3809_Nov_18_24_solicitation_doc.pdf
PDF 16 KB Posted
- Solicitation number
- 3809
- Issued by
- New Haven County, Connecticut
About this file
This document is a solicitation for the "Chemical Improvements at the Lake Saltonstall Water Treatment Plant" project issued by the South Central Connecticut Regional Water Authority. The project includes the replacement of the sulfuric acid and polymer chemical feed systems, a new fluoride bulk tank and associated instrumentation and electrical work, and building improvements such as a new chemical containment area. Bids will be received through the Authority's E-Bid Portal until 2:00 pm local time on October 5, 2021, at which time they will be opened and made public. The estimated total value of the project is not provided.
The solicitation does not mention any pricing terms, set asides, incumbents, funding requirements or sources, or other salient commercial information. It also does not provide details on the award date or contract term, including any renewal options.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 3809
Chemical Improvements at the Lake Saltonstall Water
Treatment Plant
Other (OTHR)
So. Central CT Regional Water Auth.
Page:2
General Header Information
This bid has no questions defined.
This bid does not have any documents.
No. 3809 Title: Chemical Improvements at the Lake Saltonstall Water Treatment Plant Start Date: September 10, 2021 at 11:00:00 AM GMT End Date: October 06, 2021 at 6:00:00 PM GMT Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: Bids for the WRWTP Improvements Project will be received through our
E-Bid Portal www.rwater.com until 2:00 p.m. local time on October 5th, 2021 at which time they will be opened and made public.
The project includes replacement of the sulfuric acid chemical feed system including day tank, metering pumps, and associated stainless steel piping; replacement of the polymer chemical feed a system including polymer blending units, cleaning of existing fluoride bulk tank for reuse as a polymer bulk tank, new transfer pump, piping, and associated instrumentation and electrical work; new fluoride bulk tank, transfer pump, fill station, piping, and associated instrumentation and electrical work; and building improvements including new fluoride and polymer containment area with chemical-resistant concrete coating.
Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: So. Central CT Regional Water Auth.
Brent Domkowski 90 Sargent Drive New Haven CT, 06511 United States Tel: 2034012507 Fax:
bdomkowski@rwater.com
Contact Details: If you have any questions, please contact:
Brent Domkowski 90 Sargent Drive New Haven CT, 06511 United States Tel: 2034012507 Fax:
bdomkowski@rwater.com
Selected Categories:
Page:3
Item Specifications
No. Item Alternative Supplier Part No Mfr.
Name
Mfr. No Del
Date
Unit Unit Bid Qty. Total
1 Chemical Improvements at the Lake Saltonstall Water
Treatment Plant each 0
Item Specification for Chemical Improvements at the Lake Saltonstall Water Treatment Plant
Description: Chemical Improvements at the Lake Saltonstall Water Treatment Plant
Allow Vendor to Enter Negative Value : No
Exclude Line Item from Bid Total : No
Page:4
File details come from the government source that posted it. Updated .