36C78621Q0121 SOW Marion-Crown Hill Grounds Maint FY 21.pdf
PDF 232 KB Posted
- Solicitation number
- 36C78621Q0121
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78621Q0121_1.docx | DOCX document | |
| 36C78621Q0121 Wage Determination Marion.pdf | ||
| 36C78621Q0121 Wage Determination Crown Hill.pdf | ||
| 36C78621Q0121.docx | DOCX document | |
| 36C78621Q0121 PAST PERFORMANCE QUESTIONNAIRE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C78621Q0121 SOW
General Information
a) Title of Project: Cemetery Grounds Maintenance Services
b) Scope of Work: The contractor shall provide all resources necessary to accomplish the deliverables described in this Performance Work Statement, except as otherwise specified.
a) This is a service contract for cemetery grounds maintenance services at Crown Hill National Cemetery (2.3 acres) and Crown Hill Confederate Plot (< 0.1 acre) in Indianapolis, IN, as well as Marion National Cemetery (42.3 acres) in Marion, IN. The overall responsibility of the Contractor is to plan, coordinate, organize, manage, and perform the activities described herein, which are required to maintain an acceptable appearance of the cemetery grounds with:
- turfgrass mowing (Crown Hill sites only)
- string edging around headstones after every mowing
- debris removal at every mowing
- herbicide applications (all sites)
- fertilizations (all sites)
- grub control insecticide application (all sites) (see attachment A for detailed specifications)
a) National cemeteries are a resting place for our nation's heroes and as such, the standards for management, maintenance and appearance of these cemeteries have been established by the National Cemetery Administration to reflect this nation's concern and respect for those interred there. The National Cemetery Administration (NCA) mission: the NCA honors veterans with a final resting place and lasting memorials that commemorate their service to our nation.
b) Background:
a) Crown Hill National Cemetery and Crown Hill Confederate Plot are located in Crown Hill Cemetery, 700 38th St., Indianapolis, IN, 46208.
b) Marion National Cemetery is located at 1700 East 38th Street, Marion, IN 46953
c) National Cemeteries are National Shrines. The standards of maintenance and appearance at these cemeteries must reflect this nation's concern for those interred there. For this reason, strict adherence to the specifications is required as well as National Cemetery Administration standards.
c) Performance Period: The term of this contract shall be for a period of one year beginning April 1, 2021 (or date of award) through March 31, 2022.
d) Type of Contract: Firm, fixed price.
B. Contract Award Meeting
a) The contractor shall not commence performance of the tasks in this Performance Work Statement until the contracting officer has conducted a “kick-off” meeting or has advised the contractor that a “kick-off” meeting is waived.
C. Specific Mandatory Tasks and Associated Deliverables:
a) Description of Tasks and Associated Deliverables: The contractor shall provide the specific deliverables described below within the performance period stated in Section C thru P and Attachment A of this Performance Work Statement.
b) NCA Standards and Measures:
a) Standard 6.1: Daily grounds maintenance activities do not detract from the dignity and solemnity of the cemetery.
(1) Measure 6.1: The number of complaints that are received because of operations, noise, equipment, etc. that intruded on the visitor’s experience.
(2) Target 6.1: 0 complaints.
b) Standard 6.2: All areas where cemetery operations have been conducted are neat, clean and free of debris and equipment at the end of the workday.
(1) Requirement 6.2a: Debris, equipment, tools and supplies are removed at the conclusion of each task or at the end of the workday.
(2) Requirement 6.2b: Roads, walkways, shelters and burial sections are free of grounds maintenance debris by the end of the workday.
(3) Target 6.2: 100% compliant.
c) Description of Services:
a) The contractor shall provide all personnel, equipment, tools, supplies, supervision, and other items and services necessary to ensure the specified maintenance is performed in a manner that will maintain manicured grass and professional appearance throughout the sites.
b) Services include regular mowing, trimming, and cleanup at the Crown Hill sites, and herbicide applications, fertilizations, and grub control at all listed sites.
c) All work will be done during normal Federal workdays.
d) The Contractor shall be responsible for:
e) Provide a safe working environment for Contractor, cemetery staff and general public.
f) Ensuring all work conforms to the NCA’s established National Standards.
d) Standards of Employee Conduct:
a) Contractor and Contractor personnel shall be required to adhere to the following standards of dress and conduct while performing work in the National Cemetery. These standards and regulations are enforceable under Title 38, U.S.C., Part I, Chapter 9, Section 901.
(1) Be fully clothed at all times in matching uniforms, to include long slacks or pants and shirt, buttoned up from neck to waist. Clothing shall be clean each day. Any soiled clothing should be cemetery work-related that day. T-shirts and/or tank tops and short pants as outer garments are prohibited. Shoes/boots will have no holes or loose soles. Steel-toed shoes or equivalent will be required in accordance with OSHA requirements. Contractor employees will maintain personal hygiene.
(2) Shall not engage in loud or boisterous behavior or use profane or abusive language. Shall show proper reverence during committal services.
(3) Shall neither eat nor drink beverages (except water or non-alcoholic drinks) in the work areas, nor in sight of committal shelter during a service. Use of intoxicating beverages and/or drugs is strictly prohibited.
(4) Contractor personnel shall not lean, sit or stand on or against headstones or monuments. No tools, equipment or other items will be placed or leaned on headstones or monuments.
(5) The only designated smoking area for contract personnel of the Marion National Cemetery is located by the maintenance building. All other areas are designated as NO SMOKING.
(6) Contracted personnel are required to report the damaging of any cemetery facility, equipment, grounds or headstones to the COR as soon as occurs.
e) Parking and VA Regulations:
a) Contractor employees may park privately owned vehicles in the area designated for parking by Marion National Cemetery. It is the responsibility of the Contractor to ensure his employees park in the appropriate designated parking areas. Possession of weapons is prohibited.
b) All contractor personnel operating vehicles on government property must possess a valid state driver’s license.
f) Use of Cemetery Facilities:
a) The Government shall not be responsible for any loss, damage, or theft of Contractor items.
Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of Cemetery facilities used by Contractor's employees.
b) The Government will not furnish a storage building at the cemetery site for use by the Contractor to store supplies and equipment. The Government will not be responsible for any damage to or loss of the Contractor's equipment and supplies stored on the Government's premises. The Contractor shall be responsible for maintaining fire extinguishers and other safety equipment.
c) The Contractor will be responsible for providing and safely transporting and using any chemicals, pesticides, herbicides, etc. in accordance with manufacturers recommendations. An SDS (Safety Data Sheet) is required for all chemicals, with a copy provided to the COR, pesticides, and herbicides. Additionally, copies of pesticide applicators license (if required) will be provided to the
COR.
d) Electricity and phone service will NOT be furnished by the Government for the contractor’s work area. Electricity and water are available for contract use at the Marion site only.
e) Contractor employees will not be allowed to use cemetery staff or public restrooms. Contractor must provide restroom facilities for their employees.
g) Inspection and Cleaning of Cemetery Facilities:
a) The Contractor will perform a weekly inspection. During this inspection the appearance of the cemetery will be observed, and any deficiencies noted within the scope of the contract will be corrected as soon as practicable. Items that need correcting outside the scope of the contract will be reported to the Contracting Officer or his representative (COR).
b) The Contractor will be required to submit daily inspection reports/checklists and work accomplished to the Contracting Officer Representative weekly. The Contracting Officer Representative is located at Marion National Cemetery, Marion, IN. The inspection forms/checklists shall be provided to the Contractor.
h) Performance Evaluation Meeting
a) The issuance of a Contract Discrepancy Report (CDR, Attachment B) may be cause for the scheduling of a meeting among the Contractor, Contracting Officer, and the Contracting Officer Representative. A mutual effort will be made to resolve all problems identified. The Government will prepare written minutes of the meeting. The Contractor, Contracting Officer, and the Contracting Officer Representative will sign minutes of the meeting (s).
b) Should the Contractor not concur with the minutes, he will state in writing to the Contracting Officer within ten calendar days any areas he does not concur and explain the reasons for non-concurrence.
The Contracting Officer will review and consider the reasons submitted for the Contractor's non-concurrence and make a decision. The Contracting Officer will notify the Contractor of the decision in writing within ten calendar days.
i) Actions
a) Normally, the Contracting Officer Representative will verbally advise or give a written inspection report to the Contractor of discrepancies the first time they occur and ask the Contractor to correct the problem. A notation will be made on the COR checklist of the date and the time the deficiency was discovered and the date and time the Contractor was notified.
b) If the Government created any of the discrepancies, these will not be counted against the Contractor's performance. When the Government has caused the Contractor to perform in an unsatisfactory manner, a letter must be written to the responsible organizational element requesting corrective action is taken.
c) When the Contractor is not meeting the limits of satisfactory performance, a CDR will be issued to the Contractor. The seriousness of the failures should govern whether to issue CDR at the end of the period, or as soon as the limits of satisfactory performance are exceeded.
d) When a CDR is issued for a service, the Contracting Officer must deduct from the periodic payment, a percentage of that payment as indicated in the Service Delivery System (SDS) as attached hereto.
e) If the Contractor does not achieve satisfactory performance by the end of the next period or agreed suspense date, another CDR will be issued and the appropriate amount deducted from the periodic payment.
f) A third CDR will be the cause for a Cure Notice. However, the Contracting Officer may issue a
Cure Notice at any time he/she deems appropriate.
g) Depending on the overall performance of the Contractor, an unsatisfactory reply to the Cure Notice should require a Show Cause letter to be issued, followed by consideration of termination of the contract.
j) Supervision, Work Hours and Training:
a) Project Manager: A competent and experienced “Project Manager” shall be provided by the Contractor for not less than two (2) hours per day whenever work is being performed. In the absence of the Project Manager, the Contractor will appoint a crew foreman or employee who will be responsible to ensure that the work is (i) being accomplished in an expeditious manner, (ii) performed in accordance with the contract specifications, and (iii) progress is being made without undue delay. The Project Manager must have no less than two (2) years’ experience as a direct supervisor of commercial landscape maintenance. The Project Manager will ensure all specifications are being met, ensure contract work does not conflict with ceremonies and funerals, and ensure employees are adequately supervised and proper conduct is maintained. BOTH PROJECT
MANAGER AND CREW FOREMAN ARE REQUIRED TO BE FLUENT IN ENGLISH. AT
ALL TIMES DURING THE WORKDAY, A PROJECT MANAGER OR CREW FOREMAN ARE
TO BE PRESENT WITH THE ABILITY TO MAKE DECSIONS AS NEEDED AT THE
MARION NATIONAL CEMETERY AND THE CROWN HILL CEMETERY.
b) Work Hours: Work may be performed between the hours of 7:30 a.m. to 4:00 p.m., Monday through
Friday unless otherwise directed by the COR. At the Contractor’s request, and with the written permission of the COR, work may also be permitted to be scheduled for weekends and / or Holidays.
In emergency situations caused by the Contractor, or when severe adverse weather prohibits work during the week, the Contractor shall arrange with the COR to work on weekends and/or holidays to meet performance time frames. The Government shall not compensate the Contractor for any alternate work schedules needed for the Contractor to complete all contract work within the specified project duration. No work will be permitted during Memorial Day or Veteran’s Day weekend activities. Notwithstanding, if any work under this contract will be required outside of the VA's normal working hours (7:30 a.m. to 4:00 p.m. Monday through Friday), the Contractor shall request for a deviation in writing to the COR at least 24 hours in advance. The COR will notify the appropriate individuals regarding Contractor's anticipated schedule and will provide written approval or disapproval to the Contractor.
(1) FEDERAL HOLIDAYS
(a) New Year’s Day (January)
(b) Martin Luther King’s Birthday (January)
(c) President’s Day (February)
(d) Memorial Day (May)
(e) Fourth of July (July)
(f) Labor Day (September)
(g) Columbus Day (October)
(h) Veterans Day (November)
(i) Thanksgiving Day (November)
(j) Christmas Day (December)
c) The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor shall remove employees for cause, to include, but not limited to, misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government.
d) The Contractor shall also be responsible for training and safety precautions for Contractor employees performing work under these specifications. OSHA standards shall be observed by the Contractor in all work performed. Appropriate safety equipment shall be furnished by the Contractor to Contractor personnel and shall be used as prescribed by OSHA standards, including hard hats, safety shoes, safety glasses, and hearing protection devices. The following OSHA and NFPA standards and codes are to be adhered to:
(1) National Fire Protection Association (NFPA): 10-1998 Standard for Portable Fire Extinguishers
(2) Occupational Safety and Health Administration (OSHA) 29 CFR 1910 Safety and Health
Regulations for Personal Protection, Safety Color Codes, Portable Power Tools, Electrical Safety and Portable Electric Equipment.
(3) Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.
k) Work Scheduling and Maintenance During Cemetery Functions:
a) The Contractor shall coordinate a work schedule with the COR(s) daily to ensure that no work is being performed at the immediate site of a scheduled ceremony. These daily meetings are also an opportunity for the Contractor to ask questions and ensure he/she understands the off-limit areas, which may vary, depending on the event. Contractor personnel shall not operate motorized equipment or conduct other commercial activities during ceremonies. The COR or his/her representative shall furnish the Contractor with a schedule of all interments and/or ceremonies no later than the close of business of the day prior to the scheduled internment, and a minimum of three
(3) days before any ceremonial events. The Contractor is solely responsible for ensuring that no contract work causes any funeral, ceremony, procession or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity or security of the event is compromised. The Contractor is solely responsible for staying abreast of all such upcoming events and when in doubt, he/she must ask the COR(s).
l) Historic Preservation:
Where the Contractor or any of the Contractor's employees, prior to, or during the service work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up.
D. Schedule for Deliverables
a) If for any reason any deliverable cannot be delivered within the scheduled time frame the contractor is required to explain why in writing to the contracting officer, including a firm commitment of when the work shall be completed. This notice to the contracting officer shall cite the reasons for the delay, and the impact on the overall project. The contracting officer will then review the facts and issue a response in accordance with applicable regulations.
b) The term of this contract shall be for a period of one year: April 1, 2021 (or date of award) through
March 31, 2022.
Schedule of Deliverables
E. Changes to The Performance Work Statement
a) Any changes to this Performance Work Statement shall be authorized and approved only through written correspondence from the contracting officer. A copy of each change will be kept in a project folder along with other products of the project. Costs incurred by the contractor through the actions of parties other than the contracting officer shall be borne by the contractor.
F. Reporting Requirements
a) The Contractor shall meet and communicate regularly with the Contracting Officer’s Representative
(COR) to determine work completed and ensure that work is on schedule. In the absence of the COR, the Contractor shall meet with the Alternate COR. The COR shall require documentation of work completed on forms or checklists provided by the COR.
b) The contractor is required to provide the COR with monthly written progress reports. These are due to the COR by the second workday following the end of each calendar month throughout the project’s duration. The COR is required to provide monthly progress reports to the contracting officer.
c) The progressive report shall cover all work completed during the preceding month and shall present the work to be accomplished during the subsequent month. This report shall also identify any problems that arose and a statement explaining how the problem was resolved. This report shall also identify any problems that have arisen but have not been completely resolved with an explanation.
G. Government Responsibilities
a) The Government will not be responsible for any loss, damage, or theft of Contractor items. Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of Cemetery facilities used by Contractor's employees.
b) The Government will not furnish a storage building at the cemetery site for use by the Contractor to store supplies and equipment. The Government will not be responsible for any damage to or loss of the Contractor's equipment and supplies stored on the Government's premises. The Contractor shall be responsible for maintaining fire extinguishers and other safety equipment.
c) The Contractor will be responsible for safely storing any chemicals, pesticides, herbicides, cleaning solutions, etc. in accordance with manufacturers recommendations. An SDS (Safety Data Sheet) is required for all chemicals, pesticides, herbicides and cleaning solutions.
d) Electricity and phone service will NOT be furnished by the Government for the contractor’s work area.
Electricity and water is available for contractor work at Marion only. There are no water or electric outlets at the Crown Hill properties.
H. Contractor Experience Requirements
a) Offers will be considered only from contractors who are regularly established in the business called for and who in the judgment of the Contracting Officer are financially responsible and able to show evidence of their reliability, ability, experience, equipment, facilities and personnel directly employed or supervised by them to render prompt and satisfactory service. All services are expected to be performed by competent technicians, trained and qualified to complete the specific services required. All work performed shall be done in a first-class manner and in accordance with good commercial practices.
b) Contractors must provide evidence of their experience and ability to perform the tasks described in this Performance Work Statement.
a) Performing grounds maintenance activities in a high-profile environment.
b) Operation of equipment in the vicinity of headstones.
I. Confidentiality and Nondisclosure
It is agreed that:
a) The preliminary and final deliverables and all associated working papers, application source code, and other material deemed relevant by VA which has been generated by the contractor in the performance of this task order are the exclusive property of the U.S. Government and shall be submitted to the contracting officer at the conclusion of the task order.
b) The contracting officer will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this task order. No information shall be released by the contractor. Any request for information relating to this task order presented to the contractor shall be submitted to the contracting officer for response.
c) Press releases, marketing material or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the contracting officer.
J. Operations During Cemetery Functions
Contractor personnel shall not operate motorized equipment or conduct other commercial activities within a designated area during interment services. The COR will identify the designated area. The COR or his/her representative will furnish the Contractor with a schedule of all interments and/or ceremonies no later than the close of business of the day prior to the scheduled interment, and a minimum of three (3) days before any ceremonial events.
K. Contractor’s Responsibilities and Insurance Requirements
The Contractor shall obtain all necessary licenses and/or permits required to perform this work. The Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. The Contractor shall be responsible for any injury to himself, his employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by his or her employees’ fault or negligence. Further, it is agreed that any negligence of the Government, its officers, agents, servants and employees, will not be the responsibility of the Contractor hereunder with the regard to any claims, loss, damage, injury, and liability resulting there-from. The Contractor shall maintain workmen’s compensation, personal liability, automobile liability, and property damage insurance, as prescribed by the laws of the state of Indiana, and in accordance with FAR 52.228-5. Evidence of coverage is required before commencing work under this contract (copy of Certificate of Insurance), and it may not be changed or cancelled without thirty calendar days prior written notice to the Contracting Officer.
L. Damage to Government property
The Contractor shall be responsible for repair or replacement of any contractor damaged cemetery structure, to include: turf, curb, road pavement, headstones or markers, valve boxes, grid monument control markers, trees, plant beds, etc., which are chipped, marred, damaged and/or ruined at the fault of the Contractor and shall bear all costs associated with replacement and reinstallation. Any such damage shall be brought to the immediate attention of the appointed Contracting Officer’s Representative (COR) prior to repair/replacement/installation. The Contractor shall be responsible for cleaning cemetery structures, headstones, monuments, and roadways that are soiled or stained because of Contractor’s performance. The Contractor shall wash-down with water all soiled or stained structures, headstones, and monuments at the end of each workday. Roadways shall be cleaned with a street sweeper each day, as needed, to keep the existing roads free from dirt and mud resulting from all operations. No hazardous chemicals shall be used at any time on Government property. The Contractor shall bear all costs associated with washing and cleaning. Any such washing/cleaning shall be brought to the immediate attention of the COR prior to washing/cleaning.
At the end of each day the Contractor shall remove all debris from the cemetery site resulting from the work. The Contractor shall ensure always that rubbish and trash generated by the Contractor is kept clear of vehicular and pedestrian traffic throughout the site. The Government will not provide receptacle(s) for disposal of debris related to this contract.
Adequate warning devices, barricades, guards, flagmen or other necessary precautions shall be provided by the Contractor at work site to eliminate hazards and for the protection, safety, and warning of all public visitors, pedestrians, cemetery employees, and vehicular traffic within the area.
The Government may undertake or award other contracts for additional work at or near the site of work for this contract. The Contractor shall fully cooperate with any other contractors and with Government employees and shall carefully adapt scheduling and performance of work, and needing any direction, it will be provided by the COR(s). The Contractor shall be responsible for reporting to the COR(s) any problems or questions that may arise with any other personnel on site during the period of performance of this contract. The Contractor shall not take it upon him or herself to resolve any problems or issues with other on-site contractors or employees, but rather shall leave it to the COR(s) to resolve the issue.
The Contractor (including his or her employees, subcontractors, consultants or the like) shall not operate trucks, tractors, and other heavy equipment on any turf area except as provided in this contract to perform work or as authorized by the COR. The Contractor shall be responsible for repairing turf damage caused by the Contractor equipment and staff at no additional cost to the Government.
M. Safety
Matters related to safety, and any actions of the Contractor, shall meet all safety requirements of the COR, Safety Officer, Department of Veterans Affairs, OSHA, and the State. It is incumbent upon the Contractor to be familiar with these requirements. "Safety" shall also include the Contractor having a safety representative who maintains regular and routine contact with the Safety Officer at Marion National Cemetery.
N. Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and remove and properly dispose of from the site as defined herein.
The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall immediately notify the COR of any such occurrence and repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
O. Restoration
Upon completion of contract, deliver work complete and undamaged. Existing cemetery features (lawns, paving, roads, walks, etc.) disturbed or removed because of performing required new work, will be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work. All restoration work shall be accomplished without undue delay.
The Contractor shall be responsible for restoration and the Contractor shall bear all costs associated with restoration. Any such restoration to service and repair because of damage caused by Contractor’s workmen/subcontractors to existing cemetery infrastructure shall be brought to the immediate attention of the appointed Contracting Officer’s Representative (COR) prior to restoration.
P. Disposal of Waste
The Contractor shall not dispose of any waste materials at any location on the cemetery premises. All waste materials shall be removed from cemetery property and disposed of in full accordance with local and state requirements at the contractor’s expense. The Contractor shall remove all unusable dirt, rocks, roots and other types of objects from the cemetery grounds at the contractor’s expense.
ATTACHMENT A:
MOWING, TRIMMING, HERBICIDE, FERTILIZER, GRUB CONTROL, AND TREE WORK
SPECIFICATIONS
A. SCOPE:
1. NCA Standards and Measures: Turf
a) Standard 2.1: Visually prominent areas have a well-established, healthy stand of turf.
(1) Measure 2.1a: Visually prominent areas are generally weed free.
(2) Measure 2.1b: Visually prominent areas with established turf are generally free of bare areas.
(3) Measure 2.1c: Turf in visually prominent areas is maintained within one inch above the range of that which is professionally recommended for that type and region according to the Cemetery Grounds Management Plan.
b) Standard 2.6: Visually prominent areas in the cemetery are properly trimmed and edged.
(1) Requirement 2.6a: Headstones show turf is trimmed to the recommended mowing height. There shall be no signs of turf being scalped by string trimmers.
(2) Requirement 2.6c: Other features on cemetery grounds are trimmed or edged within appropriate limits.
2. The Contractor shall be responsible for mowing and trimming all turfgrass within the cemetery.
3. Turf shall generally be mowed to a three-inch height and be maintained between 3 and 4.5 inches. Turf surrounding a headstone or marker shall be trimmed to the same height (3 inches) as it is mowed. There shall be no signs of “grass burns” or tearing of turf caused by mower tires where mowers turn. There shall be no signs of turf being “scalped” by string trimmers.
4. The contractor shall mow and trim all turfgrass within the Cemetery and including its perimeter as specified by the COR.
5. NCA Standards and Measures: Turf (Herbicides)
a) Standard 2.1: Visually prominent areas have well-established, healthy stand of turf.
b) Standard 2.1a: Visually prominent areas are generally weed free.
c) Standard 2.1b: Visually prominent areas with established turf are generally free of bare areas.
d) Standard 2.1c: Visually prominent areas are maintained within one inch above the range of that which is professionally recommended for that type and region according to Marion National Cemeteries Grounds Management Plan.
e) Standard 2.3a: All turf is free of debris, i.e., leaves, fallen branches and trash.
f) Standard 2.3b: Turf in visually prominent areas is free of trash.
g) All standards will be achieved in accordance with Marion National Cemetery Grounds Maintenance
Plan.
B. EQUIPMENT:
1. Rear discharge riding mowers may be used if they are not operated within three (3) inches of headstones, markers, monuments, tree trunks or other vertical surfaces.
2. Commercial grade power trimmers and power edger’s will be used to trim grass from around headstones, monuments, markers, etc.
3. Mower blades must be kept sharp so that grass is properly cut - not torn or damaged.
C. GENERAL REQUIREMENTS:
1. The Contractor shall be responsible for mowing and trimming all turfgrass within the cemetery as specified by COR.
2. MOWING (Crown Hill sites only): In general, turfgrass shall be mowed once per week at a three-inch height of cut.
a) During periods of rapid grass growth, such as is normal in April and May, mowing will be needed more than once per week, but also may be needed less frequently in late fall and during the hot part of the summer.
b) Direction of mowing shall be alternated with each mowing cycle as much as possible.
c) Mowing frequency shall be often enough that: 1- excessive clippings are not generated, and 2- no more than one third of the grass height is removed when mowed.
d) If mowing is delayed by weather or some other reason and grass height becomes excessive, mowing height shall be increased so no more than one third of the grass height is removed, then mowed twice per week at a slightly lower height each time till the three-inch target is again achieved.
e) Mulching blades shall be used.
f) Mowers shall have mulching decks or rear discharge to help keep headstones clean. Any Grass clippings adhering to headstones shall be cleaned off immediately following mowing.
g) Clippings shall normally be left on the turf if they are well dispersed and don’t inhibit grass growth or detract from the appearance of the cemetery, but excessive quantities or accumulations of clippings shall be dispersed or removed. Windrows or clumps shall not remain after mowing.
3. TRIMMING (Crown sites only): After grass has been mowed, all un-mowed grass around headstones, monuments, markers, and other vertical surfaces shall be trimmed to keep the grass at the same height
(3 inches) that it was mowed. Trimmed grass height shall match that of the mowed grass, three inches, and be no shorter.
a) Care will be taken near headstones to prevent damage to the headstone.
b) Grass clippings will be removed from headstone bases after trimming is completed if grass clippings are not well dispersed.
c) Trimmers will be kept level to prevent scalping between and around headstone.
d) Discarded trimmer string shall be removed from the grounds after trimming operations are complete.
e) Clippings shall be removed from all hardscape surfaces immediately following mowing, weed eating, edging, and trimming.
f) Any damage to headstones, cemetery fixtures, grounds or equipment during grounds maintenance operations must be reported to the COR immediately.
g) Extra care should be exercised with these operations when visitors are near operations.
4. PRE-EMERGENCE HERBICIDE (all sites): Pre-emergence herbicide shall be applied twice per year to prevent annual grassy weed establishment. Applications shall be in April when soil temperature approaches that necessary for crabgrass germination, and again approximately 7 weeks later. Either dithiopyr (e.g., Dimension) or prodiamine (e.g., Barricade) shall be used at the maximum label rate allowed for the site.
5. SPRAYING BROADLEAF WEEDS (all sites): In addition to proper fertilization and mowing to enhance turfgrass competitiveness against weeds, weeds shall also be controlled with appropriate use of herbicides. Broadleaf weeds shall be controlled by spraying turfgrass areas with the proper type and rate of herbicide that will control the weeds present (typically clover, dandelion, plantain, oxalis, chickweed, henbit, etc.). Spraying of all turfgrass areas will be done twice each year: in early-mid May to clean up weeds prior to Memorial Day, and in October to have maximum effect on perennial weeds and reduce winter-annual weed establishment. Contractor is also expected to spot spray at other times as needed to control localized weed populations that may not controlled by the general treatment.
6. POST-EMERGENCE HERBICIDE SPRAY FOR YELLOW NUTSEDGE AND OTHER WEEDS (all sites): To control yellow nutsedge, plus other broadleaf and grassy weeds, the following mix of herbicide active ingredients shall be sprayed on turfgrass areas around the middle of June:
• sulfentrazone at least 0.187 lbs per acre
• quinclorac at least 0.562 lbs per acre
For example, the commercial product “Solitaire” (which contains 18.75% sulfentrazone and 56.25% quinclorac) could be applied at 1.0 lb of product per acre to achieve the specified rates. This application could be combined with the grub insecticide treatment (below, if a liquid insecticide is used), with the products tank-mixed, if the products are compatible in the spray tank.
7. FERTILIZER (all sites): Shall be applied at a rate of one pound of nitrogen per 1,000 square feet three times each year: late May/early June, early September, and late October (or about the time of the final mowing for the season). It shall be applied with a properly adjusted and calibrated spreader. Overlap of spread pattern from adjacent passes shall be adequate to ensure uniform application. Streaks appearing in turf any time during the year because of non-uniform application are not acceptable. Fertilizer deposited impervious surfaces (walks/pavement) shall be removed or blown onto the turf immediately following application. Fifty percent or more of the nitrogen in the fertilizer shall be in a slow or controlled release form. The fertilizer potash (K) content shall be one third to one half that of the nitrogen content, and the phosphate (P) content shall be one fourth or more that of the nitrogen content, e.g., 24-6-8, or 26-9-13. It shall contain no iron. Variations of this regime may be approved by the COR, in consultation with the District Agronomist, if needed based on soil test results or extreme weather conditions.
8. INSECTICIDE TREATMENT FOR GRUBS (all sites): Grub control insecticide shall be uniformly applied to turf in the spring or early summer, according to label directions, to prevent turfgrass damage by grubs. If a granular product is used, any deposited on impervious surfaces (walks/pavement) shall be removed or blown onto the turf immediately following application. The maximum commercial label rate for the site of one the following insecticides shall be used:
• clothianidin (e.g., Arena)
• imidacloprid (e.g., Merit)
• thiamethoxam (e.g., Meridian)
• Chlorantraniliprole (e.g., Acelepryn)
ATTACHMENT (B)
CONTRACT DISCREPANCY REPORT FORM
Contract Discrepancy Report Contract Number:
Report No. for this Discrepancy:
To: (Contractor/Manager’s Name)
From: (Name of COR)
5. Dates 5a. Prepared:
5b. Returned by Contractor:
5c. Action Complete:
Discrepancy or Problem: (Describe in detail. Include reference to PWS Directive; attach additional sheet if necessary.)
Signature of Contracting Officer or COR:
8a. To: (Contracting Officer and/or COR)
8b. From: (Contractor)
9. Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence: (attach additional sheet if necessary.)
10a. Signature of Contractor Representative:
10b. Date:
11. Government Evaluation: (Acceptance, partial acceptance, reflection; attach additional sheet if necessary.)
12. Government Actions: (Reduced payment, cure notice, show cause, other)
13. Close Out Name Title Signature Date
a. Contractor
b. COR
c. CO
MOWING, TRIMMING, HERBICIDE, FERTILIZER, GRUB CONTROL, AND TREE WORK SPECIFICATIONS
File details come from the government source that posted it. Updated .