3c_PWS_Elevator Insp.pdf
PDF 115 KB Posted
- Attached to
- ELEVATOR INSPECTION SERVICE
- Solicitation number
- 70Z03926QCGA00006
About this file
This is a Performance Work Statement for elevator inspection services at the Coast Guard Academy in New London, Connecticut. The contractor shall provide all labor, material, transportation, and supervision to inspect 16 elevators and 6 personnel lifts, issue Certificates of Inspection, and submit detailed inspection reports. Inspections and tests must comply with ASME A17.1, A17.2, A17.3, and A18.1 standards, as well as Connecticut Laws and Rules Regulating Elevators. The contractor must conduct safety inspections (no-load and full-load tests) using GSA Form 55 for certification and maintenance inspections using a checklist format based on ASME A17.2 Appendix A. The contractor shall submit a blank Elevator Inspection Checklist Form to the Contracting Officer's Representative (COR) within 10 calendar days of contract award for approval.
All inspections and reinspections must be scheduled at least 15 days in advance, with unit prices including all travel costs. Inspection reports and GSA Form 55 certificates must be submitted within two weeks of completion; failure to meet this deadline requires reinspection at no additional cost to the Government. Emergency conditions affecting passenger or equipment safety must be reported immediately verbally and within 24 hours in writing. The contractor's inspectors must have at least three years of elevator inspection experience and possess an ASME-QEI (Qualified Elevator Inspector) Certificate, with copies submitted in the proposal. Inspectors must perform inspection work solely and cannot conduct maintenance work on elevators covered by this contract. Tests and inspections shall be performed during June of each performance period. The contractor is responsible for all permits, licenses, and compliance with local, state, and federal laws without additional cost to the Government.
Performance Work Statement
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR ELEVATOR INSPECTION SERVICE
COAST GUARD ACADEMY, NEW LONDON, CT
1. SCOPE OF WORK
The contractor shall provide all labor, material, transportation and supervision to assure effective performance of all inspection services for the 16 elevators and 6 personnel lifts detailed in Technical Exhibit 1 and issue Certificates of Inspection as warranted.
2. STANDARDS
The routine and periodic inspections/tests shall be conducted in accordance with the
American Society of Mechanical Engineer, ASME A17.1 Safety Code for Elevators, ASME
A17.2 Guide for Inspection of Elevators, Escalators, and Moving Walks, ASME A17.3 Safety
Code for Existing Elevators and Escalators, ASME 18.1 Safety Standard for Platform Lifts and
Stairway Chairlifts and Connecticut Laws and Rules Regulating Elevators. Routine and periodic inspections/tests shall include a review of the overall elevator system based on engineering practices common to the vertical transportation industry; safety code compliance, firefighters’ service, ADAAG requirements, any recommended upgrades, enhancements and/or modernization. Routine and periodic inspections/tests shall include review of the present preventative maintenance program, to determine coverage and conditions in the form of frequency, technical approach and repair techniques.
3. INSPECTIONS AND TESTS
A. Safety Inspections
No-load, full-load and/or tests shall be performed as required by the standards detailed in paragraph 2. The Coast Guard Academy’s existing elevator maintenance contractor shall be responsible for conducting the tests. The inspection form GSA 55, Certification of Elevator
Inspection, (Technical Exhibit 2), shall be used to document the certification of inspection of the elevators.
B. Maintenance Inspections
Maintenance inspections shall be made of each elevator system. The inspection contractor shall inspect each elevator and elevator system for maintenance deficiencies. The contractor shall record the results of each inspection using a checklist format equal to the checklists provided in Appendix A to ASME A17.2, Guide for Inspection of Elevators, Escalators, and Moving Walks. This form shall include a section where the contractor shall record specific deficiencies and/or recommendations. The contractor shall submit a blank copy of their Elevator Inspection Checklist Form to the Government’s Contracting Officer’s
Representative (COR) for the government’s approval. This blank form shall be submitted to the
COR within 10 calendar days after award of the contract.
4. SCHEDULING WORK
The contractor shall schedule inspection visits at least 15 days in advance. The schedule of appointments shall be submitted to the COR.
5. TRAVEL
Unit prices must include all travel costs.
6. REINSPECTION AND TESTING
Reinspections are sometimes required in the event work needed to be performed (as a result of an inspection) requires a reinspection (i.e. safety certification, cable replacement, repairs to correct safety deficiencies). The inspection contractor will be notified by the COR to perform a reinspection. The reinspection will normally be scheduled within 5 business days after the completion of the corrective work. The COR is responsible for notifying the elevator service maintenance personnel to be present during the reinspection. A reinspection appointment shall be scheduled by the COR with the inspection contractor and payment shall be made at the same rate as the inspection price specified in the Pricing Schedule.
7. EMERGENCY CONDITIONS
Any condition found affecting the immediate safety of the passengers or elevator equipment shall be reported immediately to the COR. Within 24 hours a written report, clearly listing the defects found and the action recommended, shall be submitted to the COR. A copy of the report shall also be provided to the Contracting Officer.
8. INSPECTION/REINSPECTION REPORTS
A. A separate inspection report shall be prepared for each inspection or reinspection visit.
If an inspection report is not submitted within the time frame listed below, the report shall be deemed not current and a reinspection must be performed at no additional expense to the
Government. A signed copy of the report shall be forwarded to the COR.
B. The Certificate of Elevator Inspection (GSA Form 55) shall be sent to the COR within two weeks after completion of the inspection/reinspection. If the elevator(s) did not pass inspection, the COR shall be notified verbally at the time of the visit, and in writing within 5 days of the visit.
9. COMPLIANCE
Without additional cost to the Government, the contractor shall (a) fully comply with all local, city, state and federal laws, regulations and ordinances and (b) be liable for all applicable federal state and local taxes and (c) obtain and pay for all permits and licenses necessary for performance under this contract.
10. LIABILITY ON TESTS
The contractor will not be liable for damage to Government equipment being tested when the damage results directly from or as a result of the tests specified in this contract and not due to negligence by the inspection contractor, his agents or employees.
11. QUALIFICATION OF CONTRACTOR INSPECTORS
A. The contractor's inspectors must have at least 3 years successful experience in the inspection of elevators and elevator systems of the kind to be inspected under this contract.
B. The contractor's inspectors must possess an ASME-QEI Certificate (American Society of Mechanical Engineers - Qualified Elevator Inspector). The contractor must submit copies of the inspectors' certificates with his proposal to the Contracting Officer.
C. The inspection contractor's inspectors must be performing work solely in the inspection of elevators. The contractor's inspectors cannot perform elevator maintenance work on any elevator units or systems covered by this contract during this inspection contract period. The
Contracting Officer will utilize the documentation submitted to verify contractor responsibility.
12. SUMMARY OF SUBMITTALS
Submission Date Due
Contractor’s Elevator Inspection Within 10 calendar days from
Checklist Form award of contract
Finding of Emergency Condition Immediately, verbally
Within 24 hrs, typed
Failure of Inspection Immediately, verbally
(Elevator Inspection Checklist Form) Within 5 days, written report
Inspection Report Within 2 weeks of inspection
(Elevator Inspection Checklist Form) Typed
Certificate of Elevator Within 2 weeks of inspection.
Inspection (GSA 55)
13. PERIOD OF TESTS AND INSPECTIONS
Tests and inspections shall be performed during the month June of each performance period.