This is a set of mechanical and electrical drawings for HVAC repairs at the Knoxville Air Traffic Control Tower (ATCT) cab at Tyson McGhee Metropolitan Airport in Alcoa, TN. The drawings detail plans for repairing/replacing two air handling units (AHU-1 and AHU-2) and their associated heat pump condensing units (HPCU-1 and HPCU-2) in an operational air traffic control facility.

The drawings include detailed specifications for demolition and new work, HVAC controls, refrigerant piping diagrams, electrical installations, and a phasing plan. Key technical requirements include providing temporary cooling during repairs (60,000 Btuh water-cooled portable unit), careful rigging and temporary support of AHU-1 while replacing AHU-2, replacement of condensate pans, fan motors, DX coils, and installation of new electrical disconnects and control wiring. The work requires extensive coordination due to the facility remaining operational, with most work to be performed during non-business hours (22:00-06:00). Special attention is given to maintaining air traffic control operations and safety, with multiple warnings about not interrupting critical services. The drawings also specify requirements for dealing with potential asbestos-containing materials and lead paint during construction.

View the file

Other files

File Type Posted
3f Statement of Work.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

T OF TRANSPORTAT ION

MER IC

A

O F

S T AT E S

UN ITED

DE

PA

RT

MEN

AV IAT

IO

N

LAREDEF

TR AT IO

N

SINI

MD

A

KNOXVILLE ATCT (TYS) CAB

HVAC REPAIRS

TYSON McGHEE METROPOLITAN AIRPORT

ALCOA, TN

SITE LOCATION: 35.81604, -83.99688

MECHANICAL / ELECTRICAL

GENERAL

DRAWING LIST

ME001 HVAC DEMOLITION AND NEW WORK

G002 GENERAL INFORMATION

G001 TITLE SHEET AND DRAWING L IST

H

G

F

E

D

C

B

A

8 1234567

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN REDLINE

DATE APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY DATE

DRAWING NO

DESIGNED

REVIEWED BY

$F

IL

E$ $D

AT

E$

$T

IM

E$ $N

AM

E$

APPROVED

DATE

8 23467 5

H

G

F

E

D

C

B

A

ME002 HVAC CONTROLS

IS

SU

ED

F

OR

ED

M

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

1/15/2025

SHANE HARVEY, PE

PLATFORM MANAGER, AJW-2E15B

APA

ALCOA

TYS-E-24016804-G001

DLS

DLS

KNOXVILLE ATCT CAB HVAC REPAIRS

HVAC DEMOLITION AND NEW WORK

fil e.

dw g

OPS INFRASTRUCTURE

ENGINEERING SERVICES

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

Is su e R ea so n

TYSON McGHEE METROPOLITAN AIRPORT

THIS DRAWING PRODUCED ON THEASO REGION CAD SYSTEM

DONALD SPRINKLE, PE

PROJECT ENGINEER, AJW-2E15B

24016804

TN

POINT OF CONNECTION / DEMOLITION

DETAIL NUMBER DRAWING

NUMBER WHERE SHOWN

NEW DUCTWORK

EXISTING DUCTWORK TO REMAIN

EXISTING EQUIPMENT TO REMAIN

TEMPERATURE SENSOR

SMOKE 'DUCT' DETECTOR

MOTORIZED DAMPER

AIR FILTER

CHECK VALVE

THERMOSTATIC EXPANSION VALVE

SOLENOID VALVE

S

NEW EQUIPMENT

R

XXX

XXX

EXISTING TO BE REMOVED

OR RELOCATED

NEW EQUIPMENT

EXISTING EQUIPMENT TO REMAIN

M

END SWITCH

T

ES

EXISTING PIPE

NEW PIPE

AMP

AIR CONDITIONING

AIR CONDITIONING UNIT

AIR COOLED CONDENSING UNIT

AIR CONDITIONING AND REFRIGERANT

ACCESS DOOR / PANEL

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ADJUSTABLE FROM GRAPHICS

AIR FILTRATION UNIT

AIR HANDLING UNIT

ANALOG INPUT

ANALOG OUTPUT

ACCESS PANEL

ASPIRATING SMOKE DETECTOR

AMERICAN WIRE GAUGE

BACK DRAFT DAMPER

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CHILLED WATER SUPPLY AND RETURN

CONDENSATE LINE

COMPUTER ROOM AIR CONDITIONER

COMPUTER ROOM UNIT

COMPRESSION TANK

CONDENSER UNIT

COLD WATER

DIGITAL INPUT

DIGITAL OUTPUT

DISCONNECT 'SAFETY' SWITCH

DOMESTIC WATER

DIRECT EXPANSION

ENTERING AIR

ELECTRICALLY COMUTATED MOTOR

ELECTRIC DUCT HEATER

ELECTRICAL EFFICIENCY RATION

EXHAUST FAN

ELECTRIC

ELECTRICAL METALLIC TUBING

END SWITCH

EXTERNAL STATIC PRESSURE

ENTERING WATER TEMPERATURE

EXHAUST AIR

FIRE ALARM CONTROL PANEL

FAN COIL UNIT

FILTER DRIER

FINISHED FLOOR

FEET

GALLONS PER MINUTE

HOT GAS LINE

HOT GAS REHEAT

HEAT PUMP

HEAT PUMP CONDENSING UNIT

HEATING WATER SUPPLY

HEATING WATER RETURN

HEATING WATER SUPPLY & RETURN

INTERNAL STATIC PRESSURE

KILOWATT

LIQUID-TITE FLEXIBLE METAL CONDUIT

LIQUID LINE

LWT

A A/C

ACU

ACCU

ACR

AD / P

AFF

AFG

AFG

AFU

AHU

AI

AO

AP

ASD

AWG

BDD

CHWS

CHWR

CHWS&R

CL

CRAC

CRU

CT

CU

CW

DI

DO

DS

DW

DX

EA

ECM

EDH

EER

EF

ELEC

EMT

ES

ESP

EWT

EXA

FACP

FCU

FD

FF

FT

GPM

HGL

HGR

HP

HPCU

HWS

HWR

HWS&R

ISP

KW

LFMC

LL

LWT

FLEXIBLE DUCT CONNECTION

R E

DUCT SENSOR 'AUXILLARY'

ENCAPSULATED RELAY (PAM)

MIXED AIR

METAL FLEX

MAX ALLOWABLE WATER PRESSURE

NOT IN CONTRACT

NET POSITIVE SUCTION HEAD

OUTSIDE AIR

ON CENTER

ORIGINAL EQUIPMENT MANUFACTURER

PRIMARY AIR

PRESSURE DROP

POWERED INDUCTION UNIT (FAN VAV)

POINT OF CONTACT

PACKAGED TERMINAL AIR CONDITIONER

PRESSURE REDUCING VALVE

RETURN AIR

RIGID GALVANIZED STEEL

SUPPLY AIR

SUCTION 'GAS' LINE

SIGHT GLASS

STAINLESS STEEL

TEMPORARY AIR CONDITIONING UNIT

THERMOSTAT

TEMPERATURE AND PRESSURE RELIEF VALVE

THERMOSTATIC EXPASION VALVE

TYPICAL

UNIT HEATER

VARIABLE AIR VOLUME

VOLUME DAMPER

ELECTRICAL TRANSFORMER

EXPANSION TANK

VOLT

WATER GAUGE

WITH

ZONE AREA MODULE

MA

MF

MAWP

NIC

NPSH

OA

OC

OEM

PA

PD

PIU

POC

PTAC

PRV

RA

RGS

SA

SL

SG

SS

TACU

T-STAT

TXP

TXV

TYP

UH

VAV

VD

XFMR

XT

V

WG

W/

ZAM

DUCT SENSOR REMOTE ALARM INDICATOR

EM EMERGENCY SWITCH

S

REFRIGERANT BALL AND SCHRADER VALVE

FD REFRIGERANT FILTER DRIER

REFRIGERANT SITE GLASS

LEGEND AND ABBREVIATIONS:

DISCONNECT 'SAFETY' SWITCH

WIRING CONNECTION

H

G

F

E

D

C

B

A

8 1234567

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN REDLINE

DATE APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY DATE

DRAWING NO

DESIGNED

REVIEWED BY

$F

IL

E$ $D

AT

E$

$T

IM

E$ $N

AM

E$

APPROVED

DATE

8 23467 5

H

G

F

E

D

C

B

A

WARNING!

THIS IS AN OPERATIONAL

AIR TRAFFIC CONTROL FACILITY

DO NOT WORK IN ANY AREA IF YOU ARE NOT FULLY

AWARE OF THE CONSEQUENCES OF YOUR ACTIONS

THIS INCLUDES, BUT NOT LIMITED TO:

· OPENING OR CLOSING ANY CIRCUIT BREAKER.

· OPENING OR CLOSING ANY VALVE.

· CUTTING ANY WIRE OR CABLE.

· TURNING ON OR OFF ANY PIECE OF EQUIPMENT.

· PLUGGING ANYTHING INTO A POWER OUTLET.

· CUTTING, DRILLING OR CORING INTO ANY WALL, FLOOR,

ROOF, OR CEILING.

· PERFORMING ANY ACTIVITIES THAT PRODUCE FUMES,

ODORS, OR DUST.

· CAUSING LOUD NOISES OR BUILDING VIBRATIONS.

· EFFECTING A FIRE PROTECTION OR SECURITY SYSTEM

ALARM.

KNOW WHAT YOU ARE DOING BEFORE YOU DO IT!

DON'T TAKE THE CHANCE OF CAUSING AN ACCIDENT OR

INTERRUPTING AIR TRAFFIC!

Security ATM SSC Vacant Vacant David Beal (Acting)

(XXX) XXX-XXXX (XXX) XXX-XXXX (865) 201-8568

BUILDING CODE

SUMMARY

WARNING!

THIS FACILITY IS USED IN FAA AIR TRAFFIC CONTROL. LOSS OF

HUMAN LIFE MAY RESULT FROM SERVICE INTERRUPTION. ANY

PERSON WHO INTERFERES WITH AIR TRAFFIC CONTROL, OR

DAMAGES OR TRESPASSES ON THIS PROPERTY WILL BE

PROSECUTED UNDER FEDERAL LAW.

GENERAL NOTES:

1. WORK THAT MAY INTERFERE WITH BUILDING OPERATIONS SHALL BE PERFORMED DURING NON-BUSINESS HOURS (22:00 TO 06:00) - SEE PHASING PLAN. CONTRACTOR'S

WORKING HOURS SHALL BE COORDINATED NOT LESS THAN THREE (3) WORKING DAYS IN ADVANCE AND APPROVED BY COR. NO WORK WILL BE ALLOWED OVER FEDERAL HOLIDAYS AND CONSTRUCTION MORATORIUMS ISSUED BY FAA AIR TRAFFIC MANAGEMENT. LISTING OF HOLIDAYS AND MORATORIUMS WILL BE COVERED IN THE

PRE-CONSTRUCTION MEETING.

2. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. DO NOT SCALE FOR EXACT LOCATIONS.

3. HEATING, VENTILATION AND AIR CONDITIONING SYSTEM (HVAC) SYSTEMS SHALL BE PROVIDED WITH ALL ANCILLARY COMPONENTS NECESSARY FOR COMPLETE AND FUNCTIONAL

USE AND OPERATION.

4. FIELD VERIFY EXISTING CONDITIONS AND COORDINATE WORK PLACEMENT WITH COR PRIOR TO ORDERING MATERIALS AND EQUIPMENT, FABRICATION, OR MAKING PERMANENT

INSTALLATION. CONTACT THE SSC MANAGER FOR ALL SITE-VISIT REQUESTS.

5. PROVIDE AND INSTALL PROVISIONS TO MITIGATE THE AFFECT OF THERMAL EXPANSION AND TRANSFER OF VIBRATIONS ASSOCIATED WITH MECHANICAL EQUIPMENT OR SYSTEMS. .

6. REPAIR BUILDING FINISHES THAT ARE AFFECTED BY THE WORK, TO INCLUDE BUT NOT LIMITED TO: WALLS, CEILINGS, FLOORING, ROOF, FACADE, PARKING SURFACES, PARTITIONS, DOORS, GLAZING, AND EXTERIOR GROUNDS IF DAMAGED, RESTORE TO MATCH SURROUNDINGS.

7. COORDINATE WITH FACILITY MAINTENANCE PERSONNEL TO LOCK-OUT / TAG-OUT EXISTING ELECTRICAL CIRCUITS PRIOR TO DEMOLITION OF RESPECTIVE HVAC EQUIPMENT, TO INCLUDE ASSOCIATED ELECTRICAL POWER FEED. ELECTRICAL CIRCUITS NOT REQUIRING COMPLETE DEMOLITION BACK TO PANEL SHALL BE PROPERLY TERMINATED IN A JUNCTION BOX AND INCLUDE REMOVAL OF ASSOCIATED CONDUIT BACK TO THE SAME POINT, SO LONG AS IT FACILITATES A CONTINUOUS WORKING CONDITION FOR THE

REMAINING ELECTRICAL SYSTEM.

8. COVER ALL OPEN DUCTS DURING CONSTRUCTION, AND PROTECT OR CLOSE IF ALLOWED, ANY OUTDOOR AIR OPENINGS THAT HAVE THE POTENTIAL TO INTRODUCE OBJECTIONABLE CONTAMINANTS, FUMES OR ODORS PRODUCED BY CONSTRUCTION RELATED ACTIVITIES INTO OCCUPIED SPACES. FURNISH AND INSTALL DISPOSABLE 'CONSTRUCTION FILTERS' (MERV 8 BLANKET OR ROLL FILTER MEDIA) ACROSS RETURN AIR INTAKES, IN ADDITION TO PERMANENT FILTERS OF OPERATIONAL AIR HANDLING UNITS.

9. SAFEGUARD FIRE ALARM AND SECURITY SYSTEMS FROM DAMAGE OR FALSE ALARMS PRIOR TO DOING ANY WORK. RESTORE SYSTEMS TO NORMAL OPERATION BEFORE LEAVING.

10. FIELD COORDINATE LAYOUT OF NEW EQUIPMENT FOR EASE OF ACCESS, TO AVOID OBSTRUCTIONS AND COMPLY WITH REQUIRED SERVICE-CLEARANCES.

11. HANG AND/OR SUPPORT DUCTWORK AND EQUIPMENT ONLY FROM STEEL JOISTS, AND ONLY FROM TOP CHORDS IF LOAD IS GREATER THAN 30 LBs.

12. LABEL ALL NEW EQUIPMENT, CONTROL DEVICES, AND ELECTRICAL POWER AS SPECIFIED.

13. NO ASBESTOS IS FORESEEN BEING IMPACTED BY CONSTRUCTION. TEST HIDDEN BUILDING ELEMENTS UNLESS INSTRUCTED OTHERWISE. SEE ENVIRONMENTAL CONCERN BELOW.

14. NO LEAD IS FORESEEN BEING IMPACTED BY CONSTRUCTION.

15. RESTROOM FACILITIES ARE AVAILABLE ON SITE AND USE IS PERMITTED SO LONG AS CONTRACTOR PERSONNEL EXERCISE CARE IN USING.

16. WATER (POTABLE AND NON-POTABLE) IS AVAILABLE ON SITE FOR CONTRACTOR USE. USE IS LIMITED TO ORDINARY BUILDING CONSUMPTION.

17. NORMAL BUILDING ELECTRICAL POWER MAY BE MADE AVAILABLE FOR CONTRACTOR USE ON A DAY-BY-DAY BASIS. COORDINATE NEED AT THE PRE-CONSTRUCTION MEETING.

18. THERE ARE NO DUMPSTERS OR DEBRIS DISPOSAL FACILITIES FOR CONTRACTOR USE. ALL PROJECT-GENERATED WASTE AND DEBRIS SHALL BE REMOVED OFF-SITE BY

CONTRACTOR MEANS.

19. ACCESS TO THE SITE REQUIRES PASSING THROUGH A SECURITY GATE. A DESIGNATED FAA ESCORT WILL ATTEND CONTRACTOR PERSONNEL TO AND FROM THE SITE ON A DAILY BASIS. COORDINATE ARRANGEMENTS AT THE PRE-CONSTRUCTION MEETING., TO INCLUDE EMERGENCY CONTACT AND NOTIFICIATION ALERTS.

20. DUE TO SECURITY REGULATIONS, NO FOREIGN NATIONALS WILL BE ALLOWED ON SITE WITHOUT A 30-DAY (CALENDAR) NOTIFICATION AND PRIOR APPROVAL. CONTACT THE SSC

MANAGER FOR ADDITIONAL INFORMATION.

International Mechanical Code

ENVIRONMENTAL WARNING:

WORK REVIEW REQUEST (WRR) SECM REMARKS:

1. ALL BUILDING MATERIALS ARE ASSUMED TO CONTAIN

ASBESTOS (ACM).

2. IF CONCRETE WALL CORED AN ACCREDITED ASBESTOS

INSPECTOR NEED TO CONFIRM/REFUTE THE PRESENCE OF

ASBESTOS INSULATION IN THE VOIDS (OF THE CONCRETE

BLOCK WALLS).

3. ALL PAINTED SURFACES. ANY DRILLING INTO FLOOR TILE

MUST BE PERFORMED USING THE ATTACHED SOPS ASSUMED

TO BE COATED WITH LEAD CONTAINING PAINTS (LCP).

4. ONLY PROPERLY TRAINED / CERTIFIED / LICENSED

PERSONNEL MAY IMPACT ACM AND LCP MATERIALS

5. IF CHEMICALS ARE USED, PLEASE PROVIDE SDS

NOTES :

1. * FAA LETTER OF AUTHORIZATION (LOA)

2. TYS ATCT is a United States Government-owned property of the Department of Transportation, Federal Aviation Administration (FAA). FAA engineer of record is the AUTHORITY HAVING JURISDICTION

(AHJ).

Name of Project: Knoxville ATCT (TYS) Cab HVAC Repairs

Address: Tyson McGhee Metropolitan Airport; 2055 Alcoa Hwy; Alcoa, TN 37701

Facility Type: Combined Air Traffic Control Tower (ATCT)

Owner/Contact Person: Knoxville SSC Phone: (865) 980-3053

DESIGNER'S NAME LICENSE #

Architectural

Electrical

Structural

Mechanical Donald Sprinkle, PE

Robert Blanchette FAA LOA*

FAA LOA* (404) 984-3954

(404) 293-1856

TELEPONE #

Applicable Codes:

Type Name Edition

Building Life Safety Life Safety

Life Safety

Accessiblity Mechanical Code Plumbing Code Gas Code Electrical Code Fire Prevention Energy Code International Energy Conservation Code

International Fire Code NFPA 70 - National Electric Code International Fuel Gas Code International Plumbing Code

ANSI 117.1

FAA Order 6930.1, Fire Prevention and Maintenance of Fire Protection Equipment

Alternate Standard for Fire Safety in Airport Traffic Control Towers 29 CFR 1960.17

NFPA 101 - Life Safety Code International Buidling Code 2018

Occupancy Classification, IBC and NFPA 101: BUSINESS

Fire

Civil -- -

IS

SU

ED

F

OR

ED

M

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

1/15/2025

SHANE HARVEY, PE

PLATFORM MANAGER, AJW-2E15B

APA

ALCOA

TYS-E-24016804-G002

DLS

DLS

KNOXVILLE ATCT CAB HVAC REPAIRS

HVAC DEMOLITION AND NEW WORK

fil e.

dw g

OPS INFRASTRUCTURE

ENGINEERING SERVICES

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

Is su e R ea so n

TYSON McGHEE METROPOLITAN AIRPORT

THIS DRAWING PRODUCED ON THEASO REGION CAD SYSTEM

DONALD SPRINKLE, PE

PROJECT ENGINEER, AJW-2E15B

24016804

TN

PHASING PLAN:

THE FOLLOWING IS A SUGGESTED PLAN FOR BASIS OF BID ONLY. ACTUAL ACTIVITIES, THEIR PRECEDENCE AND RELATIONSHIPS, SHALL BE PERFORMED ACCORDING TO CONTRACTOR'S CONSTRUCTION SCHEDULE AND FAA DISCRETION, TAKING INTO ACCOUNT AIR TRAFFIC OPERATIONS, BUILDING USE, WEATHER, AND UNFORSEEN CONDITIONS.

PROVIDE EMERGENCY TEMPORARY COOLING

1. PROVIDE, SET-UP, AND OPERATE A TEMPORARY BACK-UP AIR CONDITIONER: MINIMUM 1 EACH, 60,000 BthH, WATER-COOLED PORTABLE STAND ALONE AIR CONDITIONING

UNITS (SPOT COOLER). INCLUDE RESPECTIVE HOSE ATTACHMENTS, DUCTING, AND TEMPORARY ELECTRICAL WIRING BETWEEN AVAILABLE AHU POWER SOURCE AND UNIT.

REPAIR HVAC CONTROLS

2. INVESTIGATE AND REPAIR HVAC CONTROLS FOR OPERATION OF BOTH AHU-1 AND 2 WITH RESPECTIVE HPCU-1, 2, AUXILIARY ELECTRIC HEATERS, OUTDOOR AIR

ECONOMIZER, LEAD/LAG, AND FAIL-OVER.

3. COMPLETE BOTH SYSTEMS AND ESTABLISH RELIABLE OPERATION BEFORE PROCEEDING WITH OTHER WORK.

PREPARE AND APPROVE RIGGING PLAN AND TEMPORARY SUPPORT OF AHU-1

4. IDENTIFY SUITABLE SUPPORT POINTS

5. CHECK SUPPORT CAPACITY

6. PLAN FOR REDUNDANT BRACING

7. PRESENT PLAN TO FAA FOR APPROVAL

8. IMPLEMENT TEMPORARY SUPPORT OF AHU-1 FOR CONTINUOUS OPERATION

SELECTIVELY DISASSEMBLE NON-WORKING AHU AND DEMOLISH RESPECTIVE HPCU

9. LO/TO EXISTING HPCU-2 AND AHU-2.

10. RECOVER REFRIGERANT.

11. SELECTIVELY DEMOLISH AND DISPOSE OF HPCU-2

PREP FOR REINSTALLATION OF NEW HPCUs

1. MODIFY AND PAINT HPCU SUPPORT FRAME

2. INSTALL NEW ELECTRICAL DISCONNECTS AND PARTIALLY ROUTE NEW POWER AND CONTROL CONDUITS.

REPLACE NEW HPCU-2

1. SET UNIT

2. COMPLETE ELECTRICAL POWER WIRING

13. SPLICE EXISTING CONTROL WIRING AND EXTEND NEW TO UNIT.

REFURBISH AHU-2

25. PROVIDE AND INSTALL TEMPORARY SUPPORT SYSTEM FOR AHU-1 WHILE AHU-2 IS BEING WORKED ON.

26. SELECTIVELY DISASSEMBLE UNIT.

27. CLEAN DUCTWORK IN PLACE AND INSIDE OF UNIT

28. REPLACE CONDENSATE PAN

29. REPLACE FAN MOTOR, BELT, AND PULLEY

30. REPLACE DX COIL AND REASSEMBLE UNIT

31. ROUGH-IN NEW REFRIGERATION CIRCUIT WITH DEVICES BETWEEN AHU AND HPCU

32. INITIAL CHARGE AND LEAK TEST OF REFRIGERANT SYSTEM

33. REMOVE LO/TO OF AHU-2 AND HPCU-2. ENERGIZE UNITS.

34. START-UP, CHECK OUT, AND COMMISSION SYSTEM

REPEAT ABOVE FOR AHU-1 AND HPCU-1

SEAL GAPS AROUND WALL LOUVER IN MECHANICAL ROOM

36. PROVIDE SDS AND OBTAIN APPROVAL TO USE PROPOSED SEALANT PRIOR TO APPLICATION.

37. INSTALL BACKER ROD AND ELASTOMERIC SEALANT TO FILL GAPS AROUND WALL OPENING OF INTAKE/EXHAUST LOUVER.

COMPLETION AND CLEAN-UP

38. CLEAN-UP

39. CAI/JAI (PRE-FINAL AND FINAL INSPECTIONS) AND CLEAR PUNCH LIST

40. SYSTEMS TRAINING

41. O&M DOCUMENTS

42. AS-BUILTS

43. WARRANTIES LETTER

XFRMR ELEVATOR

DRUM

ELECTRONICS

POWER

POLE

FD

S

M M

M

H

G

F

E

D

C

B

A

8 1234567

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN REDLINE

DATE APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY DATE

DRAWING NO

DESIGNED

REVIEWED BY

$F

IL

E$ $D

AT

E$

$T

IM

E$ $N

AM

E$

APPROVED

DATE

8 23467 5

H

G

F

E

D

C

B

A

SCALE: 1/4" = 1'-0"

PART PLAN - MECHANCAI ROOM (WALKWAY LEVEL) NEW WORK

ME001

IS

SU

ED

F

OR

ED

M

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

1/15/2025

SHANE HARVEY, PE

PLATFORM MANAGER, AJW-2E15B

APA

ALCOA

TYS-E-24016804-ME001

DLS

DLS

KNOXVILLE ATCT CAB HVAC REPAIRS

HVAC DEMOLITION AND NEW WORK

fil e.

dw g

OPS INFRASTRUCTURE

ENGINEERING SERVICES

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

Is su e R ea so n

TYSON McGHEE METROPOLITAN AIRPORT

THIS DRAWING PRODUCED ON THEASO REGION CAD SYSTEM

DONALD SPRINKLE, PE

PROJECT ENGINEER, AJW-2E15B

24016804

TN

SCALE: 1/4" = 1'-0"

PART ROOF PLAN (INTERMEDIATE LEVEL) - NEW WORK

ME001

NOT TO SCALE

PICTURE - EXISTING AHU-1, 2

ME001

SCALE: 1/4" = 1'-0"

ELEVATION - REREFRIGERANT PIPE

ME001

EXA ABOVE OA

NOT TO SCALE

PICTURE - EXISTING HPCU-1, 2

ME001

EXISTING HVAC

CONTROL PANEL

1-3/8" S

3/4" L x2

32x24

HPCU-1 HPCU-2

1-3/8" S 3/4" L

1-1/8' S AND

5/8" L UP

EXISTING WALL CORES. SEE

9/ME001 IF NEW OR ADDITIONAL

WALL CORES ARE NEEDED.

1-1/8" S AND 5/8" L DOWN

HPCUs-1, 2

AP

PR

O

XI

M

AT

E

' L

IF

T

* BOTH LINE SETS: 1-3/8' SUCTION / 3/4"

LIQUID. NEW HPCU TUBING CONNECTIONS

ARE 1-1/8" SUCTION / 1/2" LIQUID. (2

TYPICAL)

SENSIBLE OA

1. INCLUDES FACTORY INSTALLED: ALUMINUM FIN/COPPER TUB COIL WITH LOUVERED HAIL GUARD

2. INCLUDES FACTORY INSTALLED LOW-AMBIENT HEAD PRESSURE CONTROL KIT FOR -20F OPERATION.

3. INCLUDES FACTORY INSTALLED SUCTION AND LIQUID LINE ISOLATION VALVES

4. INCLUDES FACTORY INSTALLED POWERED CONVENIENCE OUTLET

5. INCLUDES CONTRACTOR GUARANTEED 5-YEAR EXTENDED WARRANTY, TO INCLUDE OEM PARTS, LABOR, AND ANCILLARY REPAIR MATERIALS.

6. EXISTING CABINET AND FILTER FRAME TO BE RE-USED. EVAPORATOR COIL AND FAN ASSEMBLY TO BE RE-BUILT USING OEM PARTS.

TYPE BASIS OF DESIGN NOTES

HEAT PUMP CONDENSING UNIT SCHEDULE

TOTAL

MBHRPMHP

MIN

IN WG

ESP

TYPESERVESMARK

SUPPLY FAN COOLING

MBH

EAT

DB, F WB, F

EAT LAT LAT

WB, FDB, F

FILTRATION

% EFF % EFFCFM CFM

PRE POST

ELECTRICAL

AMPS

FLA,

AMPS

MOP,

AMPS

MCA,

VOLT PHASE HZ

HEATING

EAT

DB, F

LAT

DB, F TYPE

AUXILLIARY

ELECTRIC, KW

STEPS OF

CAPACITY

410-A 6AHU-1 CAB INDOOR HORIZONTAL DRAW THROUGH 1.0 2 3,460 102 92 80 67 - -3,200 120 2" - - - -208 1 60- - MERV-10-

410-A CARRIER 40BA009 300 6AHU-2 CAB INDOOR HORIZONTAL DRAW THROUGH 1.0 2 3,460 102 92 80 67 - -3,200 120 2" - - - -208 1 60- - MERV-10-

410-A CARRIER GEMINI 38AUQE12A0M5_0A2A0 HPCU-1 AHU-1 OUTDOOR AIR COOLED HEAT PUMP CONDENSER - - - 88 - 95 - - -- - - - - 44 50208 3 60- - --

410-A CARRIER GEMINI 38AUQE12A0M5_0A2A0 1HPCU-2 AHU-2 OUTDOOR AIR COOLED HEAT PUMP CONDENSER - - - 88 - 95 - - -- - - - - 44 50208 3 60- - --

- 2

EDH-2

EDH-1

HUMIDIFIER

ELPC ELPT NLPT

EF-3

AHU-1, 2

NOT TO SCALE

RISER DIAGRAM - REFRIGERANT PIPING

ME001

3 4 5

1 2 3 4 5

AHU-1, 2

NOT TO SCALE

ELEVATION - AHU-1, 2

ME001

AHU-1

AHU-2

NOTES:

1. INSTALL FLARED FITTINGS AT LIQUID LINE FILTER DRIER.

2. INSTALL BALL TYPE ISOLATION VALVES WITH SHRADER

FITTINGS TO COIL SIDE FOR BOTH EVAPORATOR AND

CONDENSER. TAKE CARE TO PLACE SHRADER ON

CORRECT SIDE TO ENABLE SERVICE WORK.

3. INSTALL EXTRA SHRADER VALVE SUCTION LINE BETWEEN

COILS.

4. INSTALL BALL TYPE ISOLATION VALVES WITH SHRADER

FITTINGS FOR BOTH ISOLATION AND BYPASS OF LIQUID

LINE FILTER DRIER.

5. *WARNING:

DOUBLE-CHECK ALL PIPING AND CONNECTION SIZES.

CONDENSING UNIT MANUFACTURER'S LITERATURE SAYS

1-1/8" SUCTION WITH 1/2" LIQUID; BUT VENDOR'S SELECTION

SAYS 1-1/4" SUCTION WITH 1/2" LIQUID, AND FREON-410A

SIZING TABLE SAYS 1-3/8" SUCTION AND 5/8 TO 3/4" LIQUID.

THEREFORE, EXPERTISE OF INSTALLING CONTRACTOR IS

IMPERATIVE FOR FINAL SIZING OF INSTALLED TUBING.

EVAPORATOR

SITE GLASS

BALL VALVE

WITH

SHRADER

FITTING

(TYPICAL)

TX VALVE WITH

REVERSING

CHECK VALVE

AND EXTERNAL

EQUILIZATION

CONDENSER

32x24

24x1624x18

24x18

R

S

NOTES:

1. LO/TO AHU-1 AND 2.

2. TEMPORARILY RELOCATE AND RE-WIRE AHU-1 SAFETY DISCONNECT SWITCH TO BE OUT OF WAY OF AHU-2 REMOVAL.

3. REMOVE AHU-2 SAFETY DISCONNECT SWITCH. SALVAGE FOR RE-USE.

4. TEMPORARILY SUSPEND AHU-2 SUPPLY TRUNK FROM BELOW BACKDRAFT DAMPER.

5. REMOVE AHU-2 HUMIDIFIER AND DUCT HEAER. SALVAGE FOR RE-USE.

6. REMOVE AHU-2 SUPPLY TRUNK FROM BACKDRAFT DAMPER TO UNIT - DO NOT REMOVE BACKDRAFT DAMPER. BLANK OFF OPEN DUCT.

7. SUSPEND AND SUPPORT AHU-1 INDEPENDENT OF EXISTING SUPPORT STAND. HANG FROM FLOOR DECK ABOVE; USE WALL ANCHORS

AND FLOOR STANDS; BUT MUST CREATE CLEARANCE TO SLIDE AHU-2 AND SUPPORT STAND FORWARD AND CLEAR OF AHU-1.

8. ENTER MIXED AIR CHAMBER FROM ACCESS HATCH ON SIDE AGAINST WALL. REACH TRHOUGH AHU-2 FILTER SECTION AND DETACH

COIL/BLOWER SECTION.

9. SLIDE ENTIRE AHU-2 COIL/BLOWER SECTION WITH SUPPORT FRAME FORWARD UNTIL ENOUGH CLEARANCE TO REMOVE COIL. INSTALL

NEW COIL AND REVERSE STEPS. SUBSTITUTE NEOPRENE EQUIPMENT PADS AND PRESSURE TREATED LUMBER TO RE-SUPPORT AHU-2

OFF FLOOR.

10. REVERSE STEPS TO RE-INSTALL AHU-2 BACK TO OPERATION.

11. AHU-1 COIL CAN BE REMOVED AND REPLACED FROM TOP.

LIQUID LINE SOLENOID VALVE

AND LINE VOLTAGE TO HPCU

POWER AND CONTROL CIRCUIT

LIQUID FILTER DRIER W/

BYPASS AND FLARED FITTINGS

LL*

SL*

12 (TYPICAL)

5/8" TO 3/4"

REDUCER

(TYPICAL)*

NOT TO SCALE

PARTIAL ONE-LINE DIAGRAM - ELECTRICAL INSTALLATION

ME001

EXISTING PANEL 'ELPT' 175A MCB 208 3PH 4W

NEW 3-#6 AWG, #10 GND;

EXISTING 1" EMT/RGS CONDUIT

(TYPICAL 2)

NEW THWN 3-#6

AWG, #10 GND; NEW

1" RGS (TYPCIAL 2)

HPCU-1

EXISTING

BREAKER 3 (7,

9, 11) 60A 3P

NOTES:

1. WALL-MOUNTED DISCONNECTS. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. BOND AND GROUND RACEWAY PER FIGURE 7 OF FAA STD-019F-CHG 3

3. NEW WIRING TO HPCU-1, 2 MUST BE THWN, AND COLOR CODED FOR PHASE AND VOLTAGE.

EXISTING

BREAKER 5 (13,

15, 17) 20A 3P

EXISTING 3-#12 AWG,

#12 GND; EXISTING

3/4" EMT (TYPICAL 2)

DS

HPCU-2

EXISTING

BREAKER 4 (6,

8, 10) 60A 3P

DS

AHU-1

AHU-1 HPCU-2

DS

HPCU-1

DS

AHU-2

AHU-2

EXISTING 3-#12 AWG,

#12 GND; EXISTING

3/4 EMT (TYPICAL 2)

EXISTING

BREAKER 6 (12,

14, 16) 20A 3P

NOT TO SCALE

DETAIL - WALL PENETRATION

ME001

NOTES:

1. ALL HOLES MADE THROUGH CONCRETE OR MASONRY WALLS

SHALL BE NEATLY CORED USING DIAMOND BIT WET METHOD.

2. MASK AND PROTECT FINISHED SURFACES PRIOR TO FILLING

ANNULAR SPACE.

USE PVC SLEEVE

GROUTED IN PLACE

IF WALL HAS VOIDS

ANNULAR FILL:

MINIMAL EXPANDING

FIRE RETARDANT

POLYURETHANE FOAM

OR ELASTOMERIC

SEALANT

CARRIER

WALL ESCUTEON

(ALL EXPOSED

FACES)

HPCU-2

NOT TO SCALE

ELEVATION - HPCU-1, 2

ME001

LAYOUT AND SET NEW HPCUs ON

EXISTING SUPPORT FRAME.

HOWEVER, EXTEND FRAME AS

NEEDED TO SPACE UNITS FOR

SUFFICIENT MAINTENANCE

CLEARANCE PER MANUFACTURER

RECOMMENDATIONS.

NEW THWN 3-#6 AWG,

#10 GND; NEW 1" LFMC

(TYPCIAL 2)

SET NEW J-BOX AND

SPLICE EXISTING

CONTROLS WIRING TO

NEW FROM THIS POINT

TO HPCUs

KEY NOTES:

POINT OF DEMOLITION OF EXISTING ELECTRICAL DISCONNECTS AND POWER FEEDS

TO HPCU-1, 2. DO NOT DISTURB EXISTING CONDUITS THROUGH ROOF PENETRATIONS.

NEW TYPE 'L' ACR SEAMLESS COPPER REFRIGERANT TUBING COMPLYING WITH ASTM

B280 OR ASTM B819, AND SUCTION AND LIQUID LINE FILTER DRIERS WITH

COMBINATION ISOLATION SERVICE VALVES AND BYPASSES. FILTER DRIER

CONNECTIONS MUST BE FLARED. SEE PIPING DIAGRAM 6/ME001. NOTE: MAY

SALVAGE AND RE-USE IN PLACE EXISTING REFRIGERANT TUBING IF SIZE, CONDITION,

AND FLUSH IS DEEMED ACCEPTABLE BY ENGINEER OF RECORD, AND CONTRACTOR

ASSUMES WARRANTY OF EXISTING TUBING AND CONNECTIONS FOR A COMPLETE

WARRANTY OF ENTIRE REFRIGERATION SYSTEM.

NEW ELECTRICAL SAFETY DISCONNECTS AND OUTDOOR POWER FEEDS TO HPCU-1, 2.

SEE WIRING DIAGRAM 8/ME001 AND FAA STD-19F CHG-3 FIGURE 7. THE NEW

DISCONNECTS MUST BE WALL MOUNTED. LAY-OUT ROUTE OF NEW CONDUIT AND

WIRING TO ACCOMMODATE CONNECTION TO EXISTING CONDUITS THROUGH ROOF

AND BACK TO UNITS WITHOUT BLOCKING MAINTENANCE OR CAUSING A TRIP HAZARD.

INCLUDE ADDITIONAL WEATHER-PROOF PULL BOXES AS NEEDED.

NEW THWN WIRE IN RGS CONDUIT FOR POWER FEEDS TO HPCU-1, 2. ROUGH-IN SAME

SIZE AS EXISTING. ROUTE ON SAME SUPPORTS AS REFRIGERANT TUBING. PROVIDE

LIQUID-TITE METAL FLEX CONNECTION AT CONNECTIONS TO UNITS. SEE WIRING

DIAGRAM 8/ME001

NEW 18/8 CONTROL WIRING IN RGS CONDUIT TO HPCU-1, 2. ROUGH-IN BETWEEN

CONVENIENT POINT OF CONNECTION INSIDE TOWER, THROUGH WALL AND TO

RESPECTIVE UNITS. INCLUDE WEATHER TIGHT PULL BOXES AND RIGID CONDUIT,

PROVIDE LIQUID-TITE METAL FLEX AT CONNECTIONS TO UNITS.

INSULATE REFRIGERANT SUCTION LINES WITH 3/4" THICK, NEOPRENE RUBBER PIPE

INSULATION. JACKET WITH 24 GAUGE GALVANIZED STEEL OR ALUMINUM WITHIN 8' OF

FINISHED FLOOR OR ROOF. USE PREFABRICATED JACKETING AND INSTALL PER

MANUFACTURER RECOMMENDATIONS.

HPCU-1

ROUGH-IN NEW POWER FEEDS

THROUGH EXISTING CONDUIT AND

ROOF PENETRATIONS BETWEEN

PANEL MDPE AND NEW

WALL-MOUNTED DISCONNECTS.

EXISTING ROOF

PENETRATIONS (TYPICAL 2)

NEW PULL BOX - CONNECT TO

EXISTING CONDUIT (TYPICAL 2)

NEW 1" RGS (TYPICAL 2)

- EXTERIOR CONDUIT

MUST BE RIGID.

GENERAL NOTES:

1. PROPERLY SAFE EXISTING ELECTRICAL CIRCUITS AFFECTED AND UNTIL CONNECTED

EQUIPMENT IS APPROVED FOR ENERGIZING.

2. FIELD VERIFY EXISTING CONDITIONS PRIOR TO ORDERING NEW AHU COMPONENTS.

VARIATIONS IN LAYOUT AND SIZING ARE ALLOWED PENDING ENGINEER OF RECORDS

APPROVAL.

3. MAINTAIN EGRESS AND ELEVATOR ACCESS TO AND FROM CAB AT ALL TIMES. PROTECT

WALL, CEILING, AND FLOOR FINISHES THROUGHOUT THE PROJECT. RESTORE

DAMAGED FINISHES TO MATCH SURROUNDING SURFACE.

4. MEASURE AND RECORD AIR FLOWS OF REFURBISHED AHUs - 3,150 CFM MINIMUM IS

ACCEPTABLE. BALANCING IS NOT REQUIRED.

5. FOREWARN OCCUPANTS PRIOR TO MAKING LOUD NOISES, FUMES, ODORS, OR

VIBRATIONS. USE CONSTRUCTION FILTERS IN AHU DURING WORK - REPLACE WITH NEW

FILTERS AFTER COMPLETION AND CLEAN-UP, BUT BEFORE TEST AND BALANCE. COVER

OPEN DUCTS DURING CONSTRUCTION.

6. SAFEGUARD ELEVATOR MACHINERY AND ELECTRONIC CABINETS BEFORE STARTING

WORK.

1 (TYPICAL)

3 (TYPICAL)

ME001

REQUIRED LINE SIZES

MAY BE 1-3/8" SUCTION

/ 3/4" LIQUID. HOWEVER,

NEW HPCU TUBING

CONNECTIONS ARE

1-1/8" SUCTION / 1/2"

LIQUID. SEE 6/ME001

NOTE 5.

NEW 100A, SS NEMA 4X

'HEAVY DUTY' FUSED

240VAC RATED, 3-PHASE,

3-POLE, DOUBLE LUG KIT;

SCHNEIDER ELECTRIC

MODEL VH364SSGL; FUSE

WITH FERRAZ MODEL TR,

50A, 208V, 200KA

INTERRUPTING CAPACITY,

OR APPROVED

EQUIVALENT - 9 EACH

INCLUDING SPARES.

(TYPICAL 2)

EXISTING PANEL 'MDPE' 600A MCB 208 3PH 4W

CARRIER 40BA009 300

EXISTING DISCONNECT

30A, NEMA 1 'HEAVY

DUTY' FUSED 240VAC

RATED, 3-PHASE,

3-POLE; 20A FUSED

(TYPICAL 2)

NOTE:

1. DO NOT FORGET TO PUT GROUNDING BUSHINGS AND PROPER

LOCKNUTS ON CONDUIT ENTRIY POINTS - SEE DETAIL ABOVE.

WARNING: EPLACEMENT

OF AHU-2 COIL WILL

REQUIRE REMOVAL OF

UNIT OUT FROM UNDER

AHU-1 AND SUPPORT

FRAME. CAREFULLY

PLAN FOR RIGGING AND

TEMPORARY SUPPORT

OF AHU-1 SO THAT IT

REMAINS IN OPERATION

WHILE WORK IS DONE TO

AHU-2.

WARNING: DO NOT

DISTURB BACK-DRAFT

DAMPERS - BE SURE

THEY REMAIN IN PLACE IF

DUCTWORK REQUIRES

REMOVAL.

CAB TRAP DOOR

FIELD INSTALLED

LIQUID-SUCTION

SUB-COOLER

H

G

F

E

D

C

B

A

8 1234567

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN REDLINE

DATE APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY DATE

DRAWING NO

DESIGNED

REVIEWED BY

$F

IL

E$ $D

AT

E$

$T

IM

E$ $N

AM

E$

APPROVED

DATE

8 23467 5

H

G

F

E

D

C

B

A

IS

SU

ED

F

OR

ED

M

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

DO NOT SIGN

1/15/2025

SHANE HARVEY, PE

PLATFORM MANAGER, AJW-2E15B

APA

ALCOA

TYS-E-24016804-ME002

DLS

DLS

KNOXVILLE ATCT CAB HVAC REPAIRS

HVAC CONTROLS

fil e.

dw g

OPS INFRASTRUCTURE

ENGINEERING SERVICES

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

Is su e R ea so n

TYSON McGHEE METROPOLITAN AIRPORT

THIS DRAWING PRODUCED ON THEASO REGION CAD SYSTEM

DONALD SPRINKLE, PE

PROJECT ENGINEER, AJW-2E15B

24016804

TN

M

T

RA

DO DI

SEQUENCE OF OPERATION:

START / STOP

HPCUs-1 AND 2: STARTED AND STOPPED AUTOMATICALLY RESPECTIVE OF PAIRED AHU. A COMPRESSOR CYCLES

DEPENDING ON COOLING AND HEATING REQUIREMENT.

AHUs-1, 2: STARTED AND STOPPED BY PROGRAMMABLE LEAD/LAG CONTROLLER WITH 'FAILURE' CHANGE-OVER.

OPERATING UNIT RUNS CONTINUOUSLY: 7-DAYS PER WEEK, 24-HOURS PER DAY, INCLUDING

WEEKENDS AND HOLIDAYS. SEQUENCING AND SCHEDULE ARE ADJUSTABLE.

COOLING

HPCUs-1, 2: IF COOLING SUPPLY AIR TEMPERATURE IS GREATER THAN SET-POINT, THEN HEAT PUMP SHALL RUN IN COOLING MODE AND CYCLE COMPRESSOR TO INCREASE COOLING UNTIL SET-POINT MET. ACTION

SHALL REVERSE AS SPACE AIR TEMPERATURE IS SATISFIED.

A 4 F (AFG) DEADBAND SHALL EXIST BETWEEN COOLING AND HEATING SUPPLY AIR SET-POINTS TO

PREVENT RESPECTIVE ACTIONS FROM HAPPENING SIMULTANEOUSLY.

COMPRESSOR HAS 2-STAGE OPERATION FROM 50 TO 100%. COMPRESSOR SOLENOID VALVE

UNLOADS COMPRESSOR TO PROVIDE STAGED OPERATION.

OUTDOOR AIR ECONOMIZER (FREE COOLING)

'OUTDOOR AIR ECONOMIZING' WILL INTRODUCE VARIABLE RATES OF OUTDOOR AIR TO MAINTAIN AN ENTERING MIXED AIR SET-POINT OF 60 F (ADJUSTABLE) WHEN OUTDOOR AIR TEMPERATURE IS LESS THAN (60 F ADJUSTABLE). OUTDOOR AIR DAMPER WILL CLOSE TO MINIMUM SETTING IF ENTERING

MIXED AIR TEMPERATURE REACHES 55 F.

HEATING

HPCUs-1, 2: IF SPACE AIR TEMPERATURE IS LESS THAN SET-POINT, THEN HEAT PUMP SHALL RUN IN HEATING

MODE AND CYCLE COMPRESSOR TO MEET SET-POINT.

IF SPACE TEMPERATURE IS LESS THAN SET-POINT AND HEAT PUMP IS OPERATING IN HEATING MODE, THEN AUXILIARY ELECTRICAL RESISTANCE HEATING ELEMENT SHALL ENERGIZE ACCORDINGLY AND HEAT SUPPLY AIR IN STAGES TO NOT LESS THAN 90 F, OR MORE THAN 110 F . ACTION SHALL

REVERSE AS HEATING SET POINT TEMPERATURE IS SATISFIED.

A 4 F (AFG) DEADBAND SHALL EXIST BETWEEN HEATING AND COOLING SUPPLY AIR SET-POINTS TO

PREVENT RESPECTIVE ACTIONS FROM OCCURRING SIMULTANEOUSLY.

VENTILATION

AHUs-1, 2: OUTDOOR AIR (OA) VENTILATION CONTROL IS SPRING CLOSED AND MOTOR OPEN. EXHAUST, MIXING, AND INTAKE AIR DAMPERS ARE CONTROLLED COLLECTIVELY BUT OPERATED

INDEPENDENTLY, USING INDIVIDUAL ACTUATORS. OA DAMPER SHALL BE INTERLOCKED TO OPEN TO

MINIMUM SETTING IF EITHER AHU IS RUNNING, AND CLOSE IF STOPPED. MINIMUM OUTDOOR

VENTILATION RATE IS 100 CFM, AND SHALL BE SET BY TEST & BALANCE.

SAFETIES

1. DE-ENERGIZED UNIT SHALL NOT SOUND ALARMS.

2. 'DIRTY FILTER': RETURN AIR FILTER SHALL BE MONITORED FOR EXCESSIVE DIFFERENTIAL PRESSURE. IF PRESSURE DROP IS GREATER THAN 'MAXIMUM' ALLOWABLE (ADJUSTABLE), THEN 'DIRTY FILTER' ALARM SHALL BE SENT. HOWEVER, 'DIRTY FILTER' CONDITION SHALL NOT BE HARD-WIRED INTERLOCKED TO STOP FAN - ONLY MONITOR AND SEND ALARM. NOTE: ANALOG INPUT READING OF 'MAXIMUM' ALLOWABLE DIFFERENTIAL PRESSURE MUST BE CORRELATED TO NORMAL AIRFLOW DURING TEST &

BALANCE.

3. FAN MOTOR PROVING: FAN MOTORS SHALL BE MONITORED FOR 'FAN FAILURE' BY BY ON-BOARD CONTROLLER USING CURRENT SENSOR ON MOTOR CIRCUIT, DIFFERENTIAL PRESSURE SWITCH ACROSS FILTER, AND/OR STATIC PRESSURE SENSOR IN SUPPLY DUCTWORK. IF MOTOR AMPERAGE IS LESS THAN NORMAL (ADJUSTABLE) AND PRESSURE DIFFERENCES ARE ZERO, THEN 'FAN FAILURE' ALARM SHALL BE SENT. NOTE: ANALOG INPUT FOR CURRENT COMPARISON MUST BE CORRELATED TO NORMAL DURING

TEST & BALANCE.

4. CONDENSATE PAN OVERFLOW: ALL UNITS SHALL HAVE INTEGRAL 'CONDENSATE' PAN OVERFLOW SWITCHES THAT SHALL ALARM IF WATER IS DETECTED IN CONDENSATE HI-LEVEL OUTLET OR AUXILIARY CONDENSATE OVER FLOW PAN.

5. HI-TEMPERATURE: IF SPACE OR RETURN AIR TEMPERATURE IS 5 F (AFG) ABOVE SET-POINT, THEN 'HI-TEMP' ALARM IS SENT.

6. LEAD/LAG CONTROL: AHU-1 AND 2 SHALL BE MONITORED FOR LEAD/LAG CONTROL AND EMERGENCY FAIL OVER. IF LEAD UNIT EXPERIENCES FAILURE OR HI-TEMPERATURE ALARM, THEN LAG UNIT SHALL BE ENERGIZED AND PREVIOUS LEAD DE-ENERGIZED.

7. EMERGENCY OUTDOOR AIR SHUT-OFF: AHU-1 AND 2 OUTDOOR VENTILATION SHALL BE EQUIPPED WITH MOTORIZED DAMPER CONTROL TO OVER-RIDE 'DAMPER-OPEN' COMMAND AND FULLY CLOSE DAMPER IF ACTIVATED. EMERGENCY OUTDOOR AIR SHUT-OFF SHALL BE MANUALLY CONTROLLED BY A PROTECTED 'EMERGENCY OFF' SWITCH LOCATED IN CAB.

8. FIRE: AHUs-1 AND 2 ARE A;READU EQUIPPED WITH SMOKE 'DUCT' DETECTORS IN SUPPLY AIR STREAM. EXISTING UNIT FIRE ALARM SEQUENCE SHUTS DOWN UNIT IF SMOKE IS DETECTED. MANUAL RESET IS REQUIRED IN EVENT OF ALARM.

CAB HVAC CONTROL PANEL

QUAD CITY CONTROL COMPANY

3110 HENSON ROAD SUITE-12; KNOXVILLE, TN 37921

POCs: TEDDY WAYLAND, OPS MANAGER / GARY GRINDER, APP ENGINEER

GENERAL NOTES ON INSTALLING LOW VOLTAGE WIRING:

1. ALL LOW-VOLTAGE CONTROL WIRING NOT IN METAL CONDUIT

SHALL BE PLENUM RATED.

2. ROUTE ALL LOW-VOLTAGE CONTROL WIRING PARALLEL AND

PERPENDICULAR TO BUILDING AXIS.

3. INCLUDE SERVICE LOOPS AT ALL CHANGES OF DIRECTION.

4. DO NOT SUPPORT OR HANG LOW VOLTAGE WIRING FROM

NON-PERMANENT FIXTURES OR BUILDING ELEMENTS.

5. USE ONLY IEEE APPROVED DEVICES FOR HANGING

LOW-VOLTAGE CABLE.

90°

90°

EXAMPLE

M

S

M

SP

DIFF

EXA

M

DIRTY

FILTER

EA

OA

M

M

M

S

OSI

D

T

SA

EA

SP

DIFF

AHU-1 INDOOR

AHU-2 INDOOR

HPCU-2 OUTDOOR HPCU-1 OUTDOOR

T

EA

AI AIAIDO DO DO DO DO DO DO DODI

DIRTY

FILTER

S

E

ENCAPSULATED RELAY

FAN

STARTER

36"

MAX

DUCT 'SMOKE'

DETECTOR

REMOTE

INDICATOR

SUPPLY

AIR DISCHARGE

1. MOUNT DUCT SENSOR RELAY WITHIN

3' OF THE DEVICE BEING CONTROLLED

PER NFPA 72.

2. ASSIGN A UNIQUE ADDRESS TO EACH

INITIATING DEVICE.

EXISTING

FACP

S E

EXISTING

FACP

INTERFACE SUPERVISED

ALARM CIRCUIT WITH

EXISTING FIRE ALARM

SYSTEM

ZAM

FAN POWER

CONTROL

RA

SA

SA

MANUAL

DISCONNECT

MANUAL

DISCONNECT

MANUAL

DISCONNECT

MANUAL

DISCONNECT

AI

T

SPACE TEMPERATURE

SENSOR (8 TYPICAL)

E

DI

EMERGENCY

SWITCH

R

R

R

S

BI-DIRECTIONAL

SOLENOID

VALVE

S

BI-DIRECTIONAL

SOLENOID

VALVE

GENERAL NOTS:

1. THIS CONTROL DIAGRAM IS ONLY A REPRESENTATION OF THE EXISTING CONTROLS SYSTEM AS

IT WAS ORIGINALLY INTENDED TO FUNCTION. THE ACTUAL CONTROL POINTS AND

PROGRAMMING MUST BE REPAIRED TO THE SAME.

2. DETAILED KNOWLEDGE OF THE SYSTEM MUST OBTAINED FROM THE ORIGINAL INSTALLER. ANY

MISSING DEVICES OR SEQUENCES OF OPERATION THAT PREVENT IMPLEMENTING THIS

DESCRIPTION MUST BE BROUGHT TO THE ATTENTION OF THE FAA ENGINEER OF RECORD FOR

RESOLUTION PRIOR TO INVESTING FURTHER TIME AND MONEY BEYOND INITIAL DISCOVERY.

3. THIS IS INTENDED TO BE ONLY REPAIR WORK, AND SOLE-SOURCED TO THE ORIGINAL

INSTALLER. DO NOTHING TO THE EXISTING CONTROLS SYSTEM THAT WILL CAUSE AN

IRREVERSIBLE CONDITION THAT MIGHT JEOPORDIZE SAFE AND ADEQUATE HEATING AND

COOLING.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Sheets and Views
Layout1
3f Drawings 2.pdf
Sheets and Views
Layout1
3f Drawings 3.pdf
Sheets and Views
Layout1
3f Drawings 4.pdf
Sheets and Views
Layout1

File details come from the government source that posted it. Updated .