3809_Jan_20_25_solicitation_doc.pdf
PDF 16 KB Posted
- Solicitation number
- 3809
- Issued by
- New Haven County, Connecticut
About this file
This is a solicitation document (No. 3809) from the South Central CT Regional Water Authority for Chemical Improvements at the Lake Saltonstall Water Treatment Plant. Bids will be received through their E-Bid Portal (www.rwater.com) until 2:00 p.m. local time on October 5th, 2021, when they will be opened publicly. The project involves replacing the sulfuric acid chemical feed system, including day tank, metering pumps, and stainless steel piping; upgrading the polymer chemical feed system with new blending units and repurposing the existing fluoride bulk tank; installing a new fluoride bulk tank system with transfer pump and fill station; and implementing building improvements including a new fluoride and polymer containment area with chemical-resistant concrete coating.
The delivery terms are specified as Free On Board Destination with vendor-specified payment terms. The bid is open to all vendors, though no estimated total value is provided. The project contact is Brent Domkowski at the South Central CT Regional Water Authority in New Haven. The solicitation period runs from September 10, 2021, to October 6, 2021. No vendor Q&A dates are specified, and the bid document indicates there are no questions defined or additional documents attached.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 3809
Chemical Improvements at the Lake Saltonstall Water
Treatment Plant
Other (OTHR)
So. Central CT Regional Water Auth.
Page:2
General Header Information
This bid has no questions defined.
This bid does not have any documents.
No. 3809 Title: Chemical Improvements at the Lake Saltonstall Water Treatment Plant Start Date: September 10, 2021 at 11:00:00 AM GMT End Date: October 06, 2021 at 6:00:00 PM GMT Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: Bids for the WRWTP Improvements Project will be received through our
E-Bid Portal www.rwater.com until 2:00 p.m. local time on October 5th, 2021 at which time they will be opened and made public.
The project includes replacement of the sulfuric acid chemical feed system including day tank, metering pumps, and associated stainless steel piping; replacement of the polymer chemical feed a system including polymer blending units, cleaning of existing fluoride bulk tank for reuse as a polymer bulk tank, new transfer pump, piping, and associated instrumentation and electrical work; new fluoride bulk tank, transfer pump, fill station, piping, and associated instrumentation and electrical work; and building improvements including new fluoride and polymer containment area with chemical-resistant concrete coating.
Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: So. Central CT Regional Water Auth.
Brent Domkowski 90 Sargent Drive New Haven CT, 06511 United States Tel: 2034012507 Fax:
bdomkowski@rwater.com
Contact Details: If you have any questions, please contact:
Brent Domkowski 90 Sargent Drive New Haven CT, 06511 United States Tel: 2034012507 Fax:
bdomkowski@rwater.com
Selected Categories:
Page:3
Item Specifications
No. Item Alternative Supplier Part No Mfr.
Name
Mfr. No Del
Date
Unit Unit Bid Qty. Total
1 Chemical Improvements at the Lake Saltonstall Water
Treatment Plant each 0
Item Specification for Chemical Improvements at the Lake Saltonstall Water Treatment Plant
Description: Chemical Improvements at the Lake Saltonstall Water Treatment Plant
Allow Vendor to Enter Negative Value : No
Exclude Line Item from Bid Total : No
Page:4
File details come from the government source that posted it. Updated .