36C78622B0006 0003.docx

DOCX document 19 KB Posted

Attached to
Z2ND--852-MM21-02A: Sinkholes Remediation, Jefferson Barracks
Solicitation number
36C78622B0006
Issued by

About this file

This document provides clarification to an amendment for a solicitation seeking sinkhole remediation services at Jefferson Barracks National Cemetery. The solicitation allows bids to be submitted by email by April 8, 2022 at 3:00 PM EST. It clarifies that a referenced cost estimate worksheet was erroneously omitted and is not required. The solicitation seeks a contractor to prepare the site, demolish existing structures, furnish labor and materials, and perform all work to remediate indicated sinkhole areas and install storm drainage according to provided drawings and specifications. The contractor must guarantee workmanship for one year after project completion and agrees to repair or replace deficiencies within that timeframe at their own expense. The soliciting agency is the Department of Veterans Affairs National Cemetery Administration.

View the file

Other files

File Type Posted
36C78622B0006 0002.docx DOCX document
36C78622B0006 0001.docx DOCX document
BID DOCUMENTS.pdf PDF
BD SPECS.pdf PDF
36C78622B0006_1.docx DOCX document
DOL Davis Bacon Wage Determination _ St Louis County.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 7741-000025

852-MM20-02A

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 To all Offerors/Bidders

36C78622B0006 02-09-2022

X X X

X Sinkholes Remediation, Jefferson Barracks National Cemetery

Clarification to the above referenced solicitation Amendment 0001.

'See attached documents'

All other Terms and Conditions remain Unchanged.

Claude Humphrey Contracting Officer

VA-NCA-2021-5F4C545C

CONTINUATION PAGE

AMENDMENT 0003

Clarification:

The following clarification is to language/statements made in Amendment 0001 issued on March 28, 2022, in response to question(s) and response(s) provided by the Contracting Officer for bidder’s information and use.

1. Clarification to Bid Submission--- Be advised that Bids response can be submitted by email to claude.humphrey@va.gov, and will be accepted up to the time/date specified for bid submission.

2. Clarification to the Bid Opening/Due time and date---The Bid Opening/Due time and date remains the same and unchanged at 3:00 p.m., EST, April 8, 2022.

3. Clarification to the question regarding the ‘Completed IFB Contractor Cost Estimate Worksheet’---Be advised that the mentioned Contractor Cost Estimate Worksheet was erroneously omitted and was not included in the solicitation package and is therefore not a required submission item. Bidders can disregard the completion requirement pertaining to the IFB Contractor Cost Estimate Worksheet.

END OF ADDENDUM 0003