2Highline Lake DrawingsSET.pdf

PDF 1 MB Posted

Attached to
PMAA, RMHI, Vault Toilet Replacement
Solicitation number
DQ1 PMAA 2015000262 4
Issued by
Colorado

About this file

This document set contains architectural and engineering drawings for the Highline Lake State Park vault toilet replacement project. The project involves the demolition of existing facilities and installation of new infrastructure at the main parking area. The scope of work includes removal of the existing vault toilet structure, removal of existing concrete sidewalks, installation of a new 5-inch, 6-foot-wide concrete sidewalk that reconnects to existing sidewalks and transitions to the new vault toilet entrance, and installation of a new fully functional precast concrete vault toilet (CXT Tioga Double model). The drawings include a demolition plan, site plan, and grading plan, with provisions for field staking of the finished floor elevation for the proposed vaulted restroom by the State's representative.

The drawings are not to scale and serve as design specifications for the project. The document set includes multiple plan views showing the configuration of the main parking area improvements and the spatial relationship between the new sidewalk and restroom facilities. No specific pricing information, bidding deadlines, contract terms, or funding details are contained within these architectural drawings.

View the file

Other files

File Type Posted
1-HIGHLINE- Vault Toilet ReplacementR.pdf PDF
3Existing Site Photos.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ryans Callout Remove existing Vault Toilet Structure

Ryans Callout Remove existing concrete sidewalk

Ryans Callout Remove existing concrete sidewalk

Ryans Line

Ryans Line

Ryans Line

Ryans Text Box Install new 5”, 6'-0 concrete sidewalk, reconnecting to existing sidewalk. Transition new sidewalk to Vault Toilet entrance.

Callout Install new fully functional precast concrete vault toilet CXT Tioga (Double)

Ryans Text Box Highline Lake State Park - Vault Toilet Replacement

Demolition Plan

MAIN PARKING AREA/

INSTALL NEW 6'-0 CONCRETE SIDEWALK

Finished floor elevation for the proposed vaulted restroom shall be staked in the field by the State's representative.

GRADING PLAN

NOT TO SCALE

Highline Lake State Park - Vault Toilet Project

Ryans Line

Ryans Rectangle

Ryans Line

Ryans Line

Ryans Line

Ryans Line

Line

6Highline Lake Drawings
6Highline Lake Site Plan
6Highline Lake Grading Plan
6HighlineDirections

Tioga_CADS

File details come from the government source that posted it. Updated .