36C78624B0029 0002.docx
DOCX document 2 MB Posted
- Attached to
- Y1PZ--820-MM24-03B Quincy Bridge and Emery Creek Stabilization at Quincy National Cemetery
- Solicitation number
- 36C78624B0029
About this file
This document is an amendment to Solicitation Number 36C78624B0029 for Project Number 820-MM24-03B Quincy Bridge and Emery Creek Stabilization at Quincy National Cemetery, issued by the Department of Veterans Affairs National Cemetery Administration. The amendment publishes responses to pre-bid Request for Information (RFI) questions submitted by interested vendors.
The key details are: the bid due date is extended to June 25, 2024 at 2:00 PM EST; the scope of work includes repointing the bridge and creek wall using natural hydraulic lime mortar, resetting loose stones and regrouting, repairing arches and piers, and installing rip rap along the creek; an approximate square footage is provided for various aspects of the work; and the procurement officer clarified that some of the requested changes, such as substituting the mortar, are not allowed. The procurement is for the repair and stabilization of a historic bridge and creek at the Quincy National Cemetery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78624B0029 0004.docx | DOCX document | |
| 36C78624B0029 0003.docx | DOCX document | |
| 36C78624B0029 0001.docx | DOCX document | |
| Revised Quincy National Cemetery Bridge Analysis Final Report.pdf | ||
| FAR 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION SEP 2023.docx | DOCX document | |
| Quincy National Cemetary Bridge Analysis Final Report.pdf | ||
| Limitations on Subcontracting Certificate for.docx | DOCX document | |
| IFB Lump Sum Division Spreadsheet.xlsx | XLSX spreadsheet | |
| 36C78624B0029_1.docx | DOCX document | |
| Statement of Work 820-MM24-03B Quincy Bridge and Emery Creek Stabilization at Quincy NC.pdf | ||
| Specification 820-MM24-03B Quincy Bridge and Emery Creek Stabilization at Quincy NC.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 7744-000029
820-MM24-03B
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 To all Offerors/Bidders
36C78624B0029 06-10-2024
X X Tuesday June 25, 2024, at 2:00PM EST X
This amendment to solicitation number 36C78624B0029 for Project Number 820-MM24-03B Quincy Bridge and Emery Creek Stabilization at Quincy National Cemetery is to publish responses to prebid Request for Information questions submitted by interested vendor. Please refer to the continuation page for the responses to the prebid RFI questions.
The bid due date is extended to Tuesday, June 25, 2024, at 2:00 PM ES T.
All amendments should be acknowledged.
Richard Adu Contracting Officer
RESPONSES TO PREBID REQUEST FOR INFORMATION
Project Number 820-MM24-03B Bridge and Emery Creek Stabilization at Quincy National Cemetery Solicitation #: 36C78624B0029 Question 1:
RE: specifications 04 05 13 2.1 HYDRAULIC LIME Can the Hydraulic Lime Tuckpoint Mortar be replaced with the attached Spec Mix type O for the bridge and type N for the creek wall?
The main difference is the small amount of portland in the Spec Mix type O as opposed to no portland in the proposed hydraulic lime product. The main difference we have found is there is absolutely no workability with the proposed hydraulic lime product. The process for repointing using the hydraulic lime product is much more difficult and time consuming, and almost impossible to use for this application.
Response NO – NHL was spec’d for a reason and must be used.
Question 2:
Can you also confirm that removing the existing shoring/cribbing in the middle and far right tunnels and repairing the displaced lower stone area in the middle tunnel is in fact included in the scope of work?
Response The Shoring removal is part of the Statement of Work.
Repairs to the bridge stone and mortar is part of the Statement of Work.
Question 3:
Is mortar analysis required to confirm Natural Hydraulic Lime Mortar?
Response NO – based on the period of construction NHL is the appropriate replacement mortar.
Question 4:
If mortar analysis is required, which of the following NHL mortars are to be used? 2, 3.5, or 5
Response 3.5
Question 5:
Scope calls for 241 LF of repointing can a SF be given for bidding purposes?
Response Estimated at 5500 sq ft. for the northern wall between the creek and the cemetery headstones. More repointing is needed for the bridge itself this estimate is only for the northern creek bank wall. (271’ x 22’ = 550 approx.)
Question 6:
Scope calls for resetting of loose stones and regrouting. Can a SF be given for bidding purposes?
Response Contractor to assume a minimum of 100 SF and provide a cost per SF over the 100sf.
Question 7:
Scope says" as indicated and needed" can an estimated percentage be given for anticipated amount "needed."
Response Only do any visible damaged/cracked areas which accounts for approximately 70% of the bridge.
Question 8:
Scope calls for repairs to arches and piers site plan only highlights in yellow the stone adjacent to Emery Creek. Are the arches included in scope of work?
Response Yes
Question 9:
If arches are included, is both sides (upstream or downstream) scheduled for repairs?
Response Yes
Question 10:
Is the underside of the arches included in the scope of work.
Response Yes there is approximately 70% of the total area requires tuck pointing on the underside of the arches due to water levels rising and lowering and tree debris damaging the grout.
Question 11:
Can an approximate SF be given for the to the area to receive rip rap?
Response 271 linear ft x 22ft height estimated from top to bottom sloped at approximately 45 degrees for southern part of creek small rip rap = 5,400 sq ft plus approximately 1,600sq ft for the larger rip rap areas.
Question 12:
Can an approximate SF be given of the wall to be cleaned?
Response Estimated at 2,300 sq ft of overburden on the wall with an estimated depth of 12’’overall (estimated).
Additional comments:
Provide an add to dredge the (16” deep) creek bed. Do not excavate below the top of bridge footing.
Photo 1:
Provide stone and grout similar to shaded area on opposite 2 sites of bridge.
Photo 2:
Install rip rap of 6-8” stone, landscape fabric over excavated area 6-8” deep above existing retaining wall. 271’ long by 8’ fence to top of existing retaining wall. Indicated in red below.
End of Document
This amendment to solicitation number 36C78624B0029 for Project Number 820-MM24-03B Quincy Bridge and Emery Creek Stabilization at Quincy National Cemetery is to publish responses to prebid Request for Information questions submitted by interested vendor.
image1.png image2.png
File details come from the government source that posted it. Updated .