36E77619R0062-0003004.pdf
PDF 14 MB Posted
- Solicitation number
- 36E77619R0062
About this file
36E77619R0062 0003 ATTACHMENT 5 - Civil_Revised.pdf
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT POLYTRAUMA
INTEGRATIVE REHABILITATION
CLINIC
RICHMOND, VA
652-320
Project Director
05-22-2019
Revisions: Date:
440 Martin Luther King Jr. Blvd
Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
F
05/22/2019 DEQ COMMENTS1
CTA TAW/CBK
07/13/2019 DEQ COMMENTS2
APPLICATION DATES
Sept. 1-Feb. 15
Feb. 16-Apr. 30
May. 1-Aug. 31
· Apply 10-10-10 FERTILIZER at a rate 450 lbs./acre (or 10 lbs./1,000sq ft
· Apply PULVERIZED AGRICULTURAL LIMESTONE at a rate of 2 tons/acre
(or 90 lbs./1,000 sq ft)
SPECIES APPLICATION RATES
50/50 Mix of Annual Ryegrass (lolium multi-florum) & Cereal (Winter) Rye (Secale cereale)
50-100 (lbs/acre)
Annual Ryegrass (lolium multi-florum) 60-100 (lbs/acre)
German Millet
50 (lbs/acre)
FERTILIZER & LIME
SEED
TABLE 3.31-B
(Revised June 2003)
TEMPORARY SEEDING SPECIFICATIONS
QUICK REFERENCE FOR ALL REGIONS
NOTE:
1 - A soil test as necessary to determine the actual amount of lime required to adjust the soil pH of site.
2 - Incorporate the lime and fertilizer into the top 4-6 inches of the soil by disking or by other means.
3 - When applying Slowly Available Nitrogen, use rates available in Erosion & sediment Control Technical Bulletin
#4, 2003 Nutrient Management for Development Sties at http:/www.dcr.state.va.us/sw/e&s.htm#pubs
LAND USE
Minimum Care Lawn
(Commercial or
Residential)
High-Maintenance
Lawn
SPECIES APPLICATION PER ACRE
Tall Fescue
Perennial Ryegrass
Kentucky Bluegrass
95-100%
0-5%
0-5%
TOTAL: 175-200 lbs.
Tall Fescue TOTAL: 200-250 lbs.
SEED
TABLE 3.32-E
(Revised June 2003)
PERMANENT SEEDING SPECIFICATIONS FOR DCR
FERTILIZER & LIME
General Slope (3:1 or less)
LOW-Maintenance Slope
(Steeper Than 3:1)
Tall Fescue
Red Top Grass or Creeping Red Fescue seasonal Nurse Crop
128 lbs.
2 lbs.
20 lbs.
Total: 150 lbs.
Tall Fescue
Red Top Grass or Creeping Red Fescue seasonal Nurse Crop
Crownvetch
108 lbs.
2 lbs.
20 lbs.
20 lbs.
Total: 150 lbs.
1- When selecting varieties of turfgrass, use the Virginia Crop Improvement Association (VCIA) recommended turfgrass variety list. Quality seed will bear a label indicating that they are approved by VCIA. A current turfgrass variety list is available at the local County Extension office or through VCIA at 804-746-4884 or at http://sudan.cses.vt.edu/html/Turf/turf/publications/publications2/html
2- Use seasonal nurse crop in accordance with seeding dates as stated below:
February 16th - April........................ Annual Rye
May 1st - August 15th....................... Foxtail Millet
August 16th - October..................... Annual Rye
November - February 15th.............. Winter Rye
3- Substitute Sericea Lespedeza for Crownvetch east of Farmville, VA (May through September use hulled seed, all other periods, use unhulled Sericea). If Flatpea is used, increase to 30 lbs/acre. If weeping lovegrass is used, including in any slope or low maintenance mixture during warmer seeding periods, increase to 30-40 lbs/acre.
· Apply 10-20-10 fertilizer at a rate of 500 lbs./acre (or 12 lbs./1,000 sq. ft.)
· Apply Pulverized Agricultural Limestone at a rate of 2 tons/acre (or 90 lbs./1,000 sq. ft.)
NOTE:
-A soil test is necessary to determine the actual amount of lime required to adjust the soil pH of the site.
-Incorporate the lime and fertilizer into the top 4-6 inches of the soil by disking or by other means.
-When applying Slowly Available Nitrogen, use rates available in Erosion & Sediment Control Technical Bulletin #4, 2003 Nutrient Management for Development Sites at http://www.dcr.state.va.us/sw/e&s.html#pubs
SURVEY NOTES
1. ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND/OR
METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. THE
CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL JOBSITE SAFETY, INCLUDING BUT NOT
LIMITED TO TRENCH SAFETY, DURING ALL PHASES OF CONSTRUCTION.
2. OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, ETC. THAT MAY BE
REQUIRED.
3. ANY DISCREPANCIES FOUND BETWEEN THE DRAWINGS, SPECIFICATIONS, AND SITE
CONDITIONS OR ANY INCONSISTENCIES OR AMBIGUITIES IN DRAWINGS OR SPECIFICATIONS
SHALL BE IMMEDIATELY REPORTED TO THE ENGINEER, IN WRITING, WHO SHALL PROMPTLY
ADDRESS SUCH INCONSISTENCIES OR AMBIGUITIES. WORK DONE AFTER DISCOVERY OF SUCH
DISCREPANCIES, INCONSISTENCIES, OR AMBIGUITIES AND BEFORE FORMAL RESPONSE FROM
THE ENGINEER SHALL BE DONE AT THE CONTRACTOR'S RISK.
4. MAINTAIN AN "AS BUILT" SET OF DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL PIPING
PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE OWNER UPON COMPLETION OF
THE PROJECT AND A COPY OF THE TRANSMITTAL LETTER (FOR RECORD KEEPING) GIVEN TO
THE ENGINEER.
5. REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BUILDING DIMENSIONS.
6. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO THE CURRENT
SPECIFICATIONS AND STANDARDS OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD
AND BRIDGE STANDARDS AND SPECIFICATIONS.
7. REPLACE WITH MATCHING MATERIALS ANY PAVEMENT, DRIVEWAYS, WALKS, CURBS,
LANDSCAPING, ETC., THAT MAY BE CUT OR THAT ARE DAMAGED DURING CONSTRUCTION AT
CONTRACTOR'S OWN EXPENSE.
8. THE CONSTRUCTION SITE, ADJACENT AREAS, AND RIGHT-OF-WAYS SHALL BE KEPT CLEAN AND
CLEAR OF CONSTRUCTION DEBRIS AT ALL TIMES.
9. EXCAVATED MATERIAL REMOVED FROM THE SITE SHALL BE DISPOSED OF IN A LAWFUL
MANNER.
10. WHEN MATERIALS WHICH ARE UNSUITABLE FOR SUBGRADES OCCUR WITHIN THE PROJECT
LIMITS, EXCAVATE SUCH MATERIAL BELOW THE SUBGRADE, AND THE AREAS SO EXCAVATED
SHALL BE BACKFILLED WITH APPROVED SUITABLE MATERIALS (SELECT BORROW).
11. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE
KEPT ON SITE AT ALL TIMES.
12. ADJUST ALL EXISTING MANHOLE RIMS, VALVE BOX COVERS, AND OTHER UTILITY SURFACE
FEATURES WITHIN PROJECT LIMITS TO FINISHED GRADE.
13. COMPLY WITH THE PROVISIONS AND REQUIREMENTS OF THE OVERHEAD HIGH VOLTAGE LINES
SAFETY ACT (SECTION 59.1-406, ET. SEQ. OF THE CODE OF VIRGINIA) IN PERFORMING WORK ON
THIS PROJECT. AS A MINIMUM,
A. CONTACT THE ELECTRICAL UTILITY 48 HOURS PRIOR TO COMMENCING WORK IF THE
CONTRACTOR'S TOOLS OR MATERIALS WILL INTRUDE TO WITHIN SIX (6) FEET OF AN
OVERHEAD POWER LINE.
B. CONTACT THE ELECTRICAL UTILITY 48 HOURS PRIOR TO COMMENCING WORK IF
COVERED EQUIPMENT SUCH AS CRANES OR DERRICKS WILL BE OPERATED WITHIN TEN
(10) FEET OF AN OVERHEAD POWER LINE.
C. POST AND MAINTAIN WARNING SIGNS WITHIN AND ON THE OUTSIDE OF EQUIPMENT
OPERATING NEAR AN OVERHEAD HIGH VOLTAGE LINE.
D. COORDINATE ALL WORK ASSOCIATED WITH EXISTING UTILITY RELOCATION, INCLUDING
TEMPORARY POLE BRACING AND GUY WIRE RELOCATION, WITH THE APPROPRIATE
UTILITY COMPANY. COSTS ASSOCIATED WITH THIS COORDINATION, MEASURES
REQUIRED BY THE UTILITY COMPANY, AND COSTS INVOICED BY THE UTILITY COMPANY
FOR WORK PERFORMED BY THEM SHALL BE CONSIDERED INCIDENTAL TO THE
CONTRACT.
E. COORDINATE WITH THE UTILITY OWNER, SHOULD THE CONTRACTOR'S EXCAVATION
ACTIVITIES REQUIRE SHORING AND BRACING OF EXISTING UTILITY POLES. VIRGINIA
POWER SHALL BE NOTIFIED TEN (10) WORKING DAYS BEFORE ANTICIPATED SHORING
AND BRACING ACTIVITIES COMMENCE. ALL SHORING AND BRACING ACTIVITIES SHALL BE
ACCOMPLISHED BY VIRGINIA POWER PERSONNEL AT CONTRACTOR'S EXPENSE.
14. DIMENSIONS TO BUILDINGS AND WALLS ARE TO FACE OF BUILDING.
15. ALL AREAS WITHIN THE PROJECT LIMITS THAT ARE NOT OCCUPIED BY BUILDINGS, PAVING, OR
OTHER HARD SURFACES SHALL BE STABILIZED AND SEEDED IF DISTURBED. THERE SHALL BE
NO DISTURBANCE OUTSIDE OF THE PROJECT LIMITS.
16. ALL GRADING SHALL BE TRANSITIONED AT A CONSTANT SLOPE BETWEEN NEW GRADES AND
NEW TO EXISTING GRADES, UNLESS SPECIFICALLY NOTED OTHERWISE.
17. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE, AND AS SHOWN ON THESE PLANS.
MAINTAIN ADEQUATE SITE DRAINAGE DURING ALL PHASES OF CONSTRUCTION. USE SILT
FENCES (OR OTHER METHODS APPROVED BY THE ENGINEER) AS REQUIRED TO PREVENT SILT
AND CONSTRUCTION DEBRIS FROM FLOWING OFFSITE. COMPLY WITH ALL APPLICABLE
FEDERAL, STATE, OR LOCAL EROSION, CONSERVATION, AND SILTATION ORDINANCES.
REMOVE ALL TEMPORARY EROSION CONTROL DEVICES UPON COMPLETION OF PERMANENT
DRAINAGE FACILITIES AND THE ESTABLISHMENT OF A STAND OF GRASS OR OTHER GROWTH
TO PREVENT EROSION. CONTACT DEQ INSPECTOR FOR APPROVAL PRIOR TO REMOVING ESC
DEVICES.
18. ALL MATERIALS USED FOR BACKFILL SHALL BE FREE OF WOOD, ROOTS, ROCKS, BOULDERS, OR ANY OTHER NON-COMPATIBLE SOIL TYPE MATERIAL. UNSATISFACTORY MATERIALS ALSO
INCLUDE MAN-MADE FILLS AND REFUSE DEBRIS DERIVED FROM ANY SOURCE.
19. CONSTRUCTION JOINTS SHALL BE USED AT THE END OF EACH DAY'S PLACING OPERATION AND
WHEN CONCRETE PLACEMENT IS INTERRUPTED FOR 30 MINUTES OR LONGER.
20. TRAFFIC CONTROLS WITHIN THE ROADWAY SHALL BE IN COMPLIANCE WITH STANDARDS OF
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
21. TRAFFIC CONTROL WITHIN ALL VEHICULAR AREAS SHALL BE IN CONFORMANCE WITH THE
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
22. FIELD VERIFY THE ACTUAL AND EXACT LOCATION, SIZE AND MATERIAL COMPOSITION OF ANY
EXISTING WATER OR SEWER SERVICE PROPOSED FOR CONNECTION OR USE ON THIS
PROJECT. THE RELOCATION OF ANY UTILITY SERVICES REQUIRED TO COMPLETE ANY
PORTION OF THESE CONSTRUCTION PLANS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
23. PRIOR TO CONSTRUCTION OR EXCAVATION, LOCATE ANY UNDERGROUND UTILITIES (PUBLIC
OR PRIVATE) THAT MAY EXIST AND CROSS THROUGH THE AREA OF CONSTRUCTION AND THAT
ARE NOT SHOWN ON THESE PLANS. BEFORE DIGGING, CALL "MISS UTILITY" OF VIRGINIA AT 811
OR 1-800-552-7001. DAMAGES WILL BE AT THE EXPENSE OF THE CONTRACTOR. THESE
INCLUDE BUT ARE NOT LIMITED TO ELECTRIC, SEWER, WATER, TELEPHONE, CABLE
TELEVISION, ETC. REPAIR OR REPLACE, AS DIRECTED BY THE OWNER, AT CONTRACTOR'S
EXPENSE ANY EXISTING UTILITIES DAMAGED DURING CONSTRUCTION. ANY TEMPORARY
REMOVAL AND REINSTALLATION OF EXISTING STREET LIGHTS SHALL BE COORDINATED WITH
DOMINION VIRGINIA POWER AND SHALL BE AT CONTRACTOR'S EXPENSE. DOMINION VIRGINIA
POWER MAY REQUIRE SIGNIFICANT ADVANCE NOTICE FOR SCHEDULING WORK.
24. VERIFY THE EXISTENCE AND LOCATION OF ALL UTILITIES PRIOR TO ANY EXCAVATION OR
CONSTRUCTION WORK. CONTACT ALL POTENTIAL UTILITY OWNERS PRIOR TO EXCAVATION.
WHERE CONFLICTS EXIST, BASED ON FIELD VERIFICATION, WHICH MAY ADVERSELY AFFECT
THE NEW WORK, THE OWNER IS TO BE NOTIFIED PRIOR TO ANY CONSTRUCTION WORK.
NOTIFY THE ENGINEER IMMEDIATELY IF THE UTILITY IS NOT LOCATED AS SHOWN ON THE PLAN.
25. COORDINATE VERIFICATION OF HORIZONTAL AND VERTICAL LOCATION OF CROSSED UTILITIES
PRIOR TO EXCAVATION FOR THE CROSSING. COORDINATE WITH THE ENGINEER ANY
REQUIRED CHANGES IN THE DESIGN DUE TO UTILITY CONFLICTS.
26. UNLESS OTHERWISE NOTED, ALL EXISTING UTILITIES SHALL REMAIN IN PLACE. PROTECT ALL
EXISTING UTILITIES FROM DAMAGE DURING CONSTRUCTION. ALL DAMAGE TO EXISTING
UTILITIES (INCLUDING BUT NOT LIMITED TO WATER, SEWER, GAS, ELECTRIC, TELEPHONE,
STORM SEWERS, ETC.) SHALL BE REPAIRED TO THE SATISFACTION OF THE AFFECTED UTILITY
OWNER AND VAMC ENGINEERING. ALL COSTS FOR ANY DAMAGE REPAIR WORK SHALL BE
BORNE SOLELY BY THE CONTRACTOR.
27. COORDINATE THE RELOCATION OR ADJUSTMENT OF ANY UTILITIES (POWER POLES,
TELEPHONE PEDESTALS, GUY WIRES, WATER METER, ETC.) WITH UTILITY OWNER AS A RESULT
OF INTERFERENCE WITH PROPOSED CONSTRUCTION.
28. HAND EXCAVATE WITHIN TWO FEET OF EXISTING UTILITIES.
29. ALL UTILITIES SHALL BE INSTALLED UNDERGROUND.
30. ALL EXISTING UTILITY LINES NOT SHOWN TO BE DEMOLISHED MUST BE PROTECTED AND
MAINTAINED DURING CONSTRUCTION.
31. MAINTAIN ACCESS TO ALL EXISTING FIRE HYDRANTS THROUGHOUT DEMOLITION AND
CONSTRUCTION.
32. CLEAN ALL STORM PIPES AND STORM STRUCTURES AFTER CONSTRUCTION AND DISPOSE OF
MATERIAL IN A LAWFUL MANNER.
33. AT THE END OF EACH DAY, DRAINAGE FACILITIES DISTURBED BY CONSTRUCTION, INCLUDING
ROADSIDE SWALES AND DITCHES, MUST BE RESTORED. RESUME THE OPERATION OF THE
DRAINAGE SYSTEM DURING THE DAY PRIOR TO A RAINFALL EVENT.
34. PROVIDE TEMPORARY DRAINAGE AS REQUIRED DURING CONSTRUCTION.
35. TOPSOIL, SEED AND FERTILIZE ALL AREAS WITHIN THE PROJECT LIMITS NOT OCCUPIED BY
STRUCTURES, PAVEMENT, OR SIDEWALKS, AND NOT DESIGNATED TO BE SODDED OR
LANDSCAPED. UNLESS OTHERWISE NOTED, ALL DENUDED AREAS SHALL BE STABILIZED
WITHIN 7 DAYS IF THEY WILL REMAIN DORMANT FOR MORE THAN 14 DAYS. PLEASE REFER TO
MINIMUM STANDARD 1.
36. THIS PROJECT INVOLVES WORK INCLUDED IN BID ALTERNATES, AS DESCRIBED IN
SPECIFICATION SECTION 01 00 00, “BID ITEMS”. REFER TO SPECIFICATIONS FOR DESCRIPTIONS
OF ALL BID ALTERNATES, WHICH MAY ELIMINATE OR REPLACE WORK INCLUDED IN THE BASE
BID. THESE DRAWINGS MAY ALSO INCLUDE ADDITIONAL NOTES WHERE REQUIRED TO
ADEQUATELY IDENTIFY BID ALTERNATES.
37. UNDERGROUND STEAM AND CONDENSATE PIPING REQUIRES A CATHODIC PROTECTION
SYSTEM AS SPECIFIED IN SECTION 26 42 00, “CATHODIC PROTECTION".
38. EFFLUENT FROM DEWATERING PRACTICES MUST BE FILTERED THROUGH A SEDIMENT
TRAPPING DEVICE. UTILIZE A SILT FENCE, PER DETAIL "SF". MAINTANENCE REQUIREMENTS TO
FOLLOW "MAINTENANCE NOTE 1 & 2" ON SHEET CE101
GENERAL NOTES
BUILDING
ASPHALT PAVEMENT
CONCRETE PAVEMENT
GRAVEL
TRAVERSE LINE
CONTOUR
℄ DITCH
TOE OF SLOPE
TOP OF BANK
BRICK PAVERS
TRAVERSE POINT
BENCHMARK
SPOT ELEVATION
FENCE
UNDERGROUND ELECTRIC
STORM DRAIN
SANITARY SEWER
WATER LINE
NATURAL GAS LINE
SANITARY SEWER FORCE MAIN
SANITARY SEWER MANHOLE
SANITARY SEWER CLEANOUT
WATER VALVE
GAS VALVE
DROP INLET
CURB INLET
STORM DRAIN MANHOLE
COMMUNICATION PEDESTAL
COMMUNICATION MANHOLE
BOLLARD/POST
SIGN
TREE
LIGHT POLE
ABBREVIATIONS
CI CURB INLET
DI DROP INLET
E EAST, EASTING
EG EXISTING GAS
EHH ELECTRICAL HANDHOLE
ELEC ELECTRIC
ELEV ELEVATION
EOI END OF INFORMATION
ESFM EXISTING SANITARY SEWER FORCE MAIN
EUC EXISTING UNDERGROUND COMMUNICATION
EUE EXISTING UNDERGROUND ELECTRIC
EW EXISTING WATER
FFE FINISH FLOOR ELEVATION
FL FLOW LINE
FOHB FIBER OPTIC HANDHOLE BOX
GV GAS VALVE
INV INVERT
LP LIGHT POLE
MG MATCH GRADE
MH MANHOLE
N NORTH, NORTHING
PVC POLYVINYL CHLORIDE
QL C QUALITY LEVEL C
RCP REINFORCE CONCRETE PIPE
SAN SANITARY SEWER
SCO SANITARY SEWER CLEANOUT
SDCO STORM DRAIN CLEANOUT
SDMH STORM DRAIN MANHOLE
SF SILT FENCE
SMH SANITARY SEWER MANHOLE
TC TOP OF CURB
TOB TOP OF BANK
TOS TOP OF SLOPE
TYP TYPICAL
UNK UNKNOWN
WV WATER VALVE
LEGEND
POLE
EXISTING PROPOSED
G G
REMOVE TO THIS POINT
CONNECT TO EXISTING
SILT FENCE
CURB AND GUTTER
PROJECT LIMITS
TREE PROTECTION
IP
INLET PROTECTION
REMOVE / DEMOLISH
BORING LOCATION
SD
ROOF DRAIN
RD
UNDERGROUND COMMUNICATION
NOTES, LEGEND & ABBREVIATIONS
C001
AutoCAD SHX Text TOPOGRAPHIC SURVEY NOTES 1. THIS SURVEY IS FOR THE MCGUIRE VETERANS HOSPITAL IN RICHMOND, VA PROJECT AND WAS PREPARED BY MIDATLANTIC SURVEYING AND LAND DESIGN, INC., SEPTEMBER 14, 2018. 2. THE EXISTENCE, SIZE AND/OR LOCATION OF UTILITIES ARE NOT GUARANTEED BY THIS SURVEY, UTILITIES SHOWN ARE BASED ON ABOVE GROUND STRUCTURES, AVAILABLE UTILITY PLANS AND AS MARKED BY ACCUMARK, INC ON SEPTEMBER 10, 2018. SEE GENERAL UTILITY NOTES. UTILITIES MARKED AS "APPROXIMATE" HAVE BEEN SCALED IN ACCORDING TO BEST FITS FROM AVAILABLE UTILITY RECORDS 3. ELEVATIONS ARE IN U.S. SURVEY FEET AND REFER TO NORTH AMERICAN VERTICAL DATUM (NAVD) 1988 AND ARE BASED ON CITY OF RICHMOND CONTROL MONUMENT 681 ELEVATION 192.76' NAVD88. 4. TEMPORARY BENCHMARK (TBM) CHART TBM# DESC. ELEV. DESC. ELEV. ELEV. BENCHMARK "C" 176.32' 176.32' 5. COORDINATES SHOWN REFER TO VIRGINIA STATE PLANE COORDINATE SYSTEM SOUTH ZONE (NAD 83/94 HARN) AND WERE ESTABLISHED UTILIZING GPS AND CONVENTIONAL EQUIPMENT. 6. THIS SURVEY IS NOT A BOUNDARY SURVEY OR SUBDIVISION OF LAND. RIGHT OF WAY LINES SHOWN ARE FOR INFORMATION ONLY AND ARE BASED ON RECORDED PLATS AND MONUMENTS FOUND.
AutoCAD SHX Text GENERAL UTILITY NOTES DATE OF SUBMITTAL: 09/10/2018 ACCUMARK, INC. PERFORMED AN UNDERGROUND UTILITY DESIGNATION EFFORT IN 08/2018 WITHIN THE PROJECT LIMITS SPECIFIED BY THE CLIENT. ACCUMARK, INC, DOES NOT GUARANTEE THAT UTILITIES SHOWN COMPRISE ALL UTILITIES WITHIN THE PROJECT LIMITS PROVIDED BY THE CLIENT FIELD DESIGNATING AND MARKING PERFORMED BY ACCUMARK, INC. IN ACCORDANCE WITH QUALITY LEVEL B STANDARDS UNLESS OTHERWISE NOTED HEREON AS QUALITY LEVELS C OR D. QUALITY CONTROL / QUALITY ASSURANCE REVIEW PERFORMED BY MIKE TAYLOR, L.S. THE UTILITY SIZES SHOWN HEREIN ARE BASED ON INFORMATION PROVIDED BY THE UTILITY COMPANY'S OWNER, BY RECORDS PROVIDED BY THE CLIENT, BY VERBAL INFORMATION OR BY OBSERVED VISUAL EVIDENCE. SURVEYED LOCATIONS OF DESIGNATED UTILITIES MAY NOT REPRESENT THE EXACT CENTERLINE OF THE UTILITY. TEST HOLES WILL BE NECESSARY TO IDENTIFY THE EXACT CENTERLINE. AT THE TIME OF UTILITY FILE SUBMITTAL NO TOPOGRAPHIC BASE MAPPING HAS BEEN PROVIDED TO ACCUMARK. ACCUMARK RESERVES THE RIGHT TO REVIEW THE UTILITY FILE AND MAKE ANY APPROPRIATE REVISIONS ONCE A BASE MAPPING FILE HAS BEEN RECEIVED.
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CONC
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
TPED
AutoCAD SHX Text
COMM MH
AutoCAD SHX Text
EUE
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
ES
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text
EW
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
DI
AutoCAD SHX Text
EG
AutoCAD SHX Text
2" PL
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
SMH
AutoCAD SHX Text
SCO
AutoCAD SHX Text
WV
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
GV
AutoCAD SHX Text
CI
AutoCAD SHX Text N 19°19'47" E
AutoCAD SHX Text 150.00'
AutoCAD SHX Text
24" OAK
AutoCAD SHX Text 15.0
AutoCAD SHX Text
TOS
AutoCAD SHX Text
TOB
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
ESFM
AutoCAD SHX Text
4" DI
AutoCAD SHX Text
7' CHAIN LINK FENCE
AutoCAD SHX Text
BM-1
AutoCAD SHX Text Spell checked by TWEAVER on 03/11/2019 8:09am
AutoCAD SHX Text B-1
AutoCAD SHX Text
IP
IP
TP
IP
C
E
TP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT POLYTRAUMA
INTEGRATIVE REHABILITATION
CLINIC
RICHMOND, VA
652-320
Project Director
05-22-2019
Revisions: Date:
440 Martin Luther King Jr. Blvd
Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
F
05/22/2019 DEQ COMMENTS1
CTA TAW/CBK
07/13/2019 DEQ COMMENTS2
80'40'20'10'0
1"=20'
GRAPHIC SCALE
CONSTRUCTION NOTES#
1. STAGING / STOCKPIILE AREA
EROSION AND SEDIMENT CONTROL NARRATIVE
PROJECT DESCRIPTION
THE PROJECT SCOPE INCLUDES REMOVING EXISTING SHEDS AND GREENHOUSE,
AND BUILDING A POLYTRAUMA INTEGRATIVE REHABILITATION CLINIC BUILDING ON
THE SITE. THE BUILDING'S USE WILL COMPLEMENT THAT OF THE EXISTING
BUILDING 514 TO THE SOUTH.
EXISTING SITE CONDITIONS
THE EXISTING SITE IS RELATIVELY FLAT AND CLEARED WITH SPARSE VEGETATION.
THE SITE CONSISTS OF A GREENHOUSE, SHEDS, PORTABLE CONEX OFFICE
TRAILERS, WITH MULTIPLE UTILITIES RUNNING THROUGH THE SITE. THE SITE
GENERALLY DRAINS TO THE NORTHEAST TO AN EXISTING PARKING LOT AT AN
AVERAGE SLOPE OF 2%.
ADJACENT PROPERTY
THE SITE IS LOCATED ON THE CAMPUS OF THE HUNTER HOLMES MCGUIRE
VETERANS AFFAIRS MEDICAL CENTER, EAST OF THE MAIN BUILDING AND JUST
NORTH OF BUILDING 514. THE PROJECT LIMITS INCLUDE APPROXIMATELY 1.25
ACRES OF LAND DISTURBANCE.
OFF-SITE AREAS
OFF SITE DISTURBANCE IS NOT ANTICIPATED FOR THIS PROJECT. IF OFFSITE
AREAS ARE TO BE UTILIZED, CONTACT THE DEQ INSPECTOR PRIOR TO USE.
SOILS
A GEOTECHNICAL REPORT FOR THE PROJECT SITE WAS PREPARED BY FROEHLING
& ROBERTSON, INC, DATED SEPTEMBER 2018. SITE SOILS GENERALLY CONSIST OF
FILL MATERIAL AND ALLUVIAL SOIL GENERALLY DESCRIBED AS SAND, CLAY, SILTY
CLAY, CLAYEY SILT AND SILT. GROUNDWATER WAS MEASURED TO BE 16.5 TO 33.8
FEET BELOW THE EXISTING GROUND SURFACE.
CRITICAL EROSION AREAS
THERE ARE NO KNOWN CRITICAL EROSION AREAS. THE SITE IS CLEARED WITH
MILD SLOPES.
EROSION AND SEDIMENT CONTROL MEASURES
ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND
MAINTAINED IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE
EROSION AND SEDIMENT CONTROL HANDBOOK.
STRUCTURAL PRACTICES
CONSTRUCTION ENTRANCE-SPECIFICATION 3.02
A TEMPORARY CONSTRUCTION ENTRANCE WILL BE PLACED NEAR THE PARKING
LOT ACCESS TO THE SITE.
SILT FENCE-SPECIFICATION 3.05
SILT FENCE IS PLACED AROUND THE PERIMETER OF THE SITE AND IS INSTALLED
GENERALLY DOWNSLOPE OF AREAS WITH FLAT GRADES TO FILTER
SEDIMENT-LADEN RUNOFF.
STORM DRAIN INLET PROTECTION - SPECIFICATION 3.07
INLET PROTECTION WILL BE SILT FENCE OR BLOCK AND GRAVEL FILTERS LOCATED
AROUND ALL DROP INLETS.
TREE PROTECTION - SPECIFICATION 3.38
TREE PROTECTION FENCE WILL BE PLACED AROUND EXISTING TREES TO REMAIN
WITHIN THE SITE. THESE AREAS ARE TO REMAIN UNDISTURBED DURING
CONSTRUCTION AND SHALL BE PROTECTED FROM SOIL COMPACTION AND
DAMAGE FROM EQUIPMENT.
VEGETATIVE PRACTICES
TOPSOILING-SPECIFICATION 3.30
TOPSOIL MAY BE EXTRACTED AND STOCKPILED ON THE SITE FOR USE DURING
GRADING OF LANDSCAPED AREAS. STOCK-PILED AREAS WILL BE STABILIZED WITH
SILT FENCE AND TEMPORARY SEEDING WITHIN 7 DAYS IF IT WILL REMAIN
DORMANT FOR MORE THAN 14 DAYS.
TEMPORARY SEEDING-SPECIFICATION 3.31
SOME AREAS NOT SCHEDULED FOR PAVING WILL BE LEFT DORMANT. THESE
AREAS WILL BE TEMPORARILY SEEDED TO PROTECT AGAINST EROSION UNTIL
SUCH AREAS ARE TO BE FINISH GRADED. FOR THESE EXTENDED PERIODS A
FAST-GERMINATING SEED WILL BE USED TO PROTECT THESE AREAS AND ACT TO
PREVENT RELEASE OF SEDIMENT INTO AREAS OF POROUS PAVEMENT.
PERMANENT SEEDING-SPECIFICATION 3.32
PERMANENT SEEDING MAY BE USED IN PLACE OF TEMPORARY SEEDING FOR ANY
AREAS AT FINISH GRADE THAT WILL NOT BE DISTURBED LATER IN CONSTRUCTION.
DUST CONTROL-SPECIFICATION 3.39
WATER, MULCHING, VEGETATION, BLANKETS AND LINERS, PAVING AND STONE, OR
CHEMICAL ADHESIVES WILL BE USED TO CONTROL DUST FROM THE PROJECT SITE
DURING LARGE SCALE GRADING OPERATIONS.
MANAGEMENT STRATEGIES
1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS BEGIN
AND END AS QUICKLY AS POSSIBLE.
2. SEDIMENT TRAPPING MEASURES WILL BE INSTALLED INITIALLY AND WILL BE
SEEDED AND MULCHED AFTER INSTALLATION.
3. TEMPORARY SEEDING OR OTHER STABILIZATION MEASURES WILL START
IMMEDIATELY AFTER GRADING FOR THOSE AREAS NOT AT FINISHED GRADE.
TEMPORARY SEEDING WILL CONFORM TO THE EROSION AND SEDIMENT CONTROL
HANDBOOK.
4. PERMANENT SEEDING WILL BE APPLIED TO THOSE AREAS AT FINISH GRADE.
PERMANENT SEEDING WILL CONFORM TO THE EROSION AND SEDIMENT CONTROL
HANDBOOK.
5. THE SITE PERSONNEL RESPONSIBLE FOR EROSION AND SEDIMENT CONTROL
WILL BE RESPONSIBLE FOR THE PROPER INSTALLATION AND MAINTENANCE OF ALL
MEASURES. THIS INDIVIDUAL WILL BE RESPONSIBLE FOR FOLLOWING AND
MAINTAINING THE SWPPP.
6. AFTER STABILIZATION OF THE SITE, TEMPORARY EROSION AND SEDIMENT
CONTROL MEASURES WILL BE CLEANED OF SEDIMENTS, REMOVED, AND THE SITE
RESTORED AT THE DISCRETION OF THE SITE INSPECTOR AND THE SITE
PERSONNEL RESPONSIBLE FOR EROSION AND SEDIMENT CONTROL. CONTACT
DEQ INSPECTOR FOR APPROVAL PRIOR TO REMOVING ESC DEVICES.
MAINTENANCE
1. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY
AND SPECIFICALLY FOLLOWING EACH RAINFALL-RUNOFF PRODUCING EVENT.
2. SILT FENCE WILL BE CHECKED REGULARLY FOR DETERIORATION OF THE
FABRIC AND UNDERMINING. REMOVE SEDIMENT WHEN IT REACHES HALF THE
HEIGHT OF THE BARRIER.
3. THE ACTING ENGINEERING CHIEF WILL BE IN CHARGE OF MAINTAINING THE
PERMANENT STORMWATER FACILITIES.
EXISTING CONDITIONS AND EROSION CONTROL
PLAN
CE101
AutoCAD SHX Text N/F UNITED STATES OF AMERICA 1201 BROAD ROCK BLVD (D.B. 308, PG. 63) PIN: C0090088010
AutoCAD SHX Text
GV
AutoCAD SHX Text
GTS
AutoCAD SHX Text
GV
AutoCAD SHX Text
GTS
AutoCAD SHX Text
GTS
AutoCAD SHX Text
1" CONDUIT
AutoCAD SHX Text
TC177.94
AutoCAD SHX Text
TC178.08
AutoCAD SHX Text
TC178.66
AutoCAD SHX Text
TC178.37
AutoCAD SHX Text
TC177.85
AutoCAD SHX Text
TC177.40
AutoCAD SHX Text
TC177.10
AutoCAD SHX Text
TC177.08
AutoCAD SHX Text
TC177.40
AutoCAD SHX Text
TC177.57
AutoCAD SHX Text
TC177.69
AutoCAD SHX Text
TC177.75
AutoCAD SHX Text
TC177.47
AutoCAD SHX Text
TC177.44
AutoCAD SHX Text
TC176.42
AutoCAD SHX Text
TC175.75
AutoCAD SHX Text
TC176.29
AutoCAD SHX Text
TC176.24
AutoCAD SHX Text
TC176.54
AutoCAD SHX Text
TC177.19
AutoCAD SHX Text
TC176.94
AutoCAD SHX Text
TC176.67
AutoCAD SHX Text
TC177.12
AutoCAD SHX Text
TC177.13
AutoCAD SHX Text
TC177.10
AutoCAD SHX Text
TC178.12
AutoCAD SHX Text
TC178.19
AutoCAD SHX Text
TC177.80
AutoCAD SHX Text
TC176.35
AutoCAD SHX Text
TC176.40
AutoCAD SHX Text
TC176.41
AutoCAD SHX Text
TC176.21
AutoCAD SHX Text
TC176.21
AutoCAD SHX Text
TC176.21
AutoCAD SHX Text
EHH
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text 177.06
AutoCAD SHX Text 175.40
AutoCAD SHX Text 175.34
AutoCAD SHX Text 175.33
AutoCAD SHX Text 175.40
AutoCAD SHX Text 177.42
AutoCAD SHX Text 177.30
AutoCAD SHX Text 177.57
AutoCAD SHX Text 176.86
AutoCAD SHX Text 176.72
AutoCAD SHX Text 176.66
AutoCAD SHX Text 176.61
AutoCAD SHX Text 177.07
AutoCAD SHX Text 177.37
AutoCAD SHX Text 177.33
AutoCAD SHX Text 177.44
AutoCAD SHX Text 177.26
AutoCAD SHX Text 177.13
AutoCAD SHX Text 176.90
AutoCAD SHX Text 176.84
AutoCAD SHX Text 176.73
AutoCAD SHX Text 181.93
AutoCAD SHX Text 181.75
AutoCAD SHX Text 181.30
AutoCAD SHX Text 181.30
AutoCAD SHX Text 181.60
AutoCAD SHX Text 181.83
AutoCAD SHX Text 182.51
AutoCAD SHX Text 182.40
AutoCAD SHX Text 182.16
AutoCAD SHX Text 181.90
AutoCAD SHX Text 181.99
AutoCAD SHX Text 181.24
AutoCAD SHX Text 180.54
AutoCAD SHX Text 179.50
AutoCAD SHX Text 179.22
AutoCAD SHX Text 183.12
AutoCAD SHX Text 182.54
AutoCAD SHX Text 182.12
AutoCAD SHX Text 181.77
AutoCAD SHX Text 181.59
AutoCAD SHX Text 181.26
AutoCAD SHX Text 181.18
AutoCAD SHX Text 181.10
AutoCAD SHX Text 180.05
AutoCAD SHX Text 179.19
AutoCAD SHX Text 179.08
AutoCAD SHX Text 179.12
AutoCAD SHX Text 183.07
AutoCAD SHX Text 182.49
AutoCAD SHX Text 182.24
AutoCAD SHX Text 181.46
AutoCAD SHX Text 181.93
AutoCAD SHX Text 182.34
AutoCAD SHX Text 181.88
AutoCAD SHX Text 181.89
AutoCAD SHX Text 182.11
AutoCAD SHX Text
RR179.6
AutoCAD SHX Text
RR177.9
AutoCAD SHX Text
CMMH
AutoCAD SHX Text
TPED
AutoCAD SHX Text 182.7
AutoCAD SHX Text 181.8
AutoCAD SHX Text 181.8
AutoCAD SHX Text 180.4
AutoCAD SHX Text 180.5
AutoCAD SHX Text 179.9
AutoCAD SHX Text 179.8
AutoCAD SHX Text 179.5
AutoCAD SHX Text 179.6
AutoCAD SHX Text 179.2
AutoCAD SHX Text 179.1
AutoCAD SHX Text 179.1
AutoCAD SHX Text 179.0
AutoCAD SHX Text 178.2
AutoCAD SHX Text 180.3
AutoCAD SHX Text 180.0
AutoCAD SHX Text 182.2
AutoCAD SHX Text 180.9
AutoCAD SHX Text 180.0
AutoCAD SHX Text 179.3
AutoCAD SHX Text 179.2
AutoCAD SHX Text 178.7
AutoCAD SHX Text 179.6
AutoCAD SHX Text 180.0
AutoCAD SHX Text 180.9
AutoCAD SHX Text 181.6
AutoCAD SHX Text 180.3
AutoCAD SHX Text 179.3
AutoCAD SHX Text 178.9
AutoCAD SHX Text 178.9
AutoCAD SHX Text 179.4
AutoCAD SHX Text 180.7
AutoCAD SHX Text 180.9
AutoCAD SHX Text 180.7
AutoCAD SHX Text 179.9
AutoCAD SHX Text 179.5
AutoCAD SHX Text 179.0
AutoCAD SHX Text 179.4
AutoCAD SHX Text 180.4
AutoCAD SHX Text 179.4
AutoCAD SHX Text 178.8
AutoCAD SHX Text 178.9
AutoCAD SHX Text 179.7
AutoCAD SHX Text 179.4
AutoCAD SHX Text 179.0
AutoCAD SHX Text 179.1
AutoCAD SHX Text 179.3
AutoCAD SHX Text 179.3
AutoCAD SHX Text 178.8
AutoCAD SHX Text 178.8
AutoCAD SHX Text 178.6
AutoCAD SHX Text 178.6
AutoCAD SHX Text 181.8
AutoCAD SHX Text 181.8
AutoCAD SHX Text 181.4
AutoCAD SHX Text 180.7
AutoCAD SHX Text 181.6
AutoCAD SHX Text 181.7
AutoCAD SHX Text 180.4
AutoCAD SHX Text 179.8
AutoCAD SHX Text 179.8
AutoCAD SHX Text 180.5
AutoCAD SHX Text 181.4
AutoCAD SHX Text 181.9
AutoCAD SHX Text 180.3
AutoCAD SHX Text 179.9
AutoCAD SHX Text 179.9
AutoCAD SHX Text 180.2
AutoCAD SHX Text 181.1
AutoCAD SHX Text 180.4
AutoCAD SHX Text 179.8
AutoCAD SHX Text 179.5
AutoCAD SHX Text 180.4
AutoCAD SHX Text 181.0
AutoCAD SHX Text 180.8
AutoCAD SHX Text 179.3
AutoCAD SHX Text 179.0
AutoCAD SHX Text 179.4
AutoCAD SHX Text 180.0
AutoCAD SHX Text 181.6
AutoCAD SHX Text 181.6
AutoCAD SHX Text 182.4
AutoCAD SHX Text 182.2
AutoCAD SHX Text 182.5
AutoCAD SHX Text 178.7
AutoCAD SHX Text 178.5
AutoCAD SHX Text 178.5
AutoCAD SHX Text 178.1
AutoCAD SHX Text 178.4
AutoCAD SHX Text 178.5
AutoCAD SHX Text 180.3
AutoCAD SHX Text 178.3
AutoCAD SHX Text 178.2
AutoCAD SHX Text 182.2
AutoCAD SHX Text 181.6
AutoCAD SHX Text 181.7
AutoCAD SHX Text 181.5
AutoCAD SHX Text 181.3
AutoCAD SHX Text 181.2
AutoCAD SHX Text 181.4
AutoCAD SHX Text 181.1
AutoCAD SHX Text 181.0
AutoCAD SHX Text 179.2
AutoCAD SHX Text 179.4
AutoCAD SHX Text 179.9
AutoCAD SHX Text 179.4
AutoCAD SHX Text 179.5
AutoCAD SHX Text 178.4
AutoCAD SHX Text 178.6
AutoCAD SHX Text 178.5
AutoCAD SHX Text 178.4
AutoCAD SHX Text 178.1
AutoCAD SHX Text 178.6
AutoCAD SHX Text 177.9
AutoCAD SHX Text 177.9
AutoCAD SHX Text 177.8
AutoCAD SHX Text 177.5
AutoCAD SHX Text 178.0
AutoCAD SHX Text 177.6
AutoCAD SHX Text 177.2
AutoCAD SHX Text 177.3
AutoCAD SHX Text 177.8
AutoCAD SHX Text 177.9
AutoCAD SHX Text 177.5
AutoCAD SHX Text 178.6
AutoCAD SHX Text 178.8
AutoCAD SHX Text 178.5
AutoCAD SHX Text 178.8
AutoCAD SHX Text 178.5
AutoCAD SHX Text 179.1
AutoCAD SHX Text 178.5
AutoCAD SHX Text 178.0
AutoCAD SHX Text 182.0
AutoCAD SHX Text 181.0
AutoCAD SHX Text 180.5
AutoCAD SHX Text 179.2
AutoCAD SHX Text 181.2
AutoCAD SHX Text 179.1
AutoCAD SHX Text 179.0
AutoCAD SHX Text 179.1
AutoCAD SHX Text 179.1
AutoCAD SHX Text 179.4
AutoCAD SHX Text 178.9
AutoCAD SHX Text 181.3
AutoCAD SHX Text 181.7
AutoCAD SHX Text 182.3
AutoCAD SHX Text 181.9
AutoCAD SHX Text 182.3
AutoCAD SHX Text 182.4
AutoCAD SHX Text 182.3
AutoCAD SHX Text 182.0
AutoCAD SHX Text 182.0
AutoCAD SHX Text 177.7
AutoCAD SHX Text 177.8
AutoCAD SHX Text 178.0
AutoCAD SHX Text 177.9
AutoCAD SHX Text 177.6
AutoCAD SHX Text 178.1
AutoCAD SHX Text 178.3
AutoCAD SHX Text 178.4
AutoCAD SHX Text 178.3
AutoCAD SHX Text 178.1
AutoCAD SHX Text 178.1
AutoCAD SHX Text 177.9
AutoCAD SHX Text 178.0
AutoCAD SHX Text 178.2
AutoCAD SHX Text 178.1
AutoCAD SHX Text 177.9
AutoCAD SHX Text 178.0
AutoCAD SHX Text 177.9
AutoCAD SHX Text 178.1
AutoCAD SHX Text 177.9
AutoCAD SHX Text 177.9
AutoCAD SHX Text 178.0
AutoCAD SHX Text 178.1
AutoCAD SHX Text 178.7
AutoCAD SHX Text 179.1
AutoCAD SHX Text 178.9
AutoCAD SHX Text 178.8
AutoCAD SHX Text 178.4
AutoCAD SHX Text 178.4
AutoCAD SHX Text 175.8
AutoCAD SHX Text 176.4
AutoCAD SHX Text 176.4
AutoCAD SHX Text 176.5
AutoCAD SHX Text 176.7
AutoCAD SHX Text 176.9
AutoCAD SHX Text 177.8
AutoCAD SHX Text 176.6
AutoCAD SHX Text 176.4
AutoCAD SHX Text 176.2
AutoCAD SHX Text 176.2
AutoCAD SHX Text 176.4
AutoCAD SHX Text 176.8
AutoCAD SHX Text 177.1
AutoCAD SHX Text 177.1
AutoCAD SHX Text 183.2
AutoCAD SHX Text 183.0
AutoCAD SHX Text 182.6
AutoCAD SHX Text 182.3
AutoCAD SHX Text 180.0
AutoCAD SHX Text 182.3
AutoCAD SHX Text 182.4
AutoCAD SHX Text 182.3
AutoCAD SHX Text 182.1
AutoCAD SHX Text 182.2
AutoCAD SHX Text 182.1
AutoCAD SHX Text 183.0
AutoCAD SHX Text 182.9
AutoCAD SHX Text 181.8
AutoCAD SHX Text 181.7
AutoCAD SHX Text 181.6
AutoCAD SHX Text 181.9
AutoCAD SHX Text 181.9
AutoCAD SHX Text 182.2
AutoCAD SHX Text 182.0
AutoCAD SHX Text 181.9
AutoCAD SHX Text 182.0
AutoCAD SHX Text 181.7
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
MULCH
AutoCAD SHX Text
MULCH
AutoCAD SHX Text
MULCH
AutoCAD SHX Text
MULCH
AutoCAD SHX Text 179.14
AutoCAD SHX Text 177.17
AutoCAD SHX Text 177.73
AutoCAD SHX Text 176.72
AutoCAD SHX Text 176.40
AutoCAD SHX Text 176.14
AutoCAD SHX Text 175.95
AutoCAD SHX Text 175.73
AutoCAD SHX Text 175.97
AutoCAD SHX Text 176.12
AutoCAD SHX Text 176.51
AutoCAD SHX Text 176.27
AutoCAD SHX Text 175.92
AutoCAD SHX Text 175.65
AutoCAD SHX Text 175.37
AutoCAD SHX Text 175.36
AutoCAD SHX Text 175.65
AutoCAD SHX Text 175.98
AutoCAD SHX Text 176.24
AutoCAD SHX Text 176.61
AutoCAD SHX Text 176.23
AutoCAD SHX Text 175.86
AutoCAD SHX Text 175.72
AutoCAD SHX Text 176.15
AutoCAD SHX Text 176.33
AutoCAD SHX Text 176.65
AutoCAD SHX Text 176.91
AutoCAD SHX Text 177.42
AutoCAD SHX Text 177.18
AutoCAD SHX Text 176.87
AutoCAD SHX Text 176.73
AutoCAD SHX Text 177.13
AutoCAD SHX Text 177.32
AutoCAD SHX Text 177.59
AutoCAD SHX Text 177.80
AutoCAD SHX Text 175.85
AutoCAD SHX Text 176.43
AutoCAD SHX Text 176.79
AutoCAD SHX Text 177.47
AutoCAD SHX Text 177.47
AutoCAD SHX Text 177.08
AutoCAD SHX Text 176.85
AutoCAD SHX Text 176.53
AutoCAD SHX Text 176.50
AutoCAD SHX Text 176.72
AutoCAD SHX Text 176.87
AutoCAD SHX Text 177.07
AutoCAD SHX Text 176.84
AutoCAD SHX Text 176.63
AutoCAD SHX Text 176.53
AutoCAD SHX Text 176.23
AutoCAD SHX Text 175.76
AutoCAD SHX Text 176.11
AutoCAD SHX Text 176.36
AutoCAD SHX Text 176.68
AutoCAD SHX Text 175.77
AutoCAD SHX Text 176.33
AutoCAD SHX Text 176.86
AutoCAD SHX Text 177.65
AutoCAD SHX Text 182.01
AutoCAD SHX Text 181.87
AutoCAD SHX Text 181.98
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
4" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
7" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
7" BEECH
AutoCAD SHX Text
15" GUM
AutoCAD SHX Text
12" MAPLE
AutoCAD SHX Text
20" OAK
AutoCAD SHX Text
12" PINE
AutoCAD SHX Text
STUMP
AutoCAD SHX Text
20" STUMP
AutoCAD SHX Text
STONE RETAINING WALL
AutoCAD SHX Text
BUILDING #514 ONE STORY BRICK BUILDING
AutoCAD SHX Text
FINISHED FLOOR=182.08' (SILL)
AutoCAD SHX Text
FINISHED FLOOR=181.85' (SILL)
AutoCAD SHX Text
FINISHED FLOOR=181.76' (SILL)
AutoCAD SHX Text
FINISHED FLOOR=181.82' (SILL)
AutoCAD SHX Text
F.F.=182.50' (SILL)
AutoCAD SHX Text
SHED, F.F.=182.76' (WOOD)
AutoCAD SHX Text
SHED, F.F.=182.84' (WOOD)
AutoCAD SHX Text
WOOD DECK & STEPS
AutoCAD SHX Text
H2O PVC
AutoCAD SHX Text
EXPOSED PVC WATER PIPE
AutoCAD SHX Text
WV
AutoCAD SHX Text T.O.N.=178.01'
AutoCAD SHX Text 176.64
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
DI
AutoCAD SHX Text
DI
AutoCAD SHX Text
CI
AutoCAD SHX Text
CI
AutoCAD SHX Text
CI
AutoCAD SHX Text
CI
AutoCAD SHX Text
8" PVC INV. =178.57'
AutoCAD SHX Text 183.07
AutoCAD SHX Text 180.70
AutoCAD SHX Text 180.12
AutoCAD SHX Text 180.04
AutoCAD SHX Text 179.67
AutoCAD SHX Text 178.91
AutoCAD SHX Text 179.68
AutoCAD SHX Text 178.69
AutoCAD SHX Text 178.52
AutoCAD SHX Text 178.17
AutoCAD SHX Text 177.69
AutoCAD SHX Text 177.32
AutoCAD SHX Text 177.19
AutoCAD SHX Text 177.25
AutoCAD SHX Text 177.47
AutoCAD SHX Text 174.52
AutoCAD SHX Text 174.51
AutoCAD SHX Text 175.04
AutoCAD SHX Text 174.99
AutoCAD SHX Text 176.65
AutoCAD SHX Text 176.60
AutoCAD SHX Text 178.11
AutoCAD SHX Text 177.80
AutoCAD SHX Text 177.28
AutoCAD SHX Text 176.85
AutoCAD SHX Text 176.54
AutoCAD SHX Text 176.49
AutoCAD SHX Text 176.80
AutoCAD SHX Text 177.00
AutoCAD SHX Text 177.07
AutoCAD SHX Text 177.25
AutoCAD SHX Text 177.41
AutoCAD SHX Text 177.67
AutoCAD SHX Text 177.87
AutoCAD SHX Text 178.04
AutoCAD SHX Text 178.07
AutoCAD SHX Text 176.93
AutoCAD SHX Text 176.09
AutoCAD SHX Text 175.38
AutoCAD SHX Text 178.42
AutoCAD SHX Text 182.91
AutoCAD SHX Text 181.95
AutoCAD SHX Text 180.17
AutoCAD SHX Text 180.09
AutoCAD SHX Text 179.32
AutoCAD SHX Text 179.17
AutoCAD SHX Text 178.22
AutoCAD SHX Text 178.77
AutoCAD SHX Text 177.60
AutoCAD SHX Text 177.77
AutoCAD SHX Text 177.86
AutoCAD SHX Text 177.84
AutoCAD SHX Text 177.85
AutoCAD SHX Text 177.82
AutoCAD SHX Text 177.95
AutoCAD SHX Text 178.14
AutoCAD SHX Text 178.16
AutoCAD SHX Text 178.29
AutoCAD SHX Text 176.54
AutoCAD SHX Text 176.86
AutoCAD SHX Text 177.00
AutoCAD SHX Text 177.81
AutoCAD SHX Text
SDCO
AutoCAD SHX Text
SDCO
AutoCAD SHX Text
SCO
AutoCAD SHX Text
SAN. PVC
AutoCAD SHX Text
EXPOSED PVC SANITARY LINE
AutoCAD SHX Text 178.9
AutoCAD SHX Text 178.9
AutoCAD SHX Text 182.3
AutoCAD SHX Text 181.8
AutoCAD SHX Text 182.1
AutoCAD SHX Text
TBM "C" ELEV. = 176.32'
AutoCAD SHX Text
FL174.32
AutoCAD SHX Text
FL174.28
AutoCAD SHX Text
FL174.70
AutoCAD SHX Text
FL174.69
AutoCAD SHX Text
FL176.37
AutoCAD SHX Text
FL176.44
AutoCAD SHX Text
FL176.43
AutoCAD SHX Text
FL177.42
AutoCAD SHX Text
FL177.62
AutoCAD SHX Text
FL178.14
AutoCAD SHX Text
FL177.84
AutoCAD SHX Text
FL177.32
AutoCAD SHX Text
FL176.87
AutoCAD SHX Text
FL176.57
AutoCAD SHX Text
FL176.53
AutoCAD SHX Text
FL176.86
AutoCAD SHX Text
FL177.03
AutoCAD SHX Text
FL177.15
AutoCAD SHX Text
FL177.26
AutoCAD SHX Text
FL177.45
AutoCAD SHX Text
FL176.95
AutoCAD SHX Text
FL175.94
AutoCAD SHX Text
FL175.27
AutoCAD SHX Text
FL175.90
AutoCAD SHX Text
FL175.80
AutoCAD SHX Text
FL176.07
AutoCAD SHX Text
FL176.73
AutoCAD SHX Text
FL176.54
AutoCAD SHX Text
FL176.29
AutoCAD SHX Text
FL176.64
AutoCAD SHX Text
FL176.68
AutoCAD SHX Text
FL176.65
AutoCAD SHX Text
FL178.16
AutoCAD SHX Text
FL177.70
AutoCAD SHX Text
FL177.27
AutoCAD SHX Text
FL175.91
AutoCAD SHX Text
FL175.92
AutoCAD SHX Text
FL175.88
AutoCAD SHX Text
FL175.75
AutoCAD SHX Text
FL175.75
AutoCAD SHX Text
FL175.64
AutoCAD SHX Text
24" OAK
AutoCAD SHX Text
24" OAK
AutoCAD SHX Text
26" OAK
AutoCAD SHX Text
GV
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
15" RCP
AutoCAD SHX Text
15" RCP
AutoCAD SHX Text
42" RCP
AutoCAD SHX Text
42" RCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
18" RCP
AutoCAD SHX Text
15" RCP
AutoCAD SHX Text
15" RCP
AutoCAD SHX Text
48" RCP
AutoCAD SHX Text SDMH RIM = 182.57' INV. (SE) 42" RCP = 173.38' INV. (S) 18" RCP = 173.84' INV. (NW) 42" RCP = 173.16'
AutoCAD SHX Text
DROP INLET RIM = 178.74' INV. (SE) 15" RCP = 173.25' INV. (NW) 6" PVC = 173.46'
AutoCAD SHX Text
DROP INLET RIM = 178.48' INV. (NE) 15" RCP = 171.92' INV. (NW) 15" RCP = 171.98'
AutoCAD SHX Text SDMH RIM = 178.00' INV. (NE) 48" RCP = 171.07' INV. (SW) 15" RCP = 171.76' INV. (NW) 42" RCP = 171.13'
AutoCAD SHX Text
CURB INLET/SDMH RIM = 177.08' INV. (NE) 15" RCP = 173.73'
AutoCAD SHX Text CURB INLET/SDMH RIM = 177.11' INV. (NE) 15" RCP = 173.58' INV. (SW) 15" RCP = 173.63'
AutoCAD SHX Text SDMH RIM = 176.72' INV. (SW) 15" RCP = INAC. STRUCTURE BOTTOM ELEVATION = 169.27'
AutoCAD SHX Text SDMH RIM = 175.68' INV. (NE) 24" RCP = 169.91' INV. (SW) 48" RCP = INAC. STRUCTURE BOTTOM ELEVATION = 169.83'
AutoCAD SHX Text CURB INLET/SDMH RIM = 175.39' INV. (SW) 24" RCP = 169.98' INV. (NW) 18" RCP = 170.07'
AutoCAD SHX Text
CURB INLET/SDMH RIM = 174.99' INV. (SE) 18" RCP = 170.80'
AutoCAD SHX Text
CURB INLET/SDMH RIM = 175.70' INV. (S) 15" RCP = 171.02'
AutoCAD SHX Text SDMH RIM = 190.13' INV. (SE) 42" RCP = 174.88' INV. (SW) 36" RCP = 175.77' INV. (NW) 42" RCP = 175.27'
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
DI
AutoCAD SHX Text DROP INLET RIM = 180.61' INV. (NW) 18" RCP = 175.31' STRUCTURE BOTTOM ELEVATION = 175.38'
AutoCAD SHX Text
BUILDING #514 ONE STORY BRICK BUILDING
AutoCAD SHX Text 30.7'
AutoCAD SHX Text 20.4'
AutoCAD SHX Text 10.0'
AutoCAD SHX Text 20.4'
AutoCAD SHX Text 30.6'
AutoCAD SHX Text 30.8'
AutoCAD SHX Text 20.4'
AutoCAD SHX Text 10.0'
AutoCAD SHX Text 20.4'
AutoCAD SHX Text 30.6'
AutoCAD SHX Text 9.8'
AutoCAD SHX Text 9.8'
AutoCAD SHX Text 32.0'
AutoCAD SHX Text 32.1'
AutoCAD SHX Text 8.0'
AutoCAD SHX Text 44.9'
AutoCAD SHX Text 7.9'
AutoCAD SHX Text 7.9'
AutoCAD SHX Text 44.9'
AutoCAD SHX Text 44.9'
AutoCAD SHX Text 44.9'
AutoCAD SHX Text 7.9'
AutoCAD SHX Text 8.0'
AutoCAD SHX Text 7.9'
AutoCAD SHX Text 7.9'
AutoCAD SHX Text 44.9'
AutoCAD SHX Text 44.9'
AutoCAD SHX Text 44.9'
AutoCAD SHX Text 8.0'
AutoCAD SHX Text 44.9'
AutoCAD SHX Text 44.9'
AutoCAD SHX Text 8.0'
AutoCAD SHX Text 7.9'
AutoCAD SHX Text 44.9'
AutoCAD SHX Text 16.2'
AutoCAD SHX Text 11.7'
AutoCAD SHX Text 8.2'
AutoCAD SHX Text 7.6'
AutoCAD SHX Text 11.9'
AutoCAD SHX Text 9.0'
AutoCAD SHX Text
EMERGENCY CALL STATION
AutoCAD SHX Text
EMERGENCY CALL STATION
AutoCAD SHX Text
H2O PVC
AutoCAD SHX Text
SAN. PVC
AutoCAD SHX Text
WOOD DECK & STEPS
AutoCAD SHX Text
H2O PVC
AutoCAD SHX Text
SAN. PVC
AutoCAD SHX Text
WOOD DECK & STEPS
AutoCAD SHX Text
WOOD DECK & STEPS
AutoCAD SHX Text
WOODEN RAMP
AutoCAD SHX Text
WOODEN RAMP
AutoCAD SHX Text
H2O PVC
AutoCAD SHX Text
SAN. PVC
AutoCAD SHX Text
H2O PVC
AutoCAD SHX Text
SAN. PVC
AutoCAD SHX Text
H2O PVC
AutoCAD SHX Text
SAN. PVC
AutoCAD SHX Text 178.8
AutoCAD SHX Text
8' STEEL FENCE
AutoCAD SHX Text
8' STEEL FENCE
AutoCAD SHX Text
8' STEEL FENCE
AutoCAD SHX Text
8' STEEL FENCE
AutoCAD SHX Text
8' STEEL FENCE
AutoCAD SHX Text
HORSESHOE PITS
AutoCAD SHX Text
PLANTER
AutoCAD SHX Text
PLANTERS
AutoCAD SHX Text
PLANTERS
AutoCAD SHX Text
GREENHOUSE
AutoCAD SHX Text
BOLLARD LIGHT (TYPICAL)
AutoCAD SHX Text
WOODEN GAZEBO
AutoCAD SHX Text
PATIO AREA
AutoCAD SHX Text
PORTABLE CONEX OFFICE TRAILER (TYP.)
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT PATCH
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT CUTS
AutoCAD SHX Text
ASPHALT CUTS
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text 178.0
AutoCAD SHX Text 178.0
AutoCAD SHX Text 178.0
AutoCAD SHX Text 177.4
AutoCAD SHX Text 178.8
AutoCAD SHX Text 178.0
AutoCAD SHX Text 179.6
AutoCAD SHX Text 180.5
AutoCAD SHX Text 180.2
AutoCAD SHX Text 178.4
AutoCAD SHX Text 177.5
AutoCAD SHX Text 177.5
AutoCAD SHX Text 177.3
AutoCAD SHX Text 177.9
AutoCAD SHX Text 178.1
AutoCAD SHX Text 179.0
AutoCAD SHX Text 178.6
AutoCAD SHX Text 177.9
AutoCAD SHX Text 177.6
AutoCAD SHX Text 177.6
AutoCAD SHX Text 177.8
AutoCAD SHX Text 178.6
AutoCAD SHX Text 178.9
AutoCAD SHX Text 177.8
AutoCAD SHX Text 178.4
AutoCAD SHX Text 177.9
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
FL176.38
AutoCAD SHX Text
#1 "MAG-HUB" W/DISK N: 3,705,828.62' E: 11,783,666.02' ELEV: 177.52'
AutoCAD SHX Text
#2 "MAG-HUB" W/ DISK N: 3,705,827.36' E: 11,783,556.45' ELEV: 179.43'
AutoCAD SHX Text
#3 "MAG-HUB" W/DISK N: 3,705,962.92' E: 11,783,429.74' ELEV: 179.24'
AutoCAD SHX Text
#17 "MAG-NAIL" W/DISK IN ASPHALT N: 3,705,672.67 E: 11,783,703.56 ELEV: 177.63
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
#16 "MAG-NAIL" W/DISK IN CURB N: 3,706,100.43' E: 11,783,479.93' ELEV: 176.83'
AutoCAD SHX Text N 43°03'56" W 185.55'
AutoCAD SHX Text S 89°20'32" W 109.58'
AutoCAD SHX Text
MULCH
AutoCAD SHX Text
MULCH
AutoCAD SHX Text
MULCH
AutoCAD SHX Text
MULCH
AutoCAD SHX Text
MULCH
AutoCAD SHX Text
TEMPORARY CONSTRUCTION TRAILER
AutoCAD SHX Text
WOODEN DECK AND STEPS
AutoCAD SHX Text
WHEEL STOP (TYPICAL)
AutoCAD SHX Text
SIGN (TYPICAL)
AutoCAD SHX Text
EBOX
AutoCAD SHX Text E
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
FOHB
AutoCAD SHX Text
FOHB
AutoCAD SHX Text
GV
AutoCAD SHX Text C/O
AutoCAD SHX Text C/O
AutoCAD SHX Text C
AutoCAD SHX Text Spigot
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EG
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text
EUE
AutoCAD SHX Text 12"
AutoCAD SHX Text
EW
AutoCAD SHX Text
EW
AutoCAD SHX Text
EW
AutoCAD SHX Text
EW
AutoCAD SHX Text
EW
AutoCAD SHX Text
EW
AutoCAD SHX Text
EW
AutoCAD SHX Text
EW
AutoCAD SHX Text
EW
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
MANHOLE TOP = 177.83 INV (W) = 170.68 15" RCP INV (N) = 170.63 15" RCP
AutoCAD SHX Text
MANHOLE TOP = 177.97 INV (S) = 170.32 18" RCP INV (N) = 170.27 18" RCP
AutoCAD SHX Text MANHOLE TOP = 177.79 INV (S)=170.04 18" RCP INV (W)=170.09 15" METAL INV (SW)=171.59 4" METAL INV (N)=170.04 18" RCP
AutoCAD SHX Text S
AutoCAD SHX Text
SAN (PLANS)
AutoCAD SHX Text
MULTISTORY METAL BUILDING FFE = 178.95±
AutoCAD SHX Text B-2
AutoCAD SHX Text B-3
AutoCAD SHX Text B-4
AutoCAD SHX Text B-1
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
(PLANS)
AutoCAD SHX Text
(PLANS)
AutoCAD SHX Text
(PLANS)
AutoCAD SHX Text
(PLANS)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
8"GAS(PLANS)
AutoCAD SHX Text D
AutoCAD SHX Text
FH
AutoCAD SHX Text Spell checked by TWEAVER on 01/15/2019 10:57am
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT POLYTRAUMA
INTEGRATIVE REHABILITATION
CLINIC
RICHMOND, VA
652-320
Project Director
05-22-2019
Revisions: Date:
440 Martin Luther King Jr. Blvd
Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
F
05/22/2019 DEQ COMMENTS1
CTA TAW/CBK
07/13/2019 DEQ COMMENTS2
THESE PLANS HAVE BEEN CHECKED TO
ENSURE INCLUSION OF EROSION AND
SEDIMENT CONTROL MEASURES
APPROPRIATE FOR THE PROJECT AND
HAVE BEEN APPROVED.
PW ENGINEERING E&S
ADMINISTRATOR
DATE
PERMANENT AND TEMPORARY SOIL
STABLIZATION SHALL BE PROVIDED.
SOIL STOCKPILES AND BORROW AREAS SHALL
BE STABILIZED WITH SILT FENCE AS SHOWN ON
THE PLANS.
PERMANENT VEGETATION SHALL BE
ESTABLISHED IN ACCORDANCE WITH THE
VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK.
SILT FENCE WILL BE INSTALLED PRIOR.
PERMANENT AND TEMPORARY SOIL
STABLIZATION SHALL BE PROVIDED.
A SEDIMENTATION BARRIER (SILT FENCE) IS
USED.
N/A
N/A
N/A
INLETS WILL BE PROTECTED.
CHANNELS INTO THE BIORETENTION ARE
PROTECTED
N/A
N/A
N/A
N/A
UNDERGROUND UTILITIES SHALL BE INSTALLED
IN ACCORDANCE ITEMS A THROUGH F OF
MS-16.
CONTROL OF SEDIMENT ONTO PAVED AREAS
SHALL BE IN ACCORDANCE WITH THE VIRGINIA
EROSION AND SEDIMENT CONTROL HANDBOOK.
INSTALLATION AND REMOVAL OF
TEMPORARY SEDIMENT CONTROL
MEASURES SHALL BE IN ACCORDANCE
WITH THE VIRGINIA EROSION AND
SEDIMENT CONTROL HANDBOOK
OVERLAND FLOW IS DIRECTED TO THE
EXISTING ADEQUATE CITY STORM DRAIN
SYSTEM.
MS1: PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED
AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE
SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO
DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR
LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT
ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
MS2: DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS
SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE
APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT
STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL
INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
MS3: A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS
NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE
CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM,
MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
MS4: SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND
OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST
STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE
UPSLOPE LAND DISTURBANCE TAKES
PLACE.
MS5: STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS
DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
MS6: SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED
BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.
a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC
YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL
DRAINAGE AREAS LESS THAN THREE ACRES.
b. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM
DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE
CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A
SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE
OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF
THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF
COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE
EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE
SEDIMENT BASIN IS UTILIZED
MS7: CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT
WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY
WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH
ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
MS8: CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS
CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR
SLOPE DRAIN STRUCTURE.
MS9: WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER
PROTECTION SHALL BE PROVIDED.
MS10: ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION
SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE
CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO
REMOVE SEDIMENT.
MS11: BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR
PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED
TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE
CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
MS12: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE
TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE
THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION.
NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.