36C78623B0022 0001.docx
DOCX document 29 KB Posted
- Solicitation number
- 36C78623B0022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 13 34 19 Metal Building Systems.pdf | ||
| 36C78623B0022.docx | DOCX document | |
| 36C78623B0022 IFB Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
823-MM23-006
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 To all Offerors/Bidders
36C78623B0022 06-30-2023
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
X Gravesite Expansion Ft McPherson National Cemetery Amendment 0001 is issued to: Response to RFI inquiry questions.
See Continuation page for clarification responses.
The Bid Opening time/date is unchanged.
No other changes are made at this time.
All other solicitation Terms and Conditions remain unchanged.
Claude Humphrey Contracting Officer
VA-NCA-2023-0006
CONTINUATION PAGE
AMENDMENT 0001
Solicitation Number: 36C78623B0022 Project Description: 823-MM-006, Pole Barns Demolition and Prefabricated Replacement Buildings, Wood National Cemetery
The following Request for Information (RFI) questions have been submitted to the Contracting Officer regarding this solicitation. The following questions and responses are provided for bidder’s information and use.
RFI 1. Is there a Site Safety Officer (SSHO) required for the contract?
Is the SSHO required to be onsite at all times?
Can the SSHO and superintendent be the same person?
Response: Yes
RFI 2. Are material sales taxes to be included with the bid?
Will the Owner be providing a tax-exemption certificate after contract award?
Response: Yes
RFI 3. The project specs did not include a section for Metal Building Systems.
Please provide a spec for the new PEMB package to confirm requirements of design loads, insulation, windows, service doors, interior/exterior panel finishes, panel thickness, etc.
Response: Design loads must be provided by manufacturer based on local environmental conditions i.e., snow load. There are No windows or insulation. Panel thickness and finish as described in the SOW. See attached NCA TIL Specification: 13 34 19 Metal Building Systems
RFI 4. Will the buildings be cleared out by the Owner prior to start of work?
Response: Yes, items to be kept will be removed by the NCA, all else will be demo'd.
RFI 5. Pre-engineered metal buildings currently have long lead-times on engineering/design and fabrication. The new PEMB will not likely be furnished within the 121-day performance period. Will the Owner provide additional contract time for items with long lead-times?
Response: Bidder should state the long lead time items in bid and provided documented proof from manufacturer / supplier(s) of lead times.
RFI 6. Where is the location of the new PEMB in relation to the buildings to demolish? Will a site drawing be provided?
Response: The new PEMB in relation to the buildings to demolish buildings, are the Same location, the COR will approve footprint (BLDG orientation) prior to construction. No drawings are to be provided; the SOW has pictures. It is and has been highly recommended that interested firms perform a pre-bid site visit.
Reminder that Per FAR 52.236-3, Contractor should survey / inspect the site prior to submitting a bid/proposal/quote in order to be fully aware of the Scope of Services required and to adequately gather existing unit’s product information, model numbers and all necessary and matching standards and requirements. Contractor shall perform a ‘Site Investigation’ to verify the magnitude of all dimensions/measurements and site conditions before start of the work or the ordering of any equipment, parts and or materials. Failure to do so shall not relieve the successful offeror from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government. Contractor shall submit an ‘After Inspection Report’ of Contractor’s findings, listing each respective Flagpole deficiencies found and recommended repair/work solutions to the COR and Contracting Officer for review and approval prior to commencing the work.
RFI 7. Are there any new bollards required at the new building?
If so, what is the quantity and locations?
Are bollard covers required?
Response: No
RFI 8. The existing buildings appear to have fiberglass panels along the eaves.
Do the new PEMB require translucent panels?
If so, what is the material spec and locations required?
Response: No, the new building will have electric lighting, per the SOW and specifications.
RFI 9. What is the finish of the metal framing members required for the new PEMB?
Response: Primer for Steel, based on modified alkyd resins, pigmented with red oxide; aka Red Iron.
RFI 10. What concrete pads are scheduled to remain?
Will the Contractor be required to replace the concrete slabs removed for installation of new building foundations?
Reference Statement of Work, par. III, CLIN2, a. Can a site drawing be provided to show locations?
Response: No concrete will be demolished; the existing slab will be reused and the new PEMB will be erected on existing slab. Any grade work mentioned will be on the gravel drive/lot surrounding the building site.
RFI 11. Will the new PEMB require any roof overhangs?
If so, what are the overhang dimensions?
Response: No soffit is required. The overhang will only be roof panel extending far enough to provide weather protection.
See attached document: 13 34 19 Metal Building Systems.
END OF AMENDMENT 0001
File details come from the government source that posted it. Updated .