A0001- West Virginia Natl Cem - 36C78623B0006.pdf

PDF 292 KB Posted

Attached to
Z1AZ--IFB (FY-23) | WEST VIRGINIA NATIONAL CEMETERY | COMMITTAL SHELTER ENCLOSED | PROJECT NO. 912CM3014
Solicitation number
36C78623B0006
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2 36C78623B0006

A0001

912CM3014

36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

To all Offerors/Bidders

36C78623B0006

01-31-2023

A0001

X

X

X 1

AMENDMENT (A0001) | West Virginia National Cemetery | IFB Sol No. 36C78623B0006 | Project No. 912CM3014

The Purpose of Amendment (A0001) is to Notify the Public of the Government's required Answers to the RFIs' for Said

Project located at the West Virginia National Cemetery.

***NOTE: There are Three (3) sets of Questions & Answers annotated on Page Two (Pg. 2).

Please See Page #2 for Content.***

Sheryl Palacio-Davis

Contracting Officer

A.1 AMENDMENT A0001 | RFI | INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

AMMENDMENT (A0001)

REQUEST FOR INFORMATION (RFI)

SUBJECT: RESPONSE TO REQUEST FOR INFORMATION (RFI) | WEST VIRGINIA NATIONAL CEMETERY | IFB

SOL NO. 36C78623B0006 | COMMITTAL SHELTER ENCLOSED | PROJECT NO. 912CM3014

QUESTION #1 & ANSWERS #1:

Will a chain link fence be required for the project as shown on the plans or will an orange construction fence be sufficient?

▪ Just Chain Link Fence.

When would the work begin for the project? We were told at the site visit not till after Memorial Day.

▪ The construction should start after Memorial Day, but the submittal process and other admin work could be done before Memorial Day.

The Period of Performance is 90 Calendar Days after the Notice to Proceed. The lead times for the materials could be several weeks after approved submittals. Can the Period of Performance be extended or can the Notice to Proceed be delayed till the submittals are approved and we know the material lead time?

▪ This is a case-by-case situation and the NCA will work with the contractor, taking in account Lead Time for delivery of materials, post the pandemic.

In Specification Section 01-81-13 Sustainable Construction Requirements it states that a project materials cost data spreadsheet is required. Will this be required for this project? The contract will be well under $250K and most of the materials involved are Division 08- Doors and Windows.

▪ Not required.

QUESTION #2 & ANSWERS #2:

Drawing CS-100 call for chain link construction fence. Can a construction fence (i.e., orange snow fence utilizing cones with snow fence by the roadway and concrete) be utilized in lieu of chain link fence?

▪ Just chain link fence.

If snow fence cannot be used, does chain link fence posts need to be drove into ground or will chain link panel fence (approximately 10’ long panels) be utilized as this fence appears to encompass the new paving and concrete that is on site? No drove into ground/asphalt/concrete.

▪ Provide metal or concrete base with sandbag.

What is the basis of design for the storefront sliding doors? It shows examples from the National Cemetery of the Alleghenies on Drawing A-101. (Please note that this project calls for manual sliding doors according to detail #1 and the pictures provided form the Alleghenies project show to be automatic sliding doors).

▪ The picture shows handle on both door and not automatic sliding doors.

QUESTION #3 & ANSWER #3:

On the manual sliding doors are they to slide only, swing only, or both slide and swing. The picture on A- 101 shows these doors to slide and swing. If they are to be slide and swing, please provide the basis of design for the doors depicted in the pictures of the National Cemetery of the Alleghenies.

▪ Both slide and swing, design base is to have sliding door with emergency push bar exit which make the door swing out

END OF DOCUMENT

File details come from the government source that posted it. Updated .