This document is a contract amendment for a solicitation related to the procurement of grass seed for Riverside National Cemetery. The purpose of the amendment is to add a Questions and Answers document that provides details on the delivery requirements, which include a single delivery of 1,400 - 50# bags of grass seed within 30 days of contract award. The cemetery staff will unload the palletized seed using their own forklift. This is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside solicitation, with a Lowest Price Technically Acceptable (LPTA) evaluation criteria. Quotes are due by 3pm EST on August 23, 2024, and must include a compliant product, completed solicitation attachments, and a price schedule. Past performance will not be evaluated. This is a new requirement with no incumbent contractor.

View the file

Other files

File Type Posted
36C78624Q50318 Questions and Answers.docx DOCX document
36C78623Q50318 A00001.docx DOCX document
36C78624Q50318 Solicitation Provisions.docx DOCX document
36C78624Q50318 Price Schedule.xlsx XLSX spreadsheet
36C78624Q50318 Statement of Need.docx DOCX document
36C78624Q50318 Contract Clauses.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning ___1_______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

A00002 08-16-2024 n/a

None 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

7H3T3

36C78623Q50318 07-30-2024

X

Riverside National Cemetery – Grass Seed The purpose of this amendment is to:

1) Add document “36C78624Q50318 Questions and Answers”.

Brian M. Werner Contracting Officer

Grass Seed – Riverside National Cemetery 36C78624Q50318 Questions and Answers

1. Can you provide the expected delivery date of the grass seed to the cemetery, and can you confirm they plan to take delivery of the entire amount all at one time?

A: Delivery date is as soon as possible but no later than 30 days after award. We can receive all at one time but please allow up to 4 hours for unloading.

1. I'm inquiring if any labor will be required on the above-mentioned solicitation.

A: Cemetery staff will unload the palatized seed with a cemetery forklift.

1. Please define the requirements that need to be met.

A: The requirement is delivery of 1,400 – 50# bags of grass seed to Riverside National Cemetery.

1. Please define the standard of supervision, labor, equipment, and supplies that will meet the standard or your requirement.

A: This section has been removed.

1. Please define the standard of necessary expertise, A: This section has been removed.

1. Does the contractor need to provide a forklift with operator at the cemetery or will the cemetery staff unload the grass seed?

A: No.

1. Is there a loading dock or does the deliveries need to be made with liftgate trucks

A: We only need a pallet jack in the truck to move seed pallets to edge for our forklift.

1. Is the driver acceptable supervision for the unloading of the seed?

A: Yes

1. Will this be unloaded at a loading dock or just into the lot?

A: Onto the lot

1. Is there access to a full size semi trailer at the cemetery?

A: Yes

1. Is this requirement for a single delivery of grass seed to Riverside Cemetery? If not, how will deliveries be scheduled periodically?

A: A single day delivery totaling 1,400 – 50# bags.

1. When is the expected delivery date following the contract award?

A: Delivery date is as soon as possible but no later than 30 days after award.

1. Do you need this exact mix or some comparable?

4. Turfgrass Seed Mix 100% Festuca arundinacea (Turf Type Tall Fescue) with a minimum of five regionally adapted cultivars, three of which must exhibit strong expression of spreading by rhizomes; Available Product: ‘Water Saver w/ RTF Turf Type Tall Fescue’ or approved equal.

Percent
Seed
Germination
Origin
24.55%
Barmesh (RTF) Tall Fescue
85%
OR
19.79%
Rhambler II Tall Fescue
85%
OR
19.72%
2nd Millennium Tall Fescue
85%
OR

A: As close as possible.

1. What is the delivery frequency of the seed? aka how much per month or week?

A:Single day delivery of 1,400 – 50# bags.
15)Are we just delivering the grass seeds?
A:Yes
16)Is the total amount 1,400 50lbs bags?
A:Yes
17)What are the preferred delivery dates?
A:Delivery date is as soon as possible but no later than 30 days after award
18)Is this a one time delivery or over a period of time?
A:One-time delivery
19)Is there a specific location for delivery within the cemetery?
A:Phase four yard
20)Are there any restrictions on vehicle size or access?
A:No
21)Are there any actual Landscaping duties included or just seed delivery?
A:No
22)Would all 1400 (50 lb bags) need to be delivered at once or is there a schedule?
A:All bags delivered at once.
23)You want the seed delivered-only. Which means we unload off the truck, with a forklift to a designated place you have set aside. We do not distribute the seed. Is this correct?
A:Correct
24)Do you have an appropriate dry, indoor storage facility that is forklift accessible for the pallets of seed?
A:No, it will be off loaded in the yard directly off the truck (no loading dock) and stored in a location we designate later.