3Existing Site Photos.pdf
PDF 468 KB Posted
- Attached to
- PMAA, RMHI, Vault Toilet Replacement
- Solicitation number
- DQ1 PMAA 2015000262 4
- Issued by
- Colorado
About this file
This file contains existing site photographs for the Highline Lake State Park vault toilet replacement project. The project involves the demolition and removal of an existing vault toilet structure and its replacement with a new CXT Double Vault Toilet model designated as TIOGA. The photographs document the current site conditions and identify specific locations where work activities will occur, including areas where concrete removal is required to prepare the site for the new facility installation.
The documentation serves as a visual reference for bidders and contractors to understand the existing conditions at Highline Lake State Park and the scope of demolition and removal work that must be completed prior to installation of the replacement vault toilet system. These site photos provide essential baseline information for contractors to develop accurate bids and project schedules for the vault toilet replacement initiative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-HIGHLINE- Vault Toilet ReplacementR.pdf | ||
| 2Highline Lake DrawingsSET.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ryans Callout Existing Vault Toilet Structure to be demolished and removed from the site.
Ryans Callout New CXT Double Vault Toilet (TIOGA) to be located here
Ryans Callout Start removal of concrete
Ryans Callout Start removal of concrete
Ryans Text Box
HIGHLINE LAKE STATE PARK - VAULT TOILET REPLACEMENT
Ryans Callout Existing Vault Toilet structure to be demolished and removed from the site.
Line
Ryans Line
Line
File details come from the government source that posted it. Updated .