This is a Job Specification document for temporary portable head and washbasin provision services aboard the USS NEW ORLEANS (LPD-18) during a scheduled availability at Sasebo.

The specification requires the provision and maintenance of eight temporary portable toilet facilities: five units designated for male use and three units for female use, each consisting of a western-type water closet, sewage accumulating tank, and locking door. Additionally, one portable washbasin with mirror and foundation (approximately 300mm height) is required. All units must be installed alongside the ship at locations designated by the Ship Superintendent. Contractor responsibilities include installing bilingual (English and Japanese) door labels, providing hoses, toilet paper, and soap; cleaning facilities twice daily; applying approximately 200 cubic centimeters of disinfectant (creosote-based deodorizer) twice daily; securing units against weather damage; and collecting, transporting, and disposing of accumulated sewage (estimated 3,380 gallons) in accordance with Japan Environmental Governing Standards. The contractor must submit a legible report in English listing the amount of sewage discharged in gallons following each disposal. The Period of Performance runs from October 22, 2026 through January 30, 2027, with an anticipated award date of November 17, 2026 and production completion date of December 30, 2026. The preparing activity is Sasebo, with the specification prepared by N. Nagato on July 14, 2026.

View the file

Other files

File Type Posted
Quotation Breakdown Sheet.xlsx XLSX spreadsheet
N6264926QE044.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:

LPD-18 USS NEW ORLEANS

JON: 38KF386303 A01

TITLE:

Temporary Head; provide

JOB SPECIFICATION

Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:

l5 1 ( 17? 1~>6 , z / ~"' 1~.,~ POP Start Date: POP End Date: SASEBO

( O / 7- '2.- / '2,.0"' 0 t / l>J o / :i.. o~ 7

PREPARED BY: CODE DATE

N. NAGATO H NA 7/14/2026

APPROVED BY: QW'\ CODE

S. MURAKAMI S225

CONCURRED BY: l~~??\1 CODE

S. MOROOKA S231

ASSIST PLANNER'S NAME:

CODE

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

DESCRIPTION:

JSN(S): SERV-L291 CASREP#

S/F CONTACT: P/E CWP# CCNS#

Approved by S300/S900Lt1#'~ Date: ?-rJl/1_ '2,-fJ 2-u Avl: 7J1

LT. M. MOLINA/ Project Officer

LWC:

Work Completed

S/Force: Rate: Date:

Ship Supt: Date: SRF CONTROL NO.:

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

Charist.Flores.RP Highlight

Charist.Flores.RP Highlight

Charist.Flores.RP Highlight

Ship/HULL NO. Ship/HULL NAME

LPD-18 USS NEW ORLEANS

JON:

TITLE:

Temporary Head; provide

1 . SCOPE:

1.1 Title: Temporary Head; provide

1 . 2 Location of Work:

1.2 . 1 Alongside of the Ship

1. 3 Identification :

ICN: Rev: Key Op:

38KF386303 A01

1.3.1 Quantity (5 EA), Temporary Portable Head for Mail Use, Each Consists of One Water Closet (Western Type) , Sewage Accumulating Tank and Door with Locking Device Located in 1.2 . 1

1.3 . 2 Quantity (3 EA), Temporary Portable Heads for Female Use , Each Consists of One Water Closet (Western Type), Sewage Accumulating Tank and Door with Locking Device Located in 1 . 2.1

1.3.3 Quantity (One EA), Portable Washbasin with Mirror and

Foundation (Approximately Foundation Height : 300 Millimeter) Located in 1.2 .1

1. 3. 4

2. REFERENCES:

2 . 1 None.

3 . REQUIREMENTS :

3.1 Provide and maintain each temporary portable head and washbasin listed in 1.3.1 through 1.3 . 3 at each location designated by SHIPSUPT during the availability .

3.1 .1 Each door must have locking device that can be operated from inside .

3 .1.1. 1 Install each label plate indicated in both ENGLISH and JAPANESE letters as FOR MALE USE on each door of head listed in 1.3.1.

3.1 . 1.2 Install each label plate indicated in both ENGLISH and JAPANESE letters as FOR FEMALE USE on each door of head listed in 1.3.2.

3 .1. 2 Provide each hose for the heads and washbasin.

3 .1. 3 Provide each toilet paper and soap during period for the temporary portable heads and washbasin .

3.1.4 Clean each temporary head and washbasin two times a day .

Ship/HULL NO. Shio/HULL NAME ICN: i Rev: Key Op:

JON:

LPD-18 USS NEW ORLEANS 38KF386303 I A01

TITLE:

Temporary Head; provide

3 . 1 . 5 Apply Approximately 200 cubic centimeters (CC) of disinfectant (deodorizer) to each head (urinals and toilet bowls) to keep clean sanitary condition .

3 . 1 . 6 Application of the disinfectant (deodorizer) must be made using materials such as creosote two times a day after clean up .

3 . 1 . 7 Each temporary head and washbasin must be secured to prevent from damage against bad weather and set up properly (flat level and height) .

3 . 2 Collect , transport and dispose of the sewage (estimated 3 , 380 gallons) accumulated in each temporary head and drain water from washbasins listed in

1.3 . 1 through 1.3 . 3 in accordance with Japan Environmental Governing Standards

(JEGS) .

(V) "REPORT"

3.2.1 Submit one legible copy of a report listing the amount of sewage discharged actually to SUPERVISOR after disposal of the sewage.

3 . 2 . 1 . 1 The report must be written in English and unit for the amount of the sewage must be in Gallon .

3 . 3 Remove each portable head and washbasin listed in 1 . 3.1 through 1 . 3 . 3 when notified by SHIPSUPT .

4. NOTES:

4.1 Initial Condition - Temporary heads are required for a period of 7Jl availability .