36E77618B0088-003.pdf
PDF 8 MB Posted
- Solicitation number
- 36E77618B0088
About this file
36E77618B0088 ATTACHMENT 2 - Final Drawings - SD Basement.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77618B0088-006.docx | DOCX document | |
| 36E77618B0088-0006000.docx | DOCX document | |
| 36E77618B0088-0005000.docx | DOCX document | |
| 36E77618B0088-0004001.docx | DOCX document | |
| 36E77618B0088-0004000.docx | DOCX document | |
| 36E77618B0088-0003000.docx | DOCX document | |
| 36E77618B0088-0003002.pdf | ||
| 36E77618B0088-0003001.pdf | ||
| 36E77618B0088-0002001.pdf | ||
| 36E77618B0088-0002003.pdf | ||
| 36E77618B0088-0002000.docx | DOCX document | |
| 36E77618B0088-0002002.docx | DOCX document | |
| 36E77618B0088-0001000.docx | DOCX document | |
| 36E77618B0088-001.docx | DOCX document | |
| 36E77618B0088-002.pdf | ||
| 36E77618B0088-004.pdf | ||
| 36E77618B0088-005.docx | DOCX document | |
| 36E77618B0088-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S W 5 - B
T U N N E L
T U N N E L T U N N E L
P ar ki ng
L ot
E
V ill a La
J ol la
C urve len =Tangent =R adius =D elta =Lot =
Pedestrian Bridge
Length = Bearing =
Length =B earing =
Gilman Drive
North Road 14 Parking
Lot - P1 17 19
Parking Lot - E1
E as t R oa d
Parking Lot - H
Parking Lot - E
Parking Lot - P
Parking Lot - P
Parking Lot - E
Parking Lot - E
3 5
South Road
HAZARDOUS MATERIALS
HM-1 GENERAL NOTES & TITLE SHEET
HM-2 HAZARDOUS MATERIALS DEMO PLAN- B134
HM-3 HAZARDOUS MATERIALS DEMO PLAN- CORRIDOR B140
HM-4 HAZARDOUS MATERIALS DEMO PLAN- STAIRWELL
MECHANICAL
M-001 MECHANICAL GENERAL NOTES, LEGEND, AND ABBRIVIATION
MH-101 MECHANICAL BASEMENT PLAN
MH-102 MECHANICAL BASEMENT INTERSTITIAL PLAN
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, LEGEND AND ABBREVIATIONS
ED-101 ELECTRICAL POWER AND LIGHTING DEMOLITION PLANS
EL-201 ELECTRICAL POWER AND LIGHTING NEW WORK
1. INPATIENT/OUTPATIENT AMBULATORY SERVICES
2. BOILER PLANT & CO-GENERATI0N
3. WEST FLAGPOLE
4. OXYGEN STORAGE PAD (DEMOLISHED)
5. EAST FLAG POLE
6. GAS METER PAD
7. INCINERATOR (DEMOLISHED)
8. OXYGEN STORAGE PAD
9. GAS BOTTLE STORAGE
10. BUS SHELTER
11. SPINAL CORD INJURY
12. EMERGENCY WATER STORAGE
13. VMRF BUILDING
14. VACANT
15. VACANT
16. HAZARDOUS MATERIAL STORAGE BUILDING
17. FINISHES STORAGE METAL BUILDING (STORAGE)
18. WASTE FACILITY
19. HAZARDOUS MATERIAL STORAGE (CONEX BOX)
20. GROUNDS AND STORAGE (CONEX BOXES)
21. UNDERGROUND FUEL STORAGE TANKS
22. SAFETY (MODULAR BUILDING)
23. MRF (MODULAR BUILDING)
BUILDING KEY PLAN
AREA OF WORK
AT BASEMENT
Project Number
MA Architects, Inc.
21515 Hawthorne Blvd –Suite 200, Torrance, CA 90503 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Revisions:
Fully Sprinklered
Water Leak Damage Remediation West Wing - Basement
664-16-835
3350 La Jolla Village Dr, San Diego, CA 92161
GI-000
COVER SHEET 100% Submittal
MA ArchSMc03-11-18
GENERAL
GI-000 COVER SHEET
GI-001 ABBREVIATIONS, GENERAL NOTES & APPLICABLE STANDARDS
GI-002 FIRE LIFE SAFETY PLAN
GI-003 INTERIM LIFE SAFETY PLAN
GC-001 PHASING PLANS
DEPARTMENT OF VETERANS AFFAIRS
VA San Diego Healthcare System
VA Project No. 664-16-835 | Water Leak Damage Remediation West Wing - Basement
PROJECT
SITE
VICINITY MAP
PARTIAL DEMOLITION AND REPLACEMENT GYPSUM SHEATHING AT STAIR SW1-B-1, RECORDS MANAGEMENT ROOM #B134 & CORRIDOR #B140 TO RECONSTRUCT THE FACILITY PARTIALLY COMPROMISED BY WATER DAMAGE FROM A PREVIOUS CONSTRUCTION ACCIDENT AND THE ABATEMENT OF ASBESTOS CONTAINING
ELEMENTS WITHIN ROOM #B134.
VA FLS OFFICER TO CONDUCT INTERIM LIFE SAFETY MEASURES OUTLINED IN SPECS WHEN STAIR SW1-B-1 IS
TEMPORARILY SHUT DOWN TO REPLACE GYPSUM SHEATHING PER THE SCOPE OF WORK.
PROJECT DESCRIPTION
ARCHITECTURAL
AE-000 OVERALL BASEMENT PLAN
AD-100 ENLARGED DEMOLITION PLANS
AE-200 ENLARGED RENOVATION PLANS
AI-500 INTERIOR FINISH PLANS
AE-800 INTERIOR DETAILS
CLIENT:
Department of Veterans Affairs VA San Diego Healthcare System Engineering Services 3350 La Jolla Village Drive Building 11, BB108 San Diego, CA 92161
Contact: Michael Degnan (COR) P: (858) 642-6298 E: michael.degnan@va.gov
ARCHITECT
MA|Architects, Inc.
21515 Hawthorne Blvd., Suite #200 Torrance, CA 90503
Contact: Steven A. McCaslin P: 650.485.9012 E: s.mccaslin@ma-architects.net
PROJECT TEAM
MEP ENGINEERS:
K.F. DAVIS
530 La Gonda Way, Suite E Danville CA
Contact: Lesa Durham P: 925.743.8884 E: lesa.durham@kfde.com
ENVIRONMENTAL ENGINEER
Millennium Consulting Associates 401 Roland Way, Suite 250 Oakland, CA 94621
Contact: Abbas Sam P: 925.808.6700 E: asam@mecaenviro.com
SHEET INDEX
Rev. Date Description
03.30.2018 100% Design Submittal steve CA Arch Lic
AB
A
ANCHOR BOLT
ACT ACOUSTICAL CEILING TILE
ACP
AD
ACOUSTICAL CEILING PANEL
AREA DRAIN
ADDL ADDITIONAL
ADH
ADDITIONAL
ADHESIVE
ADJ
AFF
ADJACENT
AFG
ABOVE FINISH FLOOR
AFS
ABOVE FINISH GRADE
AGGR
ABOVE FINISH SLAB
ALUM
AGGREGATE
ALT
ALUMINUM
ANOD
ALTERNATE
APPROX
ANODIZED
ARCH
APPROXIMATE(LY)
ACS PNL ACCESS PANEL
ARCHITECT(URAL)
ASPH ASPHALT
AVG AVERAGE
BB
B
BULLETIN BOARD
BD BOARD
BTWN
BLDG
BETWEEN
BUILDING
BM
BOT
BENCHMARK
BOTTOM
BITUM BITUMINOUS
BOS BOTTOM OF STEEL
BRG BEARING
BSMT BASEMENT
CAB
C
CABINET
CB CATCH BASIN
CCT
CG
CUBICLE CURTAIN TRACK
CORNER GUARD
CEM
CER
CEMENT, CEMENTITIOUS
CERAMIC
CCTV CLOSED CIRCUIT TELEVISION
CH BD CHALKBOARD
CI CAST IRON
CJ CONTROL JOINT
CL
CLG
CLR
CMU
CNTR
COL
CONC
CONF
CONN
CONSTR
CONT
CONTR
CORR
CPT
CSK
CSP
CSWK
CU
CW
CENTER LINE
CEILING
CLEAR
CONCRETE MASONRY UNIT
COUNTER
COLUMN
CONCRETE
CONFERENCE
CONNECTION
CONSTRUCTION
CONTINUOUS
CONTRACTOR
CORRUGATED
CARPET
COUNTERSUNK
COMBINATION STANDPIPE
CASEWORK
CUBIC
COLD WATER
D
D
DEPTH
DBL DOUBLE
DBL ACT DOUBLE ACTING
DEG DEGREE
DEMO DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DIM PT DIMENSION POINT
DISP DISPENSER
DIST DISTANCE
DN DOWN
DR DRAIN
DS DOWNSPOUT
DSP DRY STANDPIPE
DT DRAPERY TRACK
DWG DRAWING
DWGS DRAWINGS
(E)
E
EXISTING
EA EACH
EDR EQUIPMENT DRAWING
EG EDGE GUARD
EIFS EXTERIOR INSULATION FINISH SYSTEM
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EOS EDGE OF SLAB
EP ELECTRICAL PANEL
EPB ELECTRICAL PANEL BOARD
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ESCAL ESCALATOR
EST ESTIMATE(D)
EWC ELECTRIC WATER COOLER
EXC EXCAVATED
EXH EXHAUST
EXP EXPANSION
EXP JT EXPANSION JOINT
EXT EXTERIOR
FURN FURNITURE
FXTR FIXTURE
G
G
GAS
H
H
HIGH
GA GAUGE, GAGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GL GLASS
GLU LAM GLUE LAMINATED
GLZ GLAZING
GR GRADE OR GRADING
GVL GRAVEL
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
ID
I
INSIDE DIAMETER
JAN
J
JANITOR
KG
K
KILOGRAM
L
L
LENGTH, LONG
M
M
METERS
(N)
N
NEW
P
QT
Q
QUARRY TILE
R
R
RISER
S SOUTH
T
T
TREAD
W
W
WEST
XFMR
X
TRANSFORMER
YD
Y
YARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HPT HIGH POINT
HR HOUR
HVAC HEATING-VENTILATION-AIR CONDITIONING
IN INCH
INCAND INCANDESCENT
INCL INCLUDE, INCLUDING
INFO INFORMATION
INSUL INSULATION
INTR INTERIOR
INV INVERT
IVT INTRAVENOUS TRACK
JST JOIST
JT JOINT
KIT KITCHEN
KPL KICK PLATE
KS KNEE SPACE
LAB LABORATORY
LAM LAMINATE, LAMINATION
LAV LAVATORY
LB POUND
LED LIGHT EMITTING DIODE
LF LINEAR FOOT
LG LENGTH
LIN LINEAR
LL LEAD LINED
LPT LOW POINT
LT LIGHT
LT WT LIGHT WEIGHT
LTG LIGHTING
LVR LOUVER
HW HOT WATER
S
MACH MACHINE
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MC MEDICINE CABINET
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOLDING
MM MILLIMETERS
MO MASONRY OPENING
MOD MODULE, MODULAR
MTD MOUNTED
MTG MOUNTING
MVBL MOVABLE
MULL MULLION
NA NOT APPLICABLE
NAT NATURAL
NE NORTHEAST
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOICE REDUCTION COEFFICIENT
NTS NOT TO SCALE
NW NORTHWEST
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNEU PNEUMATIC
PNL PANEL
PNL BD PANEL BOARD
PNT PAINT
PORT PORTABLE
PP PUSH PLATE
PPM PARTS PER MILLION
PR PAIR
PRCST PRECAST
PREP PREPARATION
PREFAB PREFABRICATION
PRKG PARKING
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTN PARTITION
PTS PNEUMATIC TUBE STATION
PVC POLYVINYL CHLORIDE
PVG PAVING
PVMT PAVEMENT
PWR POWER
QTR QUARTER
QTY QUANTITY
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
RD ROOF DRAIN
RECT RECTANGULAR
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCE (D) (ING) (MENT)
REQD REQUIRED
REQT REQUIREMENT
RESIL RESILIENT
RET RETURN
REV REVISION
RF RESILIENT FLOORING
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHWS ROUND HEAD WOOD SCREW
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RWL RAIN WATER LEADER
SAF
SB SPLASH BLOCK
SC SOLID CORE
SCHED SCHEDULE
SCRN SCREEN
SD STORM DRAIN
SE SOUTHEAST
SECT SECTION
SEG SEGMENT
SEP SEPARATION OR SEPARATE
SEP JT SEPARATION JOINT
SHT SHEET, SHEETING
SHWR SHOWER
SHV SHELVES, SHELVING
SIM SIMILAR
SK SINK
SMS SHEET METAL SCREW
SP SPACE, SPACED, SPACING
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SQ SQUARE
SS SANITARY SEWER
SSK SERVICE SINK
SST STAINLESS STEEL
ST STREET
STA STATION
STAG STAGGERED
STC SOUND TRANSMISSION COEFFICIENT
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
STS SELF-TAPPING STEEL
SUSP SUSPENDED
SUSP CLG SUSPENDED CEILING
SVCE SERVICE
SW SOUTHWEST
SYMM SYMMETRICAL
SYST SYSTEM
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TOP OF CONCRETE, TOP OF CURB
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
THERM THERMAL
THK THICK, THICKNESS
THRES THRESHOLD
THRU THROUGH
TMPD GL TEMPERED GLASS
TO TOP OF
TOR TOP OF RAILING
TOS TOP OF STEEL
TOT TOTAL
TOW TOP OF WALL
TP TOP OF PAVEMENT
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
UC
U
UNDER COUNTER
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTABLE POWER SUPPLY
UTIL UTILITY
W/ WITH
W/O WITHOUT
WC WATER CLOSET OR WALL COVERING
WD WOOD
WDW WINDOW
WGL WIRE GLASS
WCHR WHEELCHAIR
WM WIRE MESH
WO WHERE OCCURS
WPT WORKING POINT
WR WATER RESISTANT
WSCT WAINSCOT
WSP WET STANDPIPE
WT WEIGHT
WTHPRF WEATHERPROOF
WTRPRF WATERPROOF
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
CCR CARD CONTROL READER
BUR BUILT UP ROOFING SYSTEM
CT CERAMIC TILE
F
F/F FACE TO FACE
FA FIRE ALARM
FAS FIRE ALARM STATION
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FEC FIRE EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FF FINISH FACE
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHWS FLAT HEAD WOOD SCREW
FHY FIRE HYDRANT
FLAM FLAMMABLE
FLASH FLASHING
FLEX FLEXIBLE
FLUOR FLUORESCENT
FO FACE OF
FSB FOLDING SHOWER BENCH
FSTNR FASTENER
FT FOOT, FEET
OC
O
ON CENTER
PA PUBLIC ADDRESS
OA OVERALL
OD OUTSIDE DIAMETER
OFCI
OFOI
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
OVHD OVERHEAD
OZ OUNCE
PART PARTIAL
PBD PARTICLEBOARD
PBX
PCF POUNDS PER CUBIC FOOT
PCI POUNDS PER CUBIC INCH
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PI POINT OF INTERSECTION
PL PLATE
PLAM PLASTIC LAMINIATE
P
PRIVATE TELEPHONE EXCHANGE
OWNER FURNISHED-CONTRACTOR INSTALLED
OWNER FURNISHED-OWNER INSTALLED
VAC
V
VACUUM
VB VALVE BOX
VCT VINYL COMPOSITION TYLE
VERT VERTICAL
VEST VESTIBULE
VIT VITREOUS
VP VENT PIPE
VOL VOLUME
VWC VINYL WALL COVERING
SYMBOLS AS
ABBREVIATIONS
ANGLE
@ AT
C CENTER LINEL
Ø DIAMETER
= EQUAL
> GREATER THAN
< LESS THAN
± PLUS OR MINUS (TOLERANCE)
# POUND(S)
' FOOT OR FEET
" INCH OR INCHES
FOF FACE OF FINISH
OH OPPOSITE HAND
HSS HOLLOW STRUCTURAL STEEL
SA SUPPLY AIR
GENERAL NOTES:
1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED BY
THE "INDEX OF DRAWINGS".
2. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE
DRAWINGS OF ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE - SEE
"INDEX OF DRAWINGS".
3. THE SET OF DRAWINGS, WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE
"INDEX OF DRAWINGS". PARTIAL SETS OF DRAWINGS ARE INCOMPLETE. DO NOT
DISTRIBUTE OR UTILIZE PARTIAL SETS OF DRAWINGS. THE WORK DESCRIBED BY THE
DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY THE WORK DESCRIBED ON
DRAWINGS OF ANOTHER DISCIPLINE OR MANUFACTURE INSTALLATION REQUIREMENTS.
SHOULD THEY DISAGREE IN THEMSELVES, OR WITH EACH OTHER, BIDS SHALL BE BASED
ON THE MOST EXPENSIVE COMBINATION OF QUALITY AND QUANTITY OF WORK INDICATED.
ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO
THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH ALL REQUIREMENTS OF THE
CONTRACT DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT
ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE
REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK
OF THAT PARTY.
CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES
NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,
DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED IN
THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING OR PATCHING THAT
MAY BE REQUIRED TO COMPLETE WORK OR TO MAKE ITS SEVERAL PARTS FIT TOGETHER.
5. THE ARCHITECT SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT BE
RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON
PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE
WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL
CONTRACTOR.
6. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE
ARE INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND
ESTABLISH MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.
THIS PROJECT AND ALL PARTS OF THE WORK ASSOCIATED WITH THE PROJECT -
INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC - SHALL COMPLY WITH ALL
APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND LAWS OF ALL
FEDERAL, STATE, DISTRICT, TERRITORIAL, AND LOCAL GOVERNMENT AUTHORITIES HAVING
JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,
WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT. NO PART OF THE CONTRACT
DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT WORK CONTRARY TO AN
APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE, OR LAW.
7. IF A CONFLICT EXISTS BETWEEN THE CONTRACT DOCUMENTS AND A REGULATORY
REQUIREMENT, THE CONTRACTOR SHALL COMPLY WITH THE ONE ESTABLISHING THE
MORE STRINGENT OR RESTRICTIVE REQUIREMENT:
- THE DRAWINGS AND SPECIFICATIONS MAY SET FORTH MORE DETAILED, MORE SPECIFIC,
AND/OR MORE RESTRICTIVE REQUIREMENTS THAN THOSE SET FORTH BY THE APPLICABLE
REGULATORY REQUIREMENTS. WHERE THE DRAWINGS AND SPECIFICATIONS PROVIDE
MORE DETAILED, MORE SPECIFIC, AND/OR MORE RESTRICTIVE REQUIREMENTS, THE
CONTRACTOR SHALL COMPLY WITH THOSE REQUIREMENTS.
- WHERE THE APPLICABLE REQUIREMENTS OF THE REFERENCED RULES, CODES,
REGULATIONS, ORDINANCES, OR LAWS ARE MORE RESTRICTIVE THAN THAT SET FORTH BY
THE DRAWINGS AND SPECIFICATION, THE CONTRACTOR SHALL COMPLY WITH ALL SUCH
MORE RESTRICTIVE REQUIREMENTS - ALTHOUGH SUCH REQUIREMENTS MAY NOT BE
ILLUSTRATED BY THE DRAWINGS AND SPECIFICATIONS.
8. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":
- ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT OR
ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE MANUFACTURES
AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY ILLUSTRATED BY
THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY.
- THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS OF
SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE "BASIS OF DESIGN" MAY VARY
FROM THAT SHOWN BY THE DRAWINGS.
- THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN LIEU
OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY RESIDENT
ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE (AT NO ADDITIONAL EXPENSE
TO THE OWNER) FOR ALL COORDINATION AND REVISIONS TO DIMENSIONS AND/OR DETAILS
NECESSARY TO ACHIEVE THE SAME FUNCTIONAL AND AESTHETIC DESIGN INTENT AS
ILLUSTRATED BY THE "BASIS OF DESIGN" SHOWN BY THE CONTRACT DOCUMENTS.
9. SCHEDULE CONSTRUCTION WORK HOURS TO ACCOMODATE THE OPERATION OF THE
HOSPITAL / CLINIC
10. CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES
("AS-BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ARCHITECT
UPON COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS.
RECORD DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK,
PRODUCTS, AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN
THE CONTRACT DOCUMENTS. **NO EXCEPTION ALLOWED**
11. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE
REQUIREMENTS OR MANUFACTURE REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF
THE OWNER AND THE ARCHITECT SHALL BE CORRECTED AT THE CONTRACTOR'S
EXPENSE.
THE CONTRACTOR SHALL PROMPTLY CORRECT ALL WORK REJECTED BY THE ARCHITECT
AS DEFECTIVE OR AS FAILING TO CONFORM TO THE CONTRACT DOCUMENTS WHETHER
OBSERVED BEFORE OR AFTER SUBSTANTIAL COMPLETION AND WHETHER OR NOT
FABRICATED, INSTALLED OR COMPLETED. THE CONTRACTOR SHALL BEAR ALL COSTS OF
CORRECTING SUCH REJECTED WORK, NOT TO BE REIMBURSED, INCLUDING
COMPENSATION FOR THE ARCHITECT'S ADDITIONAL SERVICES MADE NECESSARY
THEREBY.
12. THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY
SPECIFIED MATERIALS OR EQUIPMENT WHICH ARE EITHER UNAVAILABLE OR THAT WILL
CAUSE A DELAY IN THE CONSTRUCTION COMPLETION SCHEDULE. THE CONTRACTOR
SHALL SUBMIT CONFIRMATIONS OF DELIVERY DATES FOR ORDERS OF MATERIALS AND
EQUIPMENT HAVING LONG LEAD TIMES.
13. PROJECT SPECIFICATIONS ARE AN INTEGRAL PART OF THESE PLANS; SUBSTITUTIONS
FOR SPECIFIED MATERIALS REQUIRE THE WRITTEN APPROVAL FROM THE ARCHITECT AND
OWNER. ALL REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE SUBMITTED IN
WRITING AND WILL BE CONSIDERED ONLY IF BETTER SERVICE FACILITIES, A MORE
ADVANTAGEOUS DELIVERY DATE, OR A LOWER PRICE WITH CREDIT TO THE OWNER /
TENANT WILL BE PROVIDED WITHOUT SACRIFICING QUALITY, APPEARANCE, AND FUNCTION.
UNDER NO CIRCUMSTANCES WILL THE ARCHITECT BE REQUIRED TO PROVE THAT A
PRODUCT PROPOSED FOR SUBSTITUTION IS OR IS NOT OF EQUAL QUALITY TO THE
PRODUCT SPECIFIED.
14. PROVIDE CONTINUOUS INSPECTIONS AS SET FORTH IN STATE AND LOCAL CODES AND
PER CONTRACT DOCUMENTS AS NEEDED.
APPLICABLE STANDARDS VHA PG 18-3 (TOPIC 1):
VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
2018 International Building Code (IBC) (Only when specifically referenced in VA Design Documents, see notes below)
2018 NFPA 101 Life Safety Code (see notes below)
NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900
Occupational, Safety and Health Administration (OSHA) Standards.
2016 VA Seismic Design Requirements, H-18-8
2014 National Electrical Code (NEC)
International Plumbing Code (IPC)
2016 Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.
2017 ASME Boiler and Pressure Vessel Code
ASME Code for Pressure Piping
Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)
Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)
Energy policy Act of 2005 (EPAct)
DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)
Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.
The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification.
Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2016.
Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2016.
UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN THE LATEST EDITION OF EACH IN EFFECT AT THE
DATE OF PROJECT SUBMISSION (U.N.O.)
EXIT NOTES AND FIRE DEPARTMENT REQUIREMENTS
CONTRACTOR SHALL COMPLY WITH APPROVED CONSTRUCTION SAFETY PLAN SUBMITTED TO VA
AND/OR FIRE PREVENTION AUTHORITY, INCLUDING, BUT NOT LIMITED TO, PROVISIONS FOR
TEMPORARY EXITS, EXITWAYS, EGRESS MARKINGS AND SIGNAGE, CONSTRUCTION BARRIERS,
AND FIRE PROTECTION DEVICES.
1. REFER TO CONSTRUCTION BARRIER AND EXIT PLAN FOR EXIT REQUIREMENTS DURING
CONSTRUCTION.
2. DO NOT BLOCK EXITS AT ANY TIME.
3. THE CONTRACTOR SHALL PROVIDE PROPER PROTECTION DURING WELDING. FURTHER
PROTECTION SHALL BE PROVIDED TO ANY OCCUPANTS AND THE PUBLIC WITH PORTABLE, SOLID, VISION BARRICADES AROUND LOCATION WHERE WELDING IS PERFORMED. PROVIDE SIGNS
WARNING AGAINST LOOKING AT WELDING WITHOUT PROPER EYE PROTECTION OR EQUIVALENT.
4. THE GENERAL CONTRACTOR SHALL PROVIDE PROTECTIONS DURING CONSTRUCTION AND
DEMOLITION COMPLYING WITH APPLICABLE SECTIONS OF IBC CHAP. 33, IFC CHAP. 14, AND NFPA
CHAPS. 10 &16 FOR SAFEGUARDS DURING CONSTRUCTION DEMOLITION.
5. EVERY EXIT DOOR SHALL BE OPERABLE FROM INSIDE WITHOUT THE USE OF A KEY OR ANY
SPECIAL KNOWLEDGE OR EFFORT. SPECIAL LOCKING DEVICES SHALL BE OF AN APPROVED TYPE.
PROVIDE PANIC HARDWARE WHEN REQUIRED BY THE BUILDING AND FIRE CODES AND AS NOTED
ON THE PLANS.
6. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF
TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE, PANIC BARS, PUSH-PULL ACTIVATING BARS, OR OTHER HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT
REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. LOCKED EXIT DOORS SHALL
OPERATE AS ABOVE IN EGRESS DIRECTION.
7. ALL EXIT DOORS SHALL BE POSITIVE LATCHING.
8. HAND-ACTIVATED DOOR OPENING HARDWARE SHALL BE CENTERED BETWEEN 30” AND 44” ABOVE
THE FLOOR. SEE PLAN AND SCHEDULES FOR SPECIFIC MOUNTING HEIGHTS.
9. PROVIDE PANIC HARDWARE ON EXIT DOORS SERVING ROOMS, CORRIDORS, OR STAIRWAYS
HANDLING OCCUPANT LOADS OR 50 OR MORE, FROM ANY GROUP A, E, OR I OCCUPANCY, OR
WHEN REQUIRED BY LOCAL FIRE CODE AND AS NOTED ON THE PLANS. ALL PANIC HARDWARE
SHALL BE APPROVED AND LISTED BY THE STATE FIRE MARSHALL.
10. DOOR HARDWARE SHALL NOT PROJECT INTO DOOR CLEAR WIDTH MORE THAN 3 1/2".
11. DOOR OPENING FORCE FOR PUSHING OR PULLING OPEN INTERIOR SWINGING EGRESS DOORS, OTHER THAN FIRE DOORS, SHALL NOT EXCEED 5 LBS. FOR OTHER SWINGING DOORS, AS WELL AS SLIDING AND FOLDING DOORS, THE DOOR LATCH SHALL RELEASE WHEN SUBJECTED TO A 15-LB.
FORCE. THE DOOR SHALL BE SET IN MOTION WHEN SUBJECTED TO A 30-LB. FORCE. THE DOOR SHALL SWING TO A FULL-OPEN POSITION WHEN SUBJECT TO A 15-LB. FORCE. APPLIED FORCE
SHALL BE MEASURED AT THE LATCH SIDE OF THE DOOR.
12. POWER-OPERATED DOORS, SUCH AS DOORS WITH A PHOTO-ELECTRIC-ACTUATED MECHANISM TO
OPEN THE DOOR UPON THE APPROACH OF A PERSON, OR DOORS WITH POWER-ASSISTED
MANUAL OPERATION, THE DESIGN SHALL BE SUCH THAT IN THE EVENT OF POWER FAILURE, THE
DOOR IS CAPABLE OF BEING OPENED MANUALLY TO PERMIT EGRESS TRAVEL OR CLOSED WHERE
NECESSARY TO SAFEGUARD MEANS OF EGRESS. MANUAL OPENING FORCES AS NOTED ABOVE
SHALL APPLY TO THESE DOORS. FULL-POWER-OPERATED DOORS SHALL COMPLY WITH BHMA
A156.10. POWER-ASSISTED AND LOW-ENERGY DOORS SHALL COMPLY WITH BHMA A156.19.
13. EVERY DOORWAY WHICH IS LOCATED WITHIN AN ACCESSIBLE PATH OF TRAVEL SHALL BE OF A SIZE AS TO PERMIT THE INSTALLATION OF A DOOR NOT LESS THAN 3’-0” IN WIDTH AND NOT LESS
THAN 6’-8” IN HEIGHT.
14. WHEN REQUIRED EXIT DOORS AND GATES ARE REQUIRED TO BE ACCESSIBLE FOR THE DISABLED, THEY MUST SWING IN DIRECTION OF EXIT TRAVEL OVER A 5'-0" X 5'-0" LANDING NOT MORE THAN
1/2" BELOW THRESHOLD.
15. EXIT DOORS SHALL BE CAPABLE OF OPENING SO THAT THE CLEAR WIDTH OF THE EXIT IS NOT
LESS THAN 32”, MEASURED BETWEEN THE FACE OF THE DOOR AND THE OPPOSITE STOP.
16. THE BOTTOM 10” OF ALL DOORS EXCEPT AUTOMATIC AND SLIDING SHALL HAVE A SMOOTH, UNINTERRUPTED SURFACE TO ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST
WITHOUT CREATING A TRAP OR HAZARDOUS CONDITION. WHERE NARROW FRAME DOORS ARE
USED, A 10” HIGH SMOOTH PANEL SHALL BE INSTALLED ON THE PUSH SIDE OF THE DOOR, WHICH WILL ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT CREATING A TRAP
OR HAZARDOUS CONDITION.
17. ALL FIRE-RATED DOOR ASSEMBLIES SHALL BE PROVIDED WITH APPROVED GASKETING MATERIAL INSTALLED TO PROVIDE A SEAL WHERE THE DOOR MEETS THE STOP ON BOTH SIDES AND ACROSS
THE TOP.
18. MANUFACTURERS’ INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE ON THE JOB SITE FOR ALL
RATED OPENING ASSEMBLIES.
19. EXIT SIGNS SHALL HAVE MINIMUM 6” HIGH LETTERS ON CONTRASTING BACKGROUND LOCATED AT
AND LEADING TO ALL EXITS.
20. OVERHEAD EMERGENCY EXIT WAY LIGHTING SHALL BE PROVIDED GIVING A VALUE OF ONE (1)
FOOTCANDLE AT FLOOR LEVEL AND POWERED BY THE BUILDING’S ELECTRICAL SYSTEM AND AN
EMERGENCY GENERATOR OR STORAGE BATTERY BACK-UP SYSTEM WHERE THE OCCUPANT LOAD
EXCEEDS 500 FOR A2 AND 2.1 OCCUPANCY. CONFORM TO ALL OTHER BUILDING, FIRE, AND
ELECTRICAL CODE REQUIREMENTS FOR EMERGENCY EXIT LIGHTING.
21. AISLES SHALL BE MINIMUM 44” WIDE LEADING TO EXITS WITHIN EACH TENANT SPACE.
22. A CLEAR AREA, 3 FEET IN FRONT OF ALL ELECTRICAL PANELS SHALL BE MAINTAINED.
23. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAMEPROOF IN AN APPROVED
MANNER INCLUDING, BUT NOT LIMITED TO, CURTAINS, DRAPES, SHADES, HANGINGS, ETC.
24. TELEVISION ANTENNA CROSS ARMS OR OTHER ROOF OBSTRUCTIONS SHALL BE LOCATED SEVEN
(7) FEET MINIMUM ABOVE THE ROOF, IF ROOF SLOPE IS LESS THAN 30 DEGREES.
25. ROOF OBSTRUCTIONS SUCH AS RAZOR WIRE, SOLAR PANELS, GUY WIRES, ETC. SHALL NOT
PREVENT FIRE DEPT. ACCESS OR EGRESS.
26. MAXIMUM FLAME SPREAD CLASS RATING FOR EXIT ENCLOSURES AND EXIT PASSAGEWAYS, IN ‘A’ AND ‘B’ OCCUPANCIES, IN FULLY FIRE SPRINKLERED BUILDINGS, SHALL BE CLASS B. CLASS A FLAME SPREAD INDEX = 0-25 AND CLASS B FSI = 26-75. CLASS A AND B MAXIMUM SMOKE DENSITY
SHALL BE 0-450. FOR. SEE TBL.803.9 FOR OTHER OCCUPANCIES AND EXCEPTIONS.
27. EXISTING FIRE ALARM SYSTEM FOR THE BUILDING SHALL REMAIN FULLY OPERATIONAL DURING
DEMOLITION AND CONSTRUCTION PROCEDURES. SEE FIRE ALARM PLANS FOR COMPLETE
INFORMATION. COORDINATE ALL MODIFICATIONS, TEMPORARY SHUTDOWNS OR TESTING WITH THE
VA AND LOCAL FIRE MARSHALL OR FIRE PREVENTION AUTHORITY.
28. EXISTING FIRE SPRINKLER AND WET STANDPIPE SYSTEMS FOR THE BUILDING SHALL REMAIN
FULLY OPERATIONAL DURING DEMOLITION AND CONSTRUCTION PROCEDURES. SEE FIRE
PROTECTION PLANS FOR COMPLETE INFORMATION. COORDINATE ALL MODIFICATIONS,
TEMPORARY SHUTDOWNS, OR TESTING WITH THE VA AND LOCAL FIRE MARSHALL OR FIRE
PREVENTION AUTHORITY.
29. PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A-10BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PARTS OF THE BUILDING ON EACH FLOOR. PROVIDE 10BC FOR
ELECTRICAL ROOMS, MECHANICAL ROOMS, TRASH ROOMS, AND ELEVATOR MACHINE ROOMS.
30. FIRE DAMPERS OR DOORS SHALL BE PROVIDED AS REQUIRED WHERE DUCTS PENETRATE
FIRE-RATED WALLS OR CEILINGS AND SHALL BE INSTALLED PER IFC SEC. 713 AND NFPA 101.
31. FIRE DAMPERS SHALL BE APPROVED AND LISTED BY THE STATE FIRE MARSHALL. INSTALL STRICTLY IN ACCORDANCE WITH MANUFACTURER’S PRINTED INSTRUCTIONS. LISTING APPROVAL
INSTRUCTIONS SHALL BE MADE AVAILABLE TO THE INSPECTING AUTHORITIES.
32. ACCESS IS REQUIRED WHEN ONE-HOUR FIRE-RATED ASSEMBLIES ENCLOSE MECHANICAL
DEVICES AND MUST BE APPROVED BY THE FIRE DEPARTMENT.
33. PENETRATIONS THROUGH RATED WALLS AND FLOORS SHALL BE SEALED WITH A MATERIAL
CAPABLE OF PREVENTING THE PASSAGE OF FLAMES, HOT GASES, AND SMOKE WHEN SUBJECTED
TO THE REQUIREMENTS OF ASTM-E-814 AND IN COMPLIANCE WITH PROJECT PLANS AND
SPECIFICATIONS.
34. PLUMBING, MECHANICAL, AND ELECTRICAL PENETRATIONS, INCLUDING CONDUITS AND PIPING, THROUGH FIRE-RATED WALL, FLOOR, AND CEILING ASSEMBLIES SHALL BE TIGHTLY AND SOLIDLY SEALED WITH FIRESTOPPING COMPLYING WITH IFC SEC. 707 AND 708. WHEN AN ITEM PENETRATES A FIRE BARRIER WALL, THE SECTION PASSING THROUGH THE WALL SURFACE AND THE FIXTURE CONNECTIONS THERETO SHALL BE ONLY OF METAL. SEE FIRE PROTECTION DETAILS IN THE PLANS.
35. DUCT INSULATION APPLIED TO THE EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL
HAVE A FLAME SPREAD OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED RATING OF NOT MORE
THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION INCLUDING INSULATION, FACING
MATERIALS, TAPES, AND ADHESIVES AS NORMALLY APPLIED PER MANUFACTURER’S
INSTRUCTIONS.
36. DRAFTSTOPPING ENCLOSING FLOOR/CEILING SPACES AND ATTIC SPACES NOT TO EXCEED 1000 SQ. FT. SHALL BE PROVIDED WITHIN CONCEALED FLOOR-CEILING ASSEMBLIES THAT ARE FORMED
OF COMBUSTIBLE MATERIALS.
37. DRAFTSTOPPING ENCLOSING AREAS NOT TO EXCEED 3000 SQ. FT. SHALL BE PROVIDED WITHIN
ATTICS, MANSARD OVERHANGS AND SIMILAR CONCEALED SPACES FORMED OF COMBUSTIBLE
MATERIALS.
38. SUBMIT TO THE FIRE DEPARTMENT FOR APPROVAL A HAZARDOUS MATERIALS MANAGEMENT PLAN
AND A HAZARDOUS MATERIALS (MSDS) INVENTORY STATEMENT AS OUTLINED IN 2009 IFC.
39. SUBMIT TO THE FIRE DEPARTMENT FOR APPROVAL AN EMERGENCY EVACUATION PLAN. THE PLAN
SHALL BE CONSPICUOUSLY POSTED AND ALL EMPLOYEES SHALL BE TRAINED IN SUCH
PROCEDURES.
40. "ELECTRICAL ROOM" SIGN SHALL BE POSTED ON THE OUTSIDE OF ELECTRICAL ROOM DOOR.
41. “FIRE RISER ROOM" SIGN SHALL BE POSTED ON THE OUTSIDE OF THE FIRE RISER ROOM DOOR.
42. “FIRE ALARM CONTROL PANEL" SIGN SHALL BE POSTED ON THE OUTSIDE OF THE FIRE ALARM
CONTROL PANEL DOOR.
43. “ROOF ACCESS" SIGN SHALL BE POSTED ON THE ROOF ACCESS DOOR.
44. A DURABLE SIGN STATING " THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS" SHALL BE PLACED ON OR ADJACENT TO THE FRONT EXIT DOORS OF THE DEPARTMENT. THE SIGN SHALL
BE IN LETTERS NOT LESS THAN ONE INCH HIGH ON A CONTRASTING BACKGROUND.
Project Number
MA Architects, Inc.
21515 Hawthorne Blvd –Suite 200, Torrance, CA 90503 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Revisions:
Fully Sprinklered
Water Leak Damage Remediation West Wing - Basement
664-16-835
3350 La Jolla Village Dr, San Diego, CA 92161
GI-001
ABBREVIATIONS, GENERAL NOTES &
APPLICABLE STANDARDS
100% Submittal
MA ArchSMc03-11-18
PROJECT GENERAL NOTESFIRE AND LIFE SAFETY CONTINUEDABBREVIATIONS
Rev. Date Description
03.30.2018 100% Design Submittal
FIRE AND LIFE SAFETY
APPLICABLE STANDARDS
04/05/2018
D U M B
DW1- B- 1
F E C
B190
A/C SHOP
B190A
A/C SHOP
B254
A/C SHOP
B252
OFFICES(S)
B253
A/C SHOP
B255
PIPE SHOP
B191
STORAGE
B251
MECHANICAL
B200
ELECTRONICS
B177L
STORAGE
GENERAL
B177K
STORAGE
OIT
B177J
STORAGE
GENERAL
B128
KITCHEN
B177F
UTILITY
B177E
STORAGE
EQUIPMENT
B177H
RECEIVING
B236
AUTOPSY
B247
OFFICE
B248
OFFICE
B249
OFFICE(S)
B176
OFFICE(T)
B177B
CORR.
B171A
OFFICE(T)
B117P
CORR.
B173
STORAGE
OXYGEN
B177C
CORR.
B177A
CORR.
B177N
STORAGE
GENERAL
B177D
STORAGE
GENERAL
B191R
CORRIDOR
B194
STOR.
GENERAL
B194A
STOR.
GENERAL
B245
STOR.
MORGUE
B244
STOR.
MORGUE
B235
REFERIGER. B241
OFFICE
B234
OFFICE
B232B
OFFICE
B181
REFER.
B138
REFER.
B137
REFER.
B213
BIOMED
B250
OFFICE(S)
B232A
OFFICE
B233
OFFICE(T)
B177M
CORR. B117B
CORR.
B232
OFFICE(T)
B231
MECHANICAL
B136
REFER.
B183A
STOR.
GENERAL
B183
STOR.
GENERAL
B129
OFFICE(S)
B130
OFFICE(S)
B166
ELECTRICAL
B188
ELECTRICAL
B167
EQUIPMENT
OIT
B165
TELEPHONE
B165A
OIT STOR.
B176
OFFICE
B131
OFFICE(S)
B127
OFFICE(S)
B126D
OFFICE(S)
B127A-1
OFFICE(S)
B132
OFFICE(S)
B126C
OFFICE(S)
B114A
OFFICE(S)
B114
OFFICE(S)
B115
OFFICE(S)
B134
MANAGEMENT
RECORDS
B122
DISHWASHING
B119
WASH
CAR
B184
STOR.
GENERAL
B185
STOR.
GENERAL
B128B
STOR.
GENERALB186
STOR.
GENERAL
B140A
REFER.
B140
CORR.
B143
LAB
B142A
LAB
B142
LAB
B142E
LAB
B147
RESIDENT B156A
LAB
B156A
LAB
B198
ELECTRIC SHOP
B240
CORR.
B212
CORR.
B204
CORR.
B210
CARPENTRY
B210C
MECHANICAL
B141
MICROSCOPE FACILITY
CORE ELECTRON
B142D
LAB
B142B
SUPPLY
STERILE
B144
LOCKER(F)
B145
CONF. RM /OFFICE(S)
PHARMACY
B144A
LOCKER(F)
B149
LOCKER(M)
B152
OFFICE
PHARMACOECO.
BB152A
OFFICE(S)
B125
CORR.
B123
PREP
B157
VAULT
B153
STOR.
VAULT
B121
CORR.
B152E
ED. TRAINING OFF.(S)
DIR. PHARM.
B152D
DATA APPS.ANALYSIS OFF.(S)
DIR. PHARM.
B155
ADMIN.0FFICE
PHARMACY
B160
KITCHEN
B155C
SVC OFF.(S)
CHIEF PHARM.
B159B
OFFICE
B159A
OFFICE
B217
STOR.
EQUIPMENT
B223B
OFFICE(T)
B218
OFFICE(S)
B246
CORR.
B100
LOBBY
B156
AREA
PHARMACY
B215
STORAGE
B215A
STORAGE
B215B
CORRIDOR
B215B
CORRIDOR
B128C
OFFICE(S)
DIET INFO.
B117
CORRIDOR
B191J
STORAGE
GENERAL
B191G
STORAGE
OIT
B191P
STORAGE
GENERAL
B1000
CENTER OFFICE
IT SERVICE
B171
OFFICE
B201A
KITCHEN
B200A
STOR.
GENERAL
B205
KEYS
B216
LINEN
SOIL
B217A
STOR.
EQUIPMENT
SW5-1
STAIRS
SW6-B-1
STAIRS
SW2-B-1
STAIRS
SW7-B-1
STAIRS
SW8-B-1
STAIRS
B206
OFFICE(S)
B189B
STOR.
GENERAL
B198A
OFFICE(S)
SW1-B-1
STAIR
B191Q
CORR.
B191H
STORAGE
GENERAL
B214
OFFICE
B211
OFFICE
B217B
ELEC
B217C
ELEC
B212B
CORR.
B162
SERVICE OFFICE(S)
ENVIRONMENTAL
B210B
MECHANICAL
B210A
OFFICE(S)
B220
STOR.
GENERAL
B224
STOR.
HAC
B229
OPERATIONS
MGR. OFF.
B108A
STOR.
GENERAL
B101
LOBBY
B108B
STOR.
EQUIPMENT
B109
CORRIDOR
B108C
STOR.
EQUIPMENT
SW13-B-1
STAIRS
B201
STOR.
MAINTENANCE
B202
SIGNAGE
B239
CORR.
B238
CORR.
B158
STAIR
B182
KITCHEN
STOR.
B146
SHOWER(F)
B189A
STOR.
B125A
MALE TOI.
B133
FEMALE TOI.
B176A
MALE TOI.
B176B
MALE TOI.
W9-B-1
STAIR
B180
MECH.
B135A
HAC
B148
SHOWER(M)
B149A
LOCKER(M)
B149B
MECH.
B155B
OFF.OFF.(S)
ADMIN.
B155E
CORR.
B155F
CORR.
B154
CORR.
B172C
OFFICE
B196
ELEC. RM
S5-B-1
PET ELEV
B212A
CORR.
B191A
MALE TOI.
B191B
MALE TOI.
B242
MALE TOI.
B243
FEMALE TOI.
B128A
MGR. OFFICE(S)
CLINICAL NUTRITION
B128D
STOR.
GENERAL
SW11-B-1
STAIRS
SW12-B-1
STAIRS
B191K
STORAGE
GENERAL
B191E
UPPERB191D
STORAGE
GENERAL
B191C
STORAGE
B191F
STORAGE UPPER
GENERAL
B191C
STORAGE LOWER
GENERAL
B237
HAC
B232C
RECEPTION
B230A
TELECOM
B108
MECHANICAL
B152B
SAFETY OFF.(S)
DIR. MED.
B155A
PHARM. SVC OFF.(S)
ASS. CHIEF
B135
MECH.
B126B
OFFICE
B126A
OFF.(S) NUTRITION FOOD SER.
ED. SECT.
B191M
CORR.
B191L
STOR.
B152C
COOR.OFF.(S)
U.O.P. REGIONAL
B141A
CORR.
B230
OFFICE
B224A
CORR.
B222
MALE TOI.
B187
HAS
B225
CORRIDOR
B104
TOILET
B172C
STOR.
SPS SUPPLY
B125B
CORR.
SW10-B-1
LIFT
B120
STORAGE
B125C
CORR.
B144B
DRESSING RM
B155G
CORR.
S T O R A G E B19 5B
CA R T
W A S H B10 2A
H S K B227
M A L E
TOILET
B107
F E M A L E
TOIL ET
B106
CO R R I D O R
CO R R I D O R
B111
B116
SP S
S T O R A G E
B112
SP S
ADMIN ISTRA TION
OFFICE( S)B110
D E C O N B102
S P S P R E P A R E A B105
STERIL IZER
B10 2B
G A S E T O
B10 2C M E N S
L O C K E R B228
CO R R I D O R
B R E A K R O O M B226
SP S
STERILE
S T O R A G E B197
UTI L I TY A ND EQ UI PM ENT S TO RA GE
B223
V A C A N T S T O R A G E
PAT IE NT
E F F E C T S B22 3C
G E N E R A L S T O R A G E
B22 3D
CO R R I D O R
B19 1N
G E N E R A L S T O R A G E
B19 5C
MA T E RI A L M A N A GE M E NT O FF I C E
B17 2A
E Q U I P M E N T S T O R A G E
B11 2A
SP S
SU P P L Y
S T O R A G EB17 2B
E Q U I P M E N T S T O R A G E
B17 2D
E Q U I P M E N T S T O R A G E
B117
G E N E R A L S T O R A G E
B172
B22 3A
ELE CT RI CA L
U P
UPDNUPDN
E L E V A T O R S1
E L E V A T O R S2
E L E V A T O R S3
E L E V A T O R S4
AREA OF WORK
AREA: 8,222sf / 100 = 83 Occupants
AREA: 9,924sf / 100 = 100 Occupants
CONFERENCE
AREA: 375sf / 15 = 25 Occ.
AREA: 2,415sf / 100 = 25 Occupants
AREA: 1,246sf / 100 = 13 Occupants
AREA: 3,014sf / 100 = 31 Occupants
AREA: 977sf = 10 Occ.
AREA: 1,381sf / 100 = 14 Occup.
CONFERENCE
AREA 359sf / 15 = 24 Occupants
50 Occupants (260lf)
Temporary POT +525lf
MAXIMUM EGRESS LOAD =
165 (NFPA 101: 7.3.3.2)
T e m p o ra ry
P O
T lf
MAXIMUM EGRESS
LOAD = 225MAXIMUM EGRESS
LOAD = 360
MAXIMUM CORRIDOR
EGRESS LOAD = 480
MAXIMUM CORRIDOR
EGRESS LOAD = 480
MAXIMUM EGRESS LOAD =
165 (NFPA 101: 7.3.3.2)
AREA:1,700sf / 100 = 17 Occ.
AREA:11,917sf / 500 = 24 Occ.
AREA: 12,907sf / 500 = 26 Occup.
AREA: 15,881sf / 500 = 32 Occupants
AREA:3,175sf / 100 = 32 Occup.
AREA: 5,033sf / 100 = 51 Occup.
OCCUPANCY LOAD CALCULATIONS:
SUITE #100:
FLOOR AREA (STORAGE): 42,625sf
OCC. LOAD FACTOR: 1/500sf
OCCUPANTS: 86
FLOOR AREA (BUSSINESS) 37,087sf OCC. LOAD FACTOR: 1/100sf
OCCUPANTS: 371
FLOOR AREA (CONFERENCE) 734sf OCC. LOAD FACTOR: 1/15sf
OCCUPANTS: 49
TOTAL OCCUPANTS = 506 OCCUPANTS
NUMBER OF EXISTS REQ'D: 3 EXITS
NUMBER OF EXITS PROVIDED: 4 EXITS
MAXIMUM TRAVEL DIST." 300'-0"
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
PATH OF EGRESS
FIRE LIFE SAFETY LEGEND:
Project Number
MA Architects, Inc.
21515 Hawthorne Blvd –Suite 200, Torrance, CA 90503 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Revisions:
Fully Sprinklered
Water Leak Damage Remediation West Wing - Basement
664-16-835
3350 La Jolla Village Dr, San Diego, CA 92161
GI-002
FIRE LIFE SAFETY PLAN 100% Submittal
MA ArchSMc03-11-18
1/16" = 1'-0"
Fire Life Safety Plan
Rev. Date Description
03.30.2018 100% Design Submittal
D U M B
DW1- B- 1
F E C
B190
A/C SHOP
B190A
A/C SHOP
B254
A/C SHOP
B252
OFFICES(S)
B253
A/C SHOP
B255
PIPE SHOP
B191
STORAGE
B251
MECHANICAL
B200
ELECTRONICS
B177L
STORAGE
GENERAL
B177K
STORAGE
OIT
B177J
STORAGE
GENERAL
B128
KITCHEN
B177F
UTILITY
B177E
STORAGE
EQUIPMENT
B177H
RECEIVING
B236
AUTOPSY
B247
OFFICE
B248
OFFICE
B249
OFFICE(S)
B176
OFFICE(T)
B177B
CORR.
B171A
OFFICE(T)
B117P
CORR.
B173
STORAGE
OXYGEN
B177C
CORR.
B177A
CORR.
B177N
STORAGE
GENERAL
B177D
STORAGE
GENERAL
B191R
CORRIDOR
B194
STOR.
GENERAL
B194A
STOR.
GENERAL
B245
STOR.
MORGUE
B244
STOR.
MORGUE
B235
REFERIGER. B241
OFFICE
B234
OFFICE
B232B
OFFICE
B181
REFER.
B138
REFER.
B137
REFER.
B213
BIOMED
B250
OFFICE(S)
B232A
OFFICE
B233
OFFICE(T)
B177M
CORR. B117B
CORR.
B232
OFFICE(T)
B231
MECHANICAL
B136
REFER.
B183A
STOR.
GENERAL
B183
STOR.
GENERAL
B129
OFFICE(S)
B130
OFFICE(S)
B166
ELECTRICAL
B188
ELECTRICAL
B167
EQUIPMENT
OIT
B165
TELEPHONE
B165A
OIT STOR.
B176
OFFICE
B131
OFFICE(S)
B127
OFFICE(S)
B126D
OFFICE(S)
B127A-1
OFFICE(S)
B132
OFFICE(S)
B126C
OFFICE(S)
B114A
OFFICE(S)
B114
OFFICE(S)
B115
OFFICE(S)
B134
MANAGEMENT
RECORDS
B122
DISHWASHING
B119
WASH
CAR
B184
STOR.
GENERAL
B185
STOR.
GENERAL
B128B
STOR.
GENERALB186
STOR.
GENERAL
B140A
REFER.
B140
CORR.
B143
LAB
B142A
LAB
B142
LAB
B142E
LAB
B147
RESIDENT B156A
LAB
B156A
LAB
B198
ELECTRIC SHOP
B240
CORR.
B212
CORR.
B204
CORR.
B210
CARPENTRY
B210C
MECHANICAL
B141
MICROSCOPE FACILITY
CORE ELECTRON
B142D
LAB
B142B
SUPPLY
STERILE
B144
LOCKER(F)
B145
CONF. RM /OFFICE(S)
PHARMACY
B144A
LOCKER(F)
B149
LOCKER(M)
B152
OFFICE
PHARMACOECO.
BB152A
OFFICE(S)
B125
CORR.
B123
PREP
B157
VAULT
B153
STOR.
VAULT
B121
CORR.
B152E
ED. TRAINING OFF.(S)
DIR. PHARM.
B152D
DATA APPS.ANALYSIS OFF.(S)
DIR. PHARM.
B155
ADMIN.0FFICE
PHARMACY
B160
KITCHEN
B155C
SVC OFF.(S)
CHIEF PHARM.
B159B
OFFICE
B159A
OFFICE
B217
STOR.
EQUIPMENT
B223B
OFFICE(T)
B218
OFFICE(S)
B246
CORR.
B100
LOBBY
B156
AREA
PHARMACY
B215
STORAGE
B215A
STORAGE
B215B
CORRIDOR
B215B
CORRIDOR
B128C
OFFICE(S)
DIET INFO.
B117
CORRIDOR
B191J
STORAGE
GENERAL
B191G
STORAGE
OIT
B191P
STORAGE
GENERAL
B1000
CENTER OFFICE
IT SERVICE
B171
OFFICE
B201A
KITCHEN
B200A
STOR.
GENERAL
B205
KEYS
B216
LINEN
SOIL
B217A
STOR.
EQUIPMENT
SW5-1
STAIRS
SW6-B-1
STAIRS
SW2-B-1
STAIRS
SW7-B-1
STAIRS
SW8-B-1
STAIRS
B206
OFFICE(S)
B189B
STOR.
GENERAL
B198A
OFFICE(S)
SW1-B-1
STAIR
B191Q
CORR.
B191H
STORAGE
GENERAL
B214
OFFICE
B211
OFFICE
B217B
ELEC
B217C
ELEC
B212B
CORR.
B162
SERVICE OFFICE(S)
ENVIRONMENTAL
B210B
MECHANICAL
B210A
OFFICE(S)
B220
STOR.
GENERAL
B224
STOR.
HAC
B229
OPERATIONS
MGR. OFF.
B108A
STOR.
GENERAL
B101
LOBBY
B108B
STOR.
EQUIPMENT
B109
CORRIDOR
B108C
STOR.
EQUIPMENT
SW13-B-1
STAIRS
B201
STOR.
MAINTENANCE
B202
SIGNAGE
B239
CORR.
B238
CORR.
B158
STAIR
B182
KITCHEN
STOR.
B146
SHOWER(F)
B189A
STOR.
B125A
MALE TOI.
B133
FEMALE TOI.
B176A
MALE TOI.
B176B
MALE TOI.
W9-B-1
STAIR
B180
MECH.
B135A
HAC
B148
SHOWER(M)
B149A
LOCKER(M)
B149B
MECH.
B155B
OFF.OFF.(S)
ADMIN.
B155E
CORR.
B155F
CORR.
B154
CORR.
B172C
OFFICE
B196
ELEC. RM
S5-B-1
PET ELEV
B212A
CORR.
B191A
MALE TOI.
B191B
MALE TOI.
B242
MALE TOI.
B243
FEMALE TOI.
B128A
MGR. OFFICE(S)
CLINICAL NUTRITION
B128D
STOR.
GENERAL
SW11-B-1
STAIRS
SW12-B-1
STAIRS
B191K
STORAGE
GENERAL
B191E
UPPERB191D
STORAGE
GENERAL
B191C
STORAGE
B191F
STORAGE UPPER
GENERAL
B191C
STORAGE LOWER
GENERAL
B237
HAC
B232C
RECEPTION
B230A
TELECOM
B108
MECHANICAL
B152B
SAFETY OFF.(S)
DIR. MED.
B155A
PHARM. SVC OFF.(S)
ASS. CHIEF
B135
MECH.
B126B
OFFICE
B126A
OFF.(S) NUTRITION FOOD SER.
ED. SECT.
B191M
CORR.
B191L
STOR.
B152C
COOR.OFF.(S)
U.O.P. REGIONAL
B141A
CORR.
B230
OFFICE
B224A
CORR.
B222
MALE TOI.
B187
HAS
B225
CORRIDOR
B104
TOILET
B172C
STOR.
SPS SUPPLY
B125B
CORR.
SW10-B-1
LIFT
B120
STORAGE
B125C
CORR.
B144B
DRESSING RM
B155G
CORR.
S T O R A G E B19 5B
CA R T
W A S H B10 2A
H S K B227
M A L E
TOILET
B107
F E M A L E
TOIL ET
B106
CO R R I D O R
CO R R I D O R
B111
B116
SP S
S T O R A G E
B112
SP S
ADMIN ISTRA TION
OFFICE( S)B110
D E C O N B102
S P S P R E P A R E A B105
STERIL IZER
B10 2B
G A S E T O
B10 2C M E N S
L O C K E R B228
CO R R I D O R
B R E A K R O O M B226
SP S
STERILE
S T O R A G E B197
UTI L I TY A ND EQ UI PM ENT S TO RA GE
B223
V A C A N T S T O R A G E
PAT IE NT
E F F E C T S B22 3C
G E N E R A L S T O R A G E
B22 3D
CO R R I D O R
B19 1N
G E N E R A L S T O R A G E
B19 5C
MA T E RI A L M A N A GE M E NT O FF I C E
B17 2A
E Q U I P M E N T S T O R A G E
B11 2A
SP S
SU P P L Y
S T O R A G EB17 2B
E Q U I P M E N T S T O R A G E
B17 2D
E Q U I P M E N T S T O R A G E
B117
G E N E R A L S T O R A G E
B172
B22 3A
ELE CT RI CA L
U P
UPDNUPDN
E L E V A T O R S1
E L E V A T O R S2
E L E V A T O R S3
E L E V A T O R S4
AREA OF WORK
AREA: 8,222sf / 100 = 83 Occupants
AREA: 9,924sf / 100 = 100 Occupants
CONFERENCE
AREA: 375sf / 15
= 25 Occ.
AREA: 2,415sf / 100 = 25 Occupants
AREA: 1,246sf / 100 = 13 Occupants
AREA: 3,014sf / 100 = 31 Occupants
AREA: 977sf = 10 Occ.
AREA: 1,381sf / 100 = 14 Occup.
CONFERENCE
AREA 359sf / 15 = 24 Occupants
50 Occupants (260lf) / POT = 255ft
Temporary POT TO 2nd EXIT = 525ft
MAXIMUM EGRESS LOAD =
165 (NFPA 101: 7.3.3.2)
T e m
P P
O T ft
T O
S E
P A
R A
T E
Z O
N E
MAXIMUM EGRESS
LOAD = 225
MAXIMUM EGRESS
LOAD = 360
MAXIMUM CORRIDOR
EGRESS LOAD = 480
MAXIMUM CORRIDOR
EGRESS LOAD = 480
AREA:1,700sf / 100 = 17 Occ.
AREA:11,917sf / 500 = 24 Occ.
AREA: 12,907sf / 500 = 26 Occup.
AREA: 15,881sf / 500 = 32 Occupants
AREA:3,175sf / 100 = 32 Occup.
AREA: 5,033sf / 100 = 51 Occup.
TEMPORARY
BARRIER OF
STAIR EXIT
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
PATH OF EGRESS
FIRE LIFE SAFETY LEGEND:
OCCUPANCY LOAD CALCULATIONS:
SUITE #100:
FLOOR AREA (STORAGE): 42,625sf
OCC. LOAD FACTOR: 1/500sf
OCCUPANTS: 86
FLOOR AREA (BUSSINESS) 37,087sf OCC. LOAD FACTOR: 1/100sf
OCCUPANTS: 371
FLOOR AREA (CONFERENCE) 734sf OCC. LOAD FACTOR: 1/15sf
OCCUPANTS: 49
TOTAL OCCUPANTS = 506 OCCUPANTS
NUMBER OF EXISTS REQ'D: 3 EXITS
NUMBER OF EXITS PROVIDED: 3 EXITS
MAXIMUM TRAVEL DIST." 300'-0"
Project Number
MA Architects, Inc.
21515 Hawthorne Blvd –Suite 200, Torrance, CA 90503 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Revisions:
Water Leak Damage Remediation West Wing - Basement
Author
GI-003
INTERIM LIFE SAFETY PLAN
664-16-835
SMc
3350 La Jolla Village Dr, San Diego, CA 92161
03-11-18
100% Submittal
N/A
1/16" = 1'-0"
Interim Fire Life Safety Plan
Rev. Date Description
K
L
2 3 42.1 3.1 3.2
J.4
J.3
181 SF
Sprinkler Manifold
Room B140A
90 SF
Female Toilet B133
79 SF
IT Closet B135
34 SF
HSKPG.
B135A
249 SF
Stair
SW1-B-1
148 SF
Refrigerator B136
222 SF
Corridor B140
89 SF
Male Toilet B125A
358 SF
Records Management
B134
MIN. CLR.
4’−0"
AE-800
PROVIDE TEMPORARY BARRIER TO
SEPARATE AREA OF WORK FROM
PUBLIC AREAS.
K
L
2 3 42.1 3.1 3.2
J.4
J.3
181 SF
Sprinkler Manifold
Room B140A
90 SF
Female Toilet B133
79 SF
IT Closet B135
34 SF
HSKPG.
B135A
249 SF
Stair
SW1-B-1
148 SF
Refrigerator B136
222 SF
Corridor B140
89 SF
Male Toilet B125A
358 SF
Records Management
B134
MIN. CLR.
4’−0"
AE-800
PROVIDE TEMPORARY BARRIER TO
SEPARATE AREA OF WORK FROM
PUBLIC AREAS.
K
L
2 3 42.1 3.1 3.2
J.4
J.3
181 SF
Sprinkler Manifold
Room B140A
90 SF
Female Toilet B133
79 SF
IT Closet B135
34 SF
HSKPG.
B135A
249 SF
Stair
SW1-B-1
148 SF
Refrigerator B136
222 SF
Corridor B140
89 SF
Male Toilet B125A
358 SF
Records Management
B134
AE-800
PROVIDE TEMPORARY BARRIER TO
SEPARATE AREA OF WORK FROM
PUBLIC AREAS.
AREA OF WORK
Project Number
MA Architects, Inc.
21515 Hawthorne Blvd –Suite 200, Torrance, CA 90503 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Revisions:
Fully Sprinklered
Water Leak Damage Remediation West Wing - Basement
664-16-835
3350 La Jolla Village Dr, San Diego, CA 92161
GC-001
PHASING PLANS 100% Submittal
MA ArchSMc03-11-18
Rev. Date Description
03.30.2018 100% Design Submittal
1/4" = 1'-0"
Phase 1 Area of Work 1/4" = 1'-0"
Phase 2 Area of Work
1/4" = 1'-0"
Phase 3 Area of Work
95% Submittal
BG
AS
Rev.
Date
Description
01.12.2018 Site Survey & As-Built Verification
02.23.2018 35% Design
Project Number
MA Architects, Inc.
21515 Hawthorne Blvd ïSuite 200, Torrance, CA 90503 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Revisions:
Fully Sprinklered
Water Leak Damage
Remediation West Wing -
Basement
664-16-835
3350 La Jolla Village Dr, San Diego, CA 92161
BG
AS
HM-1
GENERAL NOTES & TITLE SHEET
VA SAN DIEGO LEAK DAMAGE REMEDIAITON WEST WING & BASEMENT
GENERAL HAZARDOUS MATERIALS ABATEMENT AND DEMOLITION NOTES
1. HAZARDOUS MATERIAL ABATEMENT PLANS AND SPECIFICATIONS HAVE
BEEN PREPARED ON THE BASIS OF EXISTING DOCUMENTS, SITE
INSPECTIONS AND OVERALL PROJECT INTENT.
2. THE LOCATION OF MATERIALS SCHEDULED FOR ABATEMENT AND
DEMOLITION ARE GENERAL IN NATURE. DRAWINGS ARE INTENDED TO
PROVIDE AN APPROXIMATE LOCATION OF MATERIALS TO BE REMOVED.
3. THE CONTRACTOR SHALL PREPARE ITS BID AND COORDINATE ITS WORK
WITH THE GENERAL CONTRACTOR FOR ALL PHASING, LOCATION AND
QUANTIFICATION PURPOSES PRIOR TO BIDDING.
4. CONTRACTOR IS RESPONSIBLE FOR LOCATING, ACCESSING, AND
REMOVING ALL ASBESTOS CONTAINING MATERIALS, LEAD BASED
COMPONENTS, PCB LIGHT BALLASTS, FLUORESCENT LAMPS AND OTHER
REGULATED MATERIALS THAT ARE SCHEDULED TO BE REMOVED AS
IDENTIFIED IN ARCHITECTURAL, ELECTRICAL AND MECHANICAL
DEMOLITION PLANS.
5. THE HM DRAWINGS ARE NOT TO BE CONSIDERED A STAND-ALONE
DOCUMENT. IN PREPARATION OF ITS BID, CONTRACTOR SHALL
COORDINATE ALL HAZARDOUS MATERIAL RELATED WORK WITH MA
ARCHITECTS, INC. DRAWINGS AND ALL WORK SPECIFIED ELSEWHERE IN
THE CONTRACT DOCUMENTS.
6. HAZARDOUS MATERIALS INCLUDING ASBESTOS-CONTAINING MATERIALS,
LEAD-CONTAINING SURFACE COATINGS, PCB TRANSFORMERS, PCB
BALLASTS, FLUORESCENT LAMPS HAVE BEEN IDENTIFIED. THESE
MATERIALS SHALL BE HANDLED BY PROPERLY TRAINED PERSONNEL
PRIOR TO ANY RENOVATION ACTIVITIES. REFER TO THE "SUMMARY OF
WORK" SECTION OF THE CORRESPONDING SECTION 02.82.11, 02.82.1319 OR
02.83.3313 FOR LOCATIONS OF KNOWN OR ASSUMED HAZARDOUS
MATERIALS.
7. THE CONTRACTOR SHALL COORDINATE THE REMOVAL OF ALL FURNITURE,
FIXTURES, CASEWORK, FIXED AND MOVEABLE OBJECTS, NON-HAZARDOUS
PARTITION WALLS, FINISHES, ETC., PRIOR TO HAZARDOUS MATERIAL
ABATEMENT. REFER TO THE CONTRACT DOCUMENTS FOR ITEMS
SCHEDULED FOR SALVAGE AND REUSE.
7. THE CONTRACTOR IS ADVISED OF THE PRESENCE OF A FULL-HEIGHT
INTERSTITIAL SPACE ABOVE THE CEILING. THE INTERSTITIAL SPACE
CONTAINS FRIABLE ASBESTOS-CONTAINING SPRAY-APPLIED
FIREPROOFING. THE EXISTING CEILING ASSEMBLY ACTS AS AN AIR-TIGHT
BARRIER AND SHALL NOT BE REMOVED PRIOR TO CONSTRUCTING ALL
ICRA-REQUIRED CONSTRUCTION BARRIERS AND NEGATIVE PRESSURE
ENCLOSURE ABOVE AND BELOW THE CEILING.
8. THE CONTRACTOR SHALL CAREFULLY SCHEDULE AND COORDINATE ALL
PHASES OF HAZARDOUS MATERIAL RELATED WORK TO ENSURE THAT
UNPROTECTED PERSONNEL AND WORK AREAS ARE NOT EXPOSED TO
HAZARDOUS SUBSTANCES. THIS INCLUDES THE COORDINATION OF ALL
DEBRIS CLEANUP, SOFT DEMOLITION, ABATEMENT AND MODERNIZATION
ACTIVITIES.
9. ALL SUBMITTALS REQUIRED BY THE PROJECT SPECIFICATIONS MUST BE
APPROVED BY THE OWNER'S PRIOR TO THE START OF ANY HAZARDOUS
MATERIAL RELATED WORK. REFER TO HAZARDOUS MATERIAL
SPECIFICATIONS.
10. THE CONTRACTOR SHALL DE-ENERGIZE AND LOCKOUT ELECTRICAL
POWER TO THE WORK AREAS TO THE GREATEST EXTENT POSSIBLE. THE
CONTRACTOR SHALL INSTALL TEMPORARY POWER FROM AN OUTSIDE
SOURCE, PROVIDED BY THE CONTRACTOR. TEMPORARY POWER SHALL BE
PROTECTED WITH GROUND FAULT INTERRUPTER CIRCUIT BREAKERS. THE
CONTRACTOR SHALL SUPPLY ADEQUATE POWER TO EACH OF THE WORK
AREAS SOLELY DEDICATED FOR USE BY ENVIRONMENTAL CONSULTANT.
11. PROVIDE, OPERATE AND MAINTAIN MAGNAHELIC GAUGES OR RECORDERS
OF APPROPRIATE RANGE AT THE ENTRANCE TO EACH WORK AREA DURING
ASBESTOS AND LEAD RELATED ACTIVITIES. NO ASBESTOS OR LEAD WORK
SHALL BE CONDUCTED UNLESS THE SYSTEM IS INSTALLED, OPERATING
AND RECORDING CORRECTLY.
12. ALL DIFFERENTIAL AIR PRESSURE UNITS AND VACUUMS MUST BE DOP
TESTED ON-SITE PRIOR TO USE.
13. ALL POLYETHYLENE SHEETING SHALL BE FIRE RETARDANT AS VERIFIED
AND DOCUMENTED BY UNDERWRITERS LABORATORY (U.L.) IN
ACCORDANCE WITH LOCAL FIRE DEPARTMENT REQUIREMENTS.
14. THE CONTRACTOR SHALL INSTALL AN ADEQUATE NUMBER OF CLEAR VIEW
PORTS TO EACH WORK AREA. ALL VIEW PORTS SHALL HAVE A MINIMUM
DIMENSION OF 18ó BY 18ó.
15. FINAL CLEARANCE FOR ASBESTOS WORK AREAS WILL BE CONDUCTED BY
IN ACCORDANCE WITH THE ASBESTOS HAZARD EMERGENCY RESPONSE
ACT (AHERA) REQUIREMENTS. REFER TO THE CORRESPONDING SECTION
02.82.1319, 02.83.3313 FOR LOCATIONS OF KNOWN OR ASSUMED HAZARDOUS
MATERIALS.
16. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH
FAILURE TO MEET CLEARANCE REQUIREMENTS INCLUDING: LABORATORY
COSTS, CONSULTANT COSTS, AND ANY OTHER DIRECT OR INDIRECT COSTS
INCURRED BY THE OWNER.
17. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
ASBESTOS-CONTAINING MATERIALS EXPOSED AND/OR IMPACTED AS A
RESULT OF RENOVATION ACTIVITIES (I.E., PIPE INSULATION, OR ACM
MATERIALS WITHIN CEILING PLENUMS, WALL CAVITIES, INTERIOR PIPE
CHASES, EXTERIOR PIPE CHASE, ETC) UNDER THE ARCHITECTURAL
DRAWINGS AND ALL WORK SPECIFIED ELSEWHERE IN THE CONTRACT
DOCUMENTS.
18. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT
DISTURBANCE OF ANY HAZARDOUS MATERIAL OR EXPOSING
CONTAMINATION TO THE BASEMENT INTERSTITIAL SPACE DUE TO THE
RENOVATION ACTIVITIES ON THE BASEMENT. IF DISTURBANCES DOES
OCCUR, THE CONTRACTOR SHALL HAVE THE CONSULTANT ASSESS THE
EXPOSURE AND SHALL HAVE THE ABATEMENT CONTRACTOR CLEANUP
THE EXPOSED AREA.
ABATEMENT KEY NOTES
ASBESTOS-CONTIANING MATERIALS (ACM) &
ASBESTOS-CONTAINING CONSTRUCTION
MATERIALS (ACCM)
A1: SPRAY-APPLIED FIREPROOFING
A2: SPRAY-APPLIED FIREPROOFING
DUST/DEBRIS AT ACOUSTICAL CEILING
PANEL
A3: WALLBOARD/JOINT COMPOUND
ASSEMBLY
A4: BROWN DUCT SEAM CAULKING
A5: THERMAL SYSTEM INSULATION
(FITTINGS/ELBOWS)
A6: CLOTH PIPE WRAP
SHEET INDEX
HM-1- GENERAL NOTES & TITLE SHEET
HM-2- HAZARDOUS MATERIALS DEMO
PLAN-B134
HM-3- HAZARDOUS MATERIALS DEMO
PLAN-CORRIDOR B140
HM-4- HAZARDOUS MATERIALS DEMO
PLAN-STAIRWELL
RECOMMENDED WORK/ABATEMENT
SEQUENCE:
1. SETUP THE CONTAINMENT AT ROOM B134
AND CORRIDOR B140 AND NEGATIVE AIR
MACHINES, AND ALLOW TO REACH AT A
MINIMUM -0.02" WC PRESSURE
DIFFERENTIAL
2. ERECT THE HARD BARRIER
3. REMOVE AND HEPA VACUUM CEILING
TILES AS REQUIRED BY SCOPE OF WORK
(DEBRIS ATOP CEILING TILES ASSUMED
POSITIVE).
4. ABATE DRYWALL/JOINT COMPOUND
REQUIRED BY SCOPE OF WORK.
5. AT CONCLUSION OF ABATEMENT,
CONDUCT FINAL CLEAN UP
6. VISUAL INSPECTION BY CONSULTANT
7. ENCAPSULATION OF WORK AREA
8. FINAL AIR CLEARANCE BY CONSULTANT
SCALE: NTS
181 SF
Sprinkler Manifold
Room B140A
90 SF
Female Toilet B133
285 SF
Corridor B125D
79 SF
IT Closet B135
34 SF
HSKPG.
B135A
249 SF
Stair
SW1-B-1
148 SF
Refrigerator B136
222 SF
Corridor B140
89 SF
Male Toilet B125A
358 SF
Records Management
B134
A3
A3
A3
A2
A3
A3
A2
CONTAINMENT
B134
HARD
BARRIER
CONTAINMENT
B134
HARD
BARRIER
A3
STAGE
DECON
48" MIN
CLEARANCE
NIS
NIS
NIS
NIS
NISNISNIS
A1
A4
NIS
NIS
NIS
NIS NIS NIS
HM-2
HAZARDOUS MATERIALS DEMO
PLAN- B134 95% Submittal
BG
AS
Rev.
Date
Description
01.12.2018 Site Survey & As-Built Verification
02.23.2018 35% Design
ABATEMENT KEYNOTES
ASBESTOS-CONTAINING
MATERIALS (ACM) &
ASBESTOS-CONTAINING
CONSTRUCTI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.