This is a Job Specification document for a berthing barge cleaning project on the USS NUECES (APL-40).

The work encompasses deep cleaning of interior surfaces throughout the berthing barge from the 03 Level to Third Deck, excluding tanks and spaces entered by manhole. The project is located at SASEBO and includes cleaning of all compartment surfaces (decks, bulkheads, overheads, ventilation systems, piping, insulated equipment, bathroom/toilet facilities, laundry/galley equipment, messroom equipment, furniture, and electrical equipment). Specific requirements include: running ventilation systems prior to cleaning; removing and disposing of water, trash, grease, and debris; cleaning bulkheads, overheads, ladders, and piping with fresh water and detergent; cleaning decks with fresh water and detergent; sanitizing bathroom facilities and galley equipment; polishing stainless steel surfaces with appropriate polish; wiping down furniture to remove dust and debris; cleaning accessible windows and portholes; and accomplishing surface preservation requirements per specification 009-032 to match surrounding areas. A legible condition report documenting visual inspection results must be submitted to the supervisor. The anticipated award date is 08/21/2026, with a period of performance from 09/14/2026 to 11/16/2026 and production completion date of 10/15/2026. The work is being prepared at SASEBO facility. No government-furnished materials are provided.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926Q03760001 SF 30.pdf PDF
QA Soli Amend 0001.pdf PDF
Solicitation - N6264926Q0376.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shio/HULL NO.

APL-40

TITLE:

Berthing Barge; clean

Anticipated Award Date:

POP Start Date:

PREPARED BY:

N.MATSUYA

APPROVED BY:

S.MURAKAMI

CONCURRED BY:

S.MOROOKA

ASSIST PLANNER'S NAME:

ASSIST PLANNER'S NAME:

ASSIST PLANNER'S NAME:

DESCRIPTION:

JSN(Sl: AP40-L473

Shio/HULL NAME ICN: Rev:

USS NUECES JON:

38HZA86402R

JOB SPECIFICATION

Production Completion Date: PREPARING ACTIVITY:

POP End Date: SASEBO

CODE DATE

H MA 6/01/2026

CODE

A.#-1, CODE

• CODE

CODE

CODE

CASREP#

S/F CONTACT: SCHUCHARD D. CWP# CCNS#

Approved by S300/S900

Work Completed

S/Force:

Ship Supt:

T. ESCRITOR-YAMADA

PM S320 Date: � ;2 P2/, Rate: Date:

Date: SRF CONTROL NO.:

WORK CERTIFICATION SIGNATURES

Avl: 6CM

LWC:

Key Op:

A01

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

09/14/2026 11/16/2026

LAI]

v

08/21/2026 10/15/2026

Shio/HULL NO. Shio/HULL NAME

APL-40 USS NUECES

TITLE:

Berthing Barge; clean

1. SCOPE:

1.1 Title: Berthing Barge; clean

1.2 Location of Work:

ICN: Rev:

JON:

38HZA86402R

1.2.1 Throughout the Berthing Barge, 03 Level to Third Deck

1.3 Identification:

Key Op:

A01

1.3.1 Interior Surface of Each Compartment Located in 1.2.1, Except Tank and/or Space from Entering of Manhole

2. REFERENCES:

2.1 Standard Items (FY26)

2.2 845-8893991, Booklet of General Plans

3 . REQUIREMENTS:

3.1 Clean the interior surfaces of each compartment listed in 1.3.1 including the surfaces of each deck, bulkhead, overhead, ventilation, piping, insulated equipment, bathroom/toilet equipment, laundry/galley equipment, messroom equipment, chair, bunk, locker, desk, table, pillar, closure, lifeline, stanchion, inclined ladder, lighting, cable, hanger, electrical equipment, all furniture in accordance with the following, using 2.2 for guidance.

3.1.1 Prior to the start of cleaning, run ventilation system to preclude the introduction of debris into cleaned areas.

3.1.2 Remove and dispose of water, trash, grease, and debris from the barge.

3.1.3 Clean each bulkhead, overhead, ladder, outside of piping and ventilation free of dirt, grease, loose paint and foreign matter, using clean fresh water and detergent.

3.1.4 Clean each deck with clean fresh water and detergent.

3.1.5 Clean and sanitize each bathroom facility including each sink, commode, urinal, shower and mirror, using water and detergent.

3.1.6 Clean and sanitize each galley and scullery equipment, reefers, dishwashing equipment, and laundry equipment with fresh water and detergent.

3.1.6.1 Polish stainless steel surface using a stainless

steel polish. Polish surfaces with the gain. Remove foreign matter after polishing.

Shio/HULL NO. Shio/HULL NAME ICN: Rev: Key Op:

APL-40 USS NUECES

JON:

38HZA86402R A01

TITLE:

Berthing Barge; clean

3.1.7 Wipe down chairs, tables, bunks, and lockers and remove dust and foreign matter.

3.1.8 Clean accessible windows and port holes inside and outside with glass cleaner.

3.1.9 Accomplish the requirements of 009-032 of 2.1 for cleaning and preservation of each disturbed surface to match surrounding areas.

3.1.10 Witness visual inspection of cleaned areas to be conducted by

BMT (Berge Management Team).

(V) "REPORT"

3.1.10.1 Submit one legible condition report listing results

of the requirements of 3.1.10 to SUPERVISOR.

4. NOTES:

4.1 Initial Condition - All spaces utilized by ships crew need to have a deep cleaning completed to be able to provide a clean living environment for next crew to live on APL-40.