This is an electrical plan drawing for the 2026 Feeder 37 & 46B Upgrade project at Fermi National Accelerator Laboratory, a United States Department of Energy facility. Drawing number 3-7-109, revision E-2, dated January 5, 2026, depicts the PS-5 electrical infrastructure upgrades required for the Service Building.
The project scope includes furnishing and installing a DSTR-PS5 FFDG-provided 15KV, S&C, PMH-10 air switch over existing conduits and a new feed to existing 10 four-inch conduits serving the Service Building. Additional work includes furnishing and installing 4#3/0+#6 ground, 200-amp, 480/277-volt service wire in existing conduit (approximately 75 feet); new 15KV, #4/0 aluminum, 133% EPR concentric neutral jacketed cable between the switch and transformer; and FFDG-supplied 15KV, #750 aluminum, 100% EPR concentric neutral jacketed cable in the existing ductbank per drawing E-4. The work also requires installing a new FFDG-provided 500 KVA, 13.8 KV–480V oil-filled, pad-mount transformer with a new 100-amp secondary circuit breaker (Y-PL-11) and capping and covering exposed conduits. The existing 100-amp 208/120-volt panelboard in the Service Building will remain in place, with secondary conduit and 13.8KV feed connections routed from the transformer to the DSTR-PS5.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit S - 3-7-109 SOW r1.pdf | ||
| Amendment 01 to RFP NO 381270GMK .pdf | ||
| RFP 381270GMK 2026 15KV Feeder 37 and 46B Upgrade.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
100A 208/120V
PANELBOARD
COMPARTMENT-1 COMPARTMENT-2
COMPARTMENT-3COMPARTMENT-4
COMPARTMENT-1 COMPARTMENT-2
COMPARTMENT-3COMPARTMENT-4
INSTALL DSTR-PS5 FFDG PROVIDED 15KV,
S&C, PMH-10 AIR SWITCH OVER EXISTING
CONDUITS AND NEW FEED
EXISTING
10 - 4" CONDUITS TO
SERVICE BUILDING
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
2026 FEEDER 37 & 46B UPGRADE
3-7-109 E-2
PS-5 ELECTRICAL PLAN
J
A N
S
E
NORTH
PROJECT
W
PLAN
1" = 5'
7/22/26 Prebid Meeting Correction
FURNISH AND INSTALL
4#3/0+#6 GND, 200A, 480/277V
SERVICE WIRE IN EXISTING
CONDUIT, APPROX. 75'..
EXISTING
PS-5
SERVICE BUILDING
FURNISH AND INSTALL NEW 15KV, #4/0
AL, 133% EPR CONCENTRIC NEUTRAL,
JACKETED CABLE BETWEEN SWITCH
AND TRANSFORMER.
INSTALL NEW, FFDG SUPPLIED, 15KV, #750 AL, 100%
EPR CONCENTRIC NEUTRAL, JACKETED CABLE IN
EXISTING DUCTBANK SEE DWG E-4 FOR DETAILS
EXISTING
EQUIPMENT PAD
CAP AND COVER
EXPOSED CONDUITS
CAP AND COVER
EXPOSED CONDUITS
FURNISH AND INSTALL NEW 100A SECONDARY
CIRCUIT BREAKER IN TRANSFORMER (Y-PL-11)
200A
M :\A ct iv e Pr oj ec ts \3
\7 P
O W
ER
C O
M M
UN
IC
AT
IO
N D
IS
TR
IB
UT
IO
N
\1
F dr
PS
-5
A ir
Sw \D ra w in gs
\E
-T H
RU
-E
_3
-7 -1 r7
.d w g, /2 2/
:4
8:
A M
AutoCAD SHX Text
AutoCAD SHX Text INSTALL NEW FFDG PROVIDED 500 KVA, 13.8 KV-480V, OIL FILLED, PAD MOUNT TRANSFORMER OVER EXISTING SECODARY CONDUIT AND NEW 13.8KV FEED FROM DSTR-PS5.