AnswersToVendorsQuestions_III_36C78626R501200015.pdf

PDF 245 KB Posted

Attached to
Grounds maintenance services for Riverside National Cemetery. -- S208
Solicitation number
36C78626R501200015
Issued by

About this file

This document is a Questions and Answers amendment (Amendment 0015) to federal solicitation 36C78626R501200015 for grounds maintenance services at Riverside National Cemetery. The solicitation seeks a five-year firm-fixed-price contract for comprehensive cemetery grounds maintenance, including mowing, fertilization, aeration, topdressing, pest control, interment support, irrigation system maintenance, and specialized services such as aquatic management and pond maintenance. Proposals were due November 20, 2026, with award expected thereafter. The contract includes a $23,000,000 binding ceiling across all ordering periods. The governing workload consists of 365 developed acres and 365 irrigated turf acres for all maintenance operations; approximately 360,000 flat markers requiring seasonal edging; and 30,000 square feet of annual large-scale turf renovation. The Government does not separately establish warm-season versus cool-season turf acreage breakdowns or provide measured square footage for the Medal of Honor Memorial area weekly pressure-washing requirement, requiring offerors to develop independent pricing assumptions for performance-based service delivery.

Key personnel requirements include a Site Manager with five years' supervisory experience and accreditation from the Landscape Contractors Association or equivalent nationally recognized grounds management certification (examples include NALP, PGMS, ISA, or IA credentials); submission of qualifications is mandatory at proposal time and will be reviewed for compliance only, not comparative evaluation. A licensed aquatic biologist meeting California professional standards (Certified Lake Manager plus California Qualified Applicator License in aquatic category acceptable) is required, along with certified pesticide applicators and pump/filtration technicians who may be subcontractor employees. Minimum insurance includes Workers' Compensation (state law required), Employer's Liability ($100,000/$100,000/$500,000), General Liability ($500,000 per occurrence), and Automobile Liability ($200,000/$500,000/$20,000 if applicable). The contract is not set-aside for small business or socioeconomic categories; however, joint ventures and teaming arrangements are permitted, and past performance evaluation may consider relevant experience from committed key subcontractors for newly certified SDVOSBs. No bid guarantee or performance/payment bonds are required.

View the file

Other files

File Type Posted
36C78626R50120_0015.pdf PDF
RIVERSIDE NC PriceSched_0015.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C78626R501200015

1. Teaming documentation: What information or supporting documents must the prime submit for a proposed non-SDVOSB subcontractor? Is a signed teaming agreement, subcontract commitment, or work-allocation plan required with the proposal?

Answer: Please see the instructions to offerors in the solicitation.

2. Subcontracting requirements: Which limitation-on-subcontracting clauses and compliance measurement period govern this contract? Please identify any required certifications or reporting for the proposed work split.

Answer: Please review the solicitation’s clauses.

3. Workload quantities: Round 2 Q&A, particularly Questions 3 and 8, references differing developed and turf acreages. Could you identify the final quantities governing mowing, fertilization, aeration, and topdressing, and provide the warm-season versus cool-season turf acreage left blank in Question 3(b)?

Answer: For proposal preparation and pricing purposes, the Government establishes 365 developed acres as the final governing acreage for mowing, fertilization, aeration, and topdressing requirements under this solicitation. This acreage supersedes any conflicting developed acreage figures provided in previous amendments, attachments, exhibits, or responses to vendor questions. All offerors shall base their pricing and technical approach on the 365 developed-acre figure. The Government will continue to apply the performance requirements identified in the PWS for these services. The warm-season and cool-season turf acreages referenced in Question 3(b) are provided below:

• Developed Acres: 365 acres

• Mowing: 365 acres

• Fertilization: 365 acres

• Aeration: 365 acres

• Topdressing: 365 acres

4. Governing acreage: Final Answer 3 establishes 275 turf acres for core aeration and Type 1 topdressing, while Answer 34 directs 355 developed acres for those same tasks.

Answer 8 provides additional figures, and revised Technical Exhibit 5 lists 350 irrigated acres. The difference between 275 and 355 acres represents approximately 29% more acreage for these operations.

Answer: For proposal preparation and pricing purposes, the Government establishes 365 developed acres as the governing workload quantity for grounds maintenance operations under this solicitation. Any acreage figures cited in previous amendments, technical exhibits, attachments, or responses to vendor questions that differ from this quantity are superseded by this clarification.

Specifically:

• The 275-acre quantity referenced in Final Answer 3 is no longer the governing acreage for core aeration and Type 1 topdressing.

• The 355-acre quantity referenced in Answer 34 is superseded.

• The 350 irrigated-acre figure identified in Technical Exhibit 5 is provided for reference regarding irrigated areas and does not modify the governing workload quantity for pricing purposes.

• Offerors shall base pricing, staffing, equipment, aeration, topdressing, fertilization, and mowing calculations on 365 developed acres.

5. Broadcast pest treatments: Final Answer 26 references 280 turf acres and a range of 315.8–350 acres, then directs full broadcast treatment over 365 turf acres. Please establish one governing treatment acreage.

Answer: For proposal preparation and pricing purposes, the Government establishes 365 turf acres as the governing acreage for all broadcast pest treatment applications required under the contract. Any acreage values previously referenced in responses to vendor questions, amendments, exhibits, attachments, or other solicitation documents that differ from this quantity are superseded by this clarification.

Specifically, the 280-acre figure and the 315.8- to 350-acre range cited in prior responses are no longer governing quantities for pricing or performance calculations.

Offerors shall base labor, equipment, material quantities, and pricing for broadcast pest treatment services on 365 turf acres. This clarification is issued to ensure all offerors are proposing on a common and consistent basis and to eliminate ambiguity resulting from previously published acreage figures.

Total Maintenance Area: The contractor is responsible for the full 365 developed acres of the cemetery.

6. Supply-only requirements: Final Answer 5 states these requirements were removed.

However, revised PWS §5.2.9.1 still states that Holganix products are supplied by the contractor and applied by RNC staff. Please remove or reconcile the remaining obligation.

Answer: Supply language in PWS 5.2.9.1 has been removed.

7. Topdressing material quantities: Answer 3(b) leaves the warm-season and cool-season acreage entries blank, and Answer 36 confirms that no breakdown is provided. These areas require different materials and application cycles under PWS §§5.2.22.8–.9.

Answer: The Government acknowledges that the warm-season and cool-season turf acreage values were omitted from Answer 3(b). For proposal preparation purposes, offerors shall assume that all topdressing work required under PWS 5.2.22.8 and

5.2.22.9 applies to the Government-established workload quantity of 365 turf acres.

The specific distribution of warm-season and cool-season turf is not a separately priced contract item and will not be used as an evaluation factor.

Offerors shall develop their technical and pricing proposals based on the requirements of the PWS and the total governing turf acreage. Any future adjustment or clarification regarding turf-type distribution will be provided to all offerors via amendment if determined necessary by the Government.

8. Contract maximum and price evaluation: Page 18 establishes a $23 million maximum aggregate value, while final Answers 2 and 32 describe that amount as an estimate.

Answer 32(a) does not expressly confirm whether a proposal exceeding $23 million will be considered for award. Please clarify the binding maximum and its effect on evaluation of the complete five-year price schedule.

Answer: The maximum is not binding and is only an estimate. Please review RFO 16.504-1(c) on the Acquisitio.Gov website regarding the estimated maximum amount.

Additionally, the maximum amount of the contract will be determined at award for the source selection will follow RFO 15.104 as stated in the instructions to offerors in the solicitation.

9. Key personnel: Answer 43 states that Site Manager qualifications will not be evaluated, then states that the submitted documents will be evaluated for qualification compliance under Subfactor 1a. Please clarify the evaluation treatment.

Answer: The Government clarifies that the qualifications of the proposed Site Manager are not separately evaluated or rated as a discriminating factor under Technical Subfactor 1a. However, offerors are required to submit documentation demonstrating that the proposed Site Manager meets the minimum qualifications specified in the solicitation.

Under Subfactor 1a, the Government will review submitted documentation solely to determine whether the proposed Site Manager satisfies the solicitation's minimum qualification requirements. This review is a matter of compliance and acceptability and is not a comparative evaluation of one offeror's Site Manager against another's.

Accordingly:

• Site Manager qualifications must be submitted with the proposal.

• The Government will verify compliance with the minimum qualification requirements.

• The qualifications of the Site Manager will not receive a separate strength, weakness, rating, or comparative assessment.

• Failure to demonstrate compliance with the stated minimum qualifications may render the proposal unacceptable.

This clarification supersedes any prior language that could be interpreted as both excluding and evaluating Site Manager qualifications and is intended to distinguish between a compliance review and a comparative technical evaluation.

10. Scaled site plan: Answer 13 in Amendment 0006 said scaled site plans, GIS layers and section-by-section acreage must come from the Contracting Officer. Could the Government provide a scaled site plan, or the irrigation as-builts referenced in Question 76, to all offerors?

Answer: The Government will not provide a scaled site plan, GIS layers, or irrigation as-built drawings as part of this solicitation. Offerors are responsible for developing their proposals based on the information provided in the solicitation, attachments, exhibits, amendments, and observations made during the site visit.

The Government has provided the workload quantities and performance requirements necessary for proposal preparation. Any scaled site plans, GIS data, irrigation as-built drawings, or similar facility records maintained by the Government are intended for contract administration purposes and will not be furnished to offerors during the solicitation phase.

Accordingly:

• No additional scaled site plans will be issued.

• GIS layers will not be provided to offerors.

• Irrigation as-built drawings referenced in previous questions will not be provided during the solicitation period.

• Offerors shall prepare proposals based on the solicitation requirements and Government-provided workload quantities.

This clarification applies to all offerors and supersedes any interpretation that such documents would be distributed as part of the competitive procurement process.

11. Joint ventures and teaming: Is a CVE/SBA-certified SDVOSB joint venture eligible to propose? Under Factor 2, will the Government consider the past performance of a joint venture member or a major subcontractor that will perform a significant share of the work?

Answer: Please review Factor 2, Past Performance, location in the instructions to offerors.

12. Start date: The current order ends 11/21/2026. For pricing, should offerors assume a base year that starts on the award date plus the 2–4-week phase-in in PWS 1.8.24?

Answer: After award has been made, the contracting officer and contracting officer’s representative will plan the first task order, which will allow a 2–4-week phase-in. This task order/information will be shared with the awardee no later than the post award conference.

13. One small item from the second-round answers: in the answer to Question 3(b), the warm-season and cool-season turf acreage figures appear to be blank ("approximately ___ acres are established warm-season turf ... and ___ acres are established cool-season turf"). Will those two figures be included in the upcoming amendment with the other pending answers? PWS 5.2.22.8 and 5.2.22.9 call for different topdressing materials on each turf type, so the split affects pricing?

Answer: The Government acknowledges that the warm-season and cool-season turf acreage figures were inadvertently omitted from the response to Question 3(b). For proposal preparation purposes, offerors shall base their pricing on the Government-established governing turf acreage of 365 acres. The Government will not provide a separate warm-season and cool-season acreage breakdown as part of this solicitation.

Offerors shall propose the labor, equipment, materials, and application methods necessary to meet the requirements of PWS 5.2.22.8 and 5.2.22.9 across the required turf areas. The distinction between warm-season and cool-season turf does not alter the Government's basis for evaluation, and no separate pricing schedule is required for each turf type.

Accordingly:

• The governing turf acreage for pricing purposes remains 365 acres.

• No additional warm-season or cool-season acreage breakout will be provided.

• Offerors are responsible for accounting for the PWS requirements applicable to each turf type within their proposed pricing.

All offerors shall prepare proposals on the same basis using the governing acreage established by this amendment.

14. Contract maximum value. The solicitation lists $23,000,000 as the contract maximum aggregate value, and Amendment 0010 Q&A described it as an estimate. Is $23,000,000 a binding ceiling on award for the base period and all option periods, or may the Government award above it if the best-value offer exceeds it? We note that the Government's base-year estimate of $6,200,000 implies approximately $31,000,000 over five years.

Answer: The stated ceiling is the maximum the government will pay and is binding.

Therefore, if the government states that the ceiling is $23,000,000, then an offer that exceeds $23,000,000 is not eligible for award because it exceeds the maximum amount specified in FAR 52.216-22. The amount of $6,200,000.00 was provided from the incumbent contract via a vendor’s question regarding the procurement history. However, the requirements in this solicitation differ from the requirements included in the incumbent’s contract.

15. Contract maximum value. The solicitation lists $23,000,000 as the contract maximum aggregate value, and Amendment 0010 Q&A described it as an estimate. Is $23,000,000 a binding ceiling on award for the base period and all option periods, or may the Government award above it if the best-value offer exceeds it? We note that the Government's base-year estimate of $6,200,000 implies approximately $31,000,000 over five years.

Answer: The stated ceiling is the maximum the government will pay and is binding.

Therefore, if the government states that the ceiling is $23,000,000, then an offer that exceeds $23,000,000 is not eligible for award because it exceeds the maximum amount specified in FAR 52.216-22. The amount of $6,200,000.00 was provided from the incumbent contract via a vendor’s question regarding the procurement history. However, the requirements in this solicitation differ from the requirements included in the incumbent’s contract.

16. Wage determination revision. The base solicitation attached Wage Determination

2015-5629, Revision 29. Please confirm whether Revision 31 (dated 8/27/2026) or a later revision will be incorporated into the resulting contract.

Answer: Prior to the issuance of the last amendment, the contracting officer will verify if there are revisions to the wage determination, which are later than 08/27/2026. If a new revisions exists, the contracting officer will add it to the amendment.

17. Collective bargaining agreement. Are the incumbent contractor's employees at RNC covered by a collective bargaining agreement? If so, please provide the agreement or the wage and fringe benefit rates that will apply under Section 4(c) of the Service Contract Act.

Answer: No.

18. Flat-marker edging frequency. Attachment 3 lists "Mowing, Trimming & Edging" as weekly during the growing season and bi-weekly during the dormant season. PWS

5.2.21.62 (Flat Marker Edging) states that edging frequency should be increased "to weekly as needed during high growth months," and PWS 5.2.21.63 separately covers curbs, walks, and borders. Does the Attachment 3 weekly frequency apply to every flat marker (approximately 360,000 per Q54), or to the curb, walk, and border edging under PWS 5.2.21.63, with flat-marker edging performed to the PWS 5.2.21.62 standard?

Answer: The Government clarifies that the frequencies identified in Attachment 3 for "Mowing, Trimming & Edging" apply to the routine edging of curbs, walks, borders, and similar landscape features associated with mowing operations. Flat-marker edging shall be performed in accordance with the performance requirements of PWS 5.2.21.62.

Flat-marker edging is not required to be performed on all markers weekly throughout the growing season. Rather, the Contractor shall maintain flat markers to the standards specified in PWS 5.2.21.62 and increase edging frequency to weekly, as necessary, during periods of high turf growth to maintain the required appearance standards.

Accordingly:

• PWS 5.2.21.62 governs flat-marker edging requirements and frequency.

• Attachment 3's weekly growing-season and bi-weekly dormant-season frequencies apply to routine mowing, trimming, and edging operations associated with curbs, walks, borders, and similar features described in PWS 5.2.21.63.

• The Government does not require all approximately 360,000 flat markers to be edged weekly.

The Contractor shall determine the frequency necessary to maintain flat markers in compliance with the performance standards of the PWS, including increasing frequency during high-growth periods when conditions warrant.

19. Flat-marker edging frequency. Attachment 3 lists "Mowing, Trimming & Edging" as

5.2.21.62 (Flat Marker Edging) states that edging frequency should be increased "to weekly as needed during high growth months," and PWS 5.2.21.63 separately covers curbs, walks, and borders. Does the Attachment 3 weekly frequency apply to every flat

Answer: The Government clarifies that the frequencies identified in Attachment 3 for "Mowing, Trimming & Edging" apply to routine turf maintenance activities, including edging of curbs, walks, borders, and other landscape features addressed in PWS

5.2.21.63. Flat-marker edging requirements are governed separately by PWS 5.2.21.62.

Flat markers are not required to be edged on a fixed weekly schedule cemetery-wide.

Rather, the Contractor shall perform flat-marker edging at a frequency sufficient to maintain the performance standards specified in PWS 5.2.21.62. During periods of accelerated turf growth, the Contractor shall increase flat-marker edging frequency, up to weekly as necessary, to maintain a neat, uniform appearance and prevent turf encroachment onto marker surfaces.

Accordingly:

• Attachment 3's weekly growing-season and bi-weekly dormant-season frequencies do not require edging of all approximately 360,000 flat markers at those intervals.

• Flat-marker edging shall be performed in accordance with PWS 5.2.21.62 performance requirements.

• Curbs, walks, borders, and similar landscape edging shall be maintained in accordance with the frequencies identified in Attachment 3 and PWS 5.2.21.63.

• The Contractor is responsible for adjusting flat-marker edging frequency as necessary to maintain contract standards throughout the year.

20. Flat-marker edging frequency. Attachment 3 lists "Mowing, Trimming & Edging" as

5.2.21.62 (Flat Marker Edging) states that edging frequency should be increased "to weekly as needed during high growth months," and PWS 5.2.21.63 separately covers curbs, walks, and borders. Does the Attachment 3 weekly frequency apply to every flat

Answer: The Government clarifies that Attachment 3 and PWS 5.2.21.62 and 5.2.21.63 are complementary and should be read together. The frequencies identified in Attachment 3 for "Mowing, Trimming & Edging" apply to routine grounds maintenance operations. Flat-marker edging shall be performed in accordance with the performance requirements of PWS 5.2.21.62, which requires edging frequency to be increased to weekly, as necessary, during periods of high turf growth.

The Government does not interpret Attachment 3 as requiring all approximately 360,000 flat markers to be edged weekly throughout the growing season. Rather, the Contractor shall maintain all flat markers free of turf encroachment and in accordance with the appearance standards established in the PWS. When growth conditions warrant, flat-marker edging shall be increased up to a weekly frequency in affected areas to maintain required standards.

Accordingly:

Flat-marker edging shall be performed in accordance with PWS 5.2.21.62.

Curbs, walks, borders, and similar features shall be maintained in accordance with PWS 5.2.21.63 and the frequencies identified in Attachment 3.

The Contractor is responsible for adjusting flat-marker edging frequency as necessary to meet contract performance standards.

Weekly edging of all cemetery flat markers is not required unless necessary to maintain the required performance standard.

21. Warm-season turf extent. To size flat-marker edging during high-growth months, approximately what share of the burial sections (or of the approximately 360,000 flat markers) is in Kikuyu grass or Bermuda grass, as opposed to cool-season turf?

Answer: The Government does not track or maintain a validated percentage of flat markers by associated turf type, nor is a breakdown of burial sections by Kikuyu grass, Bermuda grass, or cool-season turf available for proposal purposes. Accordingly, the Government will not provide an estimate of the number or percentage of flat markers located within warm-season versus cool-season turf areas.

Offerors shall base their proposals on the performance requirements contained in the PWS and the Government-established workload quantities provided elsewhere in the solicitation. The contract is performance-based, and the Contractor is responsible for maintaining all turf areas and flat markers to the required standards regardless of turf species or growth characteristics.

Accordingly:

• No Government estimate of warm-season versus cool-season marker distribution will be provided.

• No percentage of the approximately 360,000 flat markers is established for pricing purposes by turf type.

• Offerors shall account for varying turf growth rates and turf species conditions in their staffing, equipment, and operational approach.

• All flat markers and turf areas shall be maintained in accordance with the applicable PWS performance standards regardless of turf type.

22. Developed acreage. Amendment 0010 Q&A (Q3) states 365 developed acres, while Attachment 5 (Site Summary) lists 315.8 developed acres. Which figure should offerors use for mowing and trimming?

Answer: The Government clarifies that 365 developed acres is the governing acreage for mowing and trimming under this solicitation. Offerors shall use 365 developed acres for proposal preparation, pricing, staffing, equipment planning, and workload calculations associated with mowing and trimming services. Any conflicting acreage figures published in previous amendments, exhibits, attachments, technical exhibits, or responses to vendor questions are superseded by this clarification.

• Specifically:

• The 365 developed-acre figure identified in Amendment 0010, Question 3, is the official workload quantity for mowing and trimming

• The 315.8 developed-acre figure identified in Attachment 5 (Site Summary) is superseded for proposal and pricing purposes.

23. Interment spoils. PWS 4.1 states that "soil removal will be at RNC's spoils," while PWS

5.6.1.31 states that off-site removal and disposal of waste, "including spoils removal left over from interment operations," is the Contractor's responsibility. Must the Contractor haul interment spoils off the cemetery, or place them at the RNC spoils area? If off-site hauling is required, what is the estimated annual volume?

Answer: The Government clarifies that interment spoils generated as part of burial operations shall be placed at the designated Riverside National Cemetery (RNC) spoils area. The reference in PWS 4.1 stating that "soil removal will be at RNC's spoils" governs the disposition of interment spoils associated with routine cemetery operations.

• PWS 5.6.1.31 requiring off-site removal and disposal of waste applies to waste materials generated by the Contractor during performance of grounds maintenance services and does not require the Contractor to transport routine interment spoils offsite.

• Accordingly:

• Interment spoils shall be transported to and deposited at the Government-designated RNC spoils area.

• The Contractor is not required to haul routine interment spoils offsite.

• Offsite disposal requirements apply only to waste materials for which the Government has not provided an onsite disposal location or when specifically directed by the Contracting Officer.

• Because offsite hauling of routine interment spoils is not required, the Government is not providing an estimated annual volume for offsite disposal of interment spoils.

• Offerors base all mowing and trimming calculations on 365 developed acres.

• This clarification is intended to establish a common basis for proposal preparation and eliminate ambiguity resulting from previously published acreage discrepancies.

Accordingly, the governing acreage for mowing and trimming is 365 developed acres.

24. Incumbent staffing. To help offerors size the workforce, please provide the number of personnel the current contractor employs at RNC, by labor category.

Answer: The government is unable to provide sensitive contractor information.

25. Lift stations and pump stations. Please provide the number and locations of the stormwater pond and storm-drain lift pump stations (PWS 5.5.1.4 and 5.5.1.12), and the manufacturer and model of the irrigation pump stations (PWS 5.3.1.4). Will the Government provide the O&M manuals referenced in PWS 5.3.1 to offerors, or only to the Contractor after award?

Answer: The Government will not provide detailed inventories identifying the number, precise locations, manufacturer information, model numbers, or technical specifications of individual stormwater lift stations, storm-drain lift stations, or irrigation pump stations during the solicitation period. Offerors are expected to develop their proposals based on the performance requirements set forth in the PWS and information made available through the solicitation and site visit process.

• Operation and maintenance (O&M) manuals referenced in PWS 5.3.1 are Government-furnished information intended for contract performance and administration. These manuals will be made available to the successful contractor after contract award and during transition, as applicable.

• Accordingly:

• The Government will not provide additional station inventories, equipment schedules, manufacturer data, or model numbers during the solicitation period.

• The Government will not provide pump station O&M manuals to offerors prior to award.

• O&M manuals and other available facility documentation necessary for contract performance will be provided to the successful contractor after award, subject to availability.

• Offerors shall base their proposals on the performance requirements of the solicitation rather than manufacturer-specific equipment assumptions.

26. Aquatic biologist (PWS 1.8.16). California does not issue an aquatic biologist license.

Will the Government accept a Certified Lake Manager (North American Lake Management Society) holding a California DPR Qualified Applicator License (aquatic category) as meeting the licensed aquatic biologist requirement?

Answer: The Government acknowledges that California does not issue a license specifically titled "Aquatic Biologist." For purposes of satisfying the requirements of PWS 1.8.16, the Government will accept equivalent professional credentials that demonstrate the education, training, experience, and regulatory qualifications necessary to perform the required aquatic management services.

• Accordingly, a proposed individual holding both:

• A Certified Lake Manager (CLM) credential issued by the North American Lake Management Society (NALMS); and

• A valid California Department of Pesticide Regulation Qualified Applicator License (QAL), or equivalent California certification authorizing aquatic pesticide applications,

• will be considered acceptable in lieu of a state-issued aquatic biologist license, provided the individual possesses experience performing aquatic vegetation and water quality management services comparable to those required under this contract.

• The Government will evaluate submitted qualifications to determine whether the proposed individual meets the intent of the PWS requirement and possesses the professional expertise necessary to perform the required services. The Government does not require a credential that is unavailable through the State of California.

• This clarification supersedes any interpretation that a California-issued "aquatic biologist license" is required and is intended to allow equivalent professional qualifications that meet the Government's operational needs.

27. Page limits. Section E.2 sets page limits for each Factor 1 subfactor. Do appendices such as Safety Data Sheets and product labels, inspection checklists, requirements crosswalks, and key personnel résumés count toward those limits, or may they be submitted as separate attachments?

Answer: Please review the instructions to offerors included in this amendment 0015 for it includes some adjustments to what is required in a proposal, specifically Subfactor 1d: CLIN 0004.

28. Award and start date. With proposals now due 11/20/2026, is the base period still

01/01/2027 through 12/31/2027? PWS 1.8.24 provides a phase-in of two to four weeks beginning the first business day after award. When does the Government expect to make award so that phase-in is complete by the start date?

Answer: The period of performance dates have been adjusted. Please see the price schedule spreadsheet attached to this amendment, labeled, “RIVERSIDE NC PriceSched_0015,” and the price schedule in the amendment itself. However, the ultimate price schedule/period of performance may be adjusted again to accommodate delays in the procurement.

29. 5.3.1.166 Actuate individual irrigation zones weekly by manual starts. Observe for broken/malfunction sprinkler heads, leaks in piping visible at the surface. Isolate leaks and make repairs within 24 hours of identification. Adjust radius, arc and trajectory of sprinkler heads to prevent overspray. QUESTION: Will the cemetery provide the remote controls and or as necessary to operate irrigation control valves from the Central Computer?

Answer: RNC’s Grounds and Irrigation Section will maintain the irrigation control system. Remote controls will not be provided to the contractor.

30. 5.3.1.171 MAJOR IRRIGATION SYSTEM REPAIRS (NOT IN CONTRACT)

5.3.1.172 Repairs on pressure pipe and valves upstream of and including the master valves shall be considered “Construction” and will be repaired under a separate contractual agreement with either “the Contractor,” a different contractor, or with Government materials and/or labor, at the Government’s discretion. This typically includes water meters, service lines, backflow preventers, pressure regulating valves, master valves, flow meters, hydrometers, isolation valves, vaults and valve box assemblies in roadways, mainline pipe and fittings, pipe restraints, irrigation controllers, electrical power lines, valve control wires, cables and conduits under paving. QUESTION: Is any work required to the irrigation automatic control valves to include rebuild or replace part of Major Irrigation System Repairs?

Answer:

• PWS 5.3.1.171 – 5.3.1.172 (Major Repairs Excluded from Fixed CLIN 0003):

Explicitly classifies non-routine work—such as rebuilding/replacing master valve assemblies, major controller/clock replacements, pump station repairs, and mainlines/upstream pressure piping repairs—as Major Irrigation System Repairs ("Construction") that are outside the recurring monthly CLIN 0003 baseline.

• PWS 5.3.1.172: Define the authorization process for major repairs, specifying that major valve rebuilds or structural replacements require the contractor to submit a written itemized quote (separating labor and materials) for COR review and receive formal Government authorization/funding via contract modification or a separate task order prior to initiating work.

Additional Questions — Amendment 0012

Amendment 0012 extends the proposal deadline to 20 November 2026 and reopens the solicitation to additional questions, stating that the extension is “to allow additional time for the program office to provide clarification on certain elements of the performance work statement.” The questions below identify the elements Vet-Blue is unable to price on a common basis with other offerors, each arising from a conflict the published record has not resolved.

# Subject Why it matters

1 Governing acreage — one figure per operation

Nine different acreage figures are now in effect across the PWS, its attachments and the published answers. The spread on turf-specific operations is 275 to 355 acres — 29%. Every per-acre cost in the schedule moves with it.

2 Warm-season vs. cool-season turf split

Answer 3(b) was published with the figures left blank. Answer 36 declines and sends offerors to the COR. The two turf types take different materials on different cycles and cannot be priced from a combined number.

3 $23,000,000 maximum aggregate value — ceiling or estimate

Question 32(a) asked whether an offer above $23,000,000 will be considered for award. It was not answered. Offerors cannot know whether their proposal is eligible.

4 Site Manager accreditation following Amendment 0011

Amendment 0011 restores “or equivalent accreditation program.” Answer 43 says the resume and letter of commitment “will not be evaluated,” while Answer 4 says they are evaluated. Offerors need to know what is required and when.

5 Conform the PWS and attachments to the published answers

Four requirements the answers changed were never changed in the document: PWS 5.2.9.1, PWS 5.2.21.12, the Attachment 5 marker count, and the Attachment 3 turf renovation quantity. The documents still say the opposite of the answers.

6 Weekly de-ionized water washing — a common pricing basis

Asked twice, declined twice. The only recurring weekly task with no stated quantity. Offerors need either a figure or leave to price to a stated assumption.

Submitted to Ralph Crum, Contracting Officer — Ralph.Crum@va.gov

Solicitation 36C78626R50120 — Grounds Maintenance Services, Riverside National Cemetery

Questions due 16 November 2026, 17:00 PST (Amendment 0012)

Proposals due 20 November 2026, 17:00 PST (Amendment 0012)

Prior rounds Nine questions submitted under Amendments 0006 and 0007 were answered in Amendment 0010. The questions below arise from those answers and from the Performance Work Statement dated 4 November 2026.

Question 31 — Governing acreage: one figure per operation

Reference: Attachment 3 / Technical Exhibit 3 and Attachment 5 / Technical Exhibit 5 to the Performance Work Statement dated 4 November 2026; Answers to Vendors’ Questions 3, 8, 10, 19, 20, 26, 34, 36, 54 and 68.

Acreage is the multiplier on every turf-specific line in the price schedule: fertilization, weed control, invertebrate broadcast treatment, core aeration and Topdressing Type 1. Nine figures are presently in effect, and they are not reconcilable.

Figure Source As characterized by the Government

460 developed acres

Attachment 3 / TE 3, Key Workload Operational Notes

“The contractor is responsible for the full 460 developed acres of the cemetery.”

365 acres Attachment 3 / TE 3 workload table

Mowing, Trimming & Edging; and Pest & Weed Control

365 acres Attachment 5 / TE 5 Total Developed Cemetery

365 developed / 275 turf / 7 vegetation control

Answer 3(a) and Answer 3(c)

“offerors shall use the revised workload quantities”; “The governing acreage for core aeration and Topdressing Type 1 is 275 turf acres.”

365 turf acres Answer 26 “Broadcast treatments cover the full 365 turf acres”

355 developed / 280 turf

Answer 54, carried forward in Answers 8 and 34

Answer 34: 355 developed acres governs mowing, fertilization and weed control, and core aeration and topdressing

350 acres Attachment 5 / TE 5; Answer 3(c); Answer 8

Irrigated Turf — Answer 3(c): “The Irrigated Turf line … governs turf-specific cultural operations”

315.8 acres Answers 10, 19, 20; carried forward in Answer 8

Answer 8: Core Aeration & Topdressing

300 acres Answers 10 and 68 Irrigated turf

290 Attachment 5 / TE 5 Interment Section Area

Figure Source As characterized by the Government

280 turf acres Answer 8; Answer 26 Answer 8: Fertilization & Weed Control; and Core Aeration & Topdressing

Three conflicts are direct. First, Answer 34 states that 355 developed acres governs core aeration and topdressing; Answer 3(c) states that the governing acreage for core aeration and Topdressing Type 1 is 275 turf acres; Answer 8 states 280. Three answers in the same amendment give three different figures for the same operation. Second, Answer 3(c) states that the Irrigated Turf line governs turf-specific cultural operations — 350 acres in Attachment 5 — and then directs offerors to use 275 turf acres. The same answer names two figures. Third, Answer 26 directs that broadcast invertebrate treatment be priced across “the full 365 turf acres.” No document states 365 as a turf figure; 365 is the Total Developed Cemetery line in Attachment 5.

The attachments were not conformed. The Performance Work Statement dated 4 November 2026 carries Attachment 5 with 350 acres of Irrigated Turf and 365 acres of Total Developed Cemetery, and carries Attachment 3 with 365 acres for mowing and for pest and weed control, together with a note that the Contractor is responsible for “the full 460 developed acres.” An answer does not amend the Performance Work Statement, and the attachments as they stand contradict the answers that purport to supersede them.

The range on turf-specific operations is 275 to 355 acres — a 29% spread. Offerors selecting different figures from the same record will submit prices that are not comparable, and the lowest price will reflect the lowest acreage chosen rather than the best value to the Government.

Please state, by amendment:

(a) The single acreage governing mowing, trimming and edging under PWS 5.2.21.

(b) The single acreage governing fertilization under PWS 5.2.10 and turf weed control under PWS 5.2.21.

(c) The single acreage governing core aeration under PWS 5.2.21.70 through 5.2.21.74 and Topdressing Type 1 under PWS 5.2.22.7 through 5.2.22.10.

(d) The single acreage governing broadcast invertebrate treatment under PWS 5.2.21.12.

(e) Which of Answers 3, 8, 10, 19, 20, 26, 34, 54 and 68 remain in effect, and that Attachments 3 and 5 are revised to carry the governing figures so that the attachments and the answers no longer conflict.

Answer: Answers 3, 8, 10, 19, 20, 26, 34, 54, and 68 shall remain in effect only to the extent they are consistent with the governing acreages established herein.

Question 32 — Warm-season and cool-season turf acreage

Reference: PWS 5.2.22.8 and 5.2.22.9; Answers to Vendors’ Questions 3(b), 22, 36 and 68.

PWS 5.2.22.8 requires warm-season turf to be topdressed annually with a 90% sand / 10% reed sedge peat mix. PWS 5.2.22.9 requires cool-season turf to be topdressed with clean river sand alternating with a 40:30:30 sandy loam topsoil, peat humus and compost mixture. Different materials, different cycles, different unit costs. The quantity of each is a direct function of the acreage of each.

The Government has acknowledged the gap and has not closed it. Answer 22 states that “because warm- vs. cool-season turf acreage and overseeding acreage are missing, offerors cannot compute cubic yardage or cost for Type 1 or Type 3 topdressing.” Answer 3(b) was published with the figures omitted:

“Of this total, approximately___ acres are established warm-season turf subject to PWS 5.2.22.8 and___ acres are established cool-season turf subject to PWS 5.2.22.9.”

Answer 36 then states that the solicitation does not separate the two and directs offerors to “verify the applicable turf proportions on-site with the COR.” Offerors cannot. The only site visit was held 19 August 2026, before the revised attachments were published. The Addendum to FAR 52.212-1 designates the Contracting Officer as the point of contact for written requests for clarification and requires that questions be addressed by amendment;

a figure given to one offeror by the COR outside an amendment would neither bind the Government nor reach the other offerors.

Please state, by amendment:

(a) The acreage of established warm-season turf subject to PWS 5.2.22.8.

(b) The acreage of established cool-season turf subject to PWS 5.2.22.9.

(c) If the Government does not hold the separation, the proportion offerors are to assume for pricing, so that all offerors price the two materials on the same basis.

Answer:

The Government has reviewed the request for a breakout of warm-season and cool-season turf acreage used in connection with the topdressing requirements identified in PWS 5.2.22.8 and 5.2.22.9.

(a) The Government does not maintain a validated acreage inventory separating all established turf areas into warm-season and cool-season categories for contract administration purposes. Therefore, a specific acreage for established warm-season turf subject to PWS 5.2.22.8 is not available.

(b) The Government does not maintain a validated acreage inventory separating all established turf areas into warm-season and cool-season categories for contract administration purposes. Therefore, a specific acreage for established cool-season turf subject to PWS 5.2.22.9 is not available.

(c) In the absence of Government-maintained acreage data identifying the distribution of warm-season and cool-season turf, offerors shall base their pricing on the total governing turf acreage identified elsewhere in the solicitation and shall incorporate all labor, materials, equipment, and incidentals necessary to perform the requirements of PWS 5.2.22.8 and 5.2.22.9. No separate acreage allocation or pricing proportion will be provided by the Government. Offerors are expected to exercise their independent business judgment in developing pricing for these requirements.

This clarification establishes that no Government-provided warm-season versus cool-season acreage breakdown is available and that all offerors shall prepare their proposals using the same solicitation requirements and total governing turf quantities.

Question 33 — $23,000,000 maximum aggregate value: ceiling or estimate

Reference: Base solicitation, p. 18; FAR 52.216-22 (DEV); Answers to Vendors’ Questions 2, 7, 9, 25 and 32.

Question 32(a) asked: “Will proposals with a total evaluated price above $23,000,000 be considered for award?” The published answer reads: “The $6,393,410.00 was based on a current, one-year bridge contract that has a slightly different scope of work. The $23,000,000 is a valid estimate.” That responds to the premise of the question but not to the question itself.

The distinction is not academic. Under FAR 52.216-22 a stated maximum is a contract ceiling: the Government is not obligated to order, and the Contractor is not obligated to furnish, beyond it. Answers 2(b), 2(c) and 32 characterise the same figure as “just an estimate” and leave pricing to the offeror’s business judgment. A ceiling and an estimate have opposite consequences. If $23,000,000 is a ceiling, a price schedule that totals more than that across five ordering periods cannot be performed as priced. If it is an estimate, it constrains nothing and offerors should disregard it.

Answer 25 states the prior award was $6,393,410 for a one-year bridge contract, and Answer 9 states that figure “includes identical requirements.” Five ordering periods at that level total $31,967,050. Amendment 0006 increased the stated workload above the quantities that produced it.

Please confirm:

(a) Whether $23,000,000 is the maximum under FAR 52.216-22 (DEV), limiting the total of all orders placed under the contract, or a non-binding estimate of anticipated value.

(b) Whether an offer whose total evaluated price exceeds $23,000,000 is eligible for award.

(c) If it is a ceiling, how offerors are to price twelve months in each of five ordering periods at the workload quantities stated in Amendment 0006 and remain within it.

Answers:

(a). The stated ceiling is the maximum the government will pay and is binding. Therefore, if the government states that the ceiling is $23,000,000, then an offer that exceeds $23,000,000 is not eligible for award because it exceeds the maximum amount specified in FAR 52.216-22. The amount of $6,200,000.00 was provided from the incumbent contract via a vendor’s question regarding the procurement history. However, the requirements in this solicitation differ from the requirements included in the incumbent’s contract.

(b). No.

(c). It is a vendor’s business decision to price their prospective proposals according to the terms and conditions stated in the solicitation.

Question 34 — Site Manager accreditation and evaluation following Amendment 0011

Reference: PWS 1.8.20; Amendment 0011; Answers to Vendors’ Questions 1, 4, 34 and 43.

Amendment 0011 states that Answer 34 “was not intended to direct an offeror to propose any specific type of certification,” and restores the text of PWS 1.8.20: the Site Manager must have five years’ supervisory experience and be “accredited by the Landscape Contractors Association, OR EQUIVALENT accreditation program, (e.g., PLANET).” Vet- Blue appreciates the clarification. Two points remain unresolved.

First, what makes an accreditation program equivalent. The PWS gives one example and no standard. Offerors proposing different credentials will be evaluated against an undisclosed test, and a credential cannot be obtained between now and 20 November 2026.

Second, whether the submission is evaluated at all. Answer 4 states that the Site Manager’s resume and letter of commitment “are evaluated within Factor 1 – Technical, under the Key Personnel / Personnel Qualifications subfactor.” Answer 43(a) and 43(b) each state, in full: “This will not be evaluated.” The remainder of Answer 43(b) then directs that the resume and letter of commitment be submitted within Subfactor 1a and states that “these documents will be evaluated for compliance with the qualification requirements specified in PWS 1.8.20,” and Answer 43(c) states that they count against that subfactor’s page limit. Subfactor 1a carries a 20-page limit covering CLIN 0001, the largest technical scope in the solicitation. Whether these pages are evaluated, and whether they displace CLIN 0001 content, are opposite answers in the same response.

Please confirm:

(a) The standard by which the Government will determine that an accreditation program is “equivalent” under PWS 1.8.20, or a list of accepted programs.

(b) Whether the required accreditation must be held by the proposed Site Manager at the time of proposal submission, at award, or by the start of performance.

(c) Whether the Site Manager’s resume and letter of commitment are evaluated — and if they are, under which subfactor — reconciling Answer 4 with Answer 43.

(d) Whether the resume and letter of commitment count against the Subfactor 1a page limit, and whether the same applies to the Alternate Site Manager documentation called for by Answer 43(d).

(e) If they are not evaluated, whether compliance with PWS 1.8.20 is a matter of contractor responsibility determined at award, or a performance requirement to be met after award.

Answer:

(a) For purposes of PWS 1.8.20, an "equivalent accreditation program" is defined as a nationally recognized professional credential or accreditation program for landscape, grounds maintenance, horticulture, arboriculture, irrigation, or cemetery grounds management professionals that demonstrate competency in supervising and managing large-scale grounds maintenance operations. Examples of acceptable equivalent programs include, but are not limited to, certifications offered by the National Association of Landscape Professionals (NALP), Professional Grounds Management Society (PGMS), International Society of Arboriculture (ISA), Irrigation Association (IA), or other comparable industry-recognized organizations. The Government will evaluate equivalency based on the accreditation's relevance to grounds maintenance management, supervisory responsibilities, technical subject matter, and industry acceptance.

(b) The proposed Site Manager shall possess the required accreditation and experience qualifications at the time of proposal submission. The Government will evaluate the proposed individual based on the qualifications presented in the proposal. Any replacement Site Manager proposed after award must meet the same requirements.

(c) The Site Manager's resume and letter of commitment are evaluated as part of the Technical Factor under the Key Personnel/Personnel Qualifications subfactor. To clarify the apparent inconsistency between prior responses, the Government will evaluate these documents solely to determine whether the proposed Site Manager meets the qualification requirements identified in PWS 1.8.20 and the solicitation instructions. They are not separately scored beyond their relevance to the Key Personnel evaluation.

(d) The Site Manager resume and letter of commitment count toward the applicable page limitation established for Subfactor 1a. The same requirement applies to any Alternate Site Manager documentation required by the solicitation, including resumes and commitment letters. Offerors are responsible for managing proposal content within the prescribed page limitations.

(e) Compliance with PWS 1.8.20 is an evaluated proposal requirement and is not deferred solely to post-award performance. Accordingly, the Government will assess the qualifications of the proposed Site Manager based on the information submitted with the proposal. Failure to demonstrate compliance with the minimum qualification requirements may adversely affect the proposal's evaluation.

Question 35 — Conform the Performance Work Statement and attachments to the published answers

Reference: PWS 5.2.9.1, PWS 5.2.21.12, Attachment 3 / TE 3 and Attachment 5 / TE 5, all as issued with Amendment 0010 on 4 November 2026; Answers to Vendors’ Questions 5, 6, 9, 10, 30, 39, 61, 64 and 94.

Amendment 0010 states that “the only change to this version of the PWS was to remove any supply language in section 5.1.” Four requirements that the answers changed were therefore left standing in the document. A response in the Answers to Vendors’ Questions does not amend the Performance Work Statement, and a contractor performing to the document would perform differently from one performing to the answers.

Supply-only fertilizer products — PWS 5.2.9.1. Answers 5(a), 5(b), 5(c), 39, 61, 64 and 94 state that this requirement “has been removed from the performance work statement” and “is no longer a requirement.” The clarification remains in the 4 November 2026 Performance Work Statement in full, including “Supplied by the contractor but applied exclusively by RNC staff” and “Contractors furnish and apply conventional fertilizer;

Holganix Organic Solution is…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .