36C78621Q0135 Line Items Description - ATTACHMENT A.xlsx

XLSX spreadsheet 6 MB Posted

Attached to
S208--National Shrine Projects Various Cemeteries, Project is for Raise and Realign, Turf Renovation, Clean Headstone/Markers.
Solicitation number
36C78621Q0135
Issued by

View the file

Other files

File Type Posted
36C78621Q0135 PAST PERFORMANCE QUESTIONNAIRE - ATTACHMENT B.pdf PDF
36C78621Q0135.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Action Line Item Information

Action Type NamePrimary IDSecondary IDMod NumberTitleOrder Discount Type NameOrder Discount TypeOrder Discount
RFQ36C78621Q0135933-FY21 Ft Lyon National Shrine Project-RAM-FY21 Ft Lyon National Shrine Project. Project is for Raise and Realign, Turf Renovation, Clean Headstone/Markers.Percent0

KB Version: FY21.05A

Items

Item NumberSLINDescriptionRef CLINCommentInclude Comments in DocumentContract PeriodPop BeginPop EndQuantityUnit of MeasurePackaging MultipleReceipt TypeLine Item IsUnit PriceItem Discount Type NameItem DiscountDate UpdatedAddress1Address2Address3CityStateZipZip4CountryMark ForContact NameContact PhoneContact EmailDelivery DateFOBSpecial InstructionsInclude Instructions/Comments in DocumentPRINCIPAL NAICS CODEPRODUCT/SERVICE CODEWage Determination/ SOWSIC CODEMANUFACTURER PART NUMBER (MPN)NATIONAL STOCK NUMBERLOCAL STOCK NUMBERDM DOC IDDELIVERY REF. COUNTERUNIT TEXT/DESCRIPTIONDELIVERY REFERENCEITEM MASTER FILE NUMBEREXPENDABLE/NON-EXPENDABLEQUANTITY REQUESTEDUNIT OF PURCHASE CODEUNIT OF PURCHASE TEXT/DESC.
0001Raise/lower, realign, level, backfill upright headstones in Sections 9 and 10.Crown Hill National Cemetery - IPR F000807-21-0000001Base2095EA561730S208
0002Clean Upright headstones in Sections 9 and 10Crown Hill National Cemetery - IPR F000807-21-0000001Base2095EA561730S208
0003Ground surface renovation and re-establishment of turf with tall fescue (‘RTF’ type) sod in Sections 9 & 10.Crown Hill National Cemetery - IPR F000807-21-0000001Base91450SF561730S208
1001Raise/lower, realign, level, backfill upright marble headstones in Sections C and D. Includes surveying and installation.Ft Lyon National Cemetery - IPR F000933-21-0000004Base481EA561730S208
1002Level topsoil surface, renovate and re-establish turf grass stand in Sections C and D.Ft Lyon National Cemetery - IPR F000933-21-0000004Base79404SF561730S208
1003Clean upright marble headstonesFt Lyon National Cemetery - IPR F000933-21-0000004Base481EA561730S208
2001Kill and remove turfgrassFt Sheridan National Cemetery - IPR F000953-21-0000001Base178000SF561730S208
2002Supply, spread, grade and compact topsoil (estimated 1,800 cubic yards) to form uniform surfaces with positive drainageFt Sheridan National Cemetery - IPR F000953-21-0000001Base178000SF561730S208
2003Reset headstones to corrected height, plumb, and alignmentFt Sheridan National Cemetery - IPR F000953-21-0000001Base2400EA561730S208
2004Prepare soil for and establish turfgrass with sodFt Sheridan National Cemetery - IPR F000953-21-0000001Base178000SF561730S208
2005Clean headstonesFt Sheridan National Cemetery - IPR F000953-21-0000001Base2400EA561730S208
3001Reset, Raise, Lower, Realign & Backfill "Traditional" Upright Headstones in Sections 36 & 38.Dayton national Cemetery - IPR F365534-21-0000008Base2664EA561730S208
3002Clean Upright headstones in Sections 36 & 38.Dayton national Cemetery - IPR F365534-21-0000008Base2664EA561730S208
3003Ground surface renovation and re- establishment of turf with sod in Sections 36 & 38.Dayton national Cemetery - IPR F365534-21-0000008Base64272SF561730S208
3004Add/Alternate CLIN Reset, Raise, Lower, Realign & Backfill "Traditional" Upright Headstones in Section 1, 2, 3, 4, 5, 6, 10, 11, A, B, C, D, E, F, G, H, I, K, L, M, N, O, P, R, S, O-P, O-Q, 20, 21, 22, 24, 25, & 26Dayton national Cemetery - IPR F365534-21-0000008Base31446EA561730S208
3005Add/Alternate CLIN Clean Upright Headstones in Section 1, 2, 3, 4, 5, 6, 10, 11, A, B, C, D, E, F, G, H, I, K, L, M, N, O, P, R, S, O-P, O-Q, 20, 21, 22, 24, 25, & 26Dayton national Cemetery - IPR F365534-21-0000008Base31446EA561730S208
3006Add/Alternate CLIN Ground surface renovation and re- establishment of turf with sod in Sections 20, 21, 22, 24, 25, & 26.Dayton National Cemetery - IPR F365534-21-0000008Base355300SF561730S208
4001Reset, Raise, Lower, Realign & Backfill "Traditional" Upright Headstones in Sections K, G, & I.Keokuk National Cemetery - IPR F3661X2-21-0000004Base1004EA561730S208
4002Clean Upright headstones in Sections K, G, & I.Keokuk National Cemetery - IPR F3661X2-21-0000004Base1004EA561730S208
4003Ground surface renovation and re- establishment of turf with tall fescue (‘RTF’ type) sod in Sections K, G, & I.Keokuk National Cemetery - IPR F3661X2-21-0000004Base77314SF561730S208
4004Add/Alternate CLIN Reset, Raise, Lower, Realign & Backfill "Traditional" Upright Headstones in Sections E, C, B, A, POST, J, D, F, L, CS1, CS2, MA1, & H.Keokuk National Cemetery - IPR F3661X2-21-0000004Base3715EA561730S208
4005Add/Alternate CLIN Clean Upright headstones in Sections E, C, B, A, POST, J, D, F, L, CS1, CS2, MA1, & H.Keokuk National Cemetery - IPR F3661X2-21-0000004Base3715EA561730S208
4006Add/Alternate CLIN Ground surface renovation and re- establishment of turf with tall fescue (‘RTF’ type) sod in Sections E, C, B, A, POST, J, D, F, L, CS1, CS2, MA1, & H.Keokuk National Cemetery - IPR F3661X2-21-0000004Base258143SF561730S208
5001Realign, raise/lower, level, backfill flat markers onto grass paving system in Section F includes installation of continuous grass paving system spanning 100 unoccupied sites (i.e. with no flat markers). Includes surveying and installation.Port Hudson National Cemetery - IPR F367004-21-0000016Base1077EA561730S208
5002Level topsoil surface, renovate and re-establish turf grass stand in Section F.Port Hudson National Cemetery - IPR F367004-21-0000016Base48618SF561730S208
5003Clean flat markersPort Hudson National Cemetery - IPR F367004-21-0000016Base1077561730S208
6001Raise/lower, realign, level, backfill upright marble headstones in Section16, 17, 18 and 19. Includes surveying and installation.Ft Smith National Cemetery - IPR F367116-21-0000001Base3402EA561730S208
6002Level topsoil surface, renovate and re-establish turf grass stand in Section 16, 17, 18, 19, 27, 28 and 30.Ft Smith National Cemetery - IPR F367116-21-0000001Base334441SF561730S208
6003Clean upright marble headstonesFt Smith National Cemetery - IPR F367116-21-0000001Base5300EA561730S208

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .