This notice describes a federal contract opportunity to expand an existing patient parking garage at the Cleveland VA Medical Center. The project scope involves completing the fourth deck of the garage to add 132 parking spaces, extending vertical transportation and stairs to serve the new floor, and improving lighting and façade treatments on the existing structure. The solicitation will be an Invitation for Bid issued on or about October 18, 2019 to Service-Disabled Veteran-Owned Small Businesses as a set-aside. The NAICS code is 236220 with a size standard of $39.5 million. The period of performance is approximately 280 calendar days from notice to proceed. The estimated value is between $2-5 million. All questions must be submitted in writing by the specified due date.
36E77619B0020 0006 Attachment 1 - Bidding Drawings G001 - COVER SHEET - 01-14-2020.pdf
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
PVE ENGINEERING, LCC.
Waterfront Corporate Park III, Suite 101
2000 Georgetowne Drive, Sewickley, PA 15143
Phone: 724-444-1100
Email: info@pve-llc.com
AE Works, LTD.
209 Sandusky Street
Pittsburgh, PA 15212
Phone: 412-287-7333 www.ae-works.com
G001
COVER SHEET EXPAND PATIENT PARKING
GARAGE
10701 EAST BOULEVARD, CLEVELAND, OH 44106
541-378
05/24/19 PR AD
100% BID SET
EXPAND PATIENT PARKING GARAGE
PROJECT NO. 541-378
LOUIS STOKES CLEVELAND VA MEDICAL CENTER
10701 EAST BOULEVARD
CLEVELAND, OH 44106
VICINITY MAP
SITE
LOCATION MAP
SITE
STRUCTURAL
PROJECT DURATION:
THE PROPOSED CONSTRUCTION DURATION PLAN IS AS FOLLOWS:
PRECONSTRUCTION: 42 DAYS
CONSTRUCTION: 238 DAYS
NORTH
TRUE NORTH=
PROJECT
88.50°
DRAWING INDEX
SHEET # SHEET NAME
GENERAL
G001 COVER SHEET
G002 LIFE SAFETY PLAN
G003 CODE REVIEW -EXISTING EXTERIOR ELEVATIONS
G004 CODE REVIEW- NEW EXTERIOR ELEVATIONS
S-001 GENERAL NOTES
S-002 GENERAL NOTES
S-100 LEVEL4 FRAMING PLAN
S-101 LEVEL 4 POST-TENSIONING PLAN
S-200 SHEAR WALL ELEVATIONS
S-300 CONCRETE DETAILS
S-301 CONCRETE REPAIR DETAILS
S-302 POST-TENSIONED DETAILS
S-303 SECTIONS
S-304 CONCRETE BEAM ELEVATIONS
S-305 CONCRETE BEAM SCHEDULE & DETAILS
S-306 CONCRETE COLUMN SCHEDULE & DETAILS
S-400 MASONRY & STEEL DETAILS
S-401 WINGWALL DETAILS
S-500 METAL PANEL DETAILS
S-501 METAL PANEL DETAILS
A503 FENCING DETAILS
A701 ELEVATOR ELEVATIONS AND DETAILS
A802 SIGNAGE PLAN
MECHANICAL
M001 MECHANICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
MD103 LEVEL 3 MECHANICAL DEMOLITION PLAN
M104 LEVEL 4 MECHANICAL PLAN
M501 MECHANICAL EQUIPMENT DETAILS AND SCHEDULE
ELECTRICAL
E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED103 LEVEL 3 ELECTRICAL DEMOLITION PLAN
E203 LEVEL 3 LIGHTING PLAN
E204 LEVEL 4 LIGHTING PLAN
E303 LEVEL 3 POWER PLAN
E304 LEVELS 1 AND 4 POWER PLANS
E401 ELECTRICAL DETAILS
E501 ELECTRICAL SCHEDULES
ARCHITECTURAL
A001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS & GENERAL NOTES
AD100 DEMOLITION KEY PLANS
AD101 EXTERIOR ELEVATIONS - DEMO
AD102 WEST STAIR TOWER SECTIONS AND PLANS - DEMO
A101 NEW WORK KEY PLANS
A104 FOURTH FLOOR NEW WORK PLAN
A201 EXTERIOR ELEVATIONS - NORTH
A202 EXTERIOR ELEVATIONS - SOUTH
A203 EXTERIOR ELEVATIONS - EAST AND WEST
A401 ENLARGED STAIR AND ELEVATOR PLANS, ELEVATIONS, AND DETAILS
A402 ENLARGED SOUTH ELEVATION & SECTION
A403 ENLARGED WEST ELEVATION & SECTION
A410 DETAIL SECTIONS
A411 WALL AND ROOF DETAILS
A420 DEDUCT ALTERNATE #3 - STAIR AND ELEVATOR PLANS AND DETAILS
A421 DEDUCT ALTERNATE #3 - STAIR AND ELEVATOR ELEVATIONS
A501 PERFORATED PANEL DETAILS
A502 FINIAL DETAILS
# Revisions Date
TOTAL TIMEFRAME: 280 DAYS
THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:
CLOSURE OF LEVEL 3 WEST OF GRIDELINE 1:
CLOSURE OF LEVEL 1 & 2 WEST OF GRIDLINE 1:
CONSTRUCTION EAST OF GRIDLINE 1:
238 DAYS
42 DAYS
AFTER HOURS ONLY (4:30 PM OR WEEKENDS)