36C78622Q0081 Line Items Attachment A.xlsx

XLSX spreadsheet 450 KB Posted

Attached to
S208--MWD-807-CHNC Grounds Maintenance-Crown Hill National Cemetery Grounds Maintenance contract; PoP: June 2, 2022 thru 2027. TIERED EVALUATION
Solicitation number
36C78622Q0081
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Action Line Item Information

Action Type NamePrimary IDSecondary IDMod NumberTitleOrder Discount Type NameOrder Discount TypeOrder Discount
RFQ36C78622Q0081MWD-807-CHNC Grounds Maintenance-Crown Hill National Cemetery Grounds Maintenance contract; PoP: June 2, 2022 thru 2027.Percent0

KB Version: FY22.03A

Items

Item NumberSLINDescriptionRef CLINCommentInclude Comments in DocumentContract PeriodPop BeginPop EndQuantityUnit of MeasurePackaging MultipleReceipt TypeLine Item IsUnit PriceItem Discount Type NameItem DiscountDate UpdatedAddress1Address2Address3CityStateZipZip4CountryMark ForContact NameContact PhoneContact EmailDelivery DateFOBSpecial InstructionsInclude Instructions/Comments in DocumentPRINCIPAL NAICS CODEPRODUCT/SERVICE CODEUNSPSCSIC CODEMANUFACTURER PART NUMBER (MPN)NATIONAL STOCK NUMBERLOCAL STOCK NUMBERDM DOC IDDELIVERY REF. COUNTERUNIT TEXT/DESCRIPTIONDELIVERY REFERENCEITEM MASTER FILE NUMBEREXPENDABLE/NON-EXPENDABLEQUANTITY REQUESTEDUNIT OF PURCHASE CODEUNIT OF PURCHASE TEXT/DESC.
0001Interment Shelter/Flag – Daily Set-up and Cleaning, and Lowering and Raising U.S. Flag (BASE)NoBase270EAQuantity561790S299
0002Transport Urn and Floral Arrangements, and Place Urn into Columbarium (BASE)NoBase350EAQuantity561730S208
0003Receive and Install New and Subsequent Inscribed Niche Covers (BASE)NoBase350EAQuantity561730S208
0004Support Services for Weekend and Holiday Interments (BASE)NoBase10EAQuantity561730S208
0005Support Services for Holidays and Special Events (BASE)NoBase2EAQuantity561730S208
0006Mow Turfgrass (anticipated only 2.2 acres of Historic and Confederate July-September, with the 12 more acres of Annex starting in October (BASE)NoBase39EAQuantity561730S208
0007String Trim Around 2,095 Headstones, Plus Other Upright Objects and Edges with Every Mowing (BASE)NoBase39EAQuantity561730S208
0008Edge Along Sidewalks, Curbs, and Other Flat, Hard Surfaces (Annex only) (BASE)NoBase3JBQuantity561730S208
0009Fertilizer: Provide and Apply (2.2 acres of Historic and Confederate in September, and 14.2 acres of all three sites in October and following spring) (BASE)NoBase3JBQuantity561730S208
0010Pre-emergence Herbicide: Provide and Apply (14.2 acres two times) (BASE)NoBase2JBQuantity561730S208
0011Post-Emergence Broadleaf Herbicide: Provide and Apply (14.2 acres two times) (BASE)NoBase2JBQuantity561730S208
0012Post-Emergence Yellow Nutsedge Herbicide: Provide and Apply (14.2 acres one time)NoBase1JBQuantity561730S208
0013Grub Insecticide: Provide and Apply (14.2 acres one time)NoBase1JBQuantity561710S207
0014Core Aeration of Turfgrass (2.2 acre Historic Cemetery only in Base year) (OPTIONAL)NoBase1JBQuantity561730S208
0015Overseed Turfgrass (2.2 acre Historic Cemetery and Confederate Plot only in Base year)NoBase1JBQuantity561730S208
0016Fall Leaf Removal (Base)NoBase25JBQuantity561730S208
0017Planting Beds and Tree Rings (Mulch Rings) - Mulch and Edge MaintenanceNoBase1JBQuantity561730S208
0018Planting Beds and Tree Rings - Pre-Emergence HerbicideNoBase2JBQuantity561730S208
0019Planting Beds and Tree Rings – Emerged Weed Removal/Control (BASE)NoBase5JBQuantity561730S208
0020Shrub Maintenance/Pruning (not anticipated in base year) (BASE)NoBase0JBQuantity561730S208
0021Japanese Beetle Control on Trees and Shrubs (OPTIONAL)NoBase2JBQuantity561710S207
0022Mole and Rodent Control (BASE)NoBase8MOQuantity561710S207
0023Soil Sampling/Testing (OPTIONAL)NoBase1EAQuantity561730S208
0024Sunken Grave Repair (BASE)NoBase10EAQuantity561730S208
0025Turfgrass Renovation (BASE)NoBase400SFQuantity561730S208
0026Irrigation System – Fall Shut-Down, Spring Start-Up, Backflow Testing (BASE)NoBase1EAQuantity561730S208
0027Irrigation System – Operation and Maintenance (BASE)NoBase4MOQuantity561730S208
0028Road Cleaning/Sweeping/Blowing (BASE)NoBase156EAQuantity561730S208
0029Trash and Debris Removal (BASE)NoBase12MOQuantity561730S208
0030Pressure Wash Committal Shelter, Columbaria, Other Hardscapes (BASE)NoBase2JBQuantity561790S299
0031Insect/Pest Control at Committal Shelter and Admin Building (OPTIONAL)NoBase8MOQuantity561710S207
0032Snow Removal - Streets & Parking Lots (BASE)NoBase12JBQuantity561730S208
0033Snow Removal - Sidewalks, Walkways, & Specialty Areas (BASE)NoBase12JBQuantity561730S208
0034Ice Melt Applications - Streets & Parking Lots (BASE)NoBase10JBQuantity561730S208
0035Ice Melt Applications - Sidewalks, Walkways, & Specialty Areas (BASE)NoBase10JBQuantity561730S208
0036Headstone Cleaning (2,095 headstones, two times) (BASE)NoBase4190EAQuantity561730S208
0037Headstone Fine Tune Alignment (2,095 headstones) (BASE)NoBase1JBQuantity561730S208
0038Headstone Raise & Realignment(not anticipated in Base year) (BASE)NoBase120EAQuantity561730S208
0039Tree Pruning (OPTIONAL)NoBase10EAQuantity561730S208
0040Tree Removal (OPTIONAL)NoBase2EAQuantity561730S208
0041Tree Stump Removal (OPTIONAL)NoBase2EAQuantity561730
1001Interment Shelter/Flag – Daily Set-up and Cleaning, and Lowering and Raising U.S. Flag (BASE)NoOption 1270EAQuantity561790S299
1002Transport Urn and Floral Arrangements, and Place Urn into Columbarium (BASE)NoOption 1350EAQuantity561730S208
1003Receive and Install New and Subsequent Inscribed Niche Covers (BASE)NoOption 1350EAQuantity561730S208
1004Support Services for Weekend and Holiday Interments (BASE)NoOption 110EAQuantity561730S208
1005Support Services for Holidays and Special Events (BASE)NoOption 12EAQuantity561730S208
1006Mow Turfgrass (anticipated only 2.2 acres of Historic and Confederate July-September, with the 12 more acres of Annex starting in October (BASE)NoOption 139EAQuantity561730S208
1007String Trim Around 2,095 Headstones, Plus Other Upright Objects and Edges with Every Mowing (BASE)NoOption 139EAQuantity561730S208
1008Edge Along Sidewalks, Curbs, and Other Flat, Hard Surfaces (Annex only) (BASE)NoOption 13JBQuantity561730S208
1009Fertilizer: Provide and Apply (2.2 acres of Historic and Confederate in September, and 14.2 acres of all three sites in October and following spring) (BASE)NoOption 13JBQuantity561730S208
1010Pre-emergence Herbicide: Provide and Apply (14.2 acres two times) (BASE)NoOption 12JBQuantity561730S208
1011Post-Emergence Broadleaf Herbicide: Provide and Apply (14.2 acres two times) (BASE)NoOption 12JBQuantity561730S208
1012Post-Emergence Yellow Nutsedge Herbicide: Provide and Apply (14.2 acres one time)NoOption 11JBQuantity561730S208
1013Grub Insecticide: Provide and Apply (14.2 acres one time)NoOption 11JBQuantity561710S207
1014Core Aeration of Turfgrass (2.2 acre Historic Cemetery only in Base year) (OPTIONAL)NoOption 11JBQuantity561730S208
1015Overseed Turfgrass (2.2 acre Historic Cemetery and Confederate Plot only in Base year)NoOption 11JBQuantity561730S208
1016Fall Leaf Removal (OPTIONAL)NoOption 125JBQuantity561730S208
1017Planting Beds and Tree Rings (Mulch Rings) - Mulch and Edge MaintenanceNoOption 11JBQuantity561730S208
1018Planting Beds and Tree Rings - Pre-Emergence HerbicideNoOption 12JBQuantity561730S208
1019Planting Beds and Tree Rings – Emerged Weed Removal/Control (BASE)NoOption 18JBQuantity561730S208
1020Shrub Maintenance/Pruning (not anticipated in base year) (BASE)NoOption 12JBQuantity561730S208
1021Japanese Beetle Control on Trees and Shrubs (OPTIONAL)NoOption 12JBQuantity561710S207
1022Mole and Rodent Control (BASE)NoOption 18MOQuantity561710S207
1023Soil Sampling/Testing (OPTIONAL)NoOption 11EAQuantity561730S208
1024Sunken Grave Repair (BASE)NoOption 115EAQuantity561730S208
1025Turfgrass Renovation (BASE)NoOption 1600SFQuantity561730S208
1026Irrigation System – Fall Shut-Down, Spring Start-Up, Backflow Testing (BASE)NoOption 12EAQuantity561730S208
1027Irrigation System – Operation and Maintenance (BASE)NoOption 18MOQuantity561730S208
1028Road Cleaning/Sweeping/Blowing (BASE)NoOption 1156EAQuantity561730S208
1029Trash and Debris Removal (BASE)NoOption 112MOQuantity561730S208
1030Pressure Wash Committal Shelter, Columbaria, Other Hardscapes (BASE)NoOption 12JBQuantity561790S299
1031Insect/Pest Control at Committal Shelter and Admin Building (OPTIONAL)NoOption 18MOQuantity561710S207
1032Snow Removal - Streets & Parking Lots (BASE)NoOption 112JBQuantity561730S208
1033Snow Removal - Sidewalks, Walkways, & Specialty Areas (BASE)NoOption 112JBQuantity561730S208
1034Ice Melt Applications - Streets & Parking Lots (BASE)NoOption 110JBQuantity561730S208
1035Ice Melt Applications - Sidewalks, Walkways, & Specialty Areas (BASE)NoOption 110JBQuantity561730S208
1036Headstone Cleaning (2,095 headstones, two times) (BASE)NoOption 14190EAQuantity561730S208
1037Headstone Fine Tune Alignment (2,095 headstones) (BASE)NoOption 11JBQuantity561730S208
1038Headstone Raise & Realignment(not anticipated in Base year) (BASE)NoOption 1120EAQuantity561730S208
1039Tree Pruning (OPTIONAL)NoOption 110EAQuantity561730S208
1040Tree Removal (OPTIONAL)NoOption 12EAQuantity561730S208
1041Tree Stump Removal (OPTIONAL)NoOption 12EAQuantity561730S208
2001Interment Shelter/Flag – Daily Set-up and Cleaning, and Lowering and Raising U.S. Flag (BASE)NoOption 2270EAQuantity561790S299
2002Transport Urn and Floral Arrangements, and Place Urn into Columbarium (BASE)NoOption 2350EAQuantity561730S208
2003Receive and Install New and Subsequent Inscribed Niche Covers (BASE)NoOption 2350EAQuantity561730S208
2004Support Services for Weekend and Holiday Interments (BASE)NoOption 210EAQuantity561730S208
2005Support Services for Holidays and Special Events (BASE)NoOption 22EAQuantity561730S208
2006Mow Turfgrass (anticipated only 2.2 acres of Historic and Confederate July-September, with the 12 more acres of Annex starting in October (BASE)NoOption 239EAQuantity561730S208
2007String Trim Around 2,095 Headstones, Plus Other Upright Objects and Edges with Every Mowing (BASE)NoOption 239EAQuantity561730S208
2008Edge Along Sidewalks, Curbs, and Other Flat, Hard Surfaces (Annex only) (BASE)NoOption 24JBQuantity561730S208
2009Fertilizer: Provide and Apply (2.2 acres of Historic and Confederate in September, and 14.2 acres of all three sites in October and following spring) (BASE)NoOption 23JBQuantity561730S208
2010Pre-emergence Herbicide: Provide and Apply (14.2 acres two times) (BASE)NoOption 22JBQuantity561730S208
2011Post-Emergence Broadleaf Herbicide: Provide and Apply (14.2 acres two times) (BASE)NoOption 22JBQuantity561730S208
2012Post-Emergence Yellow Nutsedge Herbicide: Provide and Apply (14.2 acres one time)NoOption 21JBQuantity561730S208
2013Grub Insecticide: Provide and Apply (14.2 acres one time)NoOption 21JBQuantity561710S207
2014Core Aeration of Turfgrass (2.2 acre Historic Cemetery only in Base year) (OPTIONAL)NoOption 21JBQuantity561730S208
2015Overseed Turfgrass (2.2 acre Historic Cemetery and Confederate Plot only in Base year)NoOption 21JBQuantity561730S208
2016Fall Leaf Removal (OPTIONAL)NoOption 225JBQuantity561730S208
2017Planting Beds and Tree Rings (Mulch Rings) - Mulch and Edge MaintenanceNoOption 21JBQuantity561730S208
2018Planting Beds and Tree Rings - Pre-Emergence HerbicideNoOption 22JBQuantity561730S208
2019Planting Beds and Tree Rings – Emerged Weed Removal/Control (BASE)NoOption 25JBQuantity561730S208
2020Shrub Maintenance/Pruning (not anticipated in base year) (BASE)NoOption 22JBQuantity561730S208
2021Japanese Beetle Control on Trees and Shrubs (OPTIONAL)NoOption 22JBQuantity561710S207
2022Mole and Rodent Control (BASE)NoOption 28MOQuantity561710S207
2023Soil Sampling/Testing (OPTIONAL)NoOption 21EAQuantity561730S208
2024Sunken Grave Repair (BASE)NoOption 215EAQuantity561730S208
2025Turfgrass Renovation (BASE)NoOption 2600SFQuantity561730S208
2026Irrigation System – Fall Shut-Down, Spring Start-Up, Backflow Testing (BASE)NoOption 22EAQuantity561730S208
2027Irrigation System – Operation and Maintenance (BASE)NoOption 24MOQuantity561730S208
2028Road Cleaning/Sweeping/Blowing (BASE)NoOption 2156EAQuantity561730S208
2029Trash and Debris Removal (BASE)NoOption 212MOQuantity561730S208
2030Pressure Wash Committal Shelter, Columbaria, Other Hardscapes (BASE)NoOption 22JBQuantity561790S299
2031Insect/Pest Control at Committal Shelter and Admin Building (OPTIONAL)NoOption 28MOQuantity561710S207
2032Snow Removal - Streets & Parking Lots (BASE)NoOption 212JBQuantity561730S208
2033Snow Removal - Sidewalks, Walkways, & Specialty Areas (BASE)NoOption 212JBQuantity561730S208
2034Ice Melt Applications - Streets & Parking Lots (BASE)NoOption 210JBQuantity561730S208
2035Ice Melt Applications - Sidewalks, Walkways, & Specialty Areas (BASE)NoOption 210JBQuantity561730S208
2036Headstone Cleaning (2,095 headstones, two times) (BASE)NoOption 24190EAQuantity561730S208
2037Headstone Fine Tune Alignment (2,095 headstones) (BASE)NoOption 21JBQuantity561730S208
2038Headstone Raise & Realignment(not anticipated in Base year) (BASE)NoOption 2120EAQuantity561730S208
2039Tree Pruning (OPTIONAL)NoOption 210EAQuantity561730S208
2040Tree Removal (OPTIONAL)NoOption 22EAQuantity561730S208
2041Tree Stump Removal (OPTIONAL)NoOption 22EAQuantity561730S208
3001Interment Shelter/Flag – Daily Set-up and Cleaning, and Lowering and Raising U.S. Flag (BASE)NoOption 3270EAQuantity561790S299
3002Transport Urn and Floral Arrangements, and Place Urn into Columbarium (BASE)NoOption 3350EAQuantity561730S208
3003Receive and Install New and Subsequent Inscribed Niche Covers (BASE)NoOption 3350EAQuantity561730S208
3004Support Services for Weekend and Holiday Interments (BASE)NoOption 310EAQuantity561730S208
3005Support Services for Holidays and Special Events (BASE)NoOption 32EAQuantity561730S208
3006Mow Turfgrass (anticipated only 2.2 acres of Historic and Confederate July-September, with the 12 more acres of Annex starting in October (BASE)NoOption 339EAQuantity561730S208
3007String Trim Around 2,095 Headstones, Plus Other Upright Objects and Edges with Every Mowing (BASE)NoOption 339EAQuantity561730S208
3008Edge Along Sidewalks, Curbs, and Other Flat, Hard Surfaces (Annex only) (BASE)NoOption 33JBQuantity561730S208
3009Fertilizer: Provide and Apply (2.2 acres of Historic and Confederate in September, and 14.2 acres of all three sites in October and following spring) (BASE)NoOption 33JBQuantity561730S208
3010Pre-emergence Herbicide: Provide and Apply (14.2 acres two times) (BASE)NoOption 32JBQuantity561730S208
3011Post-Emergence Broadleaf Herbicide: Provide and Apply (14.2 acres two times) (BASE)NoOption 32JBQuantity561730S208
3012Post-Emergence Yellow Nutsedge Herbicide: Provide and Apply (14.2 acres one time)NoOption 31JBQuantity561730S208
3013Grub Insecticide: Provide and Apply (14.2 acres one time)NoOption 31JBQuantity561710S207
3014Core Aeration of Turfgrass (2.2 acre Historic Cemetery only in Base year) (OPTIONAL)NoOption 31JBQuantity561730S208
3015Overseed Turfgrass (2.2 acre Historic Cemetery and Confederate Plot only in Base year)NoOption 31JBQuantity561730S208
3016Fall Leaf Removal (OPTIONAL)NoOption 325JBQuantity561730S208
3017Planting Beds and Tree Rings (Mulch Rings) - Mulch and Edge MaintenanceNoOption 31JBQuantity561730S208
3018Planting Beds and Tree Rings - Pre-Emergence HerbicideNoOption 32JBQuantity561730S208
3019Planting Beds and Tree Rings – Emerged Weed Removal/Control (BASE)NoOption 35JBQuantity561730S208
3020Shrub Maintenance/Pruning (not anticipated in base year) (BASE)NoOption 32JBQuantity561730S208
3021Japanese Beetle Control on Trees and Shrubs (OPTIONAL)NoOption 32JBQuantity561710S207
3022Mole and Rodent Control (BASE)NoOption 38MOQuantity561710S207
3023Soil Sampling/Testing (OPTIONAL)NoOption 31EAQuantity561730S208
3024Sunken Grave Repair (BASE)NoOption 315EAQuantity561730S208
3025Turfgrass Renovation (BASE)NoOption 3600SFQuantity561730S208
3026Irrigation System – Fall Shut-Down, Spring Start-Up, Backflow Testing (BASE)NoOption 32EAQuantity561730S208
3027Irrigation System – Operation and Maintenance (BASE)NoOption 34MOQuantity561730S208
3028Road Cleaning/Sweeping/Blowing (BASE)NoOption 3156EAQuantity561730S208
3029Trash and Debris Removal (BASE)NoOption 312MOQuantity561730S208
3030Pressure Wash Committal Shelter, Columbaria, Other Hardscapes (BASE)NoOption 32JBQuantity561790S299
3031Insect/Pest Control at Committal Shelter and Admin Building (OPTIONAL)NoOption 38MOQuantity561710S207
3032Snow Removal - Streets & Parking Lots (BASE)NoOption 312JBQuantity561730S208
3033Snow Removal - Sidewalks, Walkways, & Specialty Areas (BASE)NoOption 312JBQuantity561730S208
3034Ice Melt Applications - Streets & Parking Lots (BASE)NoOption 310JBQuantity561730S208
3035Ice Melt Applications - Sidewalks, Walkways, & Specialty Areas (BASE)NoOption 310JBQuantity561730S208
3036Headstone Cleaning (2,095 headstones, two times) (BASE)NoOption 34190EAQuantity561730S208
3037Headstone Fine Tune Alignment (2,095 headstones) (BASE)NoOption 31JBQuantity561730S208
3038Headstone Raise & Realignment(not anticipated in Base year) (BASE)NoOption 3120EAQuantity561730S208
3039Tree Pruning (OPTIONAL)NoOption 310EAQuantity561730S208
3040Tree Removal (OPTIONAL)NoOption 32EAQuantity561730S208
3041Tree Stump Removal (OPTIONAL)NoOption 32EAQuantity561730S208
4001Interment Shelter/Flag – Daily Set-up and Cleaning, and Lowering and Raising U.S. Flag (BASE)NoOption 4270EAQuantity561790S299
4002Transport Urn and Floral Arrangements, and Place Urn into Columbarium (BASE)NoOption 4350EAQuantity561730S208
4003Receive and Install New and Subsequent Inscribed Niche Covers (BASE)NoOption 4350EAQuantity561730S208
4004Support Services for Weekend and Holiday Interments (BASE)NoOption 410EAQuantity561730S208
4005Support Services for Holidays and Special Events (BASE)NoOption 42EAQuantity561730S208
4006Mow Turfgrass (anticipated only 2.2 acres of Historic and Confederate July-September, with the 12 more acres of Annex starting in October (BASE)NoOption 439EAQuantity561730S208
4007String Trim Around 2,095 Headstones, Plus Other Upright Objects and Edges with Every Mowing (BASE)NoOption 439EAQuantity561730S208
4008Edge Along Sidewalks, Curbs, and Other Flat, Hard Surfaces (Annex only) (BASE)NoOption 44JBQuantity561730S208
4009Fertilizer: Provide and Apply (2.2 acres of Historic and Confederate in September, and 14.2 acres of all three sites in October and following spring) (BASE)NoOption 43JBQuantity561730S208
4010Pre-emergence Herbicide: Provide and Apply (14.2 acres two times) (BASE)NoOption 42JBQuantity561730S208
4011Post-Emergence Broadleaf Herbicide: Provide and Apply (14.2 acres two times) (BASE)NoOption 42JBQuantity561730S208
4012Post-Emergence Yellow Nutsedge Herbicide: Provide and Apply (14.2 acres one time)NoOption 41JBQuantity561730S208
4013Grub Insecticide: Provide and Apply (14.2 acres one time)NoOption 41JBQuantity561710S207
4014Core Aeration of Turfgrass (2.2 acre Historic Cemetery only in Base year) (OPTIONAL)NoOption 41JBQuantity561730S208
4015Overseed Turfgrass (2.2 acre Historic Cemetery and Confederate Plot only in Base year)NoOption 41JBQuantity561730S208
4016Fall Leaf Removal (OPTIONAL)NoOption 425JBQuantity561730S208
4017Planting Beds and Tree Rings (Mulch Rings) - Mulch and Edge MaintenanceNoOption 41JBQuantity561730S208
4018Planting Beds and Tree Rings - Pre-Emergence HerbicideNoOption 42JBQuantity561730S208
4019Planting Beds and Tree Rings – Emerged Weed Removal/Control (BASE)NoOption 45JBQuantity561730S208
4020Shrub Maintenance/Pruning (not anticipated in base year) (BASE)NoOption 42JBQuantity561730S208
4021Japanese Beetle Control on Trees and Shrubs (OPTIONAL)NoOption 42JBQuantity561710S207
4022Mole and Rodent Control (BASE)NoOption 48MOQuantity561710S207
4023Soil Sampling/Testing (OPTIONAL)NoOption 41EAQuantity561730S208
4024Sunken Grave Repair (BASE)NoOption 410EAQuantity561730S208
4025Turfgrass Renovation (BASE)NoOption 4400SFQuantity561730S208
4026Irrigation System – Fall Shut-Down, Spring Start-Up, Backflow Testing (BASE)NoOption 42EAQuantity561730S208
4027Irrigation System – Operation and Maintenance (BASE)NoOption 44MOQuantity561730S208
4028Road Cleaning/Sweeping/Blowing (BASE)NoOption 4156EAQuantity561730S208
4029Trash and Debris Removal (BASE)NoOption 412MOQuantity561730S208
4030Pressure Wash Committal Shelter, Columbaria, Other Hardscapes (BASE)NoOption 42JBQuantity561790S299
4031Insect/Pest Control at Committal Shelter and Admin Building (OPTIONAL)NoOption 48MOQuantity561710S207
4032Snow Removal - Streets & Parking Lots (BASE)NoOption 412JBQuantity561730S208
4033Snow Removal - Sidewalks, Walkways, & Specialty Areas (BASE)NoOption 412JBQuantity561730S208
4034Ice Melt Applications - Streets & Parking Lots (BASE)NoOption 410JBQuantity561730S208
4035Ice Melt Applications - Sidewalks, Walkways, & Specialty Areas (BASE)NoOption 410JBQuantity561730S208
4036Headstone Cleaning (2,095 headstones, two times) (BASE)NoOption 44190EAQuantity561730S208
4037Headstone Fine Tune Alignment (2,095 headstones) (BASE)NoOption 41JBQuantity561730S208
4038Headstone Raise & Realignment(not anticipated in Base year) (BASE)NoOption 4120EAQuantity561730S208
4039Tree Pruning (OPTIONAL)NoOption 410EAQuantity561730S208
4040Tree Removal (OPTIONAL)NoOption 42EAQuantity561730S208
4041Tree Stump Removal (OPTIONAL)NoOption 42EAQuantity561730S208
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .