This solicitation document is a Request for Proposal (RFP) issued by the Town of Willington, Connecticut for Owner's Project Management (OPM) services for the design and construction of a new consolidated preschool-to-Grade 8 school. The RFP, numbered 39529, seeks qualified firms to provide comprehensive project management services including state grant management, building design, site design, and construction oversight. The proposal submission period runs from October 21, 2026 at 12:30 PM EDT through November 5, 2026 at 2:00 PM EST. Bidders must submit two hard copies and one electronic copy (via thumb drive) of the Statement of Qualifications in one envelope and two hard copies and one electronic copy of the cost proposal in a separate envelope to James Marshall, Chairperson of the School Building Committee, at 40 Old Farms Road, Willington, CT 06279. No specific award date is identified in the solicitation, and the estimated total contract value is not disclosed.
The scope of work encompasses five primary tasks: project management (including kick-off and regular status meetings, monthly schedule updates, and progress reports); design reports (including topographic surveys, mapping, and Design Concept Reports with conceptual plans); detailed design and construction documents (including schematic design through final construction documents with multiple review stages); bidding assistance (including pre-bid meetings, responses to bidder inquiries, and addenda preparation); and construction phase services at the Board of Education's discretion (including construction administration, inspection, quality control, and record drawing preparation). Payment terms and contract duration are unspecified in the document. The solicitation is open to all vendors, with educational specifications available on the Town of Willington website. Supporting documents include the RFQP for Owners Project Manager and a Willington Middle School Macro Schedule. Contact for questions is James Marshall at 860-487-3100 or jmarshall@willingtonct.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Willington MS Macro Schedule.pdf | ||
| RFQP for Owners Project Manager MASTER issued Oct 21.pdf | ||
| 39529_Nov_2_26_solicitation_doc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 39529
Town of Willington RFP to Provide OPM services for Preschool
- Grade 8 School
Request for Proposal (RFP)
Willington, Town of
October 21, 2026 - November 05, 2026
Page:2
General Header Information
This bid has no questions defined.
39529
No. 39529 Title: Town of Willington RFP to Provide OPM services for Preschool - Grade
8 School Start Date: October 21, 2026 at 12:30:00 PM EDT End Date: November 05, 2026 at 2:00:00 PM EST Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: To provide Owner’s Project Management Services for state grant management, building, site design, and construction of a new consolidated preschool-to-Grade 8 school.
Educational specifications can be found at https://www.willingtonct.gov/DocumentCenter/View/4873/Willington- Public-Schools-Educational-Specifications-2026-BOE-MASTER-7-17-26.
Delivery Terms: See Delivery Notes Delivery Notes: Submission shall include two (2) hard copies and one (1) electronic copy
(Thumb drive) of the Statement of Qualifications and, in a separate envelope, two (2) hard copies and one (1) electronic copy (Thumb drive) of the cost proposal.
Payment Terms: Unspecified Contact Information: Willington, Town of
James Marshall, Chairperson – School Building Committee c/o, Administrative Assistant to the First Selectman 40 Old Farms Road, Willington, CT 06279 Tel: 860-487-3100 jmarshall@willingtonct.gov
Contact Details: If you have any questions, please contact:
James Marshall, Chairperson – School Building Committee c/o, Administrative Assistant to the First Selectman 40 Old Farms Road, Willington, CT 06279 Tel: 860-487-3100 jmarshall@willingtonct.gov
Selected Categories:
Page:3
Documents:
RFQP for Owners Project Manager MASTER issued Oct 21.pdf
Willington MS Macro Schedule.pdf
Page:4
Item Specifications
No. Item Alternative Supplier Part No Mfr.
Name
Mfr. No Del
Date
Unit Unit Bid Qty. Total
1 PROJECT
ARCHITECTURAL
DESIGN AND
CONSTRUCTION
MANAGEMENT
SERVICES - Construction
Phase (if awarded) each 1.00
Item Specification for PROJECT ARCHITECTURAL DESIGN AND CONSTRUCTION MANAGEMENT SERVICES - Construction Phase (if awarded)
Description: Task 1: Project Management The Project Architect Consultant shall establish a project management system to provide adequate scope, schedule, and budget control and be responsive to input from the BOE. Status and project meetings with all participating BOE staff shall be conducted on a regular basis. The purpose of these meetings shall be to report to the BOE on project status issues such as work in progress, work completed, and delivery schedule. Discussions on the various technical issues and strategies associated with all phases of a project shall take place during these meetings. In addition, meetings shall be held with the BOE and other agencies to coordinate multi-jurisdictional components of a project. Meeting minutes documenting the decisions made and action items shall be prepared by the Project Architect Consultant and submitted to the attending parties. Task 1.1 - Project Meetings The Project Architect Consultant shall arrange for a kick-off meeting through the BOE project manager or designee. This meeting shall serve to clarify the lines of communication and other administrative details. The Project
Architect Consultant shall then meet with the BOE staff and participating agencies on an agreed basis (as needed) to report project progress. Task 1.2 - Project Schedule The Project Architect
Consultant shall provide a project schedule identifying project meetings, project deliverables, and major milestones required by the BOE. The schedule shall be updated on a monthly basis. Task
1.3 - Project Status Reports. The Project Architect Consultant shall provide a monthly project progress report as requested that contains the following information for all projects currently under design and construction. Deliverables: Monthly Status Meetings Monthly Schedule Updates Progress Reports and Meeting Minutes Task 2: Design Reports Many projects shall require a design concept report (DCR), which typically includes Conceptual (30%) Plans. If required by the BOE, the DCR shall identify the purpose of the project, present the methodology used to define the proposed solution, summarize alternatives if applicable, provide an overview of specific issues and recommended solution(s), describe the improvements to be made, present conceptual plans delineating the limits of improvements and type(s) of work to be done, and provide a preliminary project cost estimate. When required by the BOE, the Project Architect Consultant shall be responsible for performing a topographic survey of the area including all existing features and utilities, and preparing mapping and base sheets to accurately show the existing conditions. The
DCR shall also identify and detail what coordination will be needed with existing infrastructure and stakeholders, in particular utility relocations, traffic control and businesses. These items shall also be included in the preliminary cost estimates for each project. Deliverables: Surveying, Mapping and Field Investigations Design Concept Report (DCR), including Conceptual Plans and
Estimate Task 3: Detailed Design and Construction Documents Based on approval of the DCR by the District, the Project Architect Consultant shall prepare detailed design and construction documents for review. Each review of these documents shall include plans (drawn in AutoCAD to District standards), cost estimate, and technical specifications. Task 3.1- Detailed Design
Engineering Provide complete consulting engineering and design services for architecture. Task 3.2 - Design Review Submittals Develop detailed plans, specifications and project cost estimates and submit to the BOE for review and approval at the following completion stages. The BOE will determine the level of staff review that is required prior to beginning the defined scope of work.
The following is a typical review process for BOE projects: Schematic Design Design Development 50% Construction Documents 90% Construction Documents Final Construction Documents The
Project Architect Consultant shall incorporate the BOE's review comments into the subsequent submittal. The Project Architect Consultant shall prepare a tabulation of the review comments and the proposed resolution for each comment. The Project Architect Consultant must provide a brief explanation for each comment that it proposes to not incorporate, otherwise, the District expects all comments to be addressed. Task 3.3 - Cost Estimates The Project Architect Consultant shall prepare detailed construction cost estimates for each submittal. Cost estimates shall reflect current market conditions and project timeframes. Task 3.4 - Comment Resolution Meetings The Project Architect Consultant shall participate in review meetings with BOE staff, tabulate and address comments, and submit a written comment resolution summary at each plan review stage. Responsiveness and communication relative to review comments are key components when evaluating the Project Architect Consultant's performance. The District recognizes that previous comments may be superseded as design progresses and that some review comments require additional discussion and engineering judgment prior to final resolution. Comment resolution meetings should be scheduled in order to facilitate this discussion and resolution. The BOE's expectation is that responses be documented for all review comments and that the Consultant should never independently delete or ignore review comments. Task 3.5 - Utility Coordination The
Project Architect Consultant shall assist with utility coordination and agency approvals by performing such tasks as preparing applications and supporting materials in order to secure permits and approvals for the project as well as holding utility coordination meetings. The District will provide general coordination by requesting mapping, distributing progress plan submittals to utility companies and other agencies, and related tasks. The Project Architect Consultant shall be responsible for incorporating existing utility information into the drawings and preparing its design with due consideration given to existing utilities and infrastructure. Task 3.6 - Public Meetings When requested by the BOE, the Project Architect Consultant shall assist with stakeholders and public meetings. The BOE staff will handle the day-to-day tasks associated with public outreach and communication with the public and stakeholders. The Project Architect Consultant shall be primarily responsible for preparing supporting documentation, such as exhibit boards, and attending public meetings to assist with answering questions. Task 3.7 - Final Bid Documents The
Project Architect Consultant shall furnish the BOE with one (1) full-sized set of plans, specifications and a cost estimate at each review stage, including final specifications and documents for the bid release. Final drawings and specifications shall be issued in electronic format for bid solicitation to be posted on BOE and DAS websites. Task 3.8 - Final Design Reports The detailed design development will likely generate some minor revisions and updates to the design report prepared at the 30% submittal stage. The Consultant shall incorporate such updates and submit a final report to the BOE for review. Task 4: Bidding Assistance If requested by the BOE, the Project Architect Consultant shall provide bidding assistance services, such as: Attend pre-bid meeting(s) for the project to discuss the bid documents, field conditions, and answer technical questions. Prepare pre-bid meeting minutes for review and distribution. Issue responses to requests for information (RFI) from prospective contractors and suppliers, by preparing a summary of questions and answers via written addenda. Prepare addenda for review and approval by the BOE. The
District will post all addenda to Purchasing and DAS websites. Deliverables: Pre-bid Meeting Minutes Responds to Questions from Bidders Furnish Addenda to the Bid Documents Task 5:
Construction Phase Services Construction phase services will be required at the BOE's discretion. The BOE may elect to self-perform construction administration and inspection on projects, or may request the Project Architect Consultant provide these services. Regardless of the level of service ultimately needed for construction services, successful experience in this area is desirable.
The construction administration scope will be determined prior to completion of the design and a contract amendment issued as needed, to avoid delaying the project. The following is an outline of basic services that may be requested by the BOE: Project administration assistance. Participate in the pre-construction meeting and/or progress meetings. Review shop drawings, submittals, and respond to the awarded contractor's requests for information (RFI). Review project reports created by the BOE/District Inspector or submitted by the Contractor. Review technical proposals and cost submittals and make recommendations. Construction observation, inspection, and quality control testing services. Assist with project closeout activities, including the filing of all required forms for the completion of warranties, State and Federal requirements, and commissioning of mechanical facilities. The Project Architect Consultant may be requested to prepare
Record Drawings for the project, based upon field observations and information furnished by the Contractor at project completion. The Record Drawings, if requested, shall be required in both hard copy and digital format. Deliverables: Documentation of the Construction Project Construction Meeting Minutes Construction Observations and Inspection Quality Control Test
Allow Vendor to Enter Negative Value : No
Exclude Line Item from Bid Total : No