38NBA58205_01_A01.pdf
PDF 333 KB Posted
- Attached to
- Spare Engine Run-In with Dynamometer; accomplish
- Solicitation number
- N6264926Q0559
About this file
This is a Job Specification and Test Procedure document for the U.S. Navy Ship Repair Facility (SRF) in Sasebo, Japan, detailing the inspection, repair, and dynamometer testing of a spare stern anchor winch engine.
The work involves a single MTU Detroit Diesel Corp Model 1043-7000 4-71 spare diesel engine (APL 666010355) for the LCU-1666 (NBU-7) Landing Craft Utility. The engine requires pickup from SRF, transport to the contractor's test facility, run-in testing with a dynamometer, and delivery back to SRF through SHIPSUPT. The anticipated award date is September 19, 2024, with a production completion date of January 19, 2025, and a Period of Performance from October 21, 2024, to January 19, 2025. The work location is the contractor's test facility, with SRF providing lube oil, gaskets (P/N 5150116), and fluid filter elements (P/N 5159129). The initial condition notes that during operability tests, jacket water was discovered in the oil sump, suggesting a cracked engine block; the repaired engine must undergo bench testing prior to installation per Job Order Number 38NBA58205. The test procedure requires a basic run-in phase (starting at 1,200 rpm, progressing to 2,100 rpm over approximately 195 minutes) followed by a final run-in phase at 1,700 rpm with no-load and full-load conditions, including comprehensive inspections for leaks, bolt tightness, and component integrity, with acceptance criteria specified for coolant temperature, lubricating oil pressure, air box pressure, exhaust back pressure, and horsepower output.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - N6264926Q0559.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ship/HULL NO. Ship/HULL NAME i ICN: Rev: Key Op:
LCU-1666 NBU-7
JON: 38NBA58205 01 A01
TITLE: Spare Stern Anchor Winch Engine; inspect and repair
Rev-01(FO)~Spare Engine Run-In with Dynamometer; accomplish
JOB SPECIFICATION
Anticipated Award Date: Production Completion Date:
9/tt't fi-o¼ 11--/,q /').,VZ--u,, POP Start Date: POP End Date:
r r1 I J--1 I~?, o I / I q / 'j,.oJ.,- 7
PREPARED BY: CODE
H.SENOO M SE
APPROVED BY:
CODE
S.MURAKAMI S225
CONCURRED BY:
.J"/,, A.$\
CODE
N.SASHI S232
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
DESCRIPTION:
PREPARING ACTIVITY:
SASEBO
DATE
9/19/2025
~~5-z(O f{lt .
JSN(Sl: CU66-1744 CASREP # 25018. DTG: 300100ZJUL25. C-2
S/F CONTACT: LORENZO/ gONZALEZ EN1 CWP# CCNS#
(' lCH A. RE:f 6e'1
~~ IP) /:J-~) v; Approved by S300/S900 Pl\• C:l Date: AVL: -5eM- I
l) I '/
LWC:
Work Completed
S/Force: Rate: Date:
Ship Supt: Date: SRF CONTROL NO.: /Jo(f<.O(J..l~
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
Ship/HULL NO. Ship/HULL NAME ; ICN:
JON: 38NBA58205
TITLE: Spare Stern Anchor Winch Engine; inspect and repair
Rev-01 (FO)~Spare Engine Run-In with Dynamometer; accomplish
1. SCOPE:
Rev:
: 01
1.1 Title: Spare Stern Anchor Winch Engine; inspect and repair Rev-0l(FO)~Spare Engine Run-in with Dynamometer; accomplish
1.2 Location of Work:
1.2.1 Contractor's Test Facility
1. 3 Identification:
Key Op:
A01
1.3.1 Quantity (One EA), Spare Diesel Engine for Stern Anchor Winch Hydraulic System, MFR: MTU Detroit Diesel Corp, Model: 1043-7000 4- 71, APL 666010355 (from Table 6-56 of 2.1)
2 . REFERENCES:
2.1 T9008-C7-OMP-010 Rev 1, 135-Foot Landing Craft Utility (LCU), 1627/1646 Class, Anchor Winch
2.2 T.P File No.58111-1-100 25338A, Spare Stern Anchor Winch Engine - Run-in(with Dynamometer) (Enclosed)
3. REQUIREMENTS:
3.1 Pick up the spare diesel engine listed in 1.3.1 from SRF through SHIPSUPT and transport the spare diesel engine to test facility.
(V) (G) "RUN-IN (with DYNAMOMETER)"
3.2 Accomplish the requirements of 2.2 for run-in of the spare diesel engine listed in 1.3.1, using 2.1 for guidance. -S211
3.2.1 Provide equipment which are required to conduct the run-in such as shaft coupling, jacket water cooling system, engine starting system, etc.
3.2.2 Remove each engine cooling water and lubricating oil after completion of run-in.
3.3 Deliver the spare diesel engine listed in 1.3.1 to SRF through
SHIPSUPT.
4. NOTES:
4.1 Initial Condition - During operability tests of the anchor engine, Ship's Force discovered that jacket water was in oil sump. It is suspected that the engine block is cracked. Repaired engine needs to be performed bench test prior to installation.
Ship/HULL NO. Ship/HULL NAME l lCN:
JON: 38NBA58205
TITLE: Spare Stern Anchor Winch Engine; inspect and repair
Rev-01(FO)~Spare Engine Run-In with Dynamometer; accomplish
Rev: Key Op:
01 A01
4.2 SRF-JRMC Tool Room will issue pressure gages, torque wrenches, and dial indicators when required.
4.3 SRF Production Shop will witness a bench test of spare engine listed in 1. 3 .1.
4.4 After completion of dynamometer test(run-in), spare engine listed in
1.3.1 will be installed by 38NBA58206-H01.
5. GOVERNMENT FURNISHED MATERIAL (GEM) :
5.1 SRF will provide lube oil when required.
5.2 SRF will provide following materials.
MATERIAL LIST
M
ITEM PC REF I STOCK
NO. NO. NO. C DESCRIPTION NUMBER
001 6-22-1 2.1 C GASKET, 9B 5330 003838661
P/N: 5150116
002 M FILTER, FLUID, 9B 4330 009010977
P/N: 5159129 (S1129129)
FROM MRC 83 9VHY Y 18M-6
QTY
HAZ DOC REQD/ PARA
MAl NO. UNIT NO.
N 1/EA 3.2
N 2/EA 3.2
CUI
SHIP/HULL NO.: NBU-7 / LCU-1666 ICN: Rev: Key Op:
JON:
T.P FILE NO.: 58111-1-100_25338A 38NBA58205 01 A01 Page 1 of 8
SHIP REPAIR FACILITY - JAPAN REGIONAL MAINTENANCE CENTER
( "'! :.l·, DET SASEBO TEST PROCEDURE
TITLE: JCN:
SPARE STERN ANCHOR WINCH ENGINE
CU66-1744
CWP:
- RUN-IN (With Dynamometer) NA
TEST PROCEDURE PREPARATION
PRINT NAME & SIGNATURE PHONE CODE DATE
PREPARED BY NAKASHIMA.ATSUSHl.127 o;•"""' """"• •, 4 756299 ~~~~~~T5S~~f~;~7~~299 252-8048 S246B 9/15/2025
A. NAKASHIMA
REVIEWED BY IIDA.SHUNICHl.127461912 □;•"""'"""°" •, 9/19/2025 S. IIDA 7 IIDASHUNICHl.1274619127 252-8045 S246A o.•· 2025.0919 08:0.:49 +0900'
APPROVED FOR ISSUE
PHILLIPS.SHAUN.PARRY. g~1~::i:".~!i~ PARRv, 093485625
S. PHILLIPS 1093485625 □,.., 2025.09.1906,<a,17.,,.,.,.
252-8049 S246CTE 9/19/2025
APPROVED FOR ISSUE
WAGNERMICHAELJOSEP Digltally.iQnedby 252-2228 S211 9/19/2025 WAQNER.MICHAEL.JOSEPH.1038153390
DIESEL ENGINE INSPECTOR H.1036153390 DIIII: 2025.08.11107:42·01 +Olil'OO'
PROCEDURE COMPLETED
PRINT NAME & SIGNATURE ORGANIZATION BADGE/RANK DATE
LWC
DIESEL INSPECTOR SRF-JRMC
DETSASEBO
CERTIFICATION REVIEW AND APPROVAL OF TEST RESULTS
PRINT NAME & SIGNATURE PHONE CODE DATE
REVIEW & APPROVAL (Test Results Reviewed and Approved)
DIESEL ENGINE INSPECTOR
COMMENTS:
JON:
T.P FILE NO.: 58111-1-100_25338A 38NBA58205 01 A01 Page 2 of
TEST PROCEDURE GENERAL NOTES
1. TEST SEQUENCE: Unless otherwise specified in the test document, this test procedure (TP) shall be completed in provided order.
2. VERIFICATION: The person designated to sign an action verifies, based on personal observation, objective evidence, or watch stander reports and certifications by signature that the action has been performed in accordance with the specified requirements.
3. USE ORIGINAL DOCUMENTS: All data attached to the Master TP shall have original pen and ink entries on the data sheets (unless otherwise specified in the test procedure.)
4. USE DARK INK: All signature and data shall be in dark, water insoluble ink.
5. CORRECTIONS: When an error was made, it shall be corrected by drawing a single line through the error, recording the correct entry, initialing, dating and printing the name of the person making the correction in accordance with JOINT FLEET MAINTENANCE MANUAL (JFMM), COMUSFL TFORCOMINST 4790.3, VOLUME V, QUALITY MAINTENANCE.
6. LATEST APPLICABLE REVISION: Use the latest applicable revision of plans, instructions, technical manuals, and other reference materials cited in this test procedure.
7. INSTRUMENT CALIBRATION: All measuring equipment shall be in current calibration as required by
NAVSHIPREPFACINST 4734.1.
8. OPERATION OF COMPONENTS: Only authorized personnel shall operate ship's permanently installed equipment. The cognizant Shop shall control and operate their temporary test equipment. Ship's Force shall operate temporary systems and equipment that are formally turned over to the ship.
9. SAFETY INSTRUCTION: The Test Director is responsible for the safe conduct of this test. The safety precautions of NAVSHIPREPFAC M-5100.8 shall be observed at all times.
10. TEST STOPPAGE: The Test Director shall stop the test once a problem has been found in the system or equipment being tested. S246 Testing Standard Operating Procedure (SOP) shall be used to determine course of action prior to resuming the test procedure.
11. ENERGIZED EQUIPMENT: NSTM 300, para 300-2.4 shall be followed when working on energized equipment.
12. DATA COLLECTION: The test documents may require collection of additional data for which there is no acceptance criteria, provided the data sheet identifies that data is for information only.
13. SUPPLEMENTATION: When supplementation is made, annotate the supplemental information on the page with 'See Remarks' followed by a sequential numbering system corresponding in the Remarks section.
14. USE ASTERISK(*): When supplementation, correction and/or signature is made but there is not enough space, annotate using an asterisk (*) followed by sequential number adjacent to the portion then clarify on the same page using the same annotation.
y,:
JON:
T.P FILE NO.: 58111-1-100 _25338A 38NBA58205 01 A01 Page 3 of 8
SPARE STERN ANCHOR WINCH ENGINE - RUN-IN (With Dynamometer)
1. PURPOSE
1-1 This test is to demonstrate the satisfactory operation of Spare MPDE after overhaul.
2. REFERENCES
2-1 TECHNICAL MANUAL
2-1.1 T9008-C7-OMP-010; 135-FOOT LANDING CRAFT UTILITY (LCU), 1627/1646 CLASS, ANCHOR WINCH
2-2 GSO-GENERAL SPECIFICATIONS FOR OVERHAUL OF SURFACE SHIPS: S9AA0-AB-GOS-010
2-2.1 SEC 092; SHIPBOARD TESTS
2-2.2 SEC 233; PROPULSION INTERNAL COMBUSTION ENGINES
2-3 NSTM-NAVAL SHIPS' TECHNICAL MANUAL
2-3.1 S9086-HB-STM-01 0/CH-233; DIESEL ENGINES
2-4 NAVSHIPREPFAC M-5100.8: SAFETY AND HEALTH PROGRAM MANUAL
3. TEST AND SUPPORT EQUIPMENT/MATERIAL
3-1 Dynamometer to apply load to engine
3-2 Oil pressure gauge
3-3 Oil temperature gauge
3-4 Water temperature gauge
3-5 Fuel pressure gauge
3-6 Pressure gauge or mercury manometer or water manometer for:
• Engine air box
• Crankcase
• Exhaust manifold
• Blower inlet
• Fuel manifold inlet passage
4. GENERAL PRECAUTIONS
4-1 Only those personnel actively engaged in performing or witnessing this test shall be permitted in the testing area. All specified safety regulations shall be strictly observed.
4-2 To prevent injury or death, ensure that proper test equipment is used during testing.
4-3 Safeguarding of personnel and equipment shall be adhered to at all times.
JON:
T.P FILE NO.: 58111-1-100_25338A 38NBA58205 01 A01 Page 4 of
5. TESTING STEP
5-1 PRETEST BRIEFING Conduct a pre-test briefing (e.g. safety precaution, station assignments, testing steps) with all involved test personnel.
5-2 PRE-STARTING Perform a pre-starting as follows and check mark in Section A of TEST DATA SHEET upon completion of each step.
5-2.1 Connect a dynamometer to the engine through a universal coupling to the absorption unit.
5-2.2 Fill lube oil system and fuel oil system.
5-2.3 Preliminary valve clearance adjustment must be made before the engine is started. Using the procedures in Chapter 5 of Reference 2-1.1.
5-2.4 A preliminary injector timing check must be made before starting the engine using the procedures in Chapter 5 of Reference 2-1.1.
5-2.5 Preliminary governor adjustments must be made as outlined in Chapter 5 of Reference 2-1.1.
5-2.6 Preliminary injector rack adjustment must be made as outlined in Chapter 5 of Reference 2-1.1.
5-3 RUN-IN Perform run-in as follows.
5-3.1 BASIC RUN-IN Perform a basic run-in as follows and record data and/or result (SAT/UNSAT) in TEST
DATA SHEET.
(1) Set the engine throttle at idle speed, check the lube oil pressure and check all connections to be sure there are no leaks.
(2) Also, refer to the Operating Conditions in Chapter 2 of Reference 2-1.1 which presents the engine operating characteristics. These characteristics will be a guide for tracing faulty operations or rack of power.
(3) After checking the engine performance at idle and being certain the engine and dynamometer are operating properly, increase the engine speed to 1,200 rpm and apply the load indicated on the BASIC RUN-IN SCHEDULE. The engine should be run at this speed (1,200 rpm) and load for 15 minutes to allow sufficient time for the coolant temperature to reach the normal operating range. Record length of time, speed, horsepower, coolant temperature and lube oil pressure in Section B of TEST DATA SHEET. Acceptance criteria are shown in Table 5-1.
Table 5-1: Acceptance Criteria
Parameter Acceptance Criteria
1,200 rpm
Coolant Temperature (deg. F) 160 (Minimum)
Lubricating oil pressure (psi) 18 (Minimum)
(4) Run the engine at each speed and rating for the length of time indicated in the BASIC RUN-IN SCHEDULE. Record all the required data in Section B of TEST DATA SHEET. Acceptance criteria are shown in Table 5-2.
Table 5-2: Acceptance Criteria
Parameter Acceptance Critaria
1600 rpm 1800 rpm
Coolant Temperature (deg. F) 160 (Minimum) 160 (Minimum)
Lubricating oil pressure (psi) 24 (Minimum) 28 (Minimum)
JON:
T.P FILE NO.: 58111-1-100_25338A 38NBA58205 01 A01 Page 5 of
(5) BASIC RUN-IN INSPECTION Perform a basic run-in inspection as follows and check mark the TEST DATA SHEET upon completion of each step.
1. While the engine is undergoing the Basic Run-In, check each item indicated in Section C of TEST DATA SHEET. Check for oil at rocker mechanism, lube oil leaks, fuel oil leaks, water leaks, and check and tighten all external bolts.
2. Upon completion of the Basic Run-In and Inspection, remove the load from the dynamometer and reduce the engine speed gradually to idle and then stop the engine.
(6) INSPECTION AFTER BASIC RUN-IN Perform an inspection after the basic run-in as follows and check mark in Section D of TEST DATA SHEET upon completion of each step.
1. The primary purpose of this inspection is to provide a fine engine tune-up. First, tighten the cylinder head and rocker arm shaft bolts to the proper torque. Next, complete the applicable tune-up procedure. Refer to paragraph 5-3 of Reference 2-2.1.
5-3.2 FINAL RUN-IN Perform a final run-in as follows and record data and/or result (SAT/UNSAT) in TEST
DATA SHEET.
(1) If the engine has been shut down for one hour or longer, it will be necessary to have a warm-up period of 15 minutes at the same speed and load used for warm-up in the Basic Run-In. If piston rings, cylinder liners or bearings have been replaced as a result of findings in the Basic Run-In, the entire Basic Run-In must be repeated as though the Run-In and Test procedure were started anew.
(2) Start the Final Run-In and run the engine at a specified speed (1,700 rpm) with no-load.
(3) Run the engine at specified speed (1,700 rpm) and rating for the length of time indicated in the FINAL RUN-IN SCHEDULE. Record all the required data in Section E of TEST DATA SHEET and the value will be close to the design data specified in Table 5-3. During the Final Run-In, the engine should develop, within 5%, the maximum rated horsepower indicated for the speed at that it is operating.
Table 5-3: Ooeratina Parameter & Acceotance Criteria
Parameter Design Data (at 1800 rpm)
Air box press. (inches mercury) At zero exhaust back pressure 2.8
At max full load back pressure 5.3
Exhaust back pressure (inches mercury) 3.3
Crankcase pressure 2.5
Air inlet restriction (inches water) Clean air cleaner 13.4
Fuel press. at inlet manifold (psi) 45-70
Coolant Temperature (deg. F) 170-195
Lubricating oil temperature (deg. F) 200-225
Lubricating oil pressure (psi) 43-65
(4) After the prescribed time for Final Run-In has elapsed, the load should be removed from the dynamometer and the engine speed gradually reduced to idle and the engine stopped. The Final Run-In is complete.
JON:
T.P FILE NO.: 58111-1-100_25338A 38NBA58205 01 A01 Page 6 of
(5) INSPECTION AFTER FINAL RUN-IN Perform an inspection after the final run-in as follows and check mark in Section F of TEST DATA SHEET upon completion of each inspection item.
1. This inspection will provide final assurance that the engine and accessories required in the installation are in proper working order. During this inspection the engine should also be made ready for any brief delay in delivery or installation which may occur. This is accomplished by rust proofing the fuel system. A rust inhibitor should be introduced into the cooling system.
6. TEST PROCEDURE COMPLETION
6-1 Sign the test procedure coversheet to verify that the test is complete. DEi shall review and sign this test procedure for approval.
7. REMARKS
fa(
JON:
T.P FILE NO.: 58111-1-100_25338A 38NBA58205 01 A01 Page 7 of 8
RUN-IN SCHEDULE
ENGINE
STEP TIME HORSEPOWER SPEED
(MINUTES) (BHP) (RPM)
15 15%(14) 1,200
60 50% ( 54) 1,400
BASIC ENGINE RUN-IN 60 75% ( 92) 1,600
30 100% ( 135) 1,800
30 100% ( 152) 2,100
- 0% 1,700
FINAL ENGINE RUN-IN
30 * 1,700 100% ( 130)
* Within ± 5% of brake horsepower rating shown above at governed speed.
JON:
T.P FILE NO.: 58111-1-100_25338A 38NBA58205 01 A01 Page 8 of 8
TEST DATA SHEET
A PRE-STARTING
1.
PRIME LUBE
2.
PRIME FUEL 3. ADJUST 4. TIMEINJ. 5. ADJ.GOV. 6. ADJUSTINJ.
OIL SYSTEM SYSTEM VALVES RACK
D CONDUCTED D CONDUCTED D CONDUCTED D CONDUCTED D CONDUCTED D CONDUCTED
B BASIC RUN-IN
TIME TIME
RPM BHP WATER TEMP. LUBE OIL RESULT AT SPEED PRESS. START STOP
C BASIC RUN-IN INSPECTION
INSPECTION ITEM liZICHECK
1. Check oil at rocker ann mechanism. D CONDUCTED
2. Inspect for lube oil leaks. D CONDUCTED
3. Inspect for fuel oil leaks. D CONDUCTED
4. Inspect for water leaks. D CONDUCTED
5. Check and tighten all external bolts. D CONDUCTED
D INSPECTION AFTER BASIC RUN-IN
INSPECTION ITEM liZICHECK
1. Tighten Cylinder Head & Rocker Shaft Bolts D CONDUCTED
2. Adjust Valves (Hot) D CONDUCTED
3. Time Injectors D CONDUCTED
4. Adjust Governor Gap D CONDUCTED
5. Adjust Injector Racks D CONDUCTED
E FINAL RUN-IN
TIME TOP RPM AIR BOX PRESSURE EXHAUST BACK CRANKCASE PRESS. BHP FULL LOAD PRESS. FULL LOAD FULL LOAD START STOP NO LOAD FULL LOAD
BLOWER INTAKE FUEL OIL PRESS.
RES. FULL LOAD RET.MAN.
FULL LOAD
F
INSPECTION ITEM
1. Inspect air box, pistons, liners, rings
2. Inspect blower
3. Check generator charging plate
4. Wash oil pan, check gasket
5. Clean oil pump screen
WATER TEMP. LUBE OIL TEMP. LUBE OIL PRESS
FULL LOAD FULL LOAD FULL LOAD
FINAL RUN-IN RESULT: D SAT/ D UNSAT
INSPECTION AFTER FINAL RUN-IN
liZI CHECK INSPECTION ITEM
D CONDUCTED 6. Tighten oil pump bolts
D CONDUCTED 7. Inspect oil pump drive
D CONDUCTED 8. Replace lube filter elements
D CONDUCTED 9. Tighten flywheel bolts
D CONDUCTED 10. Rust proof cooling system
INSPECTION RESULT: D SAT/ D UNSAT
CUI
IDLE SPEED
IDLE
liZICHECK
D CONDUCTED
D CONDUCTED
D CONDUCTED
D CONDUCTED
D CONDUCTED
(1/,