND CONTROL CONDUITS.
REPLACE NEW HPCU-2
1. SET UNIT
2. COMPLETE ELECTRICAL POWER WIRING
13. SPLICE EXISTING CONTROL WIRING AND EXTEND NEW TO UNIT.
REFURBISH AHU-2
25. PROVIDE AND INSTALL TEMPORARY SUPPORT SYSTEM FOR AHU-1 WHILE AHU-2 IS BEING WORKED ON.
26. SELECTIVELY DISASSEMBLE UNIT.
27. CLEAN DUCTWORK IN PLACE AND INSIDE OF UNIT
28. REPLACE CONDENSATE PAN
29. REPLACE FAN MOTOR, BELT, AND PULLEY
30. REPLACE DX COIL AND REASSEMBLE UNIT
31. ROUGH-IN NEW REFRIGERATION CIRCUIT WITH DEVICES BETWEEN AHU AND HPCU
32. INITIAL CHARGE AND LEAK TEST OF REFRIGERANT SYSTEM
33. REMOVE LO/TO OF AHU-2 AND HPCU-2. ENERGIZE UNITS.
34. START-UP, CHECK OUT, AND COMMISSION SYSTEM
REPEAT ABOVE FOR AHU-1 AND HPCU-1
SEAL GAPS AROUND WALL LOUVER IN MECHANICAL ROOM
36. PROVIDE SDS AND OBTAIN APPROVAL TO USE PROPOSED SEALANT PRIOR TO APPLICATION.
37. INSTALL BACKER ROD AND ELASTOMERIC SEALANT TO FILL GAPS AROUND WALL OPENING OF INTAKE/EXHAUST LOUVER.
COMPLETION AND CLEAN-UP
38. CLEAN-UP
39. CAI/JAI (PRE-FINAL AND FINAL INSPECTIONS) AND CLEAR PUNCH LIST
40. SYSTEMS TRAINING
41. O&M DOCUMENTS
42. AS-BUILTS
43. WARRANTIES LETTER
XFRMR ELEVATOR
DRUM
ELECTRONICS
POWER
POLE
FD
S
M M
M
H
G
F
E
D
C
B
A
8 1234567
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
$F
IL
E$ $D
AT
E$
$T
IM
E$ $N
AM
E$
APPROVED
DATE
8 23467 5
H
G
F
E
D
C
B
A
SCALE: 1/4" = 1'-0"
PART PLAN - MECHANCAI ROOM (WALKWAY LEVEL) NEW WORK
ME001
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
1/15/2025
SHANE HARVEY, PE
PLATFORM MANAGER, AJW-2E15B
APA
ALCOA
TYS-E-24016804-ME001
DLS
DLS
KNOXVILLE ATCT CAB HVAC REPAIRS
HVAC DEMOLITION AND NEW WORK
fil e.
dw g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
Is su e R ea so n
TYSON McGHEE METROPOLITAN AIRPORT
THIS DRAWING PRODUCED ON THEASO REGION CAD SYSTEM
DONALD SPRINKLE, PE
PROJECT ENGINEER, AJW-2E15B
24016804
TN
SCALE: 1/4" = 1'-0"
PART ROOF PLAN (INTERMEDIATE LEVEL) - NEW WORK
ME001
NOT TO SCALE
PICTURE - EXISTING AHU-1, 2
ME001
SCALE: 1/4" = 1'-0"
ELEVATION - REREFRIGERANT PIPE
ME001
EXA ABOVE OA
NOT TO SCALE
PICTURE - EXISTING HPCU-1, 2
ME001
EXISTING HVAC
CONTROL PANEL
1-3/8" S
3/4" L x2
32x24
HPCU-1 HPCU-2
1-3/8" S 3/4" L
1-1/8' S AND
5/8" L UP
EXISTING WALL CORES. SEE
9/ME001 IF NEW OR ADDITIONAL
WALL CORES ARE NEEDED.
1-1/8" S AND 5/8" L DOWN
HPCUs-1, 2
AP
PR
O
XI
M
AT
E
' L
IF
T
* BOTH LINE SETS: 1-3/8' SUCTION / 3/4"
LIQUID. NEW HPCU TUBING CONNECTIONS
ARE 1-1/8" SUCTION / 1/2" LIQUID. (2
TYPICAL)
SENSIBLE OA
1. INCLUDES FACTORY INSTALLED: ALUMINUM FIN/COPPER TUB COIL WITH LOUVERED HAIL GUARD
2. INCLUDES FACTORY INSTALLED LOW-AMBIENT HEAD PRESSURE CONTROL KIT FOR -20F OPERATION.
3. INCLUDES FACTORY INSTALLED SUCTION AND LIQUID LINE ISOLATION VALVES
4. INCLUDES FACTORY INSTALLED POWERED CONVENIENCE OUTLET
5. INCLUDES CONTRACTOR GUARANTEED 5-YEAR EXTENDED WARRANTY, TO INCLUDE OEM PARTS, LABOR, AND ANCILLARY REPAIR MATERIALS.
6. EXISTING CABINET AND FILTER FRAME TO BE RE-USED. EVAPORATOR COIL AND FAN ASSEMBLY TO BE RE-BUILT USING OEM PARTS.
TYPE BASIS OF DESIGN NOTES
HEAT PUMP CONDENSING UNIT SCHEDULE
TOTAL
MBHRPMHP
MIN
IN WG
ESP
TYPESERVESMARK
SUPPLY FAN COOLING
MBH
EAT
DB, F WB, F
EAT LAT LAT
WB, FDB, F
FILTRATION
% EFF % EFFCFM CFM
PRE POST
ELECTRICAL
AMPS
FLA,
AMPS
MOP,
AMPS
MCA,
VOLT PHASE HZ
HEATING
EAT
DB, F
LAT
DB, F TYPE
AUXILLIARY
ELECTRIC, KW
STEPS OF
CAPACITY
410-A 6AHU-1 CAB INDOOR HORIZONTAL DRAW THROUGH 1.0 2 3,460 102 92 80 67 - -3,200 120 2" - - - -208 1 60- - MERV-10-
410-A CARRIER 40BA009 300 6AHU-2 CAB INDOOR HORIZONTAL DRAW THROUGH 1.0 2 3,460 102 92 80 67 - -3,200 120 2" - - - -208 1 60- - MERV-10-
410-A CARRIER GEMINI 38AUQE12A0M5_0A2A0 HPCU-1 AHU-1 OUTDOOR AIR COOLED HEAT PUMP CONDENSER - - - 88 - 95 - - -- - - - - 44 50208 3 60- - --
410-A CARRIER GEMINI 38AUQE12A0M5_0A2A0 1HPCU-2 AHU-2 OUTDOOR AIR COOLED HEAT PUMP CONDENSER - - - 88 - 95 - - -- - - - - 44 50208 3 60- - --
- 2
EDH-2
EDH-1
HUMIDIFIER
ELPC ELPT NLPT
EF-3
AHU-1, 2
NOT TO SCALE
RISER DIAGRAM - REFRIGERANT PIPING
ME001
3 4 5
1 2 3 4 5
AHU-1, 2
NOT TO SCALE
ELEVATION - AHU-1, 2
ME001
AHU-1
AHU-2
NOTES:
1. INSTALL FLARED FITTINGS AT LIQUID LINE FILTER DRIER.
2. INSTALL BALL TYPE ISOLATION VALVES WITH SHRADER
FITTINGS TO COIL SIDE FOR BOTH EVAPORATOR AND
CONDENSER. TAKE CARE TO PLACE SHRADER ON
CORRECT SIDE TO ENABLE SERVICE WORK.
3. INSTALL EXTRA SHRADER VALVE SUCTION LINE BETWEEN
COILS.
4. INSTALL BALL TYPE ISOLATION VALVES WITH SHRADER
FITTINGS FOR BOTH ISOLATION AND BYPASS OF LIQUID
LINE FILTER DRIER.
5. *WARNING:
DOUBLE-CHECK ALL PIPING AND CONNECTION SIZES.
CONDENSING UNIT MANUFACTURER'S LITERATURE SAYS
1-1/8" SUCTION WITH 1/2" LIQUID; BUT VENDOR'S SELECTION
SAYS 1-1/4" SUCTION WITH 1/2" LIQUID, AND FREON-410A
SIZING TABLE SAYS 1-3/8" SUCTION AND 5/8 TO 3/4" LIQUID.
THEREFORE, EXPERTISE OF INSTALLING CONTRACTOR IS
IMPERATIVE FOR FINAL SIZING OF INSTALLED TUBING.
EVAPORATOR
SITE GLASS
BALL VALVE
WITH
SHRADER
FITTING
(TYPICAL)
TX VALVE WITH
REVERSING
CHECK VALVE
AND EXTERNAL
EQUILIZATION
CONDENSER
32x24
24x1624x18
24x18
R
S
NOTES:
1. LO/TO AHU-1 AND 2.
2. TEMPORARILY RELOCATE AND RE-WIRE AHU-1 SAFETY DISCONNECT SWITCH TO BE OUT OF WAY OF AHU-2 REMOVAL.
3. REMOVE AHU-2 SAFETY DISCONNECT SWITCH. SALVAGE FOR RE-USE.
4. TEMPORARILY SUSPEND AHU-2 SUPPLY TRUNK FROM BELOW BACKDRAFT DAMPER.
5. REMOVE AHU-2 HUMIDIFIER AND DUCT HEAER. SALVAGE FOR RE-USE.
6. REMOVE AHU-2 SUPPLY TRUNK FROM BACKDRAFT DAMPER TO UNIT - DO NOT REMOVE BACKDRAFT DAMPER. BLANK OFF OPEN DUCT.
7. SUSPEND AND SUPPORT AHU-1 INDEPENDENT OF EXISTING SUPPORT STAND. HANG FROM FLOOR DECK ABOVE; USE WALL ANCHORS
AND FLOOR STANDS; BUT MUST CREATE CLEARANCE TO SLIDE AHU-2 AND SUPPORT STAND FORWARD AND CLEAR OF AHU-1.
8. ENTER MIXED AIR CHAMBER FROM ACCESS HATCH ON SIDE AGAINST WALL. REACH TRHOUGH AHU-2 FILTER SECTION AND DETACH
COIL/BLOWER SECTION.
9. SLIDE ENTIRE AHU-2 COIL/BLOWER SECTION WITH SUPPORT FRAME FORWARD UNTIL ENOUGH CLEARANCE TO REMOVE COIL. INSTALL
NEW COIL AND REVERSE STEPS. SUBSTITUTE NEOPRENE EQUIPMENT PADS AND PRESSURE TREATED LUMBER TO RE-SUPPORT AHU-2
OFF FLOOR.
10. REVERSE STEPS TO RE-INSTALL AHU-2 BACK TO OPERATION.
11. AHU-1 COIL CAN BE REMOVED AND REPLACED FROM TOP.
LIQUID LINE SOLENOID VALVE
AND LINE VOLTAGE TO HPCU
POWER AND CONTROL CIRCUIT
LIQUID FILTER DRIER W/
BYPASS AND FLARED FITTINGS
LL*
SL*
12 (TYPICAL)
5/8" TO 3/4"
REDUCER
(TYPICAL)*
NOT TO SCALE
PARTIAL ONE-LINE DIAGRAM - ELECTRICAL INSTALLATION
ME001
EXISTING PANEL 'ELPT' 175A MCB 208 3PH 4W
NEW 3-#6 AWG, #10 GND;
EXISTING 1" EMT/RGS CONDUIT
(TYPICAL 2)
NEW THWN 3-#6
AWG, #10 GND; NEW
1" RGS (TYPCIAL 2)
HPCU-1
EXISTING
BREAKER 3 (7,
9, 11) 60A 3P
NOTES:
1. WALL-MOUNTED DISCONNECTS. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. BOND AND GROUND RACEWAY PER FIGURE 7 OF FAA STD-019F-CHG 3
3. NEW WIRING TO HPCU-1, 2 MUST BE THWN, AND COLOR CODED FOR PHASE AND VOLTAGE.
EXISTING
BREAKER 5 (13,
15, 17) 20A 3P
EXISTING 3-#12 AWG,
#12 GND; EXISTING
3/4" EMT (TYPICAL 2)
DS
HPCU-2
EXISTING
BREAKER 4 (6,
8, 10) 60A 3P
DS
AHU-1
AHU-1 HPCU-2
DS
HPCU-1
DS
AHU-2
AHU-2
EXISTING 3-#12 AWG,
#12 GND; EXISTING
3/4 EMT (TYPICAL 2)
EXISTING
BREAKER 6 (12,
14, 16) 20A 3P
NOT TO SCALE
DETAIL - WALL PENETRATION
ME001
NOTES:
1. ALL HOLES MADE THROUGH CONCRETE OR MASONRY WALLS
SHALL BE NEATLY CORED USING DIAMOND BIT WET METHOD.
2. MASK AND PROTECT FINISHED SURFACES PRIOR TO FILLING
ANNULAR SPACE.
USE PVC SLEEVE
GROUTED IN PLACE
IF WALL HAS VOIDS
ANNULAR FILL:
MINIMAL EXPANDING
FIRE RETARDANT
POLYURETHANE FOAM
OR ELASTOMERIC
SEALANT
CARRIER
WALL ESCUTEON
(ALL EXPOSED
FACES)
HPCU-2
NOT TO SCALE
ELEVATION - HPCU-1, 2
ME001
LAYOUT AND SET NEW HPCUs ON
EXISTING SUPPORT FRAME.
HOWEVER, EXTEND FRAME AS
NEEDED TO SPACE UNITS FOR
SUFFICIENT MAINTENANCE
CLEARANCE PER MANUFACTURER
RECOMMENDATIONS.
NEW THWN 3-#6 AWG,
#10 GND; NEW 1" LFMC
(TYPCIAL 2)
SET NEW J-BOX AND
SPLICE EXISTING
CONTROLS WIRING TO
NEW FROM THIS POINT
TO HPCUs
KEY NOTES:
POINT OF DEMOLITION OF EXISTING ELECTRICAL DISCONNECTS AND POWER FEEDS
TO HPCU-1, 2. DO NOT DISTURB EXISTING CONDUITS THROUGH ROOF PENETRATIONS.
NEW TYPE 'L' ACR SEAMLESS COPPER REFRIGERANT TUBING COMPLYING WITH ASTM
B280 OR ASTM B819, AND SUCTION AND LIQUID LINE FILTER DRIERS WITH
COMBINATION ISOLATION SERVICE VALVES AND BYPASSES. FILTER DRIER
CONNECTIONS MUST BE FLARED. SEE PIPING DIAGRAM 6/ME001. NOTE: MAY
SALVAGE AND RE-USE IN PLACE EXISTING REFRIGERANT TUBING IF SIZE, CONDITION,
AND FLUSH IS DEEMED ACCEPTABLE BY ENGINEER OF RECORD, AND CONTRACTOR
ASSUMES WARRANTY OF EXISTING TUBING AND CONNECTIONS FOR A COMPLETE
WARRANTY OF ENTIRE REFRIGERATION SYSTEM.
NEW ELECTRICAL SAFETY DISCONNECTS AND OUTDOOR POWER FEEDS TO HPCU-1, 2.
SEE WIRING DIAGRAM 8/ME001 AND FAA STD-19F CHG-3 FIGURE 7. THE NEW
DISCONNECTS MUST BE WALL MOUNTED. LAY-OUT ROUTE OF NEW CONDUIT AND
WIRING TO ACCOMMODATE CONNECTION TO EXISTING CONDUITS THROUGH ROOF
AND BACK TO UNITS WITHOUT BLOCKING MAINTENANCE OR CAUSING A TRIP HAZARD.
INCLUDE ADDITIONAL WEATHER-PROOF PULL BOXES AS NEEDED.
NEW THWN WIRE IN RGS CONDUIT FOR POWER FEEDS TO HPCU-1, 2. ROUGH-IN SAME
SIZE AS EXISTING. ROUTE ON SAME SUPPORTS AS REFRIGERANT TUBING. PROVIDE
LIQUID-TITE METAL FLEX CONNECTION AT CONNECTIONS TO UNITS. SEE WIRING
DIAGRAM 8/ME001
NEW 18/8 CONTROL WIRING IN RGS CONDUIT TO HPCU-1, 2. ROUGH-IN BETWEEN
CONVENIENT POINT OF CONNECTION INSIDE TOWER, THROUGH WALL AND TO
RESPECTIVE UNITS. INCLUDE WEATHER TIGHT PULL BOXES AND RIGID CONDUIT,
PROVIDE LIQUID-TITE METAL FLEX AT CONNECTIONS TO UNITS.
INSULATE REFRIGERANT SUCTION LINES WITH 3/4" THICK, NEOPRENE RUBBER PIPE
INSULATION. JACKET WITH 24 GAUGE GALVANIZED STEEL OR ALUMINUM WITHIN 8' OF
FINISHED FLOOR OR ROOF. USE PREFABRICATED JACKETING AND INSTALL PER
MANUFACTURER RECOMMENDATIONS.
HPCU-1
ROUGH-IN NEW POWER FEEDS
THROUGH EXISTING CONDUIT AND
ROOF PENETRATIONS BETWEEN
PANEL MDPE AND NEW
WALL-MOUNTED DISCONNECTS.
EXISTING ROOF
PENETRATIONS (TYPICAL 2)
NEW PULL BOX - CONNECT TO
EXISTING CONDUIT (TYPICAL 2)
NEW 1" RGS (TYPICAL 2)
- EXTERIOR CONDUIT
MUST BE RIGID.
GENERAL NOTES:
1. PROPERLY SAFE EXISTING ELECTRICAL CIRCUITS AFFECTED AND UNTIL CONNECTED
EQUIPMENT IS APPROVED FOR ENERGIZING.
2. FIELD VERIFY EXISTING CONDITIONS PRIOR TO ORDERING NEW AHU COMPONENTS.
VARIATIONS IN LAYOUT AND SIZING ARE ALLOWED PENDING ENGINEER OF RECORDS
APPROVAL.
3. MAINTAIN EGRESS AND ELEVATOR ACCESS TO AND FROM CAB AT ALL TIMES. PROTECT
WALL, CEILING, AND FLOOR FINISHES THROUGHOUT THE PROJECT. RESTORE
DAMAGED FINISHES TO MATCH SURROUNDING SURFACE.
4. MEASURE AND RECORD AIR FLOWS OF REFURBISHED AHUs - 3,150 CFM MINIMUM IS
ACCEPTABLE. BALANCING IS NOT REQUIRED.
5. FOREWARN OCCUPANTS PRIOR TO MAKING LOUD NOISES, FUMES, ODORS, OR
VIBRATIONS. USE CONSTRUCTION FILTERS IN AHU DURING WORK - REPLACE WITH NEW
FILTERS AFTER COMPLETION AND CLEAN-UP, BUT BEFORE TEST AND BALANCE. COVER
OPEN DUCTS DURING CONSTRUCTION.
6. SAFEGUARD ELEVATOR MACHINERY AND ELECTRONIC CABINETS BEFORE STARTING
WORK.
1 (TYPICAL)
3 (TYPICAL)
ME001
REQUIRED LINE SIZES
MAY BE 1-3/8" SUCTION
/ 3/4" LIQUID. HOWEVER,
NEW HPCU TUBING
CONNECTIONS ARE
1-1/8" SUCTION / 1/2"
LIQUID. SEE 6/ME001
NOTE 5.
NEW 100A, SS NEMA 4X
'HEAVY DUTY' FUSED
240VAC RATED, 3-PHASE,
3-POLE, DOUBLE LUG KIT;
SCHNEIDER ELECTRIC
MODEL VH364SSGL; FUSE
WITH FERRAZ MODEL TR,
50A, 208V, 200KA
INTERRUPTING CAPACITY,
OR APPROVED
EQUIVALENT - 9 EACH
INCLUDING SPARES.
(TYPICAL 2)
EXISTING PANEL 'MDPE' 600A MCB 208 3PH 4W
CARRIER 40BA009 300
EXISTING DISCONNECT
30A, NEMA 1 'HEAVY
DUTY' FUSED 240VAC
RATED, 3-PHASE,
3-POLE; 20A FUSED
(TYPICAL 2)
NOTE:
1. DO NOT FORGET TO PUT GROUNDING BUSHINGS AND PROPER
LOCKNUTS ON CONDUIT ENTRIY POINTS - SEE DETAIL ABOVE.
WARNING: EPLACEMENT
OF AHU-2 COIL WILL
REQUIRE REMOVAL OF
UNIT OUT FROM UNDER
AHU-1 AND SUPPORT
FRAME. CAREFULLY
PLAN FOR RIGGING AND
TEMPORARY SUPPORT
OF AHU-1 SO THAT IT
REMAINS IN OPERATION
WHILE WORK IS DONE TO
AHU-2.
WARNING: DO NOT
DISTURB BACK-DRAFT
DAMPERS - BE SURE
THEY REMAIN IN PLACE IF
DUCTWORK REQUIRES
REMOVAL.
CAB TRAP DOOR
FIELD INSTALLED
LIQUID-SUCTION
SUB-COOLER
H
G
F
E
D
C
B
A
8 1234567
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
$F
IL
E$ $D
AT
E$
$T
IM
E$ $N
AM
E$
APPROVED
DATE
8 23467 5
H
G
F
E
D
C
B
A
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
1/15/2025
SHANE HARVEY, PE
PLATFORM MANAGER, AJW-2E15B
APA
ALCOA
TYS-E-24016804-ME002
DLS
DLS
KNOXVILLE ATCT CAB HVAC REPAIRS
HVAC CONTROLS
fil e.
dw g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
Is su e R ea so n
TYSON McGHEE METROPOLITAN AIRPORT
THIS DRAWING PRODUCED ON THEASO REGION CAD SYSTEM
DONALD SPRINKLE, PE
PROJECT ENGINEER, AJW-2E15B
24016804
TN
M
T
RA
DO DI
SEQUENCE OF OPERATION:
START / STOP
HPCUs-1 AND 2: STARTED AND STOPPED AUTOMATICALLY RESPECTIVE OF PAIRED AHU. A COMPRESSOR CYCLES
DEPENDING ON COOLING AND HEATING REQUIREMENT.
AHUs-1, 2: STARTED AND STOPPED BY PROGRAMMABLE LEAD/LAG CONTROLLER WITH 'FAILURE' CHANGE-OVER.
OPERATING UNIT RUNS CONTINUOUSLY: 7-DAYS PER WEEK, 24-HOURS PER DAY, INCLUDING
WEEKENDS AND HOLIDAYS. SEQUENCING AND SCHEDULE ARE ADJUSTABLE.
COOLING
HPCUs-1, 2: IF COOLING SUPPLY AIR TEMPERATURE IS GREATER THAN SET-POINT, THEN HEAT PUMP SHALL RUN IN COOLING MODE AND CYCLE COMPRESSOR TO INCREASE COOLING UNTIL SET-POINT MET. ACTION
SHALL REVERSE AS SPACE AIR TEMPERATURE IS SATISFIED.
A 4 F (AFG) DEADBAND SHALL EXIST BETWEEN COOLING AND HEATING SUPPLY AIR SET-POINTS TO
PREVENT RESPECTIVE ACTIONS FROM HAPPENING SIMULTANEOUSLY.
COMPRESSOR HAS 2-STAGE OPERATION FROM 50 TO 100%. COMPRESSOR SOLENOID VALVE
UNLOADS COMPRESSOR TO PROVIDE STAGED OPERATION.
OUTDOOR AIR ECONOMIZER (FREE COOLING)
'OUTDOOR AIR ECONOMIZING' WILL INTRODUCE VARIABLE RATES OF OUTDOOR AIR TO MAINTAIN AN ENTERING MIXED AIR SET-POINT OF 60 F (ADJUSTABLE) WHEN OUTDOOR AIR TEMPERATURE IS LESS THAN (60 F ADJUSTABLE). OUTDOOR AIR DAMPER WILL CLOSE TO MINIMUM SETTING IF ENTERING
MIXED AIR TEMPERATURE REACHES 55 F.
HEATING
HPCUs-1, 2: IF SPACE AIR TEMPERATURE IS LESS THAN SET-POINT, THEN HEAT PUMP SHALL RUN IN HEATING
MODE AND CYCLE COMPRESSOR TO MEET SET-POINT.
IF SPACE TEMPERATURE IS LESS THAN SET-POINT AND HEAT PUMP IS OPERATING IN HEATING MODE, THEN AUXILIARY ELECTRICAL RESISTANCE HEATING ELEMENT SHALL ENERGIZE ACCORDINGLY AND HEAT SUPPLY AIR IN STAGES TO NOT LESS THAN 90 F, OR MORE THAN 110 F . ACTION SHALL
REVERSE AS HEATING SET POINT TEMPERATURE IS SATISFIED.
A 4 F (AFG) DEADBAND SHALL EXIST BETWEEN HEATING AND COOLING SUPPLY AIR SET-POINTS TO
PREVENT RESPECTIVE ACTIONS FROM OCCURRING SIMULTANEOUSLY.
VENTILATION
AHUs-1, 2: OUTDOOR AIR (OA) VENTILATION CONTROL IS SPRING CLOSED AND MOTOR OPEN. EXHAUST, MIXING, AND INTAKE AIR DAMPERS ARE CONTROLLED COLLECTIVELY BUT OPERATED
INDEPENDENTLY, USING INDIVIDUAL ACTUATORS. OA DAMPER SHALL BE INTERLOCKED TO OPEN TO
MINIMUM SETTING IF EITHER AHU IS RUNNING, AND CLOSE IF STOPPED. MINIMUM OUTDOOR
VENTILATION RATE IS 100 CFM, AND SHALL BE SET BY TEST & BALANCE.
SAFETIES
1. DE-ENERGIZED UNIT SHALL NOT SOUND ALARMS.
2. 'DIRTY FILTER': RETURN AIR FILTER SHALL BE MONITORED FOR EXCESSIVE DIFFERENTIAL PRESSURE. IF PRESSURE DROP IS GREATER THAN 'MAXIMUM' ALLOWABLE (ADJUSTABLE), THEN 'DIRTY FILTER' ALARM SHALL BE SENT. HOWEVER, 'DIRTY FILTER' CONDITION SHALL NOT BE HARD-WIRED INTERLOCKED TO STOP FAN - ONLY MONITOR AND SEND ALARM. NOTE: ANALOG INPUT READING OF 'MAXIMUM' ALLOWABLE DIFFERENTIAL PRESSURE MUST BE CORRELATED TO NORMAL AIRFLOW DURING TEST &
BALANCE.
3. FAN MOTOR PROVING: FAN MOTORS SHALL BE MONITORED FOR 'FAN FAILURE' BY BY ON-BOARD CONTROLLER USING CURRENT SENSOR ON MOTOR CIRCUIT, DIFFERENTIAL PRESSURE SWITCH ACROSS FILTER, AND/OR STATIC PRESSURE SENSOR IN SUPPLY DUCTWORK. IF MOTOR AMPERAGE IS LESS THAN NORMAL (ADJUSTABLE) AND PRESSURE DIFFERENCES ARE ZERO, THEN 'FAN FAILURE' ALARM SHALL BE SENT. NOTE: ANALOG INPUT FOR CURRENT COMPARISON MUST BE CORRELATED TO NORMAL DURING
TEST & BALANCE.
4. CONDENSATE PAN OVERFLOW: ALL UNITS SHALL HAVE INTEGRAL 'CONDENSATE' PAN OVERFLOW SWITCHES THAT SHALL ALARM IF WATER IS DETECTED IN CONDENSATE HI-LEVEL OUTLET OR AUXILIARY CONDENSATE OVER FLOW PAN.
5. HI-TEMPERATURE: IF SPACE OR RETURN AIR TEMPERATURE IS 5 F (AFG) ABOVE SET-POINT, THEN 'HI-TEMP' ALARM IS SENT.
6. LEAD/LAG CONTROL: AHU-1 AND 2 SHALL BE MONITORED FOR LEAD/LAG CONTROL AND EMERGENCY FAIL OVER. IF LEAD UNIT EXPERIENCES FAILURE OR HI-TEMPERATURE ALARM, THEN LAG UNIT SHALL BE ENERGIZED AND PREVIOUS LEAD DE-ENERGIZED.
7. EMERGENCY OUTDOOR AIR SHUT-OFF: AHU-1 AND 2 OUTDOOR VENTILATION SHALL BE EQUIPPED WITH MOTORIZED DAMPER CONTROL TO OVER-RIDE 'DAMPER-OPEN' COMMAND AND FULLY CLOSE DAMPER IF ACTIVATED. EMERGENCY OUTDOOR AIR SHUT-OFF SHALL BE MANUALLY CONTROLLED BY A PROTECTED 'EMERGENCY OFF' SWITCH LOCATED IN CAB.
8. FIRE: AHUs-1 AND 2 ARE A;READU EQUIPPED WITH SMOKE 'DUCT' DETECTORS IN SUPPLY AIR STREAM. EXISTING UNIT FIRE ALARM SEQUENCE SHUTS DOWN UNIT IF SMOKE IS DETECTED. MANUAL RESET IS REQUIRED IN EVENT OF ALARM.
CAB HVAC CONTROL PANEL
QUAD CITY CONTROL COMPANY
3110 HENSON ROAD SUITE-12; KNOXVILLE, TN 37921
POCs: TEDDY WAYLAND, OPS MANAGER / GARY GRINDER, APP ENGINEER
GENERAL NOTES ON INSTALLING LOW VOLTAGE WIRING:
1. ALL LOW-VOLTAGE CONTROL WIRING NOT IN METAL CONDUIT
SHALL BE PLENUM RATED.
2. ROUTE ALL LOW-VOLTAGE CONTROL WIRING PARALLEL AND
PERPENDICULAR TO BUILDING AXIS.
3. INCLUDE SERVICE LOOPS AT ALL CHANGES OF DIRECTION.
4. DO NOT SUPPORT OR HANG LOW VOLTAGE WIRING FROM
NON-PERMANENT FIXTURES OR BUILDING ELEMENTS.
5. USE ONLY IEEE APPROVED DEVICES FOR HANGING
LOW-VOLTAGE CABLE.
90°
90°
EXAMPLE
M
S
M
SP
DIFF
EXA
M
DIRTY
FILTER
EA
OA
M
M
M
S
OSI
D
T
SA
EA
SP
DIFF
AHU-1 INDOOR
AHU-2 INDOOR
HPCU-2 OUTDOOR HPCU-1 OUTDOOR
T
EA
AI AIAIDO DO DO DO DO DO DO DODI
DIRTY
FILTER
S
E
ENCAPSULATED RELAY
FAN
STARTER
36"
MAX
DUCT 'SMOKE'
DETECTOR
REMOTE
INDICATOR
SUPPLY
AIR DISCHARGE
1. MOUNT DUCT SENSOR RELAY WITHIN
3' OF THE DEVICE BEING CONTROLLED
PER NFPA 72.
2. ASSIGN A UNIQUE ADDRESS TO EACH
INITIATING DEVICE.
EXISTING
FACP
S E
EXISTING
FACP
INTERFACE SUPERVISED
ALARM CIRCUIT WITH
EXISTING FIRE ALARM
SYSTEM
ZAM
FAN POWER
CONTROL
RA
SA
SA
MANUAL
DISCONNECT
MANUAL
DISCONNECT
MANUAL
DISCONNECT
MANUAL
DISCONNECT
AI
T
SPACE TEMPERATURE
SENSOR (8 TYPICAL)
E
DI
EMERGENCY
SWITCH
R
R
R
S
BI-DIRECTIONAL
SOLENOID
VALVE
S
BI-DIRECTIONAL
SOLENOID
VALVE
GENERAL NOTS:
1. THIS CONTROL DIAGRAM IS ONLY A REPRESENTATION OF THE EXISTING CONTROLS SYSTEM AS
IT WAS ORIGINALLY INTENDED TO FUNCTION. THE ACTUAL CONTROL POINTS AND
PROGRAMMING MUST BE REPAIRED TO THE SAME.
2. DETAILED KNOWLEDGE OF THE SYSTEM MUST OBTAINED FROM THE ORIGINAL INSTALLER. ANY
MISSING DEVICES OR SEQUENCES OF OPERATION THAT PREVENT IMPLEMENTING THIS
DESCRIPTION MUST BE BROUGHT TO THE ATTENTION OF THE FAA ENGINEER OF RECORD FOR
RESOLUTION PRIOR TO INVESTING FURTHER TIME AND MONEY BEYOND INITIAL DISCOVERY.
3. THIS IS INTENDED TO BE ONLY REPAIR WORK, AND SOLE-SOURCED TO THE ORIGINAL
INSTALLER. DO NOTHING TO THE EXISTING CONTROLS SYSTEM THAT WILL CAUSE AN
IRREVERSIBLE CONDITION THAT MIGHT JEOPORDIZE SAFE AND ADEQUATE HEATING AND
COOLING.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| Sheets and Views |
| Layout1 |
| 3f Drawings 2.pdf |
| Sheets and Views |
| Layout1 |
| 3f Drawings 3.pdf |
| Sheets and Views |
| Layout1 |
| 3f Drawings 4.pdf |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .