About this file

This document is a lump sum bid spreadsheet template for a construction project to replace a committal shelter at Wood National Cemetery. The spreadsheet lists construction divisions from the NCA Master Construction Specifications and includes columns for lump sum pricing for CLIN 0001, CLIN 0002, and eight bid option periods. Contractors are to provide lump sum pricing for each division to be used on the project or note "N/A" if a division is not applicable. Additional items may also be priced. The total contract price will be the sum of CLIN 0001, CLIN 0002, and the selected bid option periods. The related federal contract opportunity is solicitation number 36C78624B0007 for mogote stabilization and rock removal services at Puerto Rico National Cemetery issued by the Department of Veterans Affairs National Cemetery Administration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp)
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

Solicitation Number36C78623B0014
Project Number823MM23004
Project NameReplace Committal Shelter at Wood National Cemetery
DivisionCLIN1CLIN 2TOTAL CLIN 0001 & 0002BID OPTION 1BID OPTION 2BID OPTION 3BID OPTION 4BID OPTION 5BID OPTION 6BID OPTION 7BID OPTION 8GRAND TOTAL CLIN 0001, 0002, and BID OPTIONS 1-8
Division 0
Special Sections$$$$$$$$$$$$
Division 1
General Requirements$$$$$$$$$$$$
Division 2
Existing Conditions$$$$$$$$$$$$
Division 3
Concrete$$$$$$$$$$$$
Division 4
Masonry$$$$$$$$$$$$
Division 5
Metals$$$$$$$$$$$$
Division 6
Wood and Plastic$$$$$$$$$$$$
Division 7
Thermal and Moisture$$$$$$$$$$$$
Division 8
Doors and Windows$$$$$$$$$$$$
Division 9
Finishes$$$$$$$$$$$$
Division 10
Specialties$$$$$$$$$$$$
Division 11
Equipment$$$$$$$$$$$$
Division 12
Furnishings$$$$$$$$$$$$
Division 13
Special Construction$$$$$$$$$$$$
Division 22
Plumbing$$$$$$$$$$$$
Division 23
Heat, Ventilating, and Air Conditioning$$$$$$$$$$$$
Division 25
Integrated Automation$$$$$$$$$$$$
Division 26
Electrical$$$$$$$$$$$$
Division 27
Communications$$$$$$$$$$$$
Division 28
Electronic Safety and Security$$$$$$$$$$$$
Division 31
Earthwork$$$$$$$$$$$$
Division 32
Exterior Improvements$$$$$$$$$$$$
Division 33
Utilities$$$$$$$$$$$$
Bonds
$$$$$$$$$$$$
TOTAL PRICECLIN1CLIN 2TOTAL CLIN 0001 & 0002BID OPTION 1BID OPTION 2BID OPTION 3BID OPTION 4BID OPTION 5BID OPTION 6BID OPTION 7BID OPTION 8
$$$$$$$$$$$

TOTAL CONTRACT PRICE (CLINS 0001 & 0002 PLUS ADD ALTERNATE OPTIONS 0001 THROUGH 0008): $

File details come from the government source that posted it. Updated .