This is a Statement of Work (SOW) for Solicitation #75110PR260016906 issued by the U.S. Coast Guard Training Center Birmingham Southern for rental, delivery, setup, and teardown of event furnishings and associated equipment for a formal ceremony.

The contractor must deliver and set up all equipment by June 3, 2026, at 1200 Central Time and complete teardown and removal by June 6, 2026, at 1200 Central Time. For the Bill Battle Coliseum, the contractor shall provide one stage (minimum 24' wide x 16' deep x 24" high with stairs and skirting), one podium with wireless microphone, two powered speakers with stands, 150 guest chairs, 10 stage chairs, two quiet fans for climate control, and two 6' tables with white cloth covers for the entryway. For Hulsey Hall in the Admissions Welcome Center, the contractor shall provide 25 highboy tables with fitted white cloth covers, one podium with wireless microphone, one powered speaker with stand, and two quiet fans. The contractor must provide qualified personnel including a Project Manager designated as Key personnel who serves as the single point of contact for the Contracting Officer and is available by telephone between 0800-1600 EST Monday-Friday, responding to technical issues within 12 hours. All contractor personnel require valid Real IDs for base access and must comply with Government security and conduct regulations. The contractor must submit a detailed equipment inventory and floor plan for approval 10 business days prior to setup and provide certificates of insurance prior to commencing work. Setup location is at U.S. Coast Guard Training Center Birmingham Southern, 900 Arkadelphia Road, Birmingham, AL 35254, with the Government POC identified as Ms. Liz Medina. The Government furnishes site access, electrical power for audio systems, and designated setup areas. Pre- and post-event inspections will be conducted jointly by the contractor and Government Technical Representative to confirm satisfactory completion. All work shall be performed generally between 0730-1600 Central Time Monday-Friday, except Federal holidays, though contractor employees may be required to work other hours including weekends and holidays to fulfill requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION #: 75110PR260016906

STATEMENT OF WORK

LAST UPDATED: 05/12/2026 PAGE 1/5

STATEMENT OF WORK (SOW)

FOR

RENTAL, DELIVERY, SETUP, AND TEARDOWN OF EVENT FURNISHINGS AND

ASSOCIATED EQUIPMENT

1.0 GENERAL

1.1 BACKGROUND

The U.S. Coast Guard Training Center Birmingham Southern located at 900 Arkadelphia Road, Birmingham, AL 35254 requires the rental, delivery, setup, and removal of furnishings and equipment to support a formal ceremony. The event will host up to 150 guests and will require a stage, podium, tables and audio system.

1.2 SCOPE

The Contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to deliver, install, and remove, 160 chairs, stage, podium, tables and audio system as detailed herein. The

Contractor shall also provide all required documentation and comply with all access and safety requirements.

1.3 OBJECTIVE

Provide a rental solution for furnishings and associated equipment to support a USCG ceremony, ensuring all items are delivered, installed, and removed according to the schedule and specified requirements.

1.4 APPLICABLE DOCUMENTS

• Event Layout Illustration (provided by Government)

• Certificates of Insurance (Contractor provided)

• Equipment Inventory and Floor Plan (Contractor provided prior to event)

2.0 TASK ONE EQUIPMENT AND SERVICES

The Contractor must provide the following:

• Delivery, complete setup on June 3, 2026, by 1200 pm

• Complete teardown and removal on June 6, 2026, by 1200 pm

To be placed in the Bill Battle Coliseum:

• One (1) stage, minimum 24’ wide x 16’ deep x 24” high, with stairs and skirting

• One (1) podium with wireless microphone

• Two (2) powered speakers with stands

• One hundred fifty (150) guest chairs

• Ten (10) stage chairs

• Two (02) Fans for climate control and guest comfort. Fans must be quiet and unobtrusive, operating at a noise level that will not distract from the ceremony or interfere with audio presentations

• Two (02) tables, 6’ long x 29” high, with a fitted white cloth cover to be placed in the entry way of the Coliseum before seating area

To be placed in the Hulsey Hall inside the Admissions Welcome Center:

file:///C:/Users/LJMedina/AppData/Local/Microsoft/Windows/INetCache/Content.Outlook/SCOPE%20PARAGRAPHS.doc

LAST UPDATED: 05/12/2026 PAGE 2/5

• Twenty-five (25) highboy tables each provided with a fitted white cloth cover to be placed in the

Hulsey Hall inside the Welcome Center.

• One (1) podium with wireless microphone

• One (1) powered speaker with stand

• Two (02) Fans for climate control and guest comfort. Fans must be quiet and unobtrusive, operating at a noise level that will not distract from the ceremony or interfere with audio presentations

2.1 TASK TWO SETUP AND TEARDOWN

• Setup location is at the designated sites.

• Contractor shall ensure all equipment is securely placed and installed per manufacturer’s specifications.

• No on-site support is required during the event.

• Government will provide access to power for the audio system.

• All Contractor personnel must present a valid Real ID for base access.

• Contractor must coordinate access and installation with the USCG POC: Ms. Liz Medina.

2.2 TASK TWO DOCUMENTATION, SAFETY AND COMPLIANCE, INSPECTIONS AND

ACCEPTANCE

• Contractor must provide a detailed equipment inventory and floor plan for approval no later than

10 business days prior to setup.

• Contractor must provide certificates of insurance prior to commencement of work.

• Contractor must comply with all applicable federal, state, and local laws and regulations.

• All equipment must be installed in a manner that is safe and stable for the duration of the event.

• Pre-event inspection to be conducted jointly by Contractor and Government Technical

Representative upon completion of setup.

• Post-event inspection to be conducted upon completion of teardown.

• Acceptance of work will be determined by the Designated Government Technical Representative.

3.0 CONTRACTOR PERSONNEL

It is the responsibility of the contractor to propose qualified contractor personnel to perform all requirements specified in the SOW.

3.1 QUALIFIED PERSONNEL

The Contractor must provide qualified personnel to perform all requirements specified in this SOW.

3.2 CONTINUITY OF SUPPORT

The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday.

3.3 PROJECT MANAGER

The Contractor must provide a Project Manager who must be responsible for all Contractor work performed under this SOW. The Project Manager must be a single point of contact for the Contracting

Officer. The name of the Project Manager, and the name(s) of any alternate(s) who must act for the

Contractor in the absence of the Project Manager, must be provided to the Government as part of the

Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate must have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates

LAST UPDATED: 05/12/2026 PAGE 3/5

must be able to read, write, speak and understand English. Additionally, the Contractor must not replace the Project Manager without prior approval from the Contracting Officer.

3.4.1 The Project Manager must be available to the Contracting Officer via telephone between the hours of 0800 and 1600 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 12 hours of notification.

3.5 EMPLOYEE IDENTIFICATION

3.5.1 Contractor employees visiting Government facilities must wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, name, and badge expiration date.

Visiting Contractor employees must comply with all Government escort rules and requirements. All

Contractor employees must identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.

3.5.2 Contractor employees working on-site at Government facilities must wear a government issued identification badge. All Contractor employees must identify themselves as Contractors when their status is not readily apparent (in meetings, when answering Government telephones, in e-mail messages, etc.)

and display the Government issued badge in plain view above the waist at all times.

3.6 EMPLOYEE CONDUCT

Contractor’s employees must comply with all applicable Government regulations, policies and procedures

(e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of

DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The

Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The

Project Manager must ensure Contractor employees understand and abide by Department of Homeland

Security established rules, regulations and policies concerning safety and security.

3.7 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract.

The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

4.0 OTHER APPLICABLE CONDITIONS

4.1 SECURITY

Contractor access to classified information is not currently required under this SOW.

4.2 PERIOD OF PERFORMANCE

• Setup must be completed on June 3, 2026, by 1200 Central Time Zone (CT) hours.

• Teardown and removal must be completed on June 6, 2026, by 1200 Central Time Zone (CT) hours.

• Furnishing and equipment must be available for use 24/7 during this period.

4.3 PLACE OF PERFORMANCE

• U.S. Coast Guard Training Center Birmingham Southern, 900 Arkadelphia Road, Birmingham, AL 35254

• Setup location as designated by the Government POC.

LAST UPDATED: 05/12/2026 PAGE 4/5

4.4 HOURS OF OPERATION

Contractor employees must generally perform all work between the hours of 0730 and 1600 Central Time

Zone (CT) EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.

5.0 GOVERNMENT FURNISHED RESOURCES

• Access to the event site at USCG Training Center Birmingham Southern, 900 Arkadelphia Road, Birmingham, AL 35254.

• Electrical power for the audio system and other equipment, as needed.

• Point of Contact (POC): Ms. Liz Medina for coordination and site access.

• Designated area for furnishing and equipment setup

6.0 CONTRACTOR FURNISHED PROPERTY

The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW 2.0 and

SOW 5.0.

7.0 GOVERNMENT ACCEPTANCE PERIOD

All items must be installed as specified, in good working order, and as per the approved floor plan. All safety and access requirements must be met. Satisfactory completion to be confirmed by the Designated

Government Technical Representative after pre- and post-event inspections. The Designated Government

Technical Representative will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the

Designated Government Technical Representative will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

7.1 The Designated Government Technical Representative will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the Designated Government Technical Representative of the specific reasons for rejection.

The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

7.2 The Designated Government Technical Representative will have 1 business day to review deliverables and make comments. The Contractor must have 1 business days to make corrections and redeliver.

7.3 All other review times and schedules for deliverables must be agreed upon by the parties based on the final approved Project Plan. The Contractor must be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor must work with personnel reviewing the deliverables to assure that the established schedule is maintained.

8.0 DELIVERABLES

The Contractor must consider items in BOLD as having mandatory due dates. Items in italics are deliverable or events that must be reviewed and/or approved by the CO prior to proceeding to next delivery or event in this SOW.

LAST UPDATED: 05/12/2026 PAGE 5/5

Item Deliverable Due Date Distribution

1 Equipment Inventory & Floor Plan 10 business days prior to setup USCG POC, Contracting Officer

2 Stage, Chairs, Podium, Audio Setup June 3, 2026, 1200 hrs. USCG POC

3 Teardown and Removal June 6, 2026, 1200 hrs. USCG POC