36L79722Q0010 0002.docx
DOCX document 28 KB Posted
- Solicitation number
- 36L79722Q0010
- Issued by
-
Department of Veterans Affairs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36L79722Q0010 0003.docx | DOCX document | |
| 36L79722Q0010 0001.docx | DOCX document | |
| 36L79722Q0010_4.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06/28/2022 36L797 Department of Veterans Affairs PO Box 76 Building 37 1st Ave, One Block North of Cermak Road Hines IL 60141 36L797 Department of Veterans Affairs OPAL/National Acquisition Center Building 37 1st Avenue, One Block North of Cermak Hines IL 60141 To all Offerors/Bidders
36L79722Q0010 06-07-2022
X X X
Request for Quote (RFQ) 36L79722Q0010 is amended to provide Answers to Questions on pages 2 thru 3 of this amendment as a result of Questions submitted by interested parties.
Linda D. Shirley-Diaz Contract Specialist
RFQ 36L79722Q0010
Amendment #0002
The following are Questions and Answers pertaining to subject RFQ.
Question 1)
Confirm new tumblers are to be installed within the clean production area, same position as the existing tumblers being traded-in?
Answer 1)
The new tumblers are to be installed in the same area where the existing trade-in tumblers are located.
Question 2)
Confirm if this demolition work scope is a typo from a previous project, or is it required?
Answer 2)
Demolition work is not applicable to this requirement and will be deleted from the Statement of Work (SOW). The SOW will be updated prior to Award.
Question 3)
Confirm if this drain work scope is a typo from a previous project, or is it required?
Answer 3)
Drain work is not applicable to this requirement and will be deleted from the SOW. The SOW will be updated prior to Award.
Question 4)
Identify, all hazardous materials, if any which are known to be present in laundry space that will affect the work areas specified (i.e., roofing systems, insulation, flooring, interior finishes. etc.)?
Answer 4)
There are no known hazardous materials present that will affect the work or outcome of this requirement.
Question 5)
What is the maximum available line pressure of the existing steam utility main serving the trade-in tumblers?
Answer 5)
The tumblers operate on high pressure steam coming right off the high-pressure steam header. High pressure steam for the Sioux Falls, SD Textile Care Processing Facility means 100-pound steam. The maximum steam pressure may vary and may occasionally hit 110 pounds, but the normal operating pressure is 100 pounds.
Question 6)
Confirm drain cleaning work scope is a typo from a previous project, or if it is required, provide a more detail scope of work indicating what drains are to be cleaned?
Answer 6)
Drain cleaning work is not applicable to this requirement and will be deleted from the SOW. The SOW will be updated prior to Award.
Question 7)
Confirm new electrical for the steam heated drying and conditioning tumbler with internal lint collection will originate from the electrical panel identified by the station means the complete installation of new branch circuit from existing electrical sub panel to the new tumblers includes new conduit, wire, circuit breakers and fused safety disconnect switches.
Answer 7)
Yes, the complete installation of new branch circuit from existing electrical sub panel to the new tumblers includes new conduit, wire, circuit breakers and fused safety disconnect switches.
Question 8)
Upon receipt of award, will the Medical Center provide a valid certificate of exemption for the State of South Dakota sales and use tax to the contractor?
Answer 8)
Yes, the Contracting Officer Representative will provide a valid certificate of exemption for the State of South Dakota sales and use tax to the Contractor.
File details come from the government source that posted it. Updated .