SOW - Revised 12-8-2025.pdf
PDF 88 KB Posted
- Attached to
- Santa Fe Front Gate Repair
- Solicitation number
- 36C78626Q0003
About this file
This Statement of Work (SOW) details a front gate repair project for the Santa Fe National Cemetery, issued by the Department of Veterans Affairs National Cemetery Administration's Pacific District Office in Oakland, California. The project (No. 904-M&R-FY26-004) requires the contractor to supply and install four MAX 11400 Operators (24VDC with battery backup), four concrete pads for mounting, and one photo eye with a metal cover, adhering to UL325 safety standards. The work is to be completed within 60 calendar days of the Notice to Proceed, with site work conducted between 8:00 am and 4:30 pm, Monday through Friday, excluding Federal Holidays.
The SOW emphasizes strict standards of conduct and performance, given the cemetery's status as a national shrine. Contractors must maintain absolute decorum, respect burial activities, and follow detailed guidelines on employee behavior, dress, and work practices. Key requirements include minimizing disruption to cemetery operations, ensuring work does not interfere with committal services, and maintaining the highest level of professionalism and reverence. The project is located at 501 North Guadalupe Street in Santa Fe, New Mexico, with the Contracting Officer's Representative being Robert Jones and the Acting Cemetery Director being Denise Baker.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 2-santa fe gate repair.docx | DOCX document | |
| SOW Revised 12-11-2025.pdf | ||
| Photos.zip | ZIP file | |
| AMEND1-santa fe gate repair.docx | DOCX document | |
| SOW.pdf | ||
| Wage Determination.pdf | ||
| 36C78626Q0003 RFQ Santa FE Gate Repair.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Santa Fe National Cemetery Front Gate Repair 11/21/2025 Project No. 904-M&R-FY26-004
DEPARTMENT OF VETERANS AFFAIRS, NATIONAL CEMETERY ADMINISTRATION
PACIFIC DISTRICT OFFICE
Oakland, California
Project Title:
Santa Fe National Cemetery – Front Gate Repair
Project Location:
Santa Fe National Cemetery – 501 North Guadalupe Street, Santa Fe, NM, 87501
All work shall be performed in accordance with the Statement of Work contained here within.
SCHEDULE OF SERVICES:
List of Tasks
Description
Quantity
Unit
Unit Price
Total Price
0001 Front Gate Repair 1 Job $________ $_______
Total Price $_______
SCOPE OF WORK
GENERAL SCOPE OF WORK:
The Contractor shall furnish all labor, materials, equipment, tools, supplies, services, and supervision to perform work described herein to repair front gate at Santa Fe National Cemetery (SFNC), located in Santa Fe New Mexico. Work includes but is not limited to the repair of the front gate operating system for both gates. The entry gate is not operating and the exit gate is functioning.
Work will be accomplished in accordance with VA requirements, Federal, State, and Local Code requirements.
All work will be conducted in such a manner as to minimize the impact on the cemetery operations. Submission of a schedule that minimizes the effect of normal operations on the cemetery shall be approved by the Contracting Officer’s Representative (COR) and Cemetery Director prior to the start of work.
Site work will be accomplished between the hours of 8:00 and 4:30, Monday through Friday; no work will be performed on Federal Holidays.
All work will be coordinated with the COR. Only the Contracting Officer (CO) has the authority to make changes to the contract that affects price and/or time.
Acting Cemetery Director:
Denise Baker
(505) 984-3902 x13902 Denise Baker2@va.gov
Contracting Officer’s Representative (COR):
Robert Jones
(505) 988-6400 Robert.Jones12@va.gov
Project Manager:
Daniel Ransom NCA Pacific District
(510) 418-4885 Daniel.Ransom@va.gov
DESCRIPTION/STATEMENT OF WORK/SPECIFICATIONS
Description:
The work in this project includes but is not limited to:
Item 1: Front Gate Repair A. Supply and install four (4) MAX 11400 Operators, 24VDC with battery backup.
B. Supply and install four (4) concrete pads to mount the new operators.
C. Supply and install one (1) photo eye equipped with metal cover.
1. Adhere to UL325 safety standards
GENERAL REQUIREMENTS
1. All work will be coordinated with the Contracting Officer’s Representative (COR). Only the
Contracting Officer (CO) has the authority to make changes to the contract that affects price and/or time.
2. Submittals MANUFACTURER’S PRODUCT LITERATURE AND DATA SHEETS: Submit for approval, all the items specifically mentioned under the separate sections of the Statement of Work, with information sufficient to evidence full compliance with contract requirements.
Materials, fabricated articles, and the like to be installed in permanent work shall equal those of approved submittals. After an item has been approved, no change in brand or make will be permitted unless:
a. Satisfactory written evidence is presented to, and approved by Contracting Officer, that manufacturer cannot make scheduled delivery of approved item or;
b. The item delivered has been rejected and the substitution of a suitable item is an urgent necessity or;
c. The item delivered has been rejected and the substitution of a suitable item is an urgent necessity or;
d. Other conditions become apparent, which indicates approval of a substitute item to be in the best interest of the Government.
3. Forward submittals in sufficient time to permit proper consideration and approval action by
Government. Time submission to assure adequate lead time for procurement of contract-required items. Delays attributable to untimely and rejected submittals will not serve as a basis for extending contract time for completion.
4. Submittals will be reviewed for compliance with contract requirements by the District Architect-Engineer/PM, and action thereon will be taken by the Contracting Officer’s (COR) Representative on behalf of the Contracting Officer.
5. All utilities required for the continuous operation of all existing facilities must be maintained in service at all times except when disruptions are needed. All work shall be coordinated with the COR. Work will be conducted in such a manner to minimize the impact on the Cemetery operations.
6. The Contractor shall obtain any necessary permits and cooperate with the utilities company/cemetery staff to avoid any damage or liability and provide a safe work environment for his/her employees. The Contractor is responsible for damages to utilities, above and below ground.
7. All work shall be performed in accordance with National, State, and Local Codes including the
International Building Code (IBC), the International Mechanical Code (IMC), the International Plumbing Code (IPC), and the National Electrical Code (NEC).
8. The Contractor shall coordinate with the COR to store any required materials or supplies prior to and during the performance of work, (i.e., storage containers, construction fencing, and portable latrines) if required by the contractor for project execution. Public access to the National Cemetery shall not be impaired.
9. The Contractor shall assume sole responsibility for the safety of all persons on or about the construction site in accordance with applicable laws and codes. The contractor shall be in accordance with the safety provisions of the latest manual of accident prevention published by the Associated General Contractors of America and Division of Occupational Safety and Health (DOSH) and shall meet all safety requirements of Cemetery Safety Officer, Department of Veterans Affairs, OSHA, and the State.
10. The Contractor shall repair and or replace any damage done to cemetery property to its prior existing condition when altered or damaged by the Contractor at no additional cost to the Government. (e.g., damage to turf, water utilities, headstones, curbs, and pavements.)
11. All debris shall be removed from the site by the Contractor. The Contractor shall include costs for debris removal and dump fees in quote but must provide receipts for reimbursement. Debris shall not be allowed to accumulate at the site; debris shall be removed daily.
12. The Contractor shall make all attempts to minimize disruption to cemetery activities. The burial activities at the National Cemetery shall take precedence over construction activities.
The Contractor must coordinate with the COR in arranging the construction schedule to cause the least possible interference with Cemetery activities in burial areas. Construction noise during the committal services shall not disturb the service. Trucks and workmen shall not pass through the service area during this period.
a. The Contractor is required to discontinue work in advance of Easter Sunday, Mother’s Day, Father’s Day, Memorial Day, Veteran’s Day and/or Federal Holidays to permit cleanup of all areas of operation adjacent to existing burial plots before these dates.
b. Site work will be accomplished between the hours of 8:00 am and 4:30 pm, Monday through Friday, except Federal Holiday’s. Work outside of the Cemetery’s normal operating hours should be permitted by approval of the COR and to only meet the Period of Performance.
13. The C&A requirements do not apply, and a Security Accreditation Package is not required.
14. Completion Time: Sixty (60) calendar days from date of issuance of Notice to Proceed (NTP).
CONTRACTOR QUALITY CONTROL
1. The Contractor shall guarantee that all work done under this contract will be free from faulty materials or workmanship for a period of one year after the date of Final Acceptance by the Government. The Contractor hereby agrees to repair or replace all defects appearing in the work done under this contract to the satisfaction of the Government at no additional cost to the Government. Please note if the manufacturing warranties are longer than the workmanship warranty, the manufacture shall provide the parts, but the Government shall pay for labor to install.
2. The Contractor shall provide a Job Site Superintendent who speaks and writes fluent English on site and at all times when Contractor personnel are on the premises. The Job Superintendent will:
a. Review and approve submittals
b. Inspect the quality of work performed
c. Certify the completed work for payment and other purposes
d. Ensure that a Daily Report is provided to the PM and COR by the end of each workday regardless of if work was performed or not
STANDARDS OF EMPLOYEE CONDUCT
1. The National Cemetery Administration honors veterans with a final resting place and lasting memorials that commemorate their service to our Nation. National Cemeteries are national shrines. The standards of work, appearance, and procedures performed by the contractor at this cemetery shall reflect this nation’s concern for those interred there. Due to the sensitive mission of the cemetery, contractor personnel must exercise and exhibit absolute decorum, composure, and stability at all times.
2. Contractor personnel shall be required to adhere to the following standards of dress and conduct, as briefly mentioned here, while performing work in the National Cemetery. These standards and regulations are enforceable under Title 38, U.S.C., Part I, Chapter 9, Section 5901. It shall be subject to immediate enforcement action by the Contracting Officer if these standards are not adhered to during the period of performance of this contract. Contractor management shall be responsible for training and safety precautions prescribed by OSHA regarding safety equipment and devices.
3. All construction within the national cemetery shall be conducted with the emphasis on proper cemetery etiquette as this is an active cemetery. No disrespectful activity will be tolerated.
4. Clothing shall be presentable and suitable for the work while maintaining proper appearance and decorum indicative for a National Shrine. Uniform shirts and hats are preferred.
Clothing shall be clean and cleanliness and personal hygiene are imperative. T-shirts and/or tank tops as outer garments are prohibited. Protective/safety clothing and shoes shall meet or exceed OSHA and state requirements.
5. Behavior and language must be appropriate, reverent, and respectful at all times.
6. Eating and drinking (except water) is prohibited in the work areas and within sight of a committal shelter during a service.
7. Use of intoxicating beverages, any tobacco products, and illegal drugs on the Cemetery premises is strictly prohibited.
8. Contractor personnel shall not lean, sit, or stand on or against headstones or monuments.
No tools, equipment or other items will be placed or leaned on headstones or monuments.
9. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor is expected to remove any employees from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government. If the Contractor fails to act in this regard, or the reason for a removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action will be referred to the Contacting Officer (CO) for final resolution; however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later time or date. The Contractor will not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR and is later found invalid and/or unreasonable by the Contracting Officer.
- End of Statement of Work -