This is a solicitation (IFB 36C78625B0011) issued by the Department of Veterans Affairs National Cemetery Administration for irrigation expansion services at Rock Island National Cemetery in Rock Island Arsenal/Moline, Illinois. The contractor must provide all management, supervision, labor, equipment, materials and supplies necessary to expand the automated irrigation system to approximately 50 acres within the cemetery, including full sprinkler-to-sprinkler coverage of irrigated areas.

The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses with a size standard of $41 million under NAICS code 221310 (Water Supply and Irrigation Systems). The estimated project value is between $1-5 million. Bids are due by 3:00 PM CDT on April 18, 2025, with a pre-bid site visit scheduled for March 25, 2025. The period of performance is 365 calendar days from notice to proceed. The contractor must begin work within 10 days of receiving notice to proceed. A bid bond of 20% (not to exceed $3M) is required, along with performance and payment bonds. Questions are due by March 31, 2025. Davis-Bacon Act wage determinations apply.

View the file

Other files

File Type Posted
36C78625B0011 0002.docx DOCX document
Davis-Bacon Wage Determination IL20250001 04-04-2025.pdf PDF
36C78625B0011 0001.docx DOCX document
Bid Set Drawings Part 1.pdf PDF
Bid Set Specifications.pdf PDF
Cost Estimate Worksheet.xlsx XLSX spreadsheet
Wage Determination _ Rock Island.pdf PDF
Bid Set Drawings Part 2.pdf PDF
Bid Set Drawings Part 3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 112

36C78625B0011 X 03-07-2025

_________________________ Funds Assurance 821CM3032

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle, VA 22172

Department of Veterans Affairs National Cemetery Administration Contracting Services Richard.adu@va.gov

Richard Adu 917-951-0653

Irrigation Expansion, Rock Island National Cemetery The Department of Veterans Affairs, National Cemetery Administration has a requirement for a Firm Fixed Price (FFP) contract for a Contractor to provide all Management and Supervision, Labor, Equipment, Material, Supplies, etc., necessary to provide complete construction services necessary for the Expansion of the Automated Irrigation System to approximately 50 acres within the Rock Island National Cemetery as defined and described and in accordance with applicable Local, State and Federal laws and regulations in accordance with the stated Terms and Conditions, Scope of Work, Specifications and Drawings.

This Invitations for Bids (IFB) procurement opportunity is 100% Set-Aside for Service-Disabled Veteran-Owned Small-Business, (SDVOSB) firms; Authority 38 U.S.C. 8127 (Public Law 109-461).

Bidders must be SBA VetCert verified prior to submitting a bid in accordance with VAAR 819-7003(B) AND FAR PROVISION 52.204-7(a).

Bidder must represent that it is a SDVOSB concern under NAICS code assigned to this acquisition and is SBA VetCert verified for eligibility in the https://veterans.certify.sba.gov/ - database.

In accordance with VAAR 819.7003 (b), SDVOSB firms must be verified in the SAB VetCert database, https://veterans.certify.sba.gov.

Prospective bidders must also be registered in Vendor Information Pages (VIP) at https://www.vip.vetbiz.va.gov/, Vets 4212 at https://www.dol.gov; and System for Award Management (SAM) at https://www.sam.gov/SAM at the time of Bid submission and at time of award.

The Product / Service Code (PSC) for this procurement is Y1PZ – Construction of Other Non-Building Facilities The North American Industry Classification System (NAICS) code for this procurement is 221310 – Water Supply and Irrigation Systems The Size Standard for this procurement is $41 million dollars.

The project magnitude of construction range is estimated to be between $1,000,000 and $5,000,000.

There is an organized pre-bid site visit scheduled. See 52.236-27 Site Visit for detailed site visit information.

Interested Bidders are strongly encouraged to attend the Pre-Bid Site Visit Conference.

Interested bidders will be required to furnish a Bid Bond; and the awarded Contractor will be required to provide Performance and Payment Bonds.

All Requests for Information (RFI) must be sent in writing to the Contracting Officer. See section A.3 8 QUESTIONS

10 365

X X 52.211-10

X

0 3PM CDT

04-18-2025

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Grand Total Base Bid: $ ________________________

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 http://www.tungsten-network.com/customer -campaigns/veterans-affairs/

1-877-752-0900

X

Richard Adu

36C78625B0011

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 CONTRACT ADMINISTRATION DATA

A.4 MANDATORY WRITTEN DISCLOSURES

A.5 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (MAY 2022)

A.6 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022)

A.7 PRICE/COST SCHEDULE

A.8 SCOPE OF WORK

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

1.1 52.228-1 BID GUARANTEE (SEP 1996)

1.2 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)

(FEB 2021)

1.3 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)

2.2 52.214-31 ELECTRONIC BIDS (DEC 1989)

2.3 52.216-1 TYPE OF CONTRACT (APR 1984)

2.4 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (MAY 2014)

2.5 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

2.6 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB

1995)

2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.10 VAAR 852.223-70 INSTRUCTIONS TO OFFERORS—SUSTAINABLE

ACQUISITION PLAN (SEP 2019)

2.11 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

2.12 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

2.13 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.14 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY NOTICE (FEB 2023)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) ... 42

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

3.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

REPRESENTATION AND DISCLOSURES (DEC 2023)

3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

3.6 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND

REPRESENTATION (JUN 2020)

GENERAL CONDITIONS

4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,

AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED

ENTITIES (DEC 2023)

4.3 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

PROHIBITION (DEC 2023)

4.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

4.5 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

4.6 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)

4.7 52.211-13 TIME EXTENSIONS (SEPT 2000)

4.8 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)

4.9 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)

4.10 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(FEB 2024)

4.11 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

4.12 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN

2020)

4.13 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (DEC 2010)

4.14 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT

FOR EPA-DESIGNATED ITEMS (MAY 2008)

4.15 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)

4.16 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN

1997)

4.17 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.18 52.236-4 PHYSICAL DATA (APR 1984)

4.19 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB

1997) ALTERNATE II (APR 1984)

4.20 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.21 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

4.22 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.23 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAY 2020)

4.24 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

4.25 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)

4.26 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.27 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.28 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.29 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.30 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

4.31 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ..93

4.32 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.33 VAAR 852.246-71 REJECTED GOODS (OCT 2018)

4.34 IT CONTRACT SECURITY

4.35 DAVIS –BACON ACT WAGE DETERMINATIONS

4.36 PAST PERFORMANCE

4.37 REQUEST FOR INFORMATION (RFI) FORM

Irrigation Expansion, Rock Island National Cemetery

A.3 CONTRACT ADMINISTRATION DATA

1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individual(s):

a. CONTRACTOR: ____________________________________

Unique Entity ID: _______________________________ DUNS Number: __________________________________ Tax Identification Number: _________________________

Contact Person: __________________ Telephone #: __________________ e-Mail Address: __________________

NOTE: Starting Monday, April 4, 2022, the new Unique Entity ID from SAM.gov will be the official, Federal Government-wide identifier used for Federal contract awards.

b. GOVERNMENT: Contracting Officer (36C786) Department of Veterans Affairs, National Cemetery Administration Contracting Service

2. CONTRACTOR REMITTANCE ADDRESS: Effective January 1, 1999, all payments by the Government to the Contractor will be made in accordance with Federal Acquisition Regulation (FAR) Clause 52.232-34, Payment by Electronic Funds Transfer. Contractor must be registered in the System for Award Management (SAM) database in accordance with FAR Clause 52.212-1(k).

3. INVOICES: Invoices shall be submitted within ten (10) business days after performance and acceptance of services and must include the VA Project Number, Contract Number, Purchase Obligation Number, Dates of Service, Detailed description of the services provided and Total Amount Due. Payment for services provided under the terms of this contract will be made in arrears, within thirty (30) calendar days, upon receipt of properly executed invoice(s) in accordance with:

• 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)

• UPON ACCEPTANCE OF SERVICES

• In order to comply with the Improper Payment Elimination and Recovery Act of 2010

(IPERA), the VA has mandated electronic invoice submission to the Veterans Affairs Financial Services Center (VAFSC). VAFSC has partnered with OB10 e-Invoicing network, for submissions of all electronic invoices to VA. OB10 electronic invoicing is free to all VA vendors. In order to submit electronic invoices, all VA vendors must register with OB10 by submitting an email to VA.Registration@ob10.com or calling 1- 877-752-0900 option 2 for Enrollment.

• Contractor shall submit an electronic invoice within ten (10) business days after performance and acceptance of services to the Veterans Affairs Financial Services Center (VAFSC) e-Invoice through the website at https://portal.tungsten-network.com/Login.aspx . For questions regarding the submission of VA electronic invoices, OB10 customer service may be contacted at 1-877-489-6135.

• All invoices shall reference the vendor name and address, customer name, contract number, appropriate obligation/funding order number, description of services provided, quantity provided, unit price, and total invoice amount (any additional info). Invoices shall also include any payment discount terms.

• For questions regarding invoice receipt or payment, please call VAFSC directly at 1-877- 353-9791 or email vafsccshd@va.gov

4. GOVERNMENT INVOICE ADDRESS: All invoices from the Contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 “Electronic Submission of Payment Requests.” to the following web address: http://www.fsc.va.gov/einvoice.asp.

FACSIMILE, E-MAIL, AND SCANNED DOCUMENTS ARE NOT ACCEPTABLE

FORMS OF SUBMISSION FOR PAYMENT REQUESTS.

For assistance setting up e-Invoice, the below information is provided:

* Tungsten Network e-Invoice Setup Information: 1-877-489-6135

* Tungsten Network e-Invoice email: VA.Registration@ob10.com <http://VA.Registration@ob10.com/>

* FSC e-Invoice Contact Information: 1-877-353-9791

* FSC e-invoice email: vafsccshd@va.gov <http://va.gov/>

5. CONTRACT AUTHORITY: The Contracting Officer acting within the scope of the contract and his/her duties and responsibilities is the only person authorized to approve changes or modify any of the requirements of this request. The Contractor shall communicate with the Contracting Officer on all matters pertaining to Contract Administration. Only the Contracting Officer is authorized to make commitments or issue changes that affect pricing, quantities or quality of performance, delivery terms and conditions, or the term of the contract.

6. CONTRACTING OFFICER’S REPRESENTATIVE: Notwithstanding the

Contractor’s responsibility for total management during the performance of the contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The Contracting Officer will designate a Contracting Officer’s Representative (COR) for the project, of which all work coordination shall be made through the COR. The Contractor shall be provided a copy of the COR’s Delegation of Authority letter outlining the scope of the COR’s duties and responsibilities. No other person shall be authorized to act in such capacity unless appointed in writing by the Contracting Officer.

mailto:VA.Registration@ob10.com https://portal.tungsten-network.com/Login.aspx https://portal.tungsten-network.com/Login.aspx mailto:vafsccshd@va.gov http://www.fsc.va.gov/einvoice.asp mailto:VA.Registration@ob10.com http://ob10.com/ mailto:vafsccshd@va.gov http://va.gov/

7. SUBMITTAL OF BIDS: All bids must be submitted to the attention of the Contracting Officer identified No Later Than the date/time specified. E-mail bids will be acceptable at richard.adu@va.gov.

A public bid opening will occur by telephone conference using the following:

Call Line: 872-701-0185 Conference ID: 910 644 268#

Join the meeting now Meeting ID: 260 708 652 348

Passcode: Vj7bb6mq

a. All bids shall be submitted electronically via email to the identified Contracting Officer (CO) by the due date and time outlined in the solicitation.

b. DO NOT wait until the last day to upload bid documents. Bidders are highly encouraged to submit bid packages 2-3 days in advance to avoid system lock outs:

1. Bid submitted must meet the time constraints as set forth in the solicitation.

2. Late or incomplete Bids will NOT be considered and deemed to be nonresponsive.

c. Document /transmittal naming convention. Solicitation number, Project Description, and Company name

EXAMPLE: 36C78625B0011, Irrigation Expansion, ABC 123 Corp.

d. Bid package shall consist of the following minimum required documents:

• Company cover letter identifying the Solicitation number, Project Description, Company name and address, POC name, Phone number, eMail address, and Company’s Unique Entity ID number;

• Completed blocks 14-20c of the back of the SF 1442, ensuring full completion of all blocks;

• Completed Price/Cost Schedule;

• Completed IFB Contractor Cost Estimate Worksheet;

• Completed, signed and attached SF30 Amendments (if applicable);

• Attached scanned digital copy of the Bid Bond (if applicable); (ensure to lightly darken raised seals)

NO FAX/ FACSIMILE SUBMITTED BIDS WILL BE ACCEPTED.

Bids submitted via email without set requirements will not be accepted and will be considered to be NONRESPONSIVE. Bids shall be subject to the terms and conditions of this solicitation.

STANDARD FORM 1413: Contractor shall submit copies of all Standard Form 1413's for anticipated subcontractors that would perform work on the contract prior to work being started.

CERTIFIED PAYROLL FORMS: Contractor shall submit all pertinent certified payrolls for the General Contractor and any and all subcontractor’s employees performing work on the project in accordance with FAR clause 52.222-8.

DAVIS-BACON POSTER: Contractor shall post the Davis-Bacon Poster and applicable wage determination at the worksite in a prominent and accessible location where it may be easily seen by employees.

APPRENTICES: Contractor shall submit copies of Apprenticeship Certificates for all Apprentices properly registered under approved Federal or State apprenticeship programs that perform work on the contract.

mailto:richard.adu@va.gov https://teams.microsoft.com/l/meetup-join/19%3ameeting_NjM1ZWI3Y2UtZmI1ZS00ZTQyLWFiODEtMTA2MGEyMzE5YjU2%40thread.v2/0?context=%7b%22Tid%22%3a%22e95f1b23-abaf-45ee-821d-b7ab251ab3bf%22%2c%22Oid%22%3a%22f7132a62-ecdf-4a9d-84a4-af2091990800%22%7d

8. QUESTIONS: All questions regarding this solicitation must be submitted in writing (email is acceptable) to: Richard Adu (richard.adu@va.gov). Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing. No phone responses will be accepted. NOTE: All questions must reference the Solicitation number, Project number (if applicable) and the Description of the project in the Header or Opening Statement.

9. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM:

a. FAR 42.1502 directs all Federal agencies to collect Past Performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation.

One (1) or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

b. The Past Performance evaluation process is a totally paperless process using CPARS.

CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

c. It is requested that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than thirty (30) calendar days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

d. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

e. Within sixty (60) calendar days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

1. Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.

2. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

3. All information provided should be reviewed for accuracy prior to submission.

4. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

5. Your response is due within sixty (60) calendar days after receipt of the CPAR.

On day fifteen (15), the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

mailto:richard.adu@va.gov https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/

6. If you do not sign and submit the CPAR within sixty (60) calendar days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

f. The following guidelines apply concerning your use of the past performance evaluation:

1. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

2. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

g. If you wish to discuss a Past Performance evaluation, you should request a meeting in writing to the CO no later than seven (7) calendar days following your receipt of the evaluation. The meeting will be held via telephone or other means during your sixty

(60) calendar day review period.

h. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of Administration Data)

A.4 MANDATORY WRITTEN DISCLOSURES

Mandatory written disclosures required by FAR clause 52.203-13 to the Department of Veterans Affairs, Office of Inspector General (OIG) must be made electronically through the VA OIG Hotline at https://www.vaoig.gov/hotline/online-forms and clicking on "FAR clause 52.203- 13 Reporting." If you experience difficulty accessing the website, call the Hotline at 1-800-488- 8244 for further instructions.

https://www.vaoig.gov/hotline/online-forms

A.5 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (MAY 2022)

(a) Definitions. As used in this clause—

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply that is—

(i) A commercial product (as defined in paragraph (1) of the definition of ‘‘commercial product’’ at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products. Per 46 CFR 525.1(c)(2), "bulk cargo" means cargo that is loaded and carried in bulk onboard ship without mark or count, in a loose unpackaged form, having homogenous characteristics. Bulk cargo loaded into intermodal equipment, except LASH or Seabee barges, is subject to mark and count and, therefore, ceases to be bulk cargo.

Employee assigned to the contract means an employee who was hired after November 6, 1986 (after November 27, 2009, in the Commonwealth of the Northern Mariana Islands), who is directly performing work, in the United States, under a contract that is required to include the clause prescribed at 22.1803. An employee is not considered to be directly performing work under a contract if the employee—

(1) Normally performs support work, such as indirect or overhead functions; and

(2) Does not perform any substantial duties applicable to the contract.

Subcontract means any contract, as defined in 2.101, entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.

Subcontractor means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime Contractor or another subcontractor.

United States, as defined in 8 U.S.C. 1101(a)(38), means the 50 States, the District of Columbia, Puerto Rico, Guam, the Commonwealth of the Northern Mariana Islands, and the U.S. Virgin Islands.

(b) Enrollment and verification requirements. (1) If the Contractor is not enrolled as a Federal Contractor in E-Verify at time of contract award, the Contractor shall—

(i) Enroll. Enroll as a Federal Contractor in the E-Verify program within 30 calendar days of contract award;

(ii) Verify all new employees. Within 90 calendar days of enrollment in the E-Verify program, begin to use E-Verify to initiate verification of employment eligibility of all new hires of the

Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); and

(iii) Verify employees assigned to the contract. For each employee assigned to the contract, initiate verification within 90 calendar days after date of enrollment or within 30 calendar days of the employee's assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).

(2) If the Contractor is enrolled as a Federal Contractor in E-Verify at time of contract award, the Contractor shall use E-Verify to initiate verification of employment eligibility of—

(i) All new employees. (A) Enrolled 90 calendar days or more. The Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or

(B) Enrolled less than 90 calendar days. Within 90 calendar days after enrollment as a Federal Contractor in E-Verify, the Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or

(ii) Employees assigned to the contract. For each employee assigned to the contract, the Contractor shall initiate verification within 90 calendar days after date of contract award or within 30 days after assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).

(3) If the Contractor is an institution of higher education (as defined at 20 U.S.C. 1001(a)); a State or local government or the government of a Federally recognized Indian tribe; or a surety performing under a takeover agreement entered into with a Federal agency pursuant to a performance bond, the Contractor may choose to verify only employees assigned to the contract, whether existing employees or new hires. The Contractor shall follow the applicable verification requirements at (b)(1) or (b)(2), respectively, except that any requirement for verification of new employees applies only to new employees assigned to the contract.

(4) Option to verify employment eligibility of all employees. The Contractor may elect to verify all existing employees hired after November 6, 1986 (after November 27, 2009, in the Commonwealth of the Northern Mariana Islands), rather than just those employees assigned to the contract. The Contractor shall initiate verification for each existing employee working in the United States who was hired after November 6, 1986 (after November 27, 2009, in the Commonwealth of the Northern Mariana Islands), within 180 calendar days of—

(i) Enrollment in the E-Verify program; or

(ii) Notification to E-Verify Operations of the Contractor's decision to exercise this option, using the contact information provided in the E-Verify program Memorandum of Understanding

(MOU).

(5) The Contractor shall comply, for the period of performance of this contract, with the requirements of the E-Verify program MOU.

(i) The Department of Homeland Security (DHS) or the Social Security Administration (SSA) may terminate the Contractor's MOU and deny access to the E-Verify system in accordance with the terms of the MOU. In such case, the Contractor will be referred to a suspension or debarment official.

(ii) During the period between termination of the MOU and a decision by the suspension or debarment official whether to suspend or debar, the Contractor is excused from its obligations under paragraph (b) of this clause. If the suspension or debarment official determines not to suspend or debar the Contractor, then the Contractor must reenroll in E-Verify.

(c) Web site. Information on registration for and use of the E-Verify program can be obtained via the Internet at the Department of Homeland Security Web site: https://www.e-Verify.gov

(d) Individuals previously verified. The Contractor is not required by this clause to perform additional employment verification using E-Verify for any employee—

(1) Whose employment eligibility was previously verified by the Contractor through the E- Verify program;

(2) Who has been granted and holds an active U.S. Government security clearance for access to confidential, secret, or top secret information in accordance with the National Industrial Security Program Operating Manual; or

(3) Who has undergone a completed background investigation and been issued credentials pursuant to Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors.

(e) Subcontracts. The Contractor shall include the requirements of this clause, including this paragraph (e) (appropriately modified for identification of the parties), in each subcontract that—

(1) Is for— (i) Services (except for commercial services that are part of the purchase of a COTS item (or an item that would be a COTS item, but for minor modifications), performed by the COTS provider, and are normally provided for that COTS item); or

(ii) Construction;

(2) Has a value of more than $3,500; and

(3) Includes work performed in the United States.

(End of Clause) https://www.e-verify.gov/

A.6 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON

SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND

CONSTRUCTION (NOV 2022)

(a) Pursuant to 38 U.S.C. 8127(k)(2), the offeror certifies that—

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:

(i) [] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219–73 or VOSBs as set forth in 852.219–74. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.

(ii) [xx] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219–73or VOSBs as set forth in 852.219–74.

Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(iii) [] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219–73 or VOSBs as set forth in 852.219–74. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

(3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:

(i) Referral to the VA Suspension and Debarment Committee;

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and

(iii) Prosecution for violating section 1001 of title 18.

(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

Certification

I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].

Printed Name of Signee: ___________

Printed Title of Signee: _____________

Signature: ____________

Date: ______________

Company Name and Address: _______________

A.7 PRICE/COST SCHEDULE

ITEM INFORMATION

CLIN

NUMBER

DESCRIPTION

OF SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 823CM3023 1.00 JB $__________________ $__________________

Irrigation Expansion, Rock Island National Cemetery, Contractor to provide all Management and Supervision, Labor, Material, Parts, Equipment, Supplies, etc., necessary to provide construction services to provide Expansion of the Automated Irrigation System to approximately 50 acres within Rock Island National Cemetery as defined and described and in accordance with applicable Local, State and Federal laws and regulations in accordance with the stated Terms and Conditions, Scope of Work, Specifications and Drawings.

The Contract Period of Performance (POP) is three hundred and sixty-five (365) calendar days from issuance of the Government’s Notice to Proceed letter.

NOTICE: A contract award will be made to the responsible bidder who submits the lowest bid for the work specified. A single award will be made on the Grand Total Amount for all work, specified.

Bidder must provide a breakdown cost for the work utilizing the Price Schedule Breakdown.

GRAND TOTAL $__________________

A.8 SCOPE OF WORK

The Contractor shall provide all General Construction Management, Supervision, Labor, Materials, Equipment, Parts, Tools, etc., required, and necessary to expand the automated irrigation system to approximately 50 acres within Rock Island National Cemetery. Full (sprinkler-to-sprinkler) and complete coverage of the irrigated areas is required. The actual and spirit of intent of this project outcome is clearly indicated upon the drawing sheets and within the specification documents. The contractor shall, at no additional cost to the Government, make necessary adjustments to sprinkler locations as required to achieve full coverage of irrigated areas.

I. PRE-BID SITE INSPECTION

Interested bidders are highly encouraged to Survey / Inspect the site (Rock Island National Cemetery) prior to submitting a bid in order to be fully aware of the Scope of Services required and to adequately gather existing unit’s product information, model numbers and all necessary and matching standards and requirements. Failure to do so shall not relieve the successful bidder from performing in accordance with the intent and meaning of the specifications without additional cost to the Government.

No later that after the issuance of the Government’s Notication of Award, and before the start of the work or the ordering of any equipment, parts and or materials the awarded Contractor must perform a ‘Site Inspection’ of the site to verify all dimensions/measurements and site conditions; and report any site discrepancies to the COR and Contracting Officer before start of the work or the ordering of any equipment, parts and or materials. Failure of the Contractor to do so shall not relieve the Contractor from performing in accordance with the intent and meaning of the specifications without any imposition of additional cost to the Government.

II. POST AWARD SITE INVESTIGATION INSPECTION

Per FAR 52.236-3, Contractor is required to survey / inspect the site prior to be fully aware of the Services required and to adequately gather existing unit’s product information, model numbers and all necessary and matching standards and requirements. Within ten (10) calendar days after issuance of the Notice to Proceed, the Contractor shall perform a ‘Site Investigation’ to verify the magnitude of all dimensions/measurements and site conditions before start of the work or the ordering of any equipment, parts and or materials. Prior to beginning any work, the Contractor shall survey the site and review the Statement of Work to determine the extent of the work. The Contractor shall submit an ‘After Inspection Report’ of Contractor’s findings, listing any deficiencies found and provide written recommended repair/work solutions to the COR and Contracting Officer for review and approval No Later Than five (5) calendar days after completion of the Site Investigation Inspection. Failure to do so shall not relieve the successful offeror from performing in accordance with the intent and meaning of the specifications without additional cost to the Government.

III. SCOPE

General Information: Contractor shall inspect the grounds where the work is to be completed and ascertain the work deemed necessary and required to complete the work outlined herein, failure of the Contractor to fully inspect the grounds prior to performing the work shall not relieve the Contractor from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government.

1. As noted herein, the Contractor shall:

a. Submit an ‘After Inspection Report’ of Contractor’s findings; listing any deficiencies found and provide written recommendations, to the Contracting Officer’s Representative (COR) and Contracting Officer for review and approval prior to commencing the work. The report will include all aspects of the services needed to provide the Location and Mapping services as specified herein.

b. Conduct appropriate records research, investigate site conditions and identify applicable project limits, with assistance from the National Cemetery Administration (NCA) as necessary.

c. Determine and provide all material, equipment, personnel, tools and supplies required to perform the work.

d. Take all necessary precautions to avoid damages to existing property. Any damaged caused shall be reported, repaired or replaced as approved by the COR. Repair and restore any Contractor caused damages to be as good as the original conditions or better due to construction activities. Upon completion of the work the Contractor’s On-site Superintendent, along with the COR, shall inspect the completed work for satisfactory acceptability prior to Contractor de-mobilizing from the site.

e. Locate, tag and identify any utilities and other related/associated components.

f. Obtain any and all necessary permits/licenses from appropriate City, County or Municipal jurisdictions required for completion of the work.

2. Contractor shall coordinate with Cemetery staff for all work to avoid or minimize any interruption of Cemetery functions. Contractor shall perform daily clean-up and final clean-up and shall dispose of all waste materials properly off site. The Government will not provide receptacle(s) for disposal of debris related to this contract.

a. All unused materials from the project operations shall be removed from the cemetery property by the Contractor at Contractor’s expense.

b. Contractor shall haul away and dump all debris and waste products at an appropriate approved license disposal site.

c. Any areas disturbed in performance of this contract which may require restoration shall be restored by the Contractor and considered incidental to the contract.

d. Areas outside of the construction zone impacted by operations of the Contractor shall be returned to the state it was found prior to the construction.

3. Contractor shall provide the COR and Contracting Officer with daily/weekly progress summary reports along with photographs to show the progression of work.

4. All materials and layout of site will be pre-approved by the COR before materials are ordered or work commences.

IV. IN ACCORDANCE WITH (IAW)

All work shall be performed in a professional workmanship like manner and in Accordance with (IAW) the National Cemetery Administration (NCA) Master Construction Specifications (MCS) as indicated in herein; as well as meet all local and state requirement including ASTM, ACI 381, and International Building Codes, and the work shall include full compliance with all related specifications requirements. All adjacent disturbed surfaces shall be repaired to the same quality standards of the existing work and shall also match the adjacent areas.

Any electrical work shall be in accordance with the latest edition of the National Electrical Code (NEC) and local building codes. Failure to do so shall not relieve the Contractor from performing in accordance with the intent and meaning of the specifications without additional cost to the Government.

At the completion of the work and upon satisfactory acceptance by the Government, the Contractor shall provide to the COR and Contracting Officer any applicable Operation and Maintenance Manuals (if applicable), and a certificate of Warranty / Guarantee that all work done under the contract shall be free from defaults, faulty materials or workmanship for a minimum of one (1) year from the date of final acceptance. Contractor hereby agrees to repair or replace identified deficiencies within the specified time frame by the direction of the COR or Contracting Officer at Contractor's own expense and such repaired and/or replaced deficit work shall be corrected to the satisfaction of the Government.

All materials/products and layout of site will be pre-approved by Contracting Officer, COR and District Engineer before materials/products are ordered or prior to work commencing.

V. SPECIFICATIONS AND DRAWINGS DISCREPANCIES

In the case of any differences between the Statement of Work, Specification and/or Drawings, the specifications will prevail and govern over the Statement of Work and/or Drawings. Any Statement of Work, Specification and/or Drawings discrepancies should be brought to the immediate attention of the Contracting Officer and COR for clarification. Any errors or omissions in the Statement of Work, Specification and/or Drawings must be provided promptly to the Contracting Officer and COR, but in no case later than the start of related work.

VI. CONSTRUCTION PROGRESS PHOTO DOCUMENTATION

During the construction through completion, Contractor shall provide photographic documentation of construction progress and at selected milestones per the Contracting Officer and/or the COR.

The photos shall meet the following qualifications:

1. Digital image shall be taken with a professional grade camera with minimum size of 6 megapixels (MP) capable of producing 200x250mm (8 x 10 inch) prints with a minimum of 2272 x 1704 pixels and 400x500mm (16 x 20 inch) prints with a minimum 2592 x 1944 pixels.

2. Before construction services work, the area, building, adjacent streets, roadways, parkways, driveways, curbs, sidewalks, landscaping, adjacent utilities and adjacent structures surrounding the site shall be photo documented. Overlapping photographic techniques shall be used to ensure maximum coverage.

3. If site work or area preparation is extensive, this documentation may be required immediately before construction services work begins and at several pre-determined intervals during work commencement.

4. Photography of employees, visitors, volunteers, and others on NCA premises is strictly prohibited. Photographing of NCA premises (buildings, grounds, property, site) is allowed ONLY with written permission from the COR.

VII. PERIOD OF PERFORMANCE

The Contractor shall complete all work including submittals, reviews, quality control, repair/construction services, punch list corrections, clean up, invoicing and closeouts documentation submittal…