36C78624B50290 0001.docx
DOCX document 30 KB Posted
- Solicitation number
- 36C78624B50290
About this file
This document is an amendment to a solicitation for the NMCP FY24 Shrine Project issued by the Department of Veterans Affairs National Cemetery Administration. The amendment changes the NAICS code from 238910 - Site Preparation Contractors to 237990 - Other Heavy and Civil Engineering Construction, with a size standard of $45M. It also includes responses to several RFIs, providing clarification on sod quality, watering protocols, TPI guidelines, blue tag certification, State of Hawaii certification, site management requirements, surveyor responsibilities, reporting, laydown area, permitting, phasing, and construction magnitude. The bid opening date has been extended from 7/22/2024 to 7/29/2024 at 4:00 PM EST. All other terms and conditions remain the same.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78624B50290_revised.docx | DOCX document | |
| 36C78624B50290 0003.docx | DOCX document | |
| IFB Lump Sum Division Spreadsheet.xlsx | XLSX spreadsheet | |
| 36C78624B50290 0002.docx | DOCX document | |
| EXHIBIT D-Example Site Survey Headstone Realignment and Grading Plans.pdf | ||
| 36C78624B50290.docx | DOCX document | |
| EXHIBIT A-WORK AREAS-11x17.pdf | ||
| Wage Determination_Heavy.txt | TXT text file | |
| ATT 5.pdf | ||
| EXHIBIT B-WORK AREA DETAILS 01.pdf | ||
| ATT 6-HERBICIDE APPLICATION DATA SHEET.pdf | ||
| EXHIBIT C-FLAT MARKER REALIGNMENT DIAGRAMS.pdf | ||
| 899-NMCP-NS-FY24-001_SOW_4.5.2024.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
899-NS-FY24-001
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 To all Offerors/Bidders
36C78624B50290 06-26-2024
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 7/29/2024 at 4:00PM EST X This amendment is to change the NAICS for this project from 238910 - Site Preparation Contractors to 237990 -Other Heavy and Civil Engineering Construction with a size standard of $45M.
This amendment also includes answers to the RFIs submitted. See Page 2 for details.
Bid opening has been extended from 7/22/2 024 to 7/29/2024 at 4:00 PM
EST
All other terms and conditions shall remain the same.
Auvorie Benson Contracting Officer RFI Responses Reponses are in Red.
1. Sod Quality and Inspection: RFI: Can more detailed criteria or examples be provided for what constitutes "poor quality" sod that may be rejected by the COR? This will help avoid disputes during the inspection process. Sod that showing signs of drought stress; infested with pests; diseased; not cut to uniform thickness or dimensions; not properly packaged/palletized.
1. Watering Protocols: Are there specific guidelines or restrictions on the frequency and amount of watering that can be requested by the contractor? Understanding these parameters will ensure that the sod is adequately maintained without overuse of resources. Irrigate to thoroughly wet soil to depth of 3-inches. Sod must be kept continually moist until well rooted. Time and frequency of irrigation to be established by Contractor and approved by COR.
1. TPI Guidelines: Can you provide a copy or summary of the TPI Guideline Specifications relevant to this project? Yes see link: CelebrationSpecification_Guidelines.pdf (sodsolutionspro.com)
1. Blue Tag Certification: Could you clarify the process for verifying Blue Tag certification for the seed used in the sod? Seed packaging used for growing sod will have certification that the seed is true to species and cultivar.
1. State of Hawaii Certification: What specific criteria does the State of Hawaii certification cover, and how should we document compliance? Seed has passed State of Hawaii agricultural inspection.
1. Site Management Clarification: In the section 1.8 page 9, there is reference to a Contractor Site Manager. Can you provide clarification is this a Superintendent requirement? This is not a requirement for a superintendent, but a competent individual with experience in the work being conducted.
1. Site Management Clarification: What are the requirements for Safety and QC management on site? Contractor assigns a person to be responsible for adhering to safety and training protocols as described in the SOW. Contractor assigns a person to be responsible for conducting quality control inspections in accordance with the Contractor’s Quality Control plan.
1. Land Surveyor Clarification: There is a note in reference to a Professional Land Surveyor. Is this person appointed by the VA or the responsibility of the contractor? Surveyor is the responsibility of the Contractor.
1. Weekly Reports: Will the use of Procore satisfy the requirement to provide submittals and weekly reports?
8. Yes.
1. Laydown Area: The SOW states that the contractor is responsible for cleaning the roadways with a street sweeper. Will the contractor be provided a laydown area? Yes, approximately 30’ x 40’
1. Permitting: Section 1.12 mentions the Resource Conservation and Recovery Act (RCRA) and all other applicable Federal, State, and Local law and regulations. If one regulation is more stringent than the other, which one overrides? The more stringent regulation overrides with regard to the disposal of hazardous waste.
1. Phasing and Options: Will the contractor be prohibited to work in multiple sections. What is the expectation if the base and some or all the options are awarded?
11. Contractor shall provide enough personnel to complete the work awarded within the period of performance. If the option is awarded at a later date within 365 calendar days of the initial award, additional days shall be added to the POP.
11. As far as phasing and working in multiple sections, requests to work on more than one contiguous area at a time may be submitted to the COR for approval provided that specified sod is available in required quantities for that area and can be planted within 2 weeks of sod bed preparation. The Cemetery wishes to limit exposed earth to erosion.
1. Magnitude of Construction: After reviewing the requirement, there’s approximately 195K sqft of sod for the base and option. The local sod vendor will not secure that amount for us. The amount per square foot is pretty expensive. Plus, to establish a crew there, per diem will have a major effect on the cost. Has the government accounted for that? Yes.
1. Surveyor Markers: Are there existing surveyor markers in all sections? Yes
1. Hazardous Material: Is there known hazardous material on site? No.
1. Sprinkler Heads: Per section 3.2 Irrigation Systems: “1. After markers are reset and aligned and topsoil has been placed and compacted, uncap the existing sprinkler risers, flush irrigation lines and install the new irrigation heads in preparation for weed control measures.” Question: will the contractor install new heads instead of using the removed heads. If new heads will be installed, what type of heads are they? No new irrigation heads. Reinstall existing heads. Follow SOW. “Preparation: Prior to commencing any work, the Contractor will remove the irrigation heads, cap risers, and turn the heads over to the cemetery.“
End of Document NMCP FY24 Shrine Project
File details come from the government source that posted it. Updated .