4-Addendum 1.pdf

PDF 483 KB Posted

Attached to
Hamlin Lake Park Improvements Project Phase 2, Contract No. 2025-01
Solicitation number
US.195668
Issued by
Lycoming County, Pennsylvania

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SMETHPORT BOROUGH

HAMLIN LAKE PARK IMPROVEMENTS PROJECT PHASE 2

CONTRACT NO. 2025-01

JULY 30, 2025

ADDENDUM NO. 1

This addenda material is hereby made a part of the contract. Please note the changes, additions, deletions, information, and instructions contained herein, and submit bid and be otherwise governed accordingly.

Bidders shall acknowledge receipt of this addendum on their Bid Form. Failure to do so could result in rejection of bid.

Bids will still be received and opened in PennBid as stated in the Advertisement For Bids.

Addendum No. 1 consists of seventy-two (72) pages, including this cover page and seventy-one (71) pages of the following architectural specifications:

• Architectural Specifications

Daniel J. Beyer, P.E.

Project Manager

The EADS Group, Inc.

END OF ADDENDUM NO. 1

R:\7474 Smethport Boro\24640 Hamlin Lake Park Restroom\09 Construction\Advertised Plans\2025-07-30 Addendum #1

NEW BUILDING FOR

HAMLIN PARK RESTROOMS

MCKEAN COUNTY, PA

JULY 24, 2025

INDEX

MCKEAN COUNTY, PA

SECTION NO:

00010 INDEX

PROJECT SPECIFICATIONS

DIVISION 1 – GENERAL REQUIREMENTS

01010 SCOPE OF WORK – GENERAL CONSTRUCTION

DIVISION 2 – SITEWORK

02200SF EARTHWORK

02520 CONCRETE SIDEWALKS & CURBS

02930 SEEDING & MULCHING

DIVISION 3 – CONCRETE

03300 CAST-IN-PLACE CONCRETE

DIVISION 4 – MASONRY

04220 MASONRY

04230 UNIT MASONRY REINFORCEMENT

04270 GLASS UNITS MASONRY

DIVISION 5 – METALS

05700 ORNAMENTAL METAL

DIVISION 6 – WOOD & PLASTICS

06100 ROUGH CARPENTRY

06190 PREENGINEERED WOOD TRUSSES

06200 FINISH CARPENTRY

DIVISION 7 – THERMAL & MOISTURE PROTECTION

07411 FORMED METAL ROOF PANELS

07463 EXTERIOR PLYWOOD TI-11 VERTICAL SIDING

07600 FLASHING & SHEET METAL

07632 SOFFIT & FASCIA

07635 GUTTER & DOWNSPOUT

07900 SEALANTS & CAULKING

DIVISION 8 – DOORS & WINDOWS

08100 METAL DOORS & FRAMES

08218 INSULATED METAL DOORS

08700 HARDWARE

DIVISION 9 – FINISHES

09900SF PAINTING

DIVISION 10 – SPECIALTIES

10800 TOILET & BATH ACCESSORIES

DIVISION 15 – PLUMBING & MECHANICAL

15400SF PLUMBING

DIVISION 16 – ELECTRICAL

16050SF ELECTRICAL

16500SF LIGHTING

END OF SECTION

7.25-25 SECTION 00010-2

DIVISION NUMBER

GENERAL

REQUIREMENTS

GENERAL CONSTRUCTION

INCLUDING SITE, MECHANICAL, PLUMBING & ELECTRICAL

NEW CONSTRUCTION FOR HAMLIN LAKE PARK RESTROOMS

113 WEST WILOW STREET, SMETHPORT, PA

GENERAL DESCRIPTION AND SCOPE OF WORK

SECTION 01010

PART 1 – GENERAL

1.01 SCOPE

A. The work to be done under this Contract consists of furnishings of all services, equipment, materials and labor necessary to complete the construction. And as more particularly set forth in the drawings, specifications and other contract documents.

B. The work shall include all work generally accepted as “General Construction” and including, Site, Mechanical, Plumbing and Electrical Construction as indicated on the drawings and/or specified.

1.02 DRAWINGS AND SPECIFICATIONS

A. The work shall be executed in accordance with the drawings and specifications. The drawings and specifications, which will be, if required, supplemented and explained by scale and full size details, diagrams, etc., and further by directions and instructions of the Architect.

1.03 The Contractor will be required to visit the site to verify all existing conditions.

PART II – PROJECT

2.01 GENERAL

A. Building permit and zoning permit by Owner, building is located in Smethport Borough, McKean

County, Pa.

2.02 SITEWORK

A. General Contractor to perform all necessary excavation and back filling as required for the building and site work.

2.03 CONCRETE WORK

A. General Contractor to furnish and install concrete footings as indicated in the construction documents.

B. General Contractor to furnish and install a concrete slab on grade as indicated in the construction documents. Concrete slab to be a minimum 4” thick of 3500 psi mix with one (1) layer of 6x6-10/10

WWF on one (1) layer of 6mil visqueen over 4” minimum of crushed stone. All concrete floors to be sealed with CS 309 sealer or equal.

C. General Contractor to furnish and install concrete sidewalks and handicapped ramps as indicated in the construction documents.

2.04 MASONRY

A. General Contractor to furnish and install concrete block with steel truss type reinforcement for the foundation and walls, as indicated in the construction documents.

B. General Contractor to parge and waterproof all block below grade with Thoroseal as indicated in the construction documents.

C. General Contractor may at their discretion furnish & install poured in place concrete foundation walls in lieu of concrete masonry walls.

D. General Contractor to furnish and install rebar in masonry walls and fill solid with grout as noted on the drawing.

E. General Contractor to furnish and install unit glass block as indicated on the drawings per manufacturers directions.

NEW CONSTRUCTION FOR HAMLIN LAKE PARK RESTROOMS

113 WEST WILOW STREET, SMETHPORT, PA

SECTION 01010-1

2.05 METALS

A. General Contractor to furnish and install all miscellaneous metal as required and as noted in the construction documents.

2.06 WOOD AND PLASTICS

A. General Contractor to furnish and install pre-engineered roof trusses as indicated in the construction documents. General Contractor to furnish truss drawings stamped by a registered engineer. General

Contractor to furnish and install hurricane clips for all trusses.

B. General Contractor to furnish and install continues roof purlins @ 24” O.C. as indicated in the construction documents.

C. General Contractor to furnish and install treated lumber for any wood in contact with concrete or masonry.

D. General Contractor to furnish & install wood trim & details as indicated on the drawings.

2.07 THERMAL AND MOISTURE PROTECTION

A. General Contractor to furnish and install pre-finished panel rib metal roofing as indicated in the construction documents.

1. Foundation insulation at all areas of masonry walls to be R-10 minimum thickness “blue board” foam insulation and be covered with earth. Regular white bead board will NOT be accepted. Foundation insulation to extend vertically a minimum of 36” below finish grade and

24” horizontal under slabs.

B. General Contractor to furnish and install roofing, and accessories including:

1. Panel rib metal roofing as noted on drawing and specified here in.

2. Drip edge to be pre-finished aluminum installed around the roof perimeter.

2.08 DOORS & HARDWARE

A. General Contractor to furnish and install all doors, door frames and hardware as indicated in the construction documents. All door hardware throughout the building to be ADA compliant.

2.09 FINISHES

A. General Contractor to furnish & install perforated vinyl soffit material for ceilings as indicated in the construction documents.

B. General Contractor to furnish and install vinyl base, and paint masonry walls as indicated in the construction documents.

C. General Contractor to furnish and install all necessary labor, equipment and supplies for a minimum of three (3) coats of paint including (1) coat of primer and (2) coats of finish paint on all surfaces generally to receive paint finishes, such as masonry, HM doors, HM frames, wood trim, etc. color to be selected.

2.10 SPECIALITIES

A. General Contractor to furnish and install toilet accessories as indicated on the drawings.

B. General Contractor to furnish and install ADA approved interior signage as noted on the drawings & specified here-in.

2.11 EQUIPMENT

A. Not used

2.12 FURNISHINGS

A. Not used.

2.13 SPECIAL CONSTRUCTION

2.14 CONVEYING SYSTEMS

NEW CONSTRUCTION FOR HAMLIN LAKE PARK RESTROOMS

113 WEST WILOW STREET, SMETHPORT, PA

SECTION 01010-2

2.15M MECHANICAL

A. Mechanical contractor to furnish & install a exhaust fan light & duct work for a complete & functional system.

2.16 ELECTRICAL

A. Electrical Contractor to provide temporary electrical service and lighting to the project site during construction. Utility bill to be paid by the Owner.

B. Electrical Contractor to furnish and install a new 60 AMP breaker panel as indicated on the drawings.

C. Electrical Contractor to furnish and install new emergency lighting as indicated in the construction documents.

D. Electrical Contractor to furnish and install all electrical receptacles and light switches with covers as indicated in the construction documents. Standard color to be selected by the Owner.

E. Electrical Contractor to furnish and install all light fixtures as indicated in the construction documents.

F. Electrical Contractor to furnish and install all wiring, devices fasteners for new mechanical equipment by others as required, for a complete and working system

G. Electrical Contractor to note all electrical lines to be in metallic cable, romax will not be allowed.

END OF SECTION

INCLUDING SITE, MECHANICAL, PLUMBING & ELECTRICAL

NEW CONSTRUCTION FOR HAMLIN LAKE PARK RESTROOMS

113 WEST WILOW STREET, SMETHPORT, PA

SECTION 01010-3

7-24-25

SITEWORK

EARTHWORK

SECTION 02200SF

PART 1 - GENERAL

A. Contractor shall provide all labor, materials, equipment and services for, and reasonably incidental to, furnishing and installing complete all earthwork as indicated on drawings and/or specified.

B. Work shall include, but shall not be limited to, the following:

1. Control, excavation, bedding; providing off-site borrow; removal from the site of excess and unsuitable soil materials; soils testing and certification; rough grading, sheeting and shoring for excavations; fill and back-filling for trenches, footings, piers, slabs, etc.; finish grading of sub-grades and the removal and disposal of all excess, proof rolling, preparation of sub-grades for walks, slabs and pavement, fill and back-filling, de-watering.

1.02 QUALITY ASSURANCE

A. All earthwork shall be unclassified. Contract sum shall include all material to be excavated whether wet or dry, debris, foundations, piping, water, muck soil or rock.

B. All excavation, bedding and back-fill work provided under other sections of these specifications shall conform to requirements of this section and all back-fill shall be tested and certified by the soils testing agency provided as work of Section 3.03. A certified testing laboratory shall be used that is approved by both the Architect and the Owner, and paid for by the Contractor.

C. All areas shall be proof-rolled in presence of the Inspection Agency.

D. Contractor shall be responsible for protection against damage by surface run-off whether it be soils erosion protection, protection of project construction or protection of public facilities.

E. Quality Assurance Code and Standards: Perform excavation work in compliance with applicable requirements of governing authorities having jurisdiction.

1.03 SOIL TESTING AND INSPECTION SERVICE

A. Provide soil testing and inspection service for quality control testing during earthwork operations.

Testing and inspection service is subject to acceptance.

1.04 SUBMITTALS

A. Test Reports - Excavating, Filling and Grading: Submit five (5) copies of the following reports: test reports on burrow materials; Field density test reports; One (1) optimum moisture-maximum density curve for each type of soil encountered. Report of the actual unconfined compressive strength and/or results of bearing tests of each strata tested. Conditions

1.05 SITE INFORMATION

A. Data, if provided, on indicated subsurface conditions are not intended as representations or warrants of continuity of such conditions between soil borings. Data are made available for the convenience of contractor. Additional test borings and other exploratory operations may be made by contractor at no additional cost.

1.06 EXISTING UTILITIES

A. Locate existing underground utilities in the areas of protections during earthwork operations. Should uncharted or incorrectly charted piping or other utilities be encountered during excavation, request directions as to corrective procedure. Cooperate with utility companies in keeping respective services and facilities in operation. Repair damaged utilities to satisfaction of utilities to satisfaction of utility owner. Do not interrupt existing utilities serving facilities occupied and used by anyone, except when permitted in writing, and then only after acceptable temporary utility services have been provided.

Demolish and completely remove from any site existing underground utilities indicated to be removed.

Coordinate with utility companies for shut-off of service if lines are active. Explicitly comply with filing local or state underground utility acts.

1.07 USE OF EXPLOSIVES

A. Do not bring explosives onto site or use in work without prior written permission from authorities having jurisdiction. Contractor is solely responsible for handling storage, and use of explosive materials when their is permitted.

1.08 PROTECTION OF PERSONS AND PROPERTY

A. Barricade open excavations occurring as part of this work and post with warning lights. Operate warning lights during hours from dust to dawn each day and as otherwise required. Protect structures, utilities, sidewalks, pavement, and other facilities from damage caused by settlement, lateral movement, undermining, washouts and other hazards created by earthwork operations.

EARTHWORK / SECTION 02200SF – 1

PART 2 - PRODUCTS

2.01 SOIL MATERIALS

A. Sub-base Materials: Naturally or artificially graded mixture of natural or crushed gravel, crushed slag, natural or crushed sand, as approved.

B. Drainage Fill: Washed uniformly graded mixture of crushed stone, or crushed or uncrushed gravel, with

100% passing a 1-1/2” sieve and not more than 5% passing a No. 4 sieve.

C. Back-fill and Fill Material Below Site work & Within Building

D. Cohesive-less materials shall be either A-1 (blank run gravel); A-2 (sand and fines); A-2-4 (silty sand), provided the Plastic Index shall not exceed 8 and the minimum dry unit weight shall be not less than 115

PCF as determined by AASHO T-180. Cohesive materials shall be either A-2-7 (clay-sand) or A-4 (silt), provided the Plastic Index does not exceed 10 and the minimum dry unit weight shall be not less than

105 PCF as determined by AASHO-T-180.

PART 3 - EXECUTION

3.01 INSPECTION

A. Examine the areas and conditions under which excavating, filling and grading are to be performed and notify the Construction Manager in writing of conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected in an acceptable manner.

3.02 EXCAVATION

A. Excavation consists of removal and disposal of material encountered when establishing required grade elevations.

B. Classification of Excavations: All excavations shall be unclassified. Unauthorized excavating consists of removal of material beyond indicated sub-grade elevations or dimensions without specific direction.

Under footings, foundations bases, or retaining walls, fill unauthorized excavation by extending the indicated bottom elevation of the footing base to the excavation by extending the indicated bottom elevation of the footing base to the excavation bottom, without altering required top elevations. Lean concrete fill may be used to bring elevations to proper positions, only when approved. Elsewhere, back-fill and compact unauthorized excavation as specified for authorized excavations of same classifications, unless otherwise directed.

C. Stability of Excavations: Slope sides of excavations to comply with local codes and ordinances having jurisdiction. Shore and brace where sloping is not possible either because of space restrictions or stability of material excavated. Maintain sides and slopes of excavations in a safe condition until completion of back-filling.

D. Shoring and Bracing: Provide materials for shoring and bracing, such as sheet piling, uprights, stringers and cross braces, in good serviceable condition. Provide minimum requirements for trench shoring and bracing to comply with local codes and authorities having jurisdiction. Maintain shoring and bracing in excavations regardless of time period excavations will be open. Carry down shoring and bracing as excavations progresses.

E. De-watering: Prevent surface water and subsurface or ground water from flowing into excavations and from flooding project site and surrounding area. Don’t allow water to accumulate in excavations.

Remove water to prevent softening of foundation bottoms, undercutting footings, and soil changes detrimental to stability of sub-grades and foundations. Provide and maintain pumps, sumps, suction and discharge lines, and other de-watering system components necessary to convey water away from excavations. Convey water removed from excavations and rain water to collecting or run-off areas.

Provide and maintain temporary drainage ditches and other diversions outside excavation limits for each structure. Do not use trench excavations as temporary drainage ditches.

3.03 TESTING & INSPECTION

A. Quality Control Testing During Construction: Test services shall be as determined by the Architect are as follows:

1. Footing Sub-grades: For each strata of soil on which footings will be placed, conduct at least one test to verify required design bearing capacities.

2. Paved Areas and Building Slab Sub-grade: Testing laboratory shall perform compaction test at the minimum rate of one (1) test per 1,000 square feet per layer of compaction.

3. Foundation Wall Backfill: Take additional field density tests, at locations and elevations as directed.

a. Certification: The testing agency shall certify that the fill and backfill materials have been placed in accordance with the specifications.

EARTHWORK / SECTION 02200SF - 2

3.04 MAINTENANCE

A. Protection of Graded Areas: Protect newly graded areas from traffic and erosion, and keep free of trash and debris. Repair and re-establish grades in settled, eroded and rutted areas to specified tolerance.

EARTHWORK

SECTION 02200SF – 3

10-23-24

CONCRETE SIDEWALKS AND CURBS

SECTION 02520

1.01 All concrete shall comply with all applicable ASTM Specifications.

PART 2 - MATERIALS

2.01 Concrete for curbing and other exposed surfaces shall meet the following requirements:

A. Compressive strength at twenty-eight (28) days - minimum of 4000 psi.

B. Slump must be within range of two (2”) to four (4”) inches.

C. Air entrainment must be 4.5% to 6.5%.

2.02 Concrete for non-exposed surfaces does not have to be air entrained but should meet the following requirements:

A. Compressive strength at twenty-eight (28) days - minimum of 3000 psi.

B. Slum must be within range of two (2”) to four (4”) inches.

A. The foundation for the bed shall be formed at a depth of eight (8”) inches below and parallel with the finished surface of the sidewalk or curb unless otherwise indicated on the Drawings or specified.

Unsuitable material shall be removed and replaced with approved material, and the foundation shall be thoroughly compacted and finished to a firm, even surface.

B. Approved aggregate shall be spread on the prepared foundation to form a compacted bed four (4”) inches in depth unless otherwise indicated on the Drawings or specified. This material shall be thoroughly compacted.

C. Forms shall be of wood or metal, straight, free from warp and of sufficient strength when staked to resist the pressure of the concrete without springing. If wood, they shall be nominal two (2”) inch planks surfaced on the inside and the top or, if of metal, they shall be of approved section. Forms shall have a depth equal to the depth of the concrete and shall be thoroughly cleaned and oiled before concrete is placed against them. Forms that are worn, bent or damaged shall not be used.

D. Contraction joints shall be spaced in uniform lengths of sections of five (5’) feet. Construction joints may be either hand-formed or sawed joints. They shall be 3/16” inches wide and (1”) inch deep.

Sawing of joints shall be done as soon as practicable after the concrete has set sufficiently to preclude raveling during the sawing and before any shrinkage cracking occurs in the concrete. The saw cut depth may be decreased at the edge adjacent to a curb or structure to obtain a maximum depth that will avoid damage to them. Construction joints shall have tooled edges. The ¾” pre-molded expansion joint material shall be cut to conform to the cross sectional area and be placed at structures and at the end of a days work. Where existing light standards, poles, fire hydrants and similar structures are within the limits of the sidewalk area, the concrete around such structures shall be scored in a block eight (8”) inches wider than the maximum dimension of the structure at the structures, pre-molded expansion joint filler, ¾ of an inch in thickness, shall be placed around the structure for the full depth of the concrete in the sidewalk.

E. The concrete shall be proportioned, mixed and placed in accordance with these Specifications. The concrete for sidewalks shall be four (4”) inches in depth unless otherwise indicated on the Drawings or specified. Unless otherwise indicated, an edger having a one-fourth (1/4”) inch radius shall be used for edging all joints.

1. Side forms shall not be removed within twelve (12 hours after the concrete has been placed.

After removal of the forms, minor honeycombed areas shall be filled with mortar composed of one (1) part of cement and two (2) parts of fine aggregate. Major honeycombed areas will be considered as defective work and shall be removed and replaced at no expense to the Owner.

2. After the concrete has cured for a period of not less than seventy-two hours, the spaces adjacent to the sidewalk shall be back-filled with approved material in layers of not more than four (4”) inches in depth, which shall be thoroughly compacted mechanically to the required elevation and cross section.

CONCRETE SIDEWALKS & CURBS / SECTION 02520 – 1

F. Curing shall begin as soon as the concrete has been placed and sufficiently hardened. All concrete shall be cured by membrane curing or by water curing and protected in a satisfactory manner by approved methods as herein described or as otherwise specified.

1. Any day during which the curing temperature fall below 50 degrees F. shall not be counted as a curing day except for flood during of footings. If at any time during the curing period the curing temperature falls below 35 degrees F., the concrete work may be considered as being unsatisfactory and rejected.

G. The requirements specified above shall also apply for the curing and protection during cool weather when the atmospheric temperature, as forecast by the local weather bureau, may be expected to reach

50 degrees F. In addition, the Contractor shall furnish and place hay or straw over concrete not covered by forms to a depth of no less than one (1’) foot.

1. The requirements specified for cool weather shall also apply for curing and protection during cold weather when the atmospheric temperature may, as forecast by the local weather bureau, be expected to reach 35 degrees F. or lower at any time during the curing of the concrete, or when concrete is to be placed at atmospheric temperatures below 35 degrees F.

H. The Contractor shall furnish and place sufficient canvas and frames or other satisfactory type of housing, shall completely enclose and protect the fresh concrete and forms and shall furnish sufficient approved heating apparatus, preferably steam equipment and necessary fuel before the concrete is placed.

I When the air temperature is below 35 degrees F., the air surrounding the fresh concrete shall be kept at a temperature above 50 degrees F., but not more than 80 degrees F; also, the concrete covers shall be kept moist during the curing period.

J. After the concrete has been cured for the required length of time, the temperature within the housing shall be gradually lowered during a three (3) day period to that of the surrounding air temperature.

K. All concrete construction with the State Right of Way shall be in conformance with the State or

Municipal Authority requirements.

CONCRETE SIDEWALKS AND CURBS

SECTION 02520 – 2

SEEDING AND MULCHING

SECTION 02930

1.01 QUALITY ASSURANCE

A. Source Quality Control: See producer’s tests for purity and germination of seed, dated within nine months of sowing.

1.02 SUBMITTAL

A. Test Reports: Submit vendor’s certified statement for grass seed mixture required, stating botanical and common name, percentage by weight and percentages of purity, germination and weed seed.

1.03 DELIVERY, STORAGE AND HANDLING

A. Deliver grass see in original containers showing analysis of seed mixture, percentage of pure see, year of production, net weight, date of packaging and location of packaging. Damaged packages are not acceptable.

1.04 JOB CONDITIONS

A. Existing Conditions: Perform seeing only after preceding work affecting ground surface is completed.

B. Environmental Requirements:

1. Do not perform seeding when wind exceeds 15 miles per hour.

2. Seed between calendar dates recommended by seed producer.

C. Protection: Restrict foot and vehicular traffic from seeded areas after planting to end of the established period.

1. Establishment period: 10 weeks.

2.01 SEED

A. PaDOT Formula D

1. Species % by Weight % by Purity

a. Kentucky 31 Tall Fescue 70 98

b. Pennlawn Red Fescue 20 98

c. Weeping Alkaigrass 10 95

B. Shipment: Each shipment of grass seed mixture shall be accompanied by a certified weight slip, and an analysis of the composition, purity and germination of the seed mixture certified by the seed house.

Packaging: Each kind of seed shall be furnished and delivered in sealed containers or bags sewn tight or sealed.

C. Labeling: All seed and seed labels shall be in accordance with prevailing Federal Law, Rules and

Regulations.

D. Guarantee: The seeds shall meet the minimum specified requirements on the date of sowing regardless of the guarantee of qualities on dates of testing.

1. Seed which has become wet, moldy or otherwise damaged in transit or storage will not be acceptable.

2.02 FERTILIZER

A. Commercial type, consisting of nitrogen (50% organic), phosphoric acid, and potash.

1. Percentages determined by soil analysis recommendation.

2.03 LIME

A. Shall be delivered to the site, stored in a dry area in the original containers which shall bear the manufacturer’s guaranteed statement of analysis.

1. Percentages determined by soil analysis recommendation.

2. Contractor shall keep a record of all tonnage of lime applied.

3. Lime shall be raw, ground agricultural limestone containing not less than 90% calcium carbonate and shall be ground to such a fineness that 50% will pass through a 100-mesh sieve and 90% will pass through a 20-mesh sieve.

2.04 WATER

A. Water used in the work will be suitable for irrigation and free from ingredients harmful to plant life.

Hose and other water equipment required for the work shall be furnished by the contractor.

2.05 ACCESSORIES

A. Mulching material: Oat or wheat straw, reasonably free from weeds, foreign matter detrimental to plant life, and in dry condition. Hay or chopped cornstalks are acceptable.

B. Mulching material: Wood or wood cellulose fiber free of growth or germination inhibiting ingredients.

C. Establishment blanket: Uniform, open weave jute matting.

SEEDING & MULCHING / SECTION 02930 - 1

A. Check that proceeding work affecting ground surface is completed.

B. Verify that soil is unfrozen.

3.02 PREPARATION

A. Cultivate topsoil to depth of 6 inches with mechanical tiller. Cultivate inaccessible areas by hand.

1. Rake until surface is smooth.

B. Remove from site, foreign materials collected during cultivation.

C. Grade to eliminate rough spots and low areas where ponding may occur.

1. Maintain smooth, uniform grade.

D. Assure positive drainage away from buildings.

E. Finish ground level firm and sufficient to prevent sinkage pockets when irrigation is applied.

3.03 FERTILIZING

A. Apply fertilizer in formulation and quality required by soil analysis.

B. Apply after fine grading and mix thoroughly into upper 2 inches of topsoil.

C. Do not apply grass seed and fertilizer at same time, in same machine.

D. Lightly water to aid breakdown of fertilizer and to provide moist soil for seed.

3.04 SEEDING

A. Broadcast half of seed with mechanical seeder or by hand.

B. Broadcast remaining half of seed at right angles to first seeding pattern, using same broadcast method.

C. Seeding Rate: Formula D 21 pounds per 1000 square yards.

D. Do not sow immediately following rain, when ground is too dry, or during windy periods

E. Cover seed to a depth of ½ inch by raking, harrowing or cultipacking.

F. Roll seeded area with roller not exceeding 112 lbs.

G. Apply water with fine spray immediately after each area has been sown.

H. Apply mulch in accordance with PaDOT 408 Specifications.

3.05 PROTECTION

A. Immediately after seeding, protect seeded areas from traffic until grass is established.

3.06 MAINTENANCE

A. Maintain seeded area immediately after placement for 10 week period or until grass is well established and exhibits a vigorous growing condition.

B. Maintain surfaces and supply additional topsoil where necessary, including areas affected by erosion.

C. Water to ensure uniform seed germination and to keep surfaces of soil damp.

D. Apply water slowly so that surface of soil will not puddle and crust.

3.07 CLEAN UP

A. The contractor shall dispose of excess materials and debris including, but not limited to, branches, paper and rubbish resulting from this work.

B. All areas shall be kept neat and clean and upon completion of work, the site shall be left in an orderly condition.

SEEDING & MULCHING

SECTION 02930 – 2

CONCRETE

CAST-IN-PLACE CONCRETE

SECTION 03300

A. Furnish all materials, labor, equipment and service necessary to install and complete all concrete work shown on the Drawings and/or herein specified, including, but not limited to:

1. Foundation and walls.

2. Structural slabs.

3. Slabs on grade, sub-base and vapor barrier under slabs on grade.

4. Forms, centering and temporary shorings.

5. Expansion joint and construction joint fillers.

6. Forming recesses and chases as required to receive adjoining work.

7. Barricades and protection for finished concrete work.

8. Building into concrete work all miscellaneous hardware required by other but set under this Section.

1.02 DEFINITIONS

A. The definition of all terms shall conform to pertinent Sections of the latest edition of ACI Manual of

Concrete Practice.

1.03 REGULATIONS AND STANDARDS

A. The latest ACI Manual of Concrete Practice, Parts 1, 2, and 3 are hereby included and made a part of these Specifications.

1.04 TESTS

A. Test cylinders shall be taken from each fifty (50) cubic yards when one (1) day's pour is in excess there

of. Four (4) cylinders are to be taken for each test. Provide appropriate field storage facility for storing test cylinders prior to being taken to the laboratory.

B. Testing shall be done by an approved testing laboratory with concrete strength test made at the seventh day for two (2) cylinders and at twenty-eight (28) days for the remaining two (2). Testing to be performed by concrete supplier.

C. Concrete strength test for structural concrete shall be made in accordance with Chapter 5 of the latest

ACI 318 Manual.

D. Two (2) copies of the test results shall be forwarded by the testing laboratory.

2.01 CONCRETE MIXTURES

A. The concrete mixtures shall be designed by and determined in conformance with ACI Standard 318, Section 502, Method 1 using approved materials furnished by the Contractor to obtain the minimum compressive strength at twenty-eight (28) days as listed below, and also, with the additional physical properties thereafter noted. The water content of the concrete will be the minimum necessary to obtain conditions and methods of placement.

Compres. Max. Aggr. Mix Max.

Strength Size Cement Slump

28 Days Inches (94# Bag) Inches Primary Use

3000 l-1/2 6 3 - 4 Building Foundations

3500 1 6 3 - 4 Interior Slabs

3500 1 6 3 - 4 Site Concrete

B. Concrete shall be composed of Portland cement, fine aggregate, course aggregate and water. Admixture shall be used where here in specified.

C. An air-entraining admixture shall be used in accordance with "Specifications for Air-Entraining

Admixtures for Concrete" (ASTM C-260) and with manufacturer's specifications for all exposed work.

The total air entrainer in the concrete shall be maintained between four (4%) and seven (7%) percent of the total concrete by volume.

D. A water-reducing agent may be used to increase the workability of the mix during placing operations.

Such admixture must be approved and be used in strict accordance with the manufacturer's instructions.

Admixture shall conform to "Specifications for Chemical Admixtures for Concrete" (ASTM C-494).

2.02 CEMENT: All cement shall be Portland and shall conform to ASTM C-150, Type I or Type III where high early strength is desired. All cement shall be of one (1) brand, type and color.

CAST-IN-PLACE CONCRETE / SECTION 03300 - 1

2.03 AGGREGATE

A. Fine aggregate shall consist of washed natural sand and shall be capable of developing ninety (90%) percent of the tensile strength of standard Ottawa sand. Gradation of the fine aggregate shall conform to

ASTM C-33. Sand shall not contain more than 1-1/2% clay. Sand size shall be such that when measured by weight, 95% to 100% shall pass through a #4 sieve and 45% to 70% through a #16 sieve. Sand shall be free of silt and loam.

B. Coarse aggregate shall be composed of hard durable, crushed gravel from silt, loam, shale, clay or decomposed pieces. It shall be uncoated and clean, graded 3/4" maximum. For reinforced work, aggregate shall be uniformly graded between 3/4" and #4 sieve. Bank or crushed run will not be permitted.

C. Slag aggregate must conform to ASTM Designations C-13 and C-125. Methods of sampling and testing slag aggregate must conform to "Soundness of Aggregate" C-30 and C-88, "Specific Gravity and

Absorption" C-127 and "Sieve Analysis" C-136.

2.04 WATER

A. Water used in mixing concrete shall be clean and free from injurious amount of oil, acids, alkalis, salt, organic materials or other substances that may be deleterious to concrete or steel.

2.05 REINFORCING STEEL

A. See Drawings for types and sizes of reinforcing required. Foundations reinforcing shall be in conformance with recommended footing design of soils engineer.

B. Bars shall be free from scale, oil, and structural defects and shall be kept so on the job.

C. Reinforcing bars shall conform to "Specifications for Deformed Billet Steel Bars for Concrete

Reinforcement" (ASTM A-615).

D. Welded plain wire fabric shall conform to "Specifications for Welded Steel Wire Fabric for Concrete

Reinforcement" (ASTM A-185).

2.06 METAL INSERTS

A. Metal accessories, including spacers, chairs, ties and other devices necessary for properly assembling, placing, spacing and supporting all reinforcement in place shall be provided in accordance with "Manual of Standard Practice for Reinforced Concrete Construction" of Reinforcing Steel Institute.

B. If any of the inserts are to be exposed to the elements after completion of the construction, they are to be galvanized as per ASTM A-153.

2.07 Vapor barrier shall be 6 mil, polyethylene in widest rolls available. Edges shall be lapped a minimum of eight

(8") inches.

2.08 FILL UNDER FLOOR SLABS ON GRADE

A. Material shall be 3/4" gravel, crushed stone or granulated slag. Thickness shall be a minimum of four

(4") inches or as shown on drawings.

2.09 EXPANSION JOINT FILLER

A. Thickness shall be as shown on the Drawings and shall extend for the depth of the slab. Material shall be equal to "Celotex", (one-half (1/2) exterior asphalt impregnated wall sheathing).

2.10 ADMIXTURE

A. Air-entraining admixture shall be used for all concrete exposed to the weather and shall conform to

ASTM C-260. The Contractor shall submit in writing for approval of the Admixture and the quantities he proposes to use with complete Specifications of the product.

3.01 PROPORTIONING

A. The Contractor shall submit the mix that he intends to use, which must be proved by preliminary cylinder tests. These cylinders must show a strength at twenty-eight (28) days fifteen (15%) percent higher than the ultimate strength called for.

B. The minimum ultimate strength of all concrete furnished shall be 3000 psi at twenty-eight (28) days unless otherwise specified on the Contract Drawings. All exterior concrete for walks, etc., shall be 4000 psi air entrained at twenty-eight (28) days.

3.02 FORMWORK

A. General: Design, construction and use of form-work will be in accordance with the latest ACI 347. Side forms for footings may be omitted if soil conditions will permit excavation to accurate sizes without bracing.

B. Forms shall result in a finished structure which conforms to the shape, lines, and dimension of the structure as required by the Plans and shall be substantial and sufficiently tight to prevent leakage of mortar.

C. Forms shall be properly braced or tied together so as to maintain position and shape.

CAST-IN-PLACE CONCRETE / SECTION 03300 - 2

D. Shoring shall be placed according to recommendation of ACI 347.

E. Shoring shall not be removed until the slab or member supported has attained sufficient strength as determined by the evaluation of job-cured specimens.

F. Prior to placement of any reinforcement, all forms shall be treated with a non-staining form oil or lacquer.

3.03 FABRICATION AND PLACEMENT OF REINFORCEMENT

A. Placing supporting, etc., of reinforcing steel will be in accordance with Concrete Reinforcing Steel

Institute's "Recommended Practice for Placing Reinforcing Bars" and "Recommended Practice for

Placing Bar Supports, Specifications and Nomenclature" and with applicable sections of ACI Manuals

301 and 318.

B. Reinforcement to be welded shall conform with "Recommended Practices for Welding Reinforced Steel, Metal Inserts and Connections in Reinforced Concrete Construction' (AWS D-12.1)

1. The following minimum thicknesses of concrete cover shall be: a. Slabs exposed to weather, 1".

b. Slabs not exposed to weather, ¾”

2. The surface condition of all reinforcement shall be clean and free of oil and substances harmful to bond.

3. Deformed bars placed in bearing wall grouted cores shall be inserted to the depth shown on the

Drawings and agitated to ensure adhesion to bar.

3.04 MIXING AND PLACING CONCRETE

A. General: Latest ACI 301 and ACI 614 recommendations as applicable will be used for mixing, handling and placing of concrete.

B In hot and cold weather, ACI 605 and ACI 306 recommendations as applicable will be used for mixing, handling and placing of concrete.

C. Ready mix concrete shall conform to "Specifications for Ready-Mixed Concrete" (ASTM C-94).

D. Concrete shall be deposited as nearly as practicable in its final position to avoid segregation due to re-handling or flowing.

E. After placement of concrete is started, it shall be carried on as a continuous operation until the placing of a panel or section is completed. When construction joints are necessary, they shall be made and located in accordance with ACI 318 and as shown on the drawings.

F. Concrete shall be maintained above freezing and adequate water content shall be preserved as recommended in the latest ACI 612. Accepted accelerating curing process may be employed. No admixtures to prevent freezing will be permitted. Heating must be accomplished with smokeless units.

Salamanders are not to be permitted. Concrete shall be covered with six (6") inches of straw if freezing weather is anticipated for longer than an eight (8) hour continuous period.

3.05 TOLERANCES

A. Variation from plumb shall not exceed 3/8" in 10'-0", not cumulative.

B. A maximum variation of 1/4" in 10'-0" shall be permitted in floors, not cumulative.

3.06 FINISHES

A. Exposed formed concrete surfaces, exclusive of floors, sidewalks, curbs and tread surfaces shall have a smooth surface obtained by use of plywood or lined forms. Joint marks and irregularities shall be removed by rubbing with Carborundum stones. Small defects, voids and tie holes shall be matched before rubbing. Parging shall be done promptly before concrete is thoroughly dry. Patch material shall be of same material and of same proportions as used for concrete, except that the coarse aggregate shall be omitted. Patching shall be finished in such a manner as to match the adjoining surface. All corners shall be left sharp and true.

B. All concrete floors and/or floor toppings to be exposed or to receive resilient flooring shall be smooth steel, troweled. Concrete shall be worked so that large aggregate will not be visible in the top surfaces.

C. Exterior concrete platforms and step treads shall have all exposed surfaces finished with a fine broom finish and the edges tooled with an approved edging tool.

D. Finish all concrete floors monolithic, even with finished floor line, with a minimum of steel trowelling to produce a smooth, hard surface free from blemishes.

E. Delay steel trowelling sufficiently long to prevent excessive water from being worked to the surface. No dry cement or sand will be permitted to take up excess surface water.

F. Exercise care at all joints to prevent humping. Any such humps which may occur in areas to impair the finished floor material shall be power ground to a smooth and level surface.

CAST-IN-PLACE CONCRETE / SECTION 03300 – 3

3.07 QUALITY CONTROL AND TESTS

A. Daily inspection shall be the responsibility of the job superintendent.

B. Inspection shall be continuous during the entire building process. The following constitutes a partial list of the inspection functions that should be covered:

1. Control of proportioning of concrete mixes.

2. Inspection, testing and approval of materials.

3. Inspection of forms, reinforcing steel, shoring, bracing, embedded items, joints, etc., before placing concrete.

4. Inspection of concrete handling and placing equipment, such as buckets, chutes, buggies, hoppers, vibrators, pumps, etc.

5. Inspection of concrete handling, placing, consolidation, finishing, curing, protection and repair or patching.

6. Inspection of stripping, form removal and shoring, preparation and testing of concrete strength specimens.

C. Field Quality Control

1. Sampling Fresh Concrete: Fresh concrete as delivered to the project site shall be sampled for tests to determine compliance with quality requirements of the Specifications. The procedures for obtaining representative samples shall be in accordance with ASTM C-172. All testing costs shall be paid by the Contractor.

2. Compressive Tests:

a. Making Test Specimens: One (1) set of four (4) cylinders taken from each fifty (50) cubic yards or fraction thereof, or each day's pour, whichever is less, shall be made of each class of concrete placed. Test specimens shall be made and cured in accordance with ASTM

C-31. Specimens shall be cured under field conditions when there is a possibility of the air temperature falling below 40 degrees F. Cylinders shall be tested in accordance with

ASTM C-39.

b. Testing: Each set of cylinders shall be tested as follows - two (2) cylinders at seven (7) days and two at 28 days.

3. Core Boring: Where the results of the strength test of the control specimens indicate the concrete, as placed, does not meet Specification requirements or where there is other evidence that the quality of the concrete is below Specification requirements, one (1) or both of the following tests will be required.

a. Core boring tests conforming to ASTM C-42.

b. Testing with Swiss hammer.

3.08 CLEANING

A. Clean all exposed concrete surfaces and all adjoining work stained by the leakage of concrete, mortar drippings, etc.

B. Surface defects which do not impair the structural strength shall be carefully cut out and refilled with fresh concrete. Cuts shall not be less than one (1") inch deep, thoroughly wetted just prior to filling with concrete of still consistency and of mix approximately the same color as the adjoining work. After partial set, compress and rub to produce a finish similar in texture and color to the adjoining work.

C. Metal form ties, extending from the face of permanently exposed concrete shall be cut off at least 3/4" deep in the concrete immediately after removal of forms. Fill holes with a 1:3 cement and sand mortar approximately the same color as the adjoining concrete. Mix and place the mortar as dry as possible and finish flush with the adjacent surface.

3.09 EXPANSION JOINTS

A. Expansion joints shall be provided in concrete work where indicated on the Drawings. Expansion joint filler, as specified herein before, shall be installed in all expansion joints.

B. Joint filler 1/2" thick, unless otherwise indicated on the Drawings, shall be used for interior slabs and full width and depth of the concrete contact section.

C. Joint filler 1/2", unless otherwise indicated on the Drawings, shall be installed in concrete sidewalks and curbs at approximately twenty (20') to thirty (30') feet on centers, except as otherwise shown on the

Drawings. Joints in curbs adjacent to sidewalks shall align with joints in sidewalks. Joint filler shall also be installed where concrete walks abut vertical surfaces. Joint filler shall be the full width and depth of the concrete contact section.

CAST-IN-PLACE CONCRETE / SECTION 03300 - 4

3.10 CONSTRUCTION JOINTS

A. The use and location of construction joints be as shown on drawings. In general, they shall be in accordance with the following:

1. Preparation of Joints: The surface of the concrete shall be roughened, and thoroughly cleaned.

In addition to the foregoing, joints shall be thoroughly wetted and slushed with a coat of neat cement grout immediately before placing of new concrete.

2. At all construction joints, provide additional steel dowels equal in area to the steel called for across that construction joint.

3. If keyhole construction joints are used, set 1/4" below level and do not use as screeds.

3.11 CURING

A. Exposed concrete surfaces shall be protected against loss of moisture, rapid drying or temperature changes, mechanical injury from rain or flowing water.

B. Curing the concrete by means of a commercial membrane curing compound shall be permitted provided the compound conforms to the "Standard Specifications for Liquid Membrane-Curing Compounds for

Curing Concrete" Type I, ASTM C-309 and C-156. The manufacturer of the curing compound must guarantee that his material will not cause any lack of adhesion of the resilient tile to be applied over it.

3.12 ENVIRONMENTAL CONDITIONS

A. Placing During Cold Weather: Cold weather concrete placement shall be in accordance with ACI 606 and as specified herein. If it is necessary to place concrete when the temperature of the air, aggregates or water is below 40 degrees F or when the unprotected concrete is likely to be subjected to freezing temperatures before the expiration of the specified curing period, placement shall be approved in writing.

Such approval shall be contingent upon full conformance with the following provisions: The underlying material shall be prepared and protected so that it is entirely free of frost when the concrete is deposited.

Mixing water and/or aggregates shall be heated as necessary to result in the in-place concrete temperature of between 50 degrees F and 85 degrees F. Methods and equipment for heating shall be approved. The aggregates shall be free of ice, snow and frozen lumps before entering the mixer. Covering and other means shall be provided for maintaining the concrete at a temperature of at least 50 degrees F for not less than seventy-two (72) hours after placing at a temperature above freezing for remainder of the curing period. Concrete damaged by freezing shall be removed and replaced without additional cost.

B. Placing During Hot Weather: Hot weather concrete placement shall be in accordance with ACI 605 and as specified herein. During periods of hot weather when the maximum daily air temperature is likely to exceed 85 degrees F. the following precautions shall be taken: The forms and the underlying material shall be sprinkled with water immediately before placing the concrete. The concrete shall be placed at the coolest temperature practicable, and in no case shall the temperature of the concrete when deposited in the forms exceed 90 degrees F. A retarding admixture conforming to ASTM C-194 shall be used for concrete deposited in the forms when the temperature of the concrete exceeds 85 degrees F. The aggregates and/or mixing water shall be cooled as necessary to maintain the concrete temperature at, or less than, the specified maximum. Concrete shall be placed in the forms continuously and rapidly. The finished surface of the newly poured concrete shall be kept damp by one of the following methods:

1. Surface remaining in contact with the forms.

2. Covering with burlap or cotton mats kept continuously wet.

3. Covering with paper of suitable type.

4. Continuous sprinkling of the exposed surfaces.

5. Use of an impervious membrane consisting of approved liquid sealing compound applied in an atomized form after surface water has entirely disappeared but surfaces are still moist.

Compounds shall form an effective seal which will prevent evaporation of moisture from concrete for the full curing period.

6. The surface of slabs protected by ponding.

CAST-IN-PLACE CONCRETE

SECTION 03300 - 5

MASONRY

SECTION 04220

1.01 DESCRIPTION

A. Work included: The concrete unit masonry and/or face brick required for this work is indicated on the drawings.

B. Related work described elsewhere: Concrete for footings and foundations.

1.02 QUALITY ASSURANCE

A. Qualifications of workmen: Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section.

B. Provide one skilled journeyman mason who shall be present at all times during execution of this portion of the work and who shall personally direct all work performed under this Section.

C. Codes and Standards: In addition to complying with all pertinent codes and regulations, comply with the standards of masonry installation per N.C.M.A. manual latest edition and B.I.A. manuals latest edition submittals.

1.03 SUBMITTALS

A. General: Comply with the Provisions of section 01300 Submittals.

B. Samples: Within 15 calendar days after award of the Contract, and before any masonry materials are delivered to the job site, submit one…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .