Pricing Schedule1.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C78624B0003
About this file
This document contains a pricing schedule template for contractors to provide cost estimates for work involved in federal contract number 36C78624B0003 for site improvements at the Fargo National Cemetery. The template includes sections for contractors to provide lump sum pricing for various construction divisions involved in the project such as general conditions, mobilization, site investigation, concrete work, masonry, and other mechanical, electrical, and plumbing work. Contractors are to list unit costs, quantities, extended costs, and remarks for each division. Pricing should also account for general construction subtotals, insurance if applicable, bonding if applicable, overhead costs, profit, and a grand total price.
The related federal contract opportunity is solicitation number 36C78624B0003 for initial grading and construction section, survey, and site improvements at the Fargo National Cemetery from the Department of Veterans Affairs National Cemetery Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78624B0003 Amendment 0002.pdf | ||
| 36C78624B0003 Amendment 0001.pdf | ||
| TIL Specifications.pdf | ||
| IFB Solicitation 36C78624B0003.pdf | ||
| 36C78624B0003_1.docx | DOCX document | |
| Combined Synopsis Solicitation Notice 36C78624B0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Offeror shall use and edit to fit Task Order Project | |
| Project Number: | |
| Solicitation Number: | 36C78624B0003 |
| Project Title: |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 |
| Division 02 - Existing Conditions | ||
| Site Investigation | JB | 1 |
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| GRAND TOTALS | $ |
File details come from the government source that posted it. Updated .