375962_MR.pdf
PDF 284 KB Posted
- Attached to
- Current Regulated Power Supplies
- Solicitation number
- 375962_MR
About this file
This is a Request for Proposal (RFP) #375962_MR issued by Fermi Forward Discovery Group, LLC (FFDG) for the Fermi National Accelerator Laboratory's Proton Improvement Plan II (PIP-II) project. The solicitation seeks Current Regulated Power Supplies, specifically 8 High Voltage quadrupole circuits, 18 Low Voltage quadrupole circuits, and 1 Septum Supply. The RFP is unrestricted, with a NAICS code of 335999 and a small business size standard of 550 employees. Proposals are due by February 5, 2026, at 2:00 P.M. CST, with a 90-day pricing validity period. The procurement will be a firm-fixed-price subcontract under the U.S. Department of Energy's prime contract, with delivery terms FOB Destination Fermilab in Batavia, IL.
The RFP outlines detailed submission requirements, including a Summary Pricing Sheet (Exhibit G), technical response, subcontractor certifications, and potential small business subcontracting plan requirements for awards exceeding $750,000. Pricing must be in USD with no currency conversion allowances, and economic price escalation will not be considered. FFDG will use a lowest-price, technically acceptable source selection method, reserving the right to reject any proposal. Offerors are prohibited from contacting FFDG personnel during the solicitation process, and any proprietary data must be clearly marked. International shipments will be handled under DAP Incoterms 2020, with FFDG potentially covering applicable duties and tariffs at the time of shipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EXHIBIT_F_375962_MR_Checklist.pdf | ||
| EXHIBIT_E SARC.pdf | ||
| EXHIBIT_C FL-55.pdf | ||
| EXHIBIT_D PUR-466.pdf | ||
| EXHIBIT_B FFDG_General Terms and Conditions.pdf | ||
| EXHIBIT_A_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
#375962_MR
Current Regulated Power Supplies
January 9, 2026
Table Contents
1. INTRODUCTION
2. INVITATION TO SUBMIT PROPOSAL
3. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND
SMALL BUSINESS SUBCONTRACTING PLAN
4. EXPLANATION OR INTERPRETATION OF RFP DOCUMENTS / QUESTION PERIOD .. 2
5. CONTACT WITH FFDG PERSONNEL/BLACKOUT PERIOD
6. AMENDMENT OF SOLICITATION
7. PROPOSAL DUE DATE
8. LATE SUBMISSION
9. EXCEPTIONS AND DEVIATIONS
10. OFFEROR’S MODIFICATION AND WITHDRAWAL OF PROPOSALS
11. ORDER OF PRECEDENCE
12. SUBCONTRACT AWARD
13. PREPARATION, SUBMISSION, AND EVALUATION OF PROPOSALS
13.1 PRICE PROPOSAL
13.1.1 EXHIBIT G – SUMMARY PRICING SHEET
13.2 TECHNICAL RESPONSE
13.3 SUBCONTRACTOR ANNUAL REPRESENTATIONS & CERTIFICATIONS (SARC),
FORM SARC
13.4 PROPOSAL CERTIFICATIONS, FORM PUR-466
14. DESCRIPTION OF WORK
15. DELIVERY TERMS
15.1 DUTIES/TARIFFS
16. RESTRICTION ON DISCLOSURE AND USE OF DATA
17. EXHIBITS
EXHIBIT G
The following requirements must be adhered to for the Offeror’s submission of Proposals to Fermi Forward Discovery Group, LLC (FFDG) in support of this specific requirement.
1. INTRODUCTION
Fermi National Accelerator Laboratory (Fermilab or FNAL), managed and operated by Fermi Forward Discovery Group, LLC (FFDG) under a prime contract with the U.S. Department of Energy (DOE), seeks to subcontract work aligned with its mission objectives.
The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s accelerator complex to enable the world’s most intense high-energy beam of neutrinos for the international Deep Underground Neutrino Experiment at LBNF and a broad physics program, powering discoveries for many decades to come. In support of this project, FNAL requires the acquisition of Current Regulated Power Supplies for the PIP II Beam Transfer Line, as defined herein.
2. INVITATION TO SUBMIT PROPOSAL
You are invited to submit a proposal for the items specified and with the provisions contained herein, including the terms and conditions of the proposed firm-fixed price subcontract entered into as a result of this solicitation.
3. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND
SMALL BUSINESS SUBCONTRACTING PLAN
This acquisition is unrestricted and contains no set-aside provisions. The North American Industry Classification System (NAICS) code for this solicitation is 335999, All Other Miscellaneous Electrical Equipment and Component Manufacturing. The small business size standard for this NAICS code is 550 employees.
A small business subcontracting plan will be required if the awardee does not meet the definition of a small business as described in the paragraph above and the subcontract exceeds $750,000.00. The Subcontracting Plan shall follow the Federal Acquisition Clause, 52.219-9, Small Business Subcontracting Plan (See Exhibit C. FL-55 - Small Business Subcontracting Plan). A draft plan must be submitted with your RFP response if the value exceeds $750,000.00.
4. EXPLANATION OR INTERPRETATION OF RFP DOCUMENTS / QUESTION PERIOD
The prospective offeror should examine and review the solicitation with care. Any prospective offeror who has questions or desires an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing by 2:00 P.M. CST, January 30, 2026, and be submitted to the Procurement Specialist at the email address identified below. Oral explanations or instructions given before the award of a subcontract will not be binding. Any information provided to a prospective offeror concerning a solicitation will be furnished promptly to all other prospective offerors as an amendment to the solicitation if that information is necessary for submitting proposals or if the lack of the information would be prejudicial to other prospective offerors.
Any and all changes to these specifications are valid only if included in a written addendum and shall become part of the subcontract.
All questions concerning this RFP should be submitted via email to the Procurement Specialist identified below.
Procurement Specialist: Michele Reynolds Phone: (630) 840-2448 Email: micheler@fnal.gov
Fermi Forward Discovery Group, LLC Procurement Department Kirk Road & Wilson Street Batavia, IL 60510-0500
5. CONTACT WITH FFDG PERSONNEL/BLACKOUT PERIOD
All offerors are prohibited from making any contact (including sales calls) with officials or employees of FFDG (collectively “FFDG personnel”) with regard to the request for proposals, other than in the manner and to the persons designated herein, until after an award has been made. PLEASE NOTE:
The Chief Procurement Officer or their designee reserves the right to disqualify any offeror found to have contacted FFDG personnel in any manner regarding the proposal request.
6. AMENDMENT OF SOLICITATION
FFDG may, by addenda/amendment, modify any provision or part of this RFP at any time before the award of any resultant subcontract. All terms and conditions that are not modified remain unchanged.
An offeror shall acknowledge receipt of any addenda/amendments to this RFP. Failure to acknowledge may result in the disqualification of an offeror’s proposal with no further consideration for an award. The acknowledgment shall be provided in one of the following ways:
• Immediately upon receipt of the amendment via an email sent to the FFDG Procurement
Specialist identified herein.
• Return of the Amendment with a signature on the acknowledgment signature line; or
• In the offeror’s proposal.
7. PROPOSAL DUE DATE
The offeror’s proposal shall be emailed to the Procurement Specialist no later than 2:00 P.M. CST, February 5, 2026.
PLEASE NOTE: Partial or incomplete proposals [including required documents (e.g., project timeline, examples of prior work, references, submission of the Request for Proposal Form)], specifically, failure to provide all documents required, may result in your submission being considered non-responsive and will not be considered for an award.
8. LATE SUBMISSION
Proposals received by FFDG after the Submittal Date and Time indicated may not be considered. The Respondent assumes the risk of the method of dispatch chosen.
9. EXCEPTIONS AND DEVIATIONS
Any exceptions to the General Terms and Conditions identified herein MUST be documented on a separate sheet on the Offeror’s Letterhead with your proposal submission. Exceptions to FFDG’s Terms and Conditions MUST be clearly and completely indicated on a company letterhead. FFDG is not required to accept any exceptions or deviations.
Any exceptions or additional terms noted on a Quote Form will not be considered and are hereby expressly rejected. Likewise, any references—whether through language or hyperlink—to additional terms and conditions are not accepted and are similarly rejected.
Offerors taking exceptions, deviations, or conditional assumptions to the Specifications provided herein must clearly identify and explain each exception/deviation, or conditional assumption taken with sufficient amplification and justification to permit evaluations. Such exceptions, deviations, or conditional assumptions will not, in themselves, automatically render a proposal unacceptable to FFDG. However, a large number of exceptions or one or more significant exceptions not providing a benefit to FFDG may result in the rejection of the offeror’s proposal as unacceptable.
NOTE TO OFFERORS: Please be advised that any exceptions to the specifications or to FFDG’s terms and conditions may cause your proposal to be disqualified with no further consideration for an award.
10. OFFEROR’S MODIFICATION AND WITHDRAWAL OF PROPOSALS
The offeror may submit modifications to its proposal at any time before the solicitation closing date and time and may submit modifications in response to an amendment or to correct a mistake at any time before award.
Proposals may be withdrawn at any time before the submission deadline. Withdrawals are effective upon receipt of notice by the Procurement Specialist at the email address identified herein.
11. ORDER OF PRECEDENCE
Where there appear to be variances or conflicts, the following order of precedence shall prevail:
FFDG’s drawings (if applicable), FFDG’s Statement/Scope of Work, and the RFP’s General Terms and Conditions.
12. SUBCONTRACT AWARD
The issuance of the RFP does not compel FFDG to make an award. FFDG reserves the right to accept or reject all proposals if it is determined to be in its best interest. A decision may be made without discussion; hence, an offeror’s proposal should be submitted initially on the most favorable terms.
The proposed award is based on a continuing program requirement and the issuance of obligation authority from the Procurement Department of the Fermi National Accelerator Laboratory (FNAL).
Any subsequent award issued by FFDG shall be constituted in writing by authorized representatives of the Procurement Department of the FNAL.
No other representatives of FFDG are authorized to issue contracts or agreements or bind FFDG to any form of agreement or understanding. The authorized Procurement Department official of the FNAL is the only individual who can legally commit FFDG to the expenditure of funds in connection with this proposed procurement.
13. PREPARATION, SUBMISSION, AND EVALUATION OF PROPOSALS
This is the lowest-price, technically acceptable source selection. An award shall be made to the lowest evaluated proposal that meets or exceeds the acceptability standards for non-cost factors, including past performance. FFDG shall be the sole determiner of what is deemed to be technically acceptable.
FFDG reserves the right to cancel this solicitation at any time without incurring any liability or damages associated with such cancellation.
Under no circumstances shall FFDG be responsible for any proposal preparation expenses, submission costs, or any other expenses, costs, or damages, of whatever nature, incurred as a result of an offeror’s participation in this RFP process. The Offeror understands and agrees that it submits its proposal at its own risk and expense and releases FFDG from any claim for damages or other liability arising out of the RFP and award process.
FFDG shall not be liable for any errors in the offeror’s proposal submission. Except during negotiations initiated by FFDG, no modifications to the proposal shall be accepted from the offeror after the Submittal Date. The offeror is responsible for a careful review of their entire proposal to ensure that all information, including pricing, is correct and complete. Offerors are liable for all errors or omissions contained in their proposals.
FFDG reserves the right to award a subcontract only to responsive and responsible proposers.
Responsive offers are proposals that meet all minimum requirements (e.g., submit all required documents, meet the minimum years requirement, etc.). Responsible proposers are defined as companies that demonstrate the financial ability, resources, skills, capability, willingness, and business integrity necessary to perform on the subcontract. FFDG shall be the sole determiner of whether an offer or offeror is considered responsive and/or responsible.
Any information of a proprietary nature shall be CLEARLY MARKED and identified in the offeror’s submission.
13.1 Price Proposal
The offeror shall provide unit pricing for Current Regulated Power Supplies, using the Summary Pricing Sheet (Exhibit G).
13.1.1 Exhibit G – Summary Pricing Sheet
Please complete the Summary Pricing Sheet provided herein. Additionally, on this sheet, please identify any shipping costs not included in the unit pricing. Finally, please specify the proposed delivery date after an award is made.
If any international shipping is required, the offeror must identify the HTS/Taric Code for each item.
PLEASE NOTE: Pricing must be submitted on the Exhibit G provided herein. FFDG will not accept pricing on an offeror's form.
The proposed pricing shall be a firm-fixed price for the items as identified herein, and the price proposal shall be valid for 90 days from the final proposal due date. An Offeror allowing less than the minimum acceptance period as identified herein may be rejected without further consideration for an award.
All pricing must be submitted in USD, and no allowances for currency conversion shall be made during the term of the subcontract.
Economic price-escalation language, including exchange rate fluctuations, will not be accepted or considered.
FFDG may consider a proposal nonresponsive if the prices proposed are materially unbalanced.
A proposal is considered materially unbalanced when the price of one or more line items in a submission is significantly overstated or understated, even though the total price may be acceptable when reviewing using cost or price analysis techniques. This would include a reasonable doubt that the proposal will result in the lowest overall cost to FFDG, even if it is the lowest evaluated proposal or so unbalanced as to be tantamount to an advance payment.
When applicable, FFDG will reimburse the subcontractor for actual costs incurred (e.g., freight, pre-pay, and add). No allowance shall be made for overhead and profit; any invoice containing overhead, profit, surcharges, handling costs, etc., will be rejected.
13.2 Technical Response
The offeror must provide a complete Exhibit F, 375962, Checklist, which will be used to determine responsibility technically.
Failure to provide the completed form will result in disqualification from the process with no further consideration for an award.
13.3 Subcontractor Annual Representations & Certifications (SARC), Form SARC The SARC certification submitted by the successful Offeror will be incorporated into the subsequent subcontract. If an offering entity is a joint venture, association, consortia, or partnership, each member entity must submit an individual Representations and Certifications Form (Exhibit E).
13.4 Proposal Certifications, Form PUR-466
The PUR-466 certification submitted by the successful Offeror will be incorporated into the subsequent subcontract. All sections must be completed and must be signed by a company official (Exhibit D).
14. DESCRIPTION OF WORK
The awarded offeror shall deliver the specified quantities of the items in full compliance with the requirements outlined in the referenced specifications.
15. DELIVERY TERMS
Delivery terms shall be FOB Destination Fermilab, Batavia, IL, which shall include shipping/freight costs within their firm-fixed-price proposal submission.
If any international shipping is required, the offeror must identify the HTS/Taric Code for each item.
If applicable, the offeror must include their shipping/freight costs on the Price Submission Sheet (Exhibit G).
15.1 Duties/Tariffs
FFDG recognizes that international shipments may be subject to additional charges related to duties and tariffs. Accordingly, offerors are requested to itemize these potential costs separately from the pricing for the scope of work outlined in this RFP.
If/when applicable, it is understood that FFDG will cover applicable duties and tariffs in effect at the time of shipment. However, if such duties or tariffs have been lifted or are no longer applicable at the time of shipment, FFDG will not be responsible for covering these charges.
As FFDG will accept international shipments, delivery terms shall be DAP per Incoterms 2020:
Fermilab, Batavia, IL, for non-domestic vendors. Non-domestic offerors will be provided with FFDG’s Customs Clearance Broker Information if awarded a subcontract.
16. RESTRICTION ON DISCLOSURE AND USE OF DATA
Offerors or quoters who include in their proposals or quotations data that they do not want to be disclosed to the public for any purpose or used by FFDG except for evaluation purposes, shall –
A. Mark the title page with the following legend:
“This proposal or quotation includes data that shall not be disclosed outside FFDG and shall not be duplicated, used, or disclosed – in whole or in part – for any purpose other than to evaluate this proposal or quotation. If, however, a subcontract is awarded to this Offeror or quoter as a result of – or in connection with – the submission of this data, FFDG shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting subcontract. This restriction does not limit FFDG’s right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets (insert numbers or other identification of sheets)”, and
B. Mark each sheet of data it wishes to restrict with the following legend “Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal or quotation.”
17. EXHIBITS
A. Specifications B. FFDG General Terms and Conditions for Supplies (08.2025) C. FL-55 – Small Business Subcontracting Plan D. Proposal Certifications, Form PUR-466, Rev. 5 (10/14/2025) E. Subcontractor Annual Representations & Certifications (SARC), Form SARC (Rev. 7) F. 375962_MR Checklist G. Summary Pricing Sheet
EXHIBIT G
Fermi National Accelerator Laboratory Procurement Department Finance Section
630.840.2448 micheler@fnal.gov DATE: January 9, 2026 DUE DATE: February 5, 2026
RFP#: 375962_MR
SUMMARY PRICING SHEET
ITEM QTY DESCRIPTION
HTS/Taric Code
UNIT
PRICE
TOTAL
(USD)
Fermilab requests your firm-fixed-price proposal for the following items per the terms and conditions referenced herein.
1 8 High Voltage quadrupole circuits
2 18 Low Voltage quadrupole circuits
3 1 Septum Supply
4 1 Shipping Costs (if applicable)
Proposed Delivery Date upon ROA_____________________
NAICS: 335999
Size STD: 550 Employees
ANY AND ALL exceptions to specifications and/or extra charges for containers, tooling, etc. MUST be clearly indicated.
COMPANY NAME ___________________________________ MATERIALS, SUPPLIES OR SERVICES RESULTING FROM THE QUOTE ADDRESS ____________________________________ ARE FOR WORK DONE UNDER PRIME CONTRACT#DE AC02-07CH11359 TERMS NET 30 FOB FERMILAB/BATAVIA, IL WITH THE UNITED STATES DEPARTMENT OF ENERGY. ANY ITEMS SUBMITTED BY ___________________________________ COVERED BY G.S.A. CONTRACTS SHOULD ALSO BE INDICATED.
DATE SUBMITTED __________________________________
mailto:micheler@fnal.gov
| 1. INTRODUCTION |
| 2. INVITATION TO SUBMIT PROPOSAL |
| 3. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SUBCONTRACTING PLAN |
| 4. EXPLANATION OR INTERPRETATION OF RFP DOCUMENTS / QUESTION PERIOD |
| 5. CONTACT WITH FFDG PERSONNEL/BLACKOUT PERIOD |
| 6. AMENDMENT OF SOLICITATION |
| 7. PROPOSAL DUE DATE |
| 8. LATE SUBMISSION |
| 9. EXCEPTIONS AND DEVIATIONS |
| 10. OFFEROR’S MODIFICATION AND WITHDRAWAL OF PROPOSALS |
| 11. ORDER OF PRECEDENCE |
| 12. SUBCONTRACT AWARD |
| 13. PREPARATION, SUBMISSION, AND EVALUATION OF PROPOSALS |
| 13.1 Price Proposal |
| 13.1.1 Exhibit G – Summary Pricing Sheet |
| 13.2 Technical Response |
| 13.3 Subcontractor Annual Representations & Certifications (SARC), Form SARC |
| 13.4 Proposal Certifications, Form PUR-466 |
| 14. DESCRIPTION OF WORK |
| 15. DELIVERY TERMS |
| 15.1 Duties/Tariffs |
| 16. RESTRICTION ON DISCLOSURE AND USE OF DATA |
| 17. EXHIBITS |
| EXHIBIT G |
File details come from the government source that posted it. Updated .