36E77620R0008-081.pdf
PDF Posted
- Solicitation number
- 36E77620R0008
About this file
This document includes a federal contract solicitation and local safety requirements for a related construction project. The Department of Veterans Affairs will solicit proposals for a design-build contract to reconfigure the basement floor at the Dallas VA Medical Center for IT and administrative space. Work will involve relocating services and expanding and renovating a lab. The solicitation will be a request for proposal issued to service-disabled veteran-owned small businesses with a magnitude of construction between $1 million to $2 million. Responses are due in late January to early February 2020, with a performance period of approximately 200 calendar days from notice to proceed. The local safety requirements outline plans and analyses that must be submitted addressing accident prevention, hazard communication, fire safety, and activity-specific hazards for phases of work.
36E77620R0008 ATTACHMENT 4 - Local Safety Requirements.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77620R0008 0001.pdf | ||
| Solicitation - 36E77620R0008 - 5-26-2020.pdf | ||
| 36E77620R0008-089.pdf | ||
| 36E77620R0008-080.pdf | ||
| 36E77620R0008-092.docx | DOCX document | |
| 36E77620R0008-094.pdf | ||
| 36E77620R0008-088.pdf | ||
| 36E77620R0008-082.pdf | ||
| 36E77620R0008-077.docx | DOCX document | |
| 36E77620R0008-079.pdf | ||
| 36E77620R0008-078.pdf | ||
| 36E77620R0008-084.pdf | ||
| 36E77620R0008-085.pdf | ||
| 36E77620R0008-086.pdf | ||
| 36E77620R0008-090.pdf | ||
| 36E77620R0008-083.pdf | ||
| 36E77620R0008-087.pdf | ||
| 36E77620R0008-091.doc | DOC document | |
| 36E77620R0008-093.docx | DOCX document | |
| 36E77620R0008-095.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1a: Department of Veterans Affairs
RECONFIGURE BASEMENT FLOOR FOR IT & ADMIN SPACE
Project Number 549-17-103 Transaction number:
Local Safety Requirements
VA North Texas Health Care Systems
Construction Accident Prevention Plan Requirements
Prior to commencing work contractors must submit for approval accident prevention plan. The prime contractor will write this plan for the specific work and hazards of the contract and implementing in detail the requirements for safety and occupational health. This plan shall be reviewed and found acceptable by facility Construction Safety Officer (CSO) and project
Contracting Officer Representative COR prior to initiation of work at the job site. The plan shall be developed by qualified personnel and shall be signed by a competent person AND a representative of management.
The prime contractor shall integrate all subcontractor work activities into the Safety and health plan; ensure the plan is available to all contractor and subcontractor employees. All subcontractors shall integrate the provisions of the plan into their work activities.
1) The safety plan shall include:
A. Plan Preparer’s information
a. Title,
b. signature
c. phone number
B. Plan Approver’s information:
a. Title
b. signature
c. phone number
C. Background information on the project to include:
a. Contractor
b. Contract number
c. Project name
d. Description of work to be performed
e. Location of work to be performed
f. Contractor accident experience (i.e. OSHA 200 forms, corporate safety trend analysis)
g. listing of phases of work
h. hazardous activities requiring hazard analysis
2) Statement of Safety & Health Policies
A. Administrative responsibilities for implementing the plan
B. Identification and accountability of personnel responsible for accident prevention
C. Means for controlling work activities of subcontractors and suppliers
Project Number 549-17-103
D. Responsibilities of subcontractors
E. Plans for safety indoctrination of new employees
F. Plans for continued safety training
G. Provisions for safety inspections to include
H. Work site/material and equipment inspection
I. Means for recording inspection results
J. Timetable for correction of deficiencies
K. Procedures for follow-up inspections to ensure correction
L. Responsibilities for investigation and reporting accidents/exposure o All accidents incident to the project will be investigated & reported within 24 hours o Accidents that result in a fatality, three or more persons admitted to a hospital or significant property damage will be reported immediately to the Contracting
Officer. Contractors are responsible for notifying OSHA.
M. First aid treatments shall be reported and recorded daily.
N. Responsibilities for maintaining accident data, reports and logs
O. Emergency response capabilities for disasters
P. Emergency Plans will include:
o Emergency phone numbers and shall be tested periodically o Escape procedures o Employee accounting following an emergency evacuation o Rescue and medical duties o Means of reporting emergencies o Persons to be contacted.
Q. Plans for maintaining job cleanup and safe access
R. Public safety requirements (fencing/signs)
S. Prevention of alcohol/drug abuse on the job
T. Plans shall require monthly supervisor safety meeting and weekly worker safety meetings. Meetings shall be documented and shall include:
o Date held o Attendance o Subjects o Name of individuals who conducted the meeting
3) Hazard communication plans
A. A list of hazardous chemicals known to be present
B. Methods used to inform employees of the hazards
C. All chemical containers shall be labeled
D. MSDS for all chemicals stored on site
4) Fire Safety Plan
Project Number 549-17-103
Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, as part of those specific fire safety measures the contractor should reference NFPA/LSC FIRE
PROTECTION DURING CONSTRUCTION and include those measures in the Fire
Safety Plan. As part of the Fire Safety Plan the contractor should include the contents of the NFPA 1.4 / NFPA 241 FIRE PROTECTION DURING CONSTRUCTION (see facility acceptable alternate measures).
5) Fire watch
A. Install upright sprinkler heads per NFPA 13
B. Install heat detection devices that can be cross monitored by facility fire alarm system per NFPA
NOTE: At minimum contractor’s safety plan shall comply with all applicable OSHA 1926 standards
Project Number 549-17-103
Activity Hazard Analysis Requirements
Prior to beginning EACH MAJOR PHASE OF WORK, an activity hazard analysis shall be prepared by the contractor performing the work and submitted for review by the facility
Construction Safety Officer and Contracting Officer Representative COR at least 15 calendar days prior to the start of each phase.
The analysis will:
• Define the activity being performed
• Identify the sequence of work to be accomplished
• Identify the specific hazards that are anticipated
• Identify the control measures that shall be implemented to reduce each hazard to an acceptable level
Hazard analysis shall identify the principal steps to be accomplished in sequence to accomplish the operations. Equipment used in the operation shall be listed on the hazard analysis form.
Inspection requirements for the equipment and machinery shall be listed on the hazard analysis form. Each step shall be analyzed to identify its potential hazards and a recommended control shall be identified to reduce the hazard to an acceptable level.
Common hazards identified on the job site include but are not limited to the following:
• Fall protection
• Asbestos exposure
• Confined space entry
• Crane operations
• Scaffold erection and dismantling
• Lock out/tag out
• Excavations
• Electrical safety
• Machinery and mechanized equipment
• Hand and power tools
• Contingency plan for severe weather
NOTE: Activity Hazard Analysis shall at minimum comply with applicable OSHA standards
SEE ATTACHED FORMAT
Project Number 549-17-103