This document is an amendment to a solicitation for the Salisbury National Cemetery FY24 Shrine Project. The key details are:
The amendment is issued to provide responses to Requests for Information (RFIs) submitted by interested vendors. The RFI responses clarify that Weatherzyme can be used to clean the headstones in addition to D2, confirm the correct wage determination is NC20230070, acknowledge the project duration is 548 calendar days, and provide details on the sod, site access, and other requirements. The solicitation number is 36C78624B50263, the agency is the Department of Veterans Affairs National Cemetery Administration, and the project involves headstone restoration and turf renovation work at the Salisbury National Cemetery. The solicitation closing date has been extended to September 9, 2024 at 2:30 PM EST. All other terms and conditions remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination_Heavy.txt | TXT text file | |
| IFB Lump Sum Division Spreadsheet.xlsx | XLSX spreadsheet | |
| 36C78624B50263_1.docx | DOCX document | |
| Salisbury SOW FY24 NRM-NS Updated 6-18-24.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 To all Offerors/Bidders
36C78624B50263 06-08-2024
X X X 9/9/2024 at 2:30PM EST X This amendment is to answer the RFIs submitted by interested vendors. Please see continuation page for details.
This solicitation shall be extended to 9/9/2024 at 2:30PM EST
All other terms and conditions shall remain the same.
Auvorie Benson RFI Responses
1. SOW article A.7 states that D2 is the only authorized cleaner of marble headstones. More recently the VA has allowed the use of Weatherzyme from United Laboratories. Is the Contractor required to utilize D2 or is Weatherzyme allowable?
0. Weatherzyme can be used to clean the headstones as well as D2
1. Regarding SOW paragraph A.6.1, please confirm there are no concrete collars at Salisbury National Cemetery. The SOW makes reference to Calverton National Cemetery.
1. Calverton National Cemetery is a typo. The correct reference should be Salisbury National Cemetery. See Revised SOW.
1. The wage determination provided on SAM.gov to bidders, titled "Wage Determination_Heavy.txt" is "General Decision Number: NC20240019 01/05/2024" which is for dredging. There does not appear to be a wage determination listed in the solicitation or scope of work for bidders to reference that is applicable to the SOW. Please confirm the prevailing wage for this project is "General Decision Number: NC20240070 01/05/2024"
2. Confirmed. The correct Wage Determination is NC20230070.
1. It's stated on the SF1442 block 10 and on page 1 of the SOW document that the project duration is 548 calendar days. Block 11 of the SF1442 states the project must be completed within 365 calendar days of NTP. Please confirm the period of performance for the project.
3. 548 calendar days. Block 11 is incorrect.
1. Can the VA provide the name of the sod farm the cemetery currently uses?
4. Still awaiting response from cemetery. Will answer in a future amendment.
1. Please confirm the sod is to be 100% tall fescue.
5. Yes, 100% turf type tall fescue or as close as possible.
1. The SF 1442 Block 10 states the total performance time is 548 calendar days. Block 11 states the project is 365 calendar days. With the amount of work, the 548 days seems correct. Please acknowledge the project calendar days.
6. 548 calendar days. Block 11 is incorrect.
1. Section A.10.2 states the Contractor shall have a “Project Manager” on site at all times during the contract performance. Section 9 states to have a Foreman/Supervisor on site at all times. Is the Project Manager in addition to the Project Superintendent/Foreman or can one person be onsite to perform all duties required?
7. One person, either the project manager or foreman must be onsite at all times.
1. Page 10 of 64 of the IFB states to submit a completed S02_Attachment. Is the S02 the Excel Spreadsheet for a price breakdown by divisions?
8. Yes. Naming was change by accident. “IFB Lump Sum Division Spreadsheet” is the attachment that shall be filled out
1. According to measurements taken at the Site Visit, there is approximately 9 square feet of disturbance per headstone/marker. The SOW states a much larger amount of SOD. What is the intended purpose of the extra area of SOD?
9. Additional acreage is to account for perimeters of the cemetery sections.
1. The requirement for “Base Aggregate” includes moistened crushed limestone. Would crushed marble or granite #2 aggregate stone be sufficient?
10. #2 Moistened crushed limestone is required.
1. Is it the intent of this project to repair any major sinkhole type areas of the cemetery, or simply raise and realign the stones to standard heights and alignment?
11. This project does not require repairs of any sinkholes, only raise and realignment of headstones. Please note that adding topsoil in any low spots or depressions and raking and leveling of the section is required as part of the turf renovation process.
1. Will there be a laydown area to have stone base delivered, or do we need to bring it in in bags and store on the back of a truck?
12. An area should be provided by the cemetery for stone base to be delivered and stored.
1. Will the contractor be able to control the irrigation system for watering the SOD sufficiently, or will we be restricted to the set schedule of irrigation?
13. Will Respond in future amendment.
1. Will work be restricted during internment services?
14. Yes, if an interment is scheduled in a section where the contractor is working, all work must stop until the service is completed.
End of Document Salisbury Nat’l FY24 Shrine Project