XLSX spreadsheet 18 KB Posted
- Solicitation number
- DACA175260001600
About this file
This is a Construction Specifications Bid Proposal Worksheet for the Recruiting Station - Marines Permanent Contact Station in Wauchula, FL. The worksheet serves as a pricing template requiring contractors to provide detailed cost estimates for all construction and build-out work necessary to prepare a 733-965 gross rentable square feet retail storefront space for occupancy as a Marine recruiting station.
The worksheet itemizes approximately 116 line items across multiple construction categories: HVAC/Mechanical, Plumbing (including water fountain, restrooms, janitorial closet, and wet pantry), Electrical (general, interior/exterior lighting, signage, emergency lighting, and roller shades), Communications (conduit, CAT-6 wiring), Safety & Fire Equipment, and Architectural Finishes-Fixtures-Supplies (ceilings, walls, soundproofing, paint, flooring options including porcelain tile, VCT, luxury vinyl tile, and carpet by military service branch, base cove, window treatments, doors, trim work, restroom fixtures, perforated window wraps, shelving, and desktops). Additional line items cover signage (interior and exterior options by service branch), Security Systems (video intercom entry control systems, CCTV systems with cameras and monitors, security closet), Permits and Fees, Architectural/Design Costs, and provision for Other Items. Each line item requires the contractor to input unit quantity, price per unit, and subtotal. All information supplied must comply with construction specifications provided by the USACE Representative, and the entire worksheet must be completed in its entirety; failure to do so may result in rejection of the overall offer. The Grand Total line aggregates all construction costs into a single bid price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Recruiting Facilities Program |
| Construction Specifications Bid Proposal Worksheet |
| Version: 2021-10-15 (REV 1) |
| IMPORTANT NOTES: |
| 1) All information supplied by the lessor/contractor on this bid proposal worksheet MUST include ALL appropriate requirements from the construction specifications Appendix provided by the USACE Representative. |
| 2) The entire bid proposal worksheet MUST be filled out in its entirety. Failure to fill out this bid proposal worksheet may result in the overall offer being rejected by USACE. |
| Bid Category | Quantity | $ - Each | Sub-Total | Comments |
| HVAC / Mechanical | 1 | $ 1.00 | $ 1.00 | |
| Plumbing: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Water Fountain | 1 | $ 1.00 | $ 1.00 | |
| Restroom (1) | 1 | $ 1.00 | $ 1.00 | |
| Restroom (2) | 1 | $ 1.00 | $ 1.00 | |
| Janitorial Closet | 1 | $ 1.00 | $ 1.00 | |
| Wet Pantry (if applicable) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Electrical: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Interior Lighting | 1 | $ 1.00 | $ 1.00 | |
| Exterior Lighting | 1 | $ 1.00 | $ 1.00 | |
| Exterior Signage | 1 | $ 1.00 | $ 1.00 | |
| Emergency Lighting | 1 | $ 1.00 | $ 1.00 | |
| Roller Shades | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Communications: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Conduit | 1 | $ 1.00 | $ 1.00 | |
| CAT-6 Wiring | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Safety & Fire Equipment | 1 | $ 1.00 | $ 1.00 | |
| Architectural Finishes-Fixtures-Supplies: | ||||
| Ceilings | 1 | $ 1.00 | $ 1.00 | |
| Walls | 1 | $ 1.00 | $ 1.00 | |
| Soundproofing | 1 | $ 1.00 | $ 1.00 | |
| Paint: | ||||
| Common Area (Gov't Controlled) | 1 | $ 1.00 | $ 1.00 | |
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Porcelain Tile (wall / floor) | 1 | $ 1.00 | $ 1.00 | |
| Vinyl Composition Tile (VCT) | 1 | $ 1.00 | $ 1.00 | |
| Luxury Vinyl Tile (Air & Army Natl Guard) | 1 | $ 1.00 | $ 1.00 | |
| Carpet: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Base Cove (to include tiled areas) | 1 | $ 1.00 | $ 1.00 | |
| Fragment Retention Film | 1 | $ 1.00 | $ 1.00 | |
| Mini-Blinds | 1 | $ 1.00 | $ 1.00 | |
| Windows | 1 | $ 1.00 | $ 1.00 | |
| Doors | 1 | $ 1.00 | $ 1.00 | |
| Trim Work (chair rail, etc.) | 1 | $ 1.00 | $ 1.00 | |
| Roller Shades | 1 | $ 1.00 | $ 1.00 | |
| Fixed Panel Shade(s) | 1 | $ 1.00 | $ 1.00 | |
| Secondary Exit Door Security Hardware | 1 | $ 1.00 | $ 1.00 | |
| Restroom Fixtures | 1 | $ 1.00 | $ 1.00 | |
| Perforated Window Wrap(s): | ||||
| JRFC (Joint) Graphic | 1 | $ 1.00 | $ 1.00 | |
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Shelving | 1 | $ 1.00 | $ 1.00 | |
| Desk-Top(s) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Signage: | ||||
| Interior Signage: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Restroom(s) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Exterior Signage: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Video Intercom Entry Control System | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Marquee / Pylon Signage | 1 | $ 1.00 | $ 1.00 | |
| Security Systems: | ||||
| Video Intercom Entry Control System: | ||||
| General/System (main parts/wiring/etc.) | 1 | $ 1.00 | $ 1.00 | |
| Door Station(s) | 1 | $ 1.00 | $ 1.00 | |
| Desk Stations (master + sub-masters) | 1 | $ 1.00 | $ 1.00 | |
| CCTV System: | ||||
| General/System (NVR /Wiring / Etc.) | 1 | $ 1.00 | $ 1.00 | |
| Cameras | 1 | $ 1.00 | $ 1.00 | |
| TV Monitor(s) - (office displays) | 1 | $ 1.00 | $ 1.00 | |
| Security Closet | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Permits Fees (all necessary, including low voltage if applicable) | 1 | $ 1.00 | $ 1.00 | |
| Architectural / Design Costs | 1 | $ 1.00 | $ 1.00 | |
| Other Items (define): | ||||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| BID PROPOSAL - GRAND TOTAL | 1 | $ 1.00 | $ 116.00 |