36E77619B0020-0007003.pdf

PDF Posted

Attached to
Expand Patient Parking Garage - Cleveland - Minor Construction
Solicitation number
36E77619B0020
Issued by

About this file

This federal solicitation is for an Expand Patient Parking Garage Minor Construction project at the Cleveland VA Medical Center. The scope of work involves expanding an existing parking garage to add 132 additional spaces on a new fourth deck, extending vertical transportation and stairs to serve the new floor, and improving lighting and façade treatments on the existing structure to match the adjacent larger garage. The project will be awarded as a firm-fixed-price contract using design-bid-build procedures. The solicitation will be issued as a Service-Disabled Veteran-Owned Small Business set-aside with a NAICS code of 236220 and size standard of $39.5 million. The performance period is approximately 280 calendar days from notice to proceed. The estimated value is between $2-5 million. The solicitation is scheduled to post to SAM.gov on October 18, 2019 with all bids due on the date specified.

36E77619B0020 0007 Bidding Drawings G001 - COVER SHEET - 01-14-2020.pdf

View the file

Other files

File Type Posted
36E77619B0020-0007004.pdf PDF
36E77619B0020-0007002.pdf PDF
36E77619B0020-0007000.docx DOCX document
36E77619B0020-0007001.pdf PDF
36E77619B0020-0007005.pdf PDF
36E77619B0020-0006004.pdf PDF
36E77619B0020-0006001.pdf PDF
36E77619B0020-0006003.pdf PDF
36E77619B0020-0006000.docx DOCX document
36E77619B0020-0006002.pdf PDF
36E77619B0020-0005000.docx DOCX document
36E77619B0020-0005002.pdf PDF
36E77619B0020-0005001.pdf PDF
36E77619B0020-0004000.docx DOCX document
36E77619B0020-0004001.pdf PDF
36E77619B0020-0004002.pdf PDF
36E77619B0020-0003002.pdf PDF
36E77619B0020-0003016.pdf PDF
36E77619B0020-0003022.pdf PDF
36E77619B0020-0003011.pdf PDF
36E77619B0020-0003004.pdf PDF
36E77619B0020-0003018.pdf PDF
36E77619B0020-0003024.pdf PDF
36E77619B0020-0003003.pdf PDF
36E77619B0020-0003006.pdf PDF
36E77619B0020-0003017.pdf PDF
36E77619B0020-0003023.pdf PDF
36E77619B0020-0003014.pdf PDF
36E77619B0020-0003020.pdf PDF
36E77619B0020-0003009.pdf PDF
36E77619B0020-0003021.pdf PDF
36E77619B0020-0003013.pdf PDF
36E77619B0020-0003019.pdf PDF
36E77619B0020-0003025.pdf PDF
36E77619B0020-0003007.pdf PDF
36E77619B0020-0003012.pdf PDF
36E77619B0020-0003026.pdf PDF
36E77619B0020-0003010.pdf PDF
36E77619B0020-0003000.docx DOCX document
36E77619B0020-0003001.pdf PDF
36E77619B0020-0003005.pdf PDF
36E77619B0020-0003008.pdf PDF
36E77619B0020-0003015.pdf PDF
36E77619B0020-0002002.pdf PDF
36E77619B0020-0002001.pdf PDF
36E77619B0020-0002000.docx DOCX document
36E77619B0020-0001001.pdf PDF
36E77619B0020-0001000.docx DOCX document
36E77619B0020-0001000.docx DOCX document
36E77619B0020-0001001.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

PVE ENGINEERING, LCC.

Waterfront Corporate Park III, Suite 101

2000 Georgetowne Drive, Sewickley, PA 15143

Phone: 724-444-1100

Email: info@pve-llc.com

AE Works, LTD.

209 Sandusky Street

Pittsburgh, PA 15212

Phone: 412-287-7333 www.ae-works.com

G001

COVER SHEET EXPAND PATIENT PARKING

GARAGE

10701 EAST BOULEVARD, CLEVELAND, OH 44106

541-378

05/24/19 PR AD

100% BID SET

EXPAND PATIENT PARKING GARAGE

PROJECT NO. 541-378

LOUIS STOKES CLEVELAND VA MEDICAL CENTER

10701 EAST BOULEVARD

CLEVELAND, OH 44106

VICINITY MAP

SITE

LOCATION MAP

SITE

STRUCTURAL

PROJECT DURATION:

THE PROPOSED CONSTRUCTION DURATION PLAN IS AS FOLLOWS:

PRECONSTRUCTION: 42 DAYS

CONSTRUCTION: 238 DAYS

NORTH

TRUE NORTH=

PROJECT

88.50°

DRAWING INDEX

SHEET # SHEET NAME

GENERAL

G001 COVER SHEET

G002 LIFE SAFETY PLAN

G003 CODE REVIEW -EXISTING EXTERIOR ELEVATIONS

G004 CODE REVIEW- NEW EXTERIOR ELEVATIONS

S-001 GENERAL NOTES

S-002 GENERAL NOTES

S-100 LEVEL4 FRAMING PLAN

S-101 LEVEL 4 POST-TENSIONING PLAN

S-200 SHEAR WALL ELEVATIONS

S-300 CONCRETE DETAILS

S-301 CONCRETE REPAIR DETAILS

S-302 POST-TENSIONED DETAILS

S-303 SECTIONS

S-304 CONCRETE BEAM ELEVATIONS

S-305 CONCRETE BEAM SCHEDULE & DETAILS

S-306 CONCRETE COLUMN SCHEDULE & DETAILS

S-400 MASONRY & STEEL DETAILS

S-401 WINGWALL DETAILS

S-500 METAL PANEL DETAILS

S-501 METAL PANEL DETAILS

A503 FENCING DETAILS

A701 ELEVATOR ELEVATIONS AND DETAILS

A802 SIGNAGE PLAN

MECHANICAL

M001 MECHANICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

MD103 LEVEL 3 MECHANICAL DEMOLITION PLAN

M104 LEVEL 4 MECHANICAL PLAN

M501 MECHANICAL EQUIPMENT DETAILS AND SCHEDULE

ELECTRICAL

E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED103 LEVEL 3 ELECTRICAL DEMOLITION PLAN

E203 LEVEL 3 LIGHTING PLAN

E204 LEVEL 4 LIGHTING PLAN

E303 LEVEL 3 POWER PLAN

E304 LEVELS 1 AND 4 POWER PLANS

E401 ELECTRICAL DETAILS

E501 ELECTRICAL SCHEDULES

ARCHITECTURAL

A001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS & GENERAL NOTES

AD100 DEMOLITION KEY PLANS

AD101 EXTERIOR ELEVATIONS - DEMO

AD102 WEST STAIR TOWER SECTIONS AND PLANS - DEMO

A101 NEW WORK KEY PLANS

A104 FOURTH FLOOR NEW WORK PLAN

A201 EXTERIOR ELEVATIONS - NORTH

A202 EXTERIOR ELEVATIONS - SOUTH

A203 EXTERIOR ELEVATIONS - EAST AND WEST

A401 ENLARGED STAIR AND ELEVATOR PLANS, ELEVATIONS, AND DETAILS

A402 ENLARGED SOUTH ELEVATION & SECTION

A403 ENLARGED WEST ELEVATION & SECTION

A410 DETAIL SECTIONS

A411 WALL AND ROOF DETAILS

A420 DEDUCT ALTERNATE #3 - STAIR AND ELEVATOR PLANS AND DETAILS

A421 DEDUCT ALTERNATE #3 - STAIR AND ELEVATOR ELEVATIONS

A501 PERFORATED PANEL DETAILS

A502 FINIAL DETAILS

# Revisions Date

TOTAL TIMEFRAME: 280 DAYS

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CLOSURE OF LEVEL 3 WEST OF GRIDELINE 1:

CLOSURE OF LEVEL 1 & 2 WEST OF GRIDLINE 1:

CONSTRUCTION EAST OF GRIDLINE 1:

238 DAYS

42 DAYS

AFTER HOURS ONLY (4:30 PM OR WEEKENDS)

Sheets
G001 - COVER SHEET

File details come from the government source that posted it. Updated .