36E77619R0062-002.docx

DOCX document 23 KB Posted

Attached to
Construct Polytrauma Integrative Rehabilitation Clinic Addition (VA-19-00048037)
Solicitation number
36E77619R0062
Issued by

About this file

36E77619R0062 ATTACHMENT 1 - SOW.docx

View the file

Other files

File Type Posted
36E77619R0062-0004001.pdf PDF
36E77619R0062-0004000.docx DOCX document
36E77619R0062-0004000.docx DOCX document
36E77619R0062-0004001.pdf PDF
36E77619R0062-0003003.pdf PDF
36E77619R0062-0003002.pdf PDF
36E77619R0062-0003004.pdf PDF
36E77619R0062-0003000.docx DOCX document
36E77619R0062-0003001.pdf PDF
36E77619R0062-0003000.docx DOCX document
36E77619R0062-0003003.pdf PDF
36E77619R0062-0003004.pdf PDF
36E77619R0062-0003001.pdf PDF
36E77619R0062-0003002.pdf PDF
36E77619R0062-0002000.docx DOCX document
36E77619R0062-0002000.docx DOCX document
36E77619R0062-0001001.pdf PDF
36E77619R0062-0001000.docx DOCX document
36E77619R0062-0001001.pdf PDF
36E77619R0062-0001000.docx DOCX document
36E77619R0062-006.pdf PDF
36E77619R0062-015.docx DOCX document
36E77619R0062-002.docx DOCX document
36E77619R0062-008.pdf PDF
36E77619R0062-017.pdf PDF
36E77619R0062-016.docx DOCX document
36E77619R0062-001.docx DOCX document
36E77619R0062-003.pdf PDF
36E77619R0062-010.pdf PDF
36E77619R0062-005.pdf PDF
36E77619R0062-014.pdf PDF
36E77619R0062-013.pdf PDF
36E77619R0062-011.pdf PDF
36E77619R0062-007.pdf PDF
36E77619R0062-009.pdf PDF
36E77619R0062-004.pdf PDF
36E77619R0062-012.pdf PDF
36E77619R0062-004.pdf PDF
36E77619R0062-010.pdf PDF
36E77619R0062-011.pdf PDF
36E77619R0062-007.pdf PDF
36E77619R0062-003.pdf PDF
36E77619R0062-015.docx DOCX document
36E77619R0062-014.pdf PDF
36E77619R0062-017.pdf PDF
36E77619R0062-006.pdf PDF
36E77619R0062-013.pdf PDF
36E77619R0062-008.pdf PDF
36E77619R0062-016.docx DOCX document
36E77619R0062-001.docx DOCX document
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H.H. McGuire V.A. Medical Center 1201 Broad Rock Blvd.

Richmond, Virginia 23249

SCOPE OF WORK

Project # 652-320 Construct Polytrauma Integrative Rehabilitation Clinic

-- Scope --

GENERAL:

The project includes the construction of an approximately 18,000 square foot free standing building and site development to relate the new building to the existing Polytrauma Transitional Rehabilitation Center, Building 514 at the Hunter Holmes McGuire VA Medical Center in Richmond.

The construction will include architectural, structural, civil/site work, environmental, interior design, mechanical (chilled water, steam, advanced HVAC, controls, etc.), fire protection and detection, plumbing, electrical & electrical distribution, telecommunications, hospital systems and devices, any specialized equipment/utilities for Polytrauma space, and site modifications in accordance with the drawings and specification provided.

GENERAL CONSTRUCTION BASE BID:

Work includes general construction, site alterations, walks, grading, drainage, structural and utility systems and necessary removal of any existing temporary structures and construction required to construct the new Polytrauma facility as described in the drawings and specifications.

BID ALTERNATE NO. 1: All work described on the Drawings and Specifications minus Bid Alternate No. 1 described as follows:

Delete the following items shown on the Civil drawings from the project:

Remove Greenhouse, Remove Gazebo, Remove Shed, and Remove Planters. These items will be removed by others.

BID ALTERNATE NO.2: All work described on the Drawings and Specifications minus Bid Alternate No. 1 along with Bid Alternate No. 2 described as follows:

Delete the CCTV camera system from the project as described on the drawings.

BID ALTERNATE NO. 3: All work described on the Drawings and Specifications minus Bid Alternate No. 1, and Bid Alternate No. 2 along with Bid Alternate No. 3 described as follows:

Delete the Clinical Service Sink and associated water supply and drains at Room 159 as described on the drawings.

BID ALTERNATE NO. 4: All work described on the Drawings and Specifications minus Bid Alternate No. 1, Bid Alternate No. 2, and Bid Alternate No. 3 along with Bid Alternate No. 4 described as follows:

Replace the SBS Modified Bitumen Roofing system found at the low slope roof location with a complete, flashed single ply TPO roofing system including walk pads as described in Specification Section 07 54 23.

BID ALTERNATE NO. 5: All work described on the Drawings and Specifications minus Bid Alternate No. 1, Bid Alternate No. 2, Bid Alternate No. 3, and Bid Alternate No. 4 along with Bid Alternate No. 5 described as follows:

Delete the installation of the 300Kva Emergency Generator, integral fuel tank base, concrete pad, and wiring to the new building. (The ATS equipment will remain in the project.)See Drawings for instructions for deleting generator and inclusion of battery powered emergency devices in lieu of Generator emergency power.

BID ALTERNATE NO.6: All work described on the Drawings and Specifications minus Bid Alternate No. 1, Bid Alternate No. 2, Bid Alternate No. 3, Bid Alternate No. 4, and Bid Alternate No. 5 along with Bid Alternate No. 6 described as follows:

Delete the 8 blast resistant windows located on the West elevation at Rooms 140 – 147 and the 4 blast resistant windows located on the north elevation at Rooms 131 – 134.

Delete the approximately 288 sf of blast resistant curtain wall on the North elevation at Room 101 as well as associated structural elements included for blast requirements.

The exterior brick veneer wall would be continuous in lieu of the deleted openings.

BID ALTERNATE NO. 7: All work described on the Drawings and Specifications minus Bid Alternate No. 1, Bid Alternate No. 2, Bid Alternate No. 3, Bid Alternate No. 4, Bid Alternate No. 5, and Bid Alternate No. 6 along with Bid Alternate No. 7 described as follows:

Delete the installation portions of VC listed accessories in the Exam Rooms and VC listed accessories and technical equipment (exhaust hoods) at the AT Lab, Rooms 170, 171 and 172, and as described on the drawings. Installation portion will be by others.

BID ALTERNATE NO. 8: All work described on the Drawings and Specifications minus Bid Alternate No. 1, Bid Alternate No. 2, Bid Alternate No. 3, Bid Alternate No. 4, Bid Alternate No. 5, Bid Alternate No. 6, and Bid Alternate No. 7 along with Bid Alternate No. 8 described as follows:

Delete complete exterior ACM panel system at all locations shown at the Ground Floor level and substitute with horizontal metal siding found on the upper walls at the low slope Roof level and cementitious soffit panels as described on the drawings.

BID ALTERNATE NO. 9: All work described on the Drawings and Specifications minus Bid Alternate No. 1, Bid Alternate No. 2, Bid Alternate No. 3, Bid Alternate No. 4, Bid Alternate No. 5, Bid Alternate No. 6, Bid Alternate No. 7, and Bid Alternate No. 8 along with Bid Alternate No. 9 described as follows:

Delete approximately 72 lf of Outrigger Sunshade located at the windows of Room 163 and the north side of Room 101 as described on the drawings.

Delete the 10 LED lighted mirrors and replace with standard framed mirrors as described on the drawings.

BID ALTERNATE NO. 10: All work described on the Drawings and Specifications minus Bid Alternate No. 1, Bid Alternate No. 2, Bid Alternate No. 3, Bid Alternate No. 4, Bid Alternate No. 5, Bid Alternate No. 6, Bid Alternate No. 7, Bid Alternate No. 8, and Bid Alternate No. 9 along with Bid Alternate No. 10 described as follows:

Delete casework, countertops, sink and 2 canopy hoods (hoods only, not infrastructure) in the AT Lab (Rooms 170-172) as described on the drawings.

BID ALTERNATE NO. 11: All work described on the Drawings and Specifications minus Bid Alternate No. 1, Bid Alternate No. 2, Bid Alternate No. 3, Bid Alternate No. 4, Bid Alternate No. 5, Bid Alternate No. 6, Bid Alternate No. 7, Bid Alternate No. 8, Bid Alternate No. 9, and Bid Alternate No. 10 along with Bid Alternate No. 11 described as follows:

Delete the installation of the Outdoor Exercise Canopy and Slab. Include the footings, concrete paving, Steel structure, lighting, roofing and accessories as described on the drawings.

BID ALTERNATE NO. 12: All work described on the Drawings and Specifications minus Bid Alternate No. 1, Bid Alternate No. 2, Bid Alternate No. 3, Bid Alternate No. 4, Bid Alternate No. 5, Bid Alternate No. 6, Bid Alternate No. 7, Bid Alternate No. 8, Bid Alternate No. 9, Bid Alternate No. 10, Bid Alternate No. 11,along with Bid Alternate No. 12 described as follows:

Delete approximately 750 sf of finished interior space, at Rooms 130 – 135, by only completing shelled construction of the exterior and corridor walls. Delete common walls, ceilings, doors, flooring, wall base, painting, and provide rough-ins only for building systems as further described on the drawings.

Period of Performance: 578 Days