3822433_ATTACH_GREEN.pdf
PDF 252 KB Posted
- Attached to
- F108 Fan Frame Weldment
- Solicitation number
- FA812225R0005
About this file
The document is an Affirmative Procurement Statement User's Guide and Statement from Tinker Air Force Base, dated October 2022. The guide outlines the purpose and procedures for documenting environmentally conscious procurement practices for projects not requiring specific EPA, USDA, Energy Star, or FEMP-listed items. The statement specifically relates to Project No. FD20302400570 for an "F108 Fan Frame Weldment" and is signed by Jennifer Reich from 421 SCMS/CL on 20 Dec 22.
The statement confirms that none of the procurement products are on mandatory environmental purchasing lists and demonstrates a commitment to reducing environmental impact by considering environmentally preferable products. Key environmental considerations include reduced packaging, durability, reduced toxicity, natural resource conservation, water conservation, low VOC content, asbestos alternatives, recyclability, and alternative fuel options. The document is part of the procurement process for the Air Force Materiel Command Air Force Sustainment Center, ensuring environmentally conscious acquisition practices are followed for the F108 aircraft component procurement.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Affirmative Procurement Statement Users Guide & Statement-JAN2022 Tinker Air Force Base, Environmental Mgmt. Branch
AFFIRMATIVE PROCUREMENT STATEMENT
USER’S GUIDE — OCT 2022
1. PURPOSE OF STATEMENT. The “Affirmative Procurement Statement” provides documentation that Affirmative Procurement Plan (APP) has been considered for projects that do not require the use of U.S. EPA-designated CPG items, USDA-designated biobased items, Energy Star® listed items, or FEMP Low Standby Power items.
2. APPLICABILITY. Affirmative Procurement Statement applies to all procurement actions (other than GPC purchases) that do not require items that must comply with CPG, biobased, Energy Star®, or FEMP requirements.
3. INTENT FOR USE.
a. Contractors and CE Operations shop personnel (for in-house job and work orders regardless of project cost) will be responsible for completing a Affirmative Procurement Statement for all procurement actions if none of the items on the mandatory purchasing lists are required.
b. If the procurement action includes any CPG, biobased, Energy Star®, or FEMP Low Standby
Power items, use the Recovered Materials Determination Form instead.
4. SIGNER. The Affirmative Procurement Statement can be signed by any person who has technical knowledge of the products or services being purchased. For service and construction contracts, the signer should have general knowledge of the products that will be purchased by the contractor to complete the job. It is the signer’s responsibility to check the mandatory purchase lists and determine if any of those products will be purchased.
5. FILING PROCEDURE. If applicable, the Affirmative Procurement Statement will be included in the purchasing or contracting file. Contracting is responsible for ensuring that either an Affirmative Procurement Statement or Recovered Materials Determination Form (RMDF) is included in contracting files.
Affirmative Procurement Statement Users Guide & Statement-JAN2022 Tinker Air Force Base, Environmental Mgmt. Branch
AFFIRMATIVE PROCUREMENT STATEMENT — OCT 2022
Tinker Air Force Base
Project No. ____________________________________________ and/or Project Title ____________________________________________
None of the products that I am specifying for procurement are listed on a mandatory environmental purchasing list, including:
• U.S. EPA Recommendations of Specifications, Standards and Ecolabels for Federal Purchasing published at https://www.epa.gov/greenerproducts/recommendations-specifications-standards-and-ecolabels-federal-purchasing
• U.S. EPA, Electronic Product Environmental Assessment Tool (EPEAT), published at https://www.epa.gov/greenerproducts/electronic-product-environmental-assessment-tool-epeat
• USDA Biobased product listings published at https://www.biopreferred.gov/BioPreferred/
• Energy Star® product listings published at www.energystar.gov/products
• FEMP Low Standby Power product listings published at http://oahu.lbl.gov/
Therefore, I am not required to include the Tinker AFB Recovered Material Determination Form with this procurement package.
In addition, I have sought to reduce the environmental damages associated with this procurement by considering the specification of environmentally preferable products and services to the extent feasible, consistent with price, performance, availability, and safety considerations. I have considered products with recycled or biobased content as well as other environmentally preferable attributes, such as:
• Reduced packaging
• Durability and reparability
• Reduced toxicity
• Conservation of natural resources
• Water conservation
• Low Volatile Organic Compound (VOC) Content
• Asbestos alternative
• Recyclability
• Alternative fuel
Signature Date 20 Dec 22
Printed Name Jennifer Reich
Title/Role 421 SCMS/CL https://www.epa.gov/greenerproducts/recommendations-specifications-standards-and-ecolabels-federal-purchasing https://www.epa.gov/greenerproducts/recommendations-specifications-standards-and-ecolabels-federal-purchasing https://www.epa.gov/greenerproducts/electronic-product-environmental-assessment-tool-epeat https://www.biopreferred.gov/BioPreferred/ http://www.energystar.gov/products http://oahu.lbl.gov/
| AFFIRMATIVE PROCUREMENT STATEMENT |
| USER’S GUIDE — OCT 2022 |
| Project No: FD20302400570 |
| Project Title: F108 Fan Frame Weldment |
File details come from the government source that posted it. Updated .