3c_15710850 Specifications.pdf
PDF 771 KB Posted
- Attached to
- REPAIR AIDS TO NAVIGATION (ATON) EASTERN MAINE
- Solicitation number
- 70Z0G125BABCD0077
About this file
This document is a comprehensive specifications file for the United States Coast Guard's Repair of Aids to Navigation (ATON) in Eastern Maine, Project Number PSN 15710850. The project involves repairing or replacing five navigational light structures at specific locations along the Maine coastline: Merry Island Daybeacon 15, Guptill Ledge Daybeacon 6, Emms Rock Light 9, Clark Ledge Daybeacon 3, and Porterfield Ledge Daybeacon. An optional bid item includes removing the Drunkard Ledge Daybeacon. The work encompasses equipment, materials, labor, and supervision necessary for structure removal, repairs, and replacements, including tasks like replacing steel structures, stabilizing stone block foundations, and repointing granite masonry.
The project specifications detail precise technical requirements for marine construction, including rock socketed steel pipe piles, marine concrete, steel coatings, and navigational light structure installations. The work will be executed in various marine environments, ranging from submerged to tidal and atmospheric zones. Key technical specifications cover materials like fiberglass reinforced plastic grating, safety climb systems, and specific coating requirements such as coal-tar epoxy. The project will require specialized diving operations, precise surveying, and adherence to strict environmental and safety regulations. The contract is administered by the US Coast Guard Civil Engineering Unit in Providence, Rhode Island, with work locations spanning different coastal sites in Eastern Maine.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
SHORE INFRASTRUCTURE LOGISTICS CENTER
SPECIFICATIONS FOR
REPAIR ATON EASTERN MAINE (FY23 CPOP)
FEB 2025
PSN: 15710850
AT
USCG CEU PROVIDENCE
WARWICK, RHODE ISLAND
Lydia E. Van Winkle David N. Glass, P.E.
DESIGN PROJECT MANAGER DESIGN TEAM 2 SUPERVISOR
_____Michael P. Carosotto, PE_____
TECHNICAL DIRECTOR
by direction of the
COMMANDING OFFICER
UNITED STATES COAST GUARD
CIVIL ENGINEERING UNIT PROVIDENCE
475 KILVERT STREET, SUITE 100
WARWICK, RHODE ISLAND 02886
THIS PAGE INTENTIONALLY LEFT BLANK
Repair ATON Eastern Maine (FY23 CPOP) PSN 15710850
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/24 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 14 00 11/22, CHG 3: 08/24 WORK RESTRICTIONS
01 30 00 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 08/23, CHG 1: 08/24 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL
01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 77 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 03 - CONCRETE
03 31 30 05/24 MARINE CONCRETE
03 62 16 08/23 NON-SHRINK GROUTING
DIVISION 05 - METALS
05 05 20 05/22, CHG 1: 08/24 ANCHORS AND DOWELS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 51 33 08/24 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 73 01 08/23 FIBERGLASS REINFORCED PLASTIC (FRP)
GRATING
DIVISION 09 - FINISHES
09 97 13.00 20 11/14 STEEL COATINGS
DIVISION 10 - SPECIALTIES
10 99 02 09/24 SAFETY CLIMB SYSTEM
DIVISION 31 - EARTHWORK
31 62 16.17 09/24 ROCK SOCKETED STEEL PIPE PILES
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 00 00 09/24 GRANITE MASONRY
35 10 35 09/24 DIVING
35 13 10 09/24 INSTALLATION OF NAVIGATIONAL LIGHT
STRUCTURES
PROJECT TABLE OF CONTENTS Page 1
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
List of Appendices
Appendix A PERMITS
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/24
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING
NO.
SHEET ID TITLE
01 G-000 Cover Sheet
02 G-001 Symbols and Abbreviations
03 G-002 General Notes
04 C-100 Enlarged Vicinity Map
05 C-101 Site Plan (1 of 3)
06 C-102 Site Plan (2 of 3)
07 C-103 Site Plan (3 of 3)
08 S-501 Merry Island Daybeacon 15 Existing Conditions & Demolition
09 S-502 Merry Island Daybeacon 15 Repair Details
10 S-503 Guptill Ledge Daybeacon 6 Existing Conditions & Demolition
11 S-504 Guptill Ledge Daybeacon 6 Repair Details
DOCUMENT 00 01 15 Page 1
Daniel Walker Cross-Out
Daniel Walker Cross-Out
DRAWING
NO.
SHEET ID TITLE
12 S-505 Emms Rock Light 9 Existing Conditions & Demolition
13 S-506 Emms Rock Light 9 Repair Details (1 of 2)
14 S-507 USCG Standard 5-ft Square Pipe Tower Details (1 of 4)
15 S-508 USCG Standard 5-ft Square Pipe Tower Details (2 of 4)
16 S-509 USCG Standard 5-ft Square Pipe Tower Details (3 of 4)
17 S-510 USCG Standard 5-ft Square Pipe Tower Details (4 of 4)
18 S-511 Emms Rock Light 9 Repair Details (2 of 2)
19 S-512 Clark Ledge Daybeacon 3 Esisting Conditions & Demolition
20 S-513 Clark Ledge Daybeacon 3 Repair Details
21 S-514 Porterfield Ledge Daybeacon Existing Conditions & Demolition
22 S-515 Porterfield Ledge Daybeacon Repair Details (1 of 2)
23 S-516 Porterfield Ledge Daybeacon Repair Details (2 of 2)
24 S-517 Drunkard Ledge Daybeacon Existing Conditions & Demolition (OB1)
1.3 SUPPLEMENTARY DRAWINGS
None provided.
-- End of Document --
DOCUMENT 00 01 15 Page 2
SECTION 01 11 00
SUMMARY OF WORK
02/24
PART 1 GENERAL
1.1 DEFINITIONS
COR: Contracting Officer Representative
FURNISH: After submittal approval (when required), deliver specified materials, components, equipment, and/or systems to the project site and protect until installed.
INSTALL: Install at location indicated or approved; make ready for service as specified.
KO: Contracting Officer
KTR: Contractor
NEW: As used in these specifications, "new" is indicated for the convenience of the KTR. Unless the word "existing" is used as a qualifier, all devices, components, and equipment indicated shall be new from the manufacturer.
REMOVE AND DISPOSE: Completely remove materials, components, equipment, and/or systems identified; dispose of legally; repair remaining surfaces damaged as a result of removal.
REMOVE AND REINSTALL: Completely remove materials, components, equipment, and/or systems identified to allow for completion of specified work;
reinstall as specified afterwards.
REMOVE AND STOCKPILE: Completely remove materials, components, equipment, and/or systems identified; store and protect; and reinstall as specified.
SHALL: Mandatory.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The project is defined by the Contract Documents and consists of all work including equipment, materials, labor and supervision necessary for removal, repairs and/or replacement of aids to navigation light structures and incidental related work.
The project includes five (5) Base Bid Items (BBI) and one (1) Optional Bid Item (OBI) as summarized below. Any work that is not specified as being part of an OBI shall be included as part of the Base Bid scope.
BBI #1
LLNR 5365, Merry Island Daybeacon 15: Replace aid in its entirety.
SECTION 01 11 00 Page 1
BBI #2
LLNR 1945, Guptill Ledge Daybeacon 6: Replace aid in its entirety.
BBI #3
LLNR 1305, Emms Rock Light 9: Replace steel structure in its entirety.
Replace top concrete cap. Stabilize and repoint supporting stone block foundation.
BBI #4
LLNR 925, Clark Ledge Daybeacon 3: Replace aid in its entirety.
BBI #5
LLNR 4270, Porterfield Ledge Daybeacon: Replace steel structure in its entirety. Cap off opening of steel structure into granite superstructure.
Stabilize and repoint supporting stone block foundation.
OBI #1
LLNR 4100, Drunkard Ledge Daybeacon: Remove remnant, dilapitated aid in its entirety.
1.2.2 Location
Various Locations in Maine.
This conctract is administered by:
USCG Civil Engineering Unit Providence 475 Kilvert Street, Suite 100, Warwick, Rhode Island 02886
The work is located at various locations under the USCG First District Area of Operation (AOR), approximately as indicated below. The exact location will be shown by the COR.
Light Light List Number
(LLNR)
LAT LONG
Merry Island Daybeacon 15
5365 43-57-21.000N 069-34-32.500W
Guptill Ledge Daybeacon 6
1945 44-23-18.318N 068-05-07.782W
Emms Rock Light 9 1305 44-31-44.363N 067-33-56.951W
Clark Ledge Daybeacon 3
925 44-54-55.400N 066-59-04.700W
Porterfield Ledge Daybeacon
4270 44-09-14.629N 069-03-41.297W
Drunkard Ledge Daybeacon
4100 44-06-08.310N 068-57-08.076W
SECTION 01 11 00 Page 2
1.3 CONTRACT DRAWINGS
The following drawings accompany this specification and are a part thereof.
Drawing No. P15710850 Sheets 01 through 24
Drawings for the project have been prepared using AutoCAD. One set of the original files will be provided to the successful Contrator for the sole purpose of facilitating the execution of the work specified, including the preparation of shop drawings, coordination drawings, record drawings, and other submittals. Refer to 01 77 00 CLOSEOUT SUBMITTALS, Paragraph titled SOURCE DRAWING FILES for limitation. The Contrator shall field verify all information as required to successfully provide the work specified.
1.4 OCCUPANCY OF PREMISES
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, and use of approaches.
1.5 EXISTING WORK
Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the KO. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.6 LOCATION OF UNDERGROUND UTILITIES
Verify existing utility locations indicated on contract drawings, within area of work.
1.6.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
SECTION 01 11 00 Page 3
1.7 FEDERAL AND OTHER AUTHORITIES HAVING JURISDICTION
All work shall be in compliance with Federal, State, and local regulations and requirements, including but not limited to the environmental regulatory permits received for this project prior to commencement of construction.
1.8 SALVAGE MATERIAL AND EQUIPMENT
Items designated to be salvaged remain the property of the Government. Any items designated on the drawings for reuse, shall be carefully removed and stored in safe location on site for reinstallation as indicated in the Contract drawings, or directed by the COR.
1.9 SUPERVISION
Have at least one qualified Supervisor, Contractor Quality Control (CQC) System Manager, and Site Safety and Health Officer (SSHO) capable of reading, writing, and conversing fluently in the English language on the job site during working hours. For this Contract, the Supervisor, CQC System Manager, and SSHO may be the same individual, provided that they possess the minimum qualifications required as specified herein.
1.10 MEETINGS
The KTR shall attend the Pre-Construction Conference and Construction Progress Meetings with the KO, COR, USCG Construction Inspector, and other project personnel in accordance with the requirements specified herein.
1.11 INSPECTION
The KTR shall keep the KO or duly appointed representative fully informed of contract operations and plans so that a representative may arrange to be present at various times that work is being performed.
1.11.1 Contractor's Daily Log
The Contrator shall complete the USCG Daily Log form at the end of each working day and deliver it to the Government Inspector and COR. The USCG Construction Inspector will attest to its accuracy by initialing the form and forwarding that form to CEU Providence. The form template will be provided to the Contrator by the COR.
PART 2 PRODUCTS
2.1 BUY AMERICAN COMPLIANCE
All equipment purchased by U.S. Government agencies must comply with the "Buy American Act" (BAA). In summary, this means that the equipment or systems installed must be made in the USA.
2.2 BASIS OF DESIGN AND BRAND NAME OR EQUAL
In general, the federal government does not include the name of
SECTION 01 11 00 Page 4 manufacturers or model numbers to specify various items, equipment, components or systems. However, since equipment or other items of equal capacity is not necessarily available in the same arrangement, size or construction required for the specific use or application required, manufacturers' model numbers, figures or other "Brand Name" information or references are used in the Contract Documents for the convenience of the government and as a service to bidders, in order to generally identify features, performance and level of quality or materials to be provided.
The information may appear in the specifications, on the drawings (in the form of drawing notes, schedules or other similar methods), or a combination of these methods.
Use of the name of a manufacturer in conjunction with the words "or equal" or "Design Basis" does not indicate a preference for this equipment, but rather that the government is not aware of all possible or acceptable sources of supply for the particular item but has located at least one source. However, given the impact on the construction schedule and need for coordination during that period, these two conditions have specific meanings relative to contract document requirements.
2.2.1 Basis of Design
Items specified without identifying a manufacturer or using "Design Basis" or "Basis of Design" may be proposed as part of the normal submittal process.
2.2.2 Brand Name or Equal
Items specified with the words "Brand Name or Equal" (information in square brackets may be a manufacturer plus model number or series of equipment) have been so specified because of their particular significance relative to successfully achieving design requirements and intent. When this specification method is used, the KTR shall, if s/he would like to use a manufacturer/model number other than that specified, include a detailed submittal fully describing the item, including its ability to meet or exceed the required salient characteristics of the specified equipment, with the bid materials submitted, as an alternate manufacturer for evaluation as part of the bidding process. The KTR shall also fully bear any costs associated with use of the alternate equipment or item, if approved (e.g., work by other trades, other modifications required to achieve project requirements).
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 5
SECTION 01 14 00
WORK RESTRICTIONS
11/22, CHG 3: 08/24
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals in accordance with this section . Submit the following in accordance with 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List Of Contact Personnel
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. The Contractor shall not interfere with ATON Team operations or impede upload or water-based access. Access to emergency response vessels and the ability to go underway shall be continuously maintained.
b. The contractor shall be responsible for obtaining approval to begin each phase of work in coordination with the COR and local ATON Team.
c. The KTR shall have all necessary materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
d. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the USCG activity.
e. Areas of the project not under active construction shall remain in operation during the project.
f. Permission to interrupt any channels or storage areas must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
g. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations. The KTR shall identify on the construction schedule each factor which constitutes a potential interruption to ATON operation.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Wear appropriate personal protective equipment (PPE) in designated areas. Ensure all Contractor equipment, include vessels, are clearly identified/ marked for identification.
SECTION 01 14 00 Page 1
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.2 Working Hours
Regular working hours will consist of an 8 1/2 hour period established by the Contracting Officer, between Monday through Friday, excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Submit request in writing at least 2 full working days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
1.3.4 Exclusionary Period
No work may be performed during the period excluded in the project permits, if any, without prior written approval of the Contracting Officer. This period has not been considered in computing the time allowed for the performance of this contract. The contractor shall consider these periods in their construction schedule and notify they KO of any potential impacts to their work.
1.4 SECURITY REQUIREMENTS
1.4.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the KTR and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.2 Areas Not Covered by Contract
The KTR will not be permitted to enter buildings or areas not covered by the work included in this contract, except by prior approval of the COR.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 14 00 Page 2
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
11/20, CHG 4: 08/24
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements
1.2 SUBMITTALS
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Superintendent Qualifications
Project Manager Qualifications
1.3 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 52.228-5, Insurance-Work on a Government Installation, during the entire period of performance under this contract. Provide other insurance coverage as required by State law.
1.4 SUPERVISION
1.4.1 Superintendent Qualifications
Provide project superintendent with a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent.
For projects where the superintendent is permitted to also serve as the Quality Control (QC) Manager as established in Section01 45 00 QUALITY CONTROL, and the Site Safety and Health Officer (SSHO) as established in accordance with 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, the superintendent must have qualifications in accordance with that section.
SECTION 01 30 00 Page 1
1.4.2 Minimum Communication Requirements
Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of Contract work.
1.4.3 Duties
The project superintendent is primarily responsible for managing subcontractors and coordinating day-to-day production and schedule adherence on the project. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.
1.4.4 Project Manager
Assign a Project Manager with the responsibility for the overall management of the project.
1.4.4.1 Project Manager Qualifications
The Project Manager must have a minimum 10 years' experience as a Project Manager or Superintendent on projects of similar size and complexity. The Project Manager shall be capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work.
1.4.5 Non-Compliance Actions
The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to ensure timely completion.
Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.
1.5 MEETINGS
1.5.1 Preconstruction Meeting Conference
Immediately after award, prior to commencing any work at the site, coordinate with the Contracting Officer a time and place to meet for the Preconstruction Meeting Conference . The meeting conference must take place within 35 calendar days after award of the contract, but prior to commencement of any work at the site. The purpose of this meeting conference is to discuss and develop a mutual understanding of the administrative requirements of the Contract including but not limited to:
daily reporting, invoicing, value engineering, safety, base-access, outage requests, hot work permits, schedule requirements, quality control, schedule of prices or earned value report, shop drawings, submittals, cybersecurity, prosecution of the work, government acceptance, final inspections and contract close-out. Contractor must present and discuss their basic approach to scheduling the construction work and any required phasing.
SECTION 01 30 00 Page 2
1.5.2 Construction Progress Meetings
Construction Progress Meetings (aka 'Job Meetings') will be held on a regular basis in person or via video conference (e.g., MS TEAMS). The need for these meetings shall be at the discretion of the COR, but it is anticipated that initially, at a minimum, these meetings shall occur biweekly until all submittals are approved. Meetings may increase to weekly as the period for on-site construction approaches, and continue on a weekly basis until no longer required, at the discretion of the COR. The KTR will record and distribute the progress meeting minutes to each party present and to parties requiring information. Review progress since the last meeting. Review items of significance that could affect progress.
Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to KTR's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.
1.5.2.1 Progress Meeting Minutes
Progress Meeting Minutes shall include the following:
a. Project Name, Meeting Date, and List of Attendees
b. Project Status (i.e. Items On-Time/Ahead-of-Schedule/Behind-Schedule
c. Submittal and RFI Status
d. Previous Outstanding KTR Concerns/Issues
e. Previous Outstanding Government Concerns/Issues
f. Progress/Schedule
g. New KTR Concerns/Issues
h. New Government Concerns/Issues
1.5.3 Attendees
Contractor attendees must include the Project Manager, Superintendent, Site Safety and Health Officer (SSHO), Quality Control Manager and major subcontractors.
1.5.3.1 ELECTRONIC MAIL (E-MAIL) ADDRESS
Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 days after contract award, provide the KO a single (only one) e-mail address for electronic communications from the KO related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The KO may also use email to notify the KTR of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats. Multiple email addresses are not allowed.
It is the KTR's responsibility to make timely distribution of all KO
SECTION 01 30 00 Page 3 initiated e-mail with its own organization including field office(s).
Promptly notify the KO, in writing, of any changes to this email address.
1.6 MOBILIZATION
Contractor shall mobilize to the jobsite within 60 calendar days after contract award. Mobilize is defined as having equipment AND having a physical presence of at least one person from the contractor's team on the jobsite.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 30 00 Page 4
SECTION 01 32 01.00 10
PROJECT SCHEDULE
08/23, CHG 1: 08/24
PART 1 GENERAL
1.1 SUBMITTALS
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Schedule Of Values;
Construction Schedule;
1.2 CONSTRUCTION SCHEDULE AND SCHEDULE OF VALUES
At the Pre-Construction Conference, submit a Construction Schedule and Schedule of Values in accordance with FAR Clause 52.236.15. The Schedule of Values shall be based on the actual breakdown of the bid price. The cost of insurance shall not be listed as a separate item but included as part of each item of work. The actual cost of bonds may be paid as the first progress payment when a receipt from the bonding company is presented to the KO. In addition, keep the Government Inspector informed daily of the expected delivery dates for major pieces of equipment and materials.
1.2.1 Contents
The Construction Schedule and the Schedule of Values shall be incorporated into separate forms which clearly indicate the start and completion dates and unit value of all major work components. Include the following project specific items at a minimum:
a. Bonds
b. Pre-Construction Submittals
c. Mobilization
d. Work Activities
e. Factors which constitute Potenital Interruptions to ATON Operations
f. Potential Interruptions to ATON Operations
g. Work restriction timeframe and environmental permit in-water work windows
h. Quality Control
i. In-Progress Submittals
j. Final Government Inspection
SECTION 01 32 01.00 10 Page 1
k. Close-out Submittals, i.e. Testing Balancing Reports, Warranties, Operation and Maintenance Manuals, Posted Instructions
l. As-Built Drawings
m. Demobilization
1.2.1.1 Definitions
a. Pre-Construction Submittals: Pre-Construction Submittals are those activities which encompass the obtaining, submission, review and approval of submittals necessary prior to the start of the related site work. KTR shall annotate all such activities into the progress schedule with their forecasted time periods. These activity periods shall not be exclusive of the contract performance period. No site work shall commence until the respective submittals have been approved.
b. Mobilization: Mobilization is defined as having equipment AND having a physical presence of at least one person from the KTR's team on the jobsite.
c. Work Activities: The value of all major work components within the project shall be identified on the Schedule of Values on a unit quantity and unit cost basis, e.g. cost per volume of concrete, cost per length of pile installed, cost per special order item and cost per.
1.2.2 Format
The Construction Schedule shall be provided in a horizontal Gantt-chart format and prepared using MS PROJECT or approved equal. Include any constraints and work restrictions (e.g., exclusionary periods, holidays, government scheduled events, etc.), phasing, work performed by the government, staging of construction for major portions of the work, and milestones. Subdivide schedule into sufficient number of work activities to accurately display the work schedule, sequence of work, activity duration, and interdependence of each activity. Clearly show the activities of the critical path. The critical path is defined as the longest path.
The Schedule of Values shall be provided on the attached KTR's Schedule of Values Form.
Provide one (1) electronic copy of both the Construction Schedule and Schedule of Values in PDF format as well as one (1) electronic copy of the Construction Schedule in MS PROJECT format prior to the start of construction. Provide updated versions in accordance with paragraph Updated Schedules.
1.2.3 KTR Schedule Responsibilities
The Construction Schedule and Schedule of Values as approved by the Government is not a substitute for quantities conveyed by the specification and drawings and those required for a complete job.
Omissions and errors on the Construction Schedule and Schedule of Values are the responsibility of the KTR. Payments will not be made until the schedule of prices has been submitted to and approved by the KO.
SECTION 01 32 01.00 10 Page 2
1.2.4 Updated Schedules
Update the Construction Schedule, Schedule of Values, and equipment delivery schedule at monthly intervals or when schedule has been revised.
Reflect any changes occurring once the last update. Submit copies of the purchase orders and confirmation of the delivery dates as directed.
1.3 PROJECT SCHEDULER QUALIFICATIONS
Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. The authorized representative must have a minimum of 2 years of experience scheduling construction projects similar in size and nature to this project with scheduling software that meets the requirements of this specification. Representative must have a comprehensive knowledge of CPM scheduling principles and application. Qualifications shall be submitted upon request of the COR.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of construction is the responsibility of the Contractor. Contractor management personnel must actively participate in its development. Subcontractors, and suppliers working on the project must also contribute in developing and maintaining an accurate Project Schedule.
3.1.1 Scheduling Expectations Kickoff Meeting(SEKO)
In conjunction with the post award conference or pre construction conference the Government and the Contractor will hold a separate and distinct Scheduling Expectations Kickoff Meeting(SEKO). The intent of this meeting is for the Government to review with the contractor the requirements of the scheduling specification, communicate the Government’s expectations regarding schedule development and management, and answer any questions the Contractor may have regarding the schedule requirements.
3.1.2 Withholdings / Payment Rejection
Failure to meet the requirements of this specification may result in the disapproval of the preliminary, initial or periodic schedule updates and subsequent rejection of payment requests until compliance is met.
In the event that the KO directs schedule revisions and those revisions have not been included in subsequent Project Schedule revisions or updates, the KO may withhold 10 percent of pay request amount from each payment period until such revisions to the project schedule have been made.
SECTION 01 32 01.00 10 Page 3
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The Contracting Officer will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:
3.2.2 Activity Durations
Reasonable activity durations are those that allow the progress of ongoing activities to be accurately determined between update periods.
Non-procurement activities Original Durations (OD) are not to exceed 20 workdays or 30 calendar days.
3.2.3 Procurement Activities
Include in the schedule activities associated with the critical submittals and their approvals, procurement, fabrication, and delivery of long lead materials, equipment, fabricated assemblies, and supplies. Long lead procurement activities are those with an anticipated procurement sequence of over 60 calendar days.
3.2.4 Government Activities
Show in schedule, Government and other agency activities that could impact progress. These activities include, but are not limited to environmental permit approvals by State regulators, inspections, utility tie-in, Government Furnished Equipment (GFE) and Notice to Proceed (NTP) for phasing requirements.
3.2.5 Adverse Weather
Ensure anticipated adverse weather is accounted for in the Project Schedule. AACE 84R-13 provides methodologies for techniques in planning for adverse weather. The preferred methodology is the use of a weather calendar. If a method other than a weather calendar is proposed, discuss the reason during the SEKO meeting.
3.2.6 Calendars
Schedule activities on a Calendar to which the activity logically belongs. Develop calendars to accommodate any contract defined work period such as a 7-day calendar for Government Acceptance activities, concrete cure times, etc. Develop the default Calendar to match the physical work plan with non-work periods identified including weekends and holidays. Develop Seasonal Calendar(s) and assign to seasonally affected activities as applicable.
If a weather calendar is used its implementation and execution is to be in accordance with AACE 84R-13
3.2.7 Phase of Work
Assign Phase of Work to all activities. Examples of phase of work are procurement phase and construction phase.
SECTION 01 32 01.00 10 Page 4
3.2.8 Out-of-Sequence Progress
Activities that have progressed before all preceding logic has been satisfied (Out-of-Sequence Progress) will be allowed only on a case-by-case basis subject to approval by the Contracting Officer.
Propose logic corrections to eliminate out of sequence progress or justify not changing the sequencing for approval prior to submitting an updated project schedule. Address out of sequence progress or logic changes in the Narrative Report and in the periodic schedule update meetings.
3.2.9 Added and Deleted Activities
Do not delete activities from the project schedule or add new activities to the schedule without approval from the Contracting Officer. Activity ID and description changes are considered new activities and cannot be changed without Contracting Officer approval.
3.2.10 Percent Complete
Update the percent complete for each activity started, based on the realistic assessment of earned value.
3.2.11 Remaining Duration
Update the remaining duration for each activity based on the number of estimated workdays it will take to complete the activity. Remaining duration may not mathematically correlate with percentage found under paragraph entitled Percent Complete. The remaining duration for unstarted activities are not to be less than its orginal duration.
3.3 REQUESTS FOR TIME EXTENSIONS
Provide justification of delay to the Contracting Officer in accordance with the contract provisions and clauses for approval, within 10 days of a delay occuring. Also prepare a time impact analysis for each Government request for proposal (RFP).
3.3.1 Justification of Delay
Provide a description of the event(s) that caused the delay and/or impact to the work. As part of the description, identify all schedule activities impacted. Show that the event that caused the delay/impact was the responsibility of the Government. Provide a time impact analysis that demonstrates the effects of the delay or impact on the project completion date, or interim completion date(s). Evaluate multiple impacts chronologically; each with its own justification of delay. With multiple impacts consider any concurrency of delay. A time extension and the schedule fragnet becomes part of the project schedule and all future schedule updates upon approval by the Contracting Officer.
3.3.2 Time Extension
The Contracting Officer must approve the Justification of Delay including the time impact analysis before a time extension will be granted. No time extension will be granted unless the delay consumes all available Project Float and extends the projected finish date ("End Project" milestone) beyond the Contract Completion Date. The time extension will be in calendar days.
SECTION 01 32 01.00 10 Page 5
Actual delays that are found to be caused by the Contractor's own actions, which result in a calculated schedule delay, are not a cause for an extension to the performance period, completion date, or any interim milestone date.
3.4 FAILURE TO ACHIEVE PROGRESS
Should the progress fall behind the approved project schedule for reasons other than those that are excusable within the terms of the contract, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra workdays, etc.
3.4.1 Artificially Improving Progress
Artificially improving progress by means such as, but not limited to, revising the schedule logic, modifying, or adding constraints, shortening activity durations, or changing calendars in the project schedule is prohibited. Indicate assumptions made and the basis for any logic, constraint, duration, and calendar changes used in the creation of the recovery plan. Any additional resources, manpower, or daily and weekly work hour changes proposed in the recovery plan must be evident at the work site and documented in the daily report along with the Schedule Narrative Report.
3.4.2 Failure to Perform
Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.
3.5 MODIFICATIONS
When a modification is issued by the Government, record the modification as the last activity of the Construction Schedule and Schedule of Values and include the value of the modification. Adjust the Schedule of Values to reflect the inclusion of the modification. Revise the Construction Schedule portion of the form to annotate the progress change. Enter all modifications in this manner in sequential order.
SECTION 01 32 01.00 10 Page 6
SECTION 01 33 00
SUBMITTAL PROCEDURES
08/18, CHG 4: 02/21
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Submittal Information
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
1.1.2 Submission of Submittals
Schedule and provide submittals requiring Government approval before acquiring the material or equipment covered thereby.
1.2 DEFINITIONS
1.2.1 Submittals
Shop drawings, product data, samples, and administrative submittals presented for review and approval. Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and
(f) apply to all "submittals."
1.2.1.1 Types of Submittals
All submittals are classified as indicated in paragraph "Submittal Descriptions (SD)". Submittals also are grouped as follows:
a. Shop drawings: As used in this section, drawings, schedules, diagrams, and other data prepared specifically for this contract, by contractor or through contractor by way of subcontractor, manufacturer, supplier, distributor, or other lower tier contractor, to illustrate portion of work.
b. Product data: Preprinted material such as illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer's descriptive literature, catalog data, and other data to illustrate portion of work, but not prepared exclusively for this contract.
c Samples: Physical examples of products, materials, equipment, assemblies, or workmanship that are physically identical to portion of work, illustrating portion of work or establishing standards for evaluating appearance of finished work or both.
d. Administrative submittals: Data presented for reviews and approval to ensure that administrative requirements of project are adequately met but not to ensure directly that work is in accordance with design concept and in compliance with contract documents.
SECTION 01 33 00 Page 1
1.2.2 Submittal Descriptions (SD)
Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:
SD-01 Preconstruction Submittals
Submittals that are required prior to or commencing with the start of work on site. Submittals that are required prior to or at the start of construction (work) or the next major phase of the construction on a multiphase contract.
Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.
The following shall be submitted within 10 calendar days of contract award unless specified elsewhere in the specifications.
Certificates Of Insurance Surety Bonds
The following Division 01 preconstruction submittals are required prior to mobilization or commencing on site work:
Construction Progress Schedule List Of Proposed Subcontractors List Of Proposed Products Submittal Register Accident Prevention Plan Health and Safety Plan Work Plan Quality Control (QC) Plan Environmental Protection Plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended
SECTION 01 33 00 Page 2 product warranties.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports
Daily logs and checklists
Final acceptance test and operational test procedure
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits
Text of posted operating instructions
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and Safety Data Sheets(SDS)concerning impedances, hazards and safety precautions.
SD-10 Operation and Maintenance Data
Data provided by the manufacturer, or the system provider, including manufacturer's help and product line documentation, necessary to maintain and install equipment, for operating and maintenance use by facility personnel.
SECTION 01 33 00 Page 3
Data required by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
Data incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
SD-12 Facilities Preventative Maintenance Program (FPMP)
The KTR shall develop and submit an FPMP for all newly constructed or installed infrastructure that accurately identifies the preventive maintenance required to professionally maintain each system or piece of equipment provided in this contract.
1.2.3 Approving Authority
Office or designated person authorized to approve the submittal.
1.2.4 Work
As used in this section, on-site and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction. In exception, excludes work to produce SD-01 submittals.
1.3 SUBMITTALS
Government approval is required for submittals in accordance with this section . Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Submittal Register
Approval of the above submittal is required prior to mobilization or commencing on site work
1.4 USE OF SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not change data in columns (a), (b), (c), and (d) as delivered by government.
SECTION 01 33 00 Page 4
1.4.1 Submittal Register Updates
Prepare and submit monthly updates of submittal register or at COR's discretion.
1.4.2 Submittal Register
Submit submittal register. Verify that all submittals required for project are listed and add missing submittals. Complete the following on the register:
Column (e) Contractor Submit Date: Scheduled date for approving authority to received submittals
Column (f) Date Forwarded to Approving Authority: Actual date submittal is forwarded to Approving Authority.
1.5 PROCEDURES FOR SUBMITTALS
1.5.1 Reviewing, Certifying, Approving Authority
Government organization shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements. Approving authority on submittals is the Project Manager unless otherwise specified for specific submittal.
1.5.2 Constraints
a. Submittals listed or specified in this contract shall conform to provisions of this section, unless explicitly stated otherwise.
b. Submittals shall be complete for each definable feature of work;
components of definable feature interrelated as a system shall be submitted at same time.
c. When acceptability of a submittal is dependent on conditions, items, or materials included in separate subsequent submittals, submittal will be returned without review.
d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.
1.5.3 Scheduling
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential requirements to resubmit.
b. Except as specified otherwise, allow review period, beginning with receipt by approving authority, that includes at least 10 working days. Period of review for each resubmittal is the same as for initial submittal. Allow longer time periods where processing must be coordinated with subsequent submittals.
SECTION 01 33 00 Page 5
c. No time extensions shall be authorized because of the Contractor's failure to transmit submittals to the USCG sufficiently in advance of the work.
1.5.4 Variations
Variations from contract requirements require Government approval pursuant to contract Clause entitled "FAR 52.236-21, Specifications and Drawings for Construction" and will be considered where advantageous to government.
1.5.4.1 Proposing Variations
When proposing variation, deliver written request to the contracting officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to government. If lower cost is a benefit, also include an estimate of the cost saving. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.
1.5.4.2 Warranting That Variation Are Compatible
When delivering a variation for approval, contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work, and deliver the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .